CN102080560B - Tunnel wind room relay ventilation method for long blind heading - Google Patents

Tunnel wind room relay ventilation method for long blind heading Download PDF

Info

Publication number
CN102080560B
CN102080560B CN 201010587780 CN201010587780A CN102080560B CN 102080560 B CN102080560 B CN 102080560B CN 201010587780 CN201010587780 CN 201010587780 CN 201010587780 A CN201010587780 A CN 201010587780A CN 102080560 B CN102080560 B CN 102080560B
Authority
CN
China
Prior art keywords
air compartment
way
ventilation
transverse passage
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010587780
Other languages
Chinese (zh)
Other versions
CN102080560A (en
Inventor
豆小天
赵金田
陈庆怀
何志洪
李占奎
胡永强
李志军
陈大军
张学军
杨艳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN 201010587780 priority Critical patent/CN102080560B/en
Publication of CN102080560A publication Critical patent/CN102080560A/en
Application granted granted Critical
Publication of CN102080560B publication Critical patent/CN102080560B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The invention provides a tunnel wind room relay ventilation method for long blind heading, which comprises the following steps of: preparing for construction; constructing wind rooms, i.e. separating the upper cross section of a tunnel in a certain range into the wind rooms by steel plates or arranging main holes with certain length as the wind rooms; ventilating the wind rooms, delivering fresh air to the wind rooms through ventilation pipes and a fan, and then introducing the fresh air to all working surfaces of the tunnel through the wind rooms; examining the ventilation effect of all working surfaces, and analysing a ventilation system and examining the seal conditions of the wind rooms and the ventilation pipes when the ventilation effect cannot meet the requirements on the working surfaces; and increasing excavation mileages when the ventilation effect meets the requirements on the working surfaces. The method largely improves the ventilation conditions of the working surfaces, almost reduces the wind leakage rate of the wind rooms to zero and greatly increases the length of blind heading.

Description

Only driving tunnel air compartment relay ventilation method of long distance
Technical field
The present invention relates to only driving tunnel air compartment relay ventilation method of a kind of long distance.
Background technology
Along with the development of national economy, the Construction amount in the tunnel of growing up in the railway construction is increasing.In the domestic constructing tunnel, owing to still extensively adopt the drilling and blasting method excavation, and the mechanization of building operation degree improves day by day, after the explosion and operating environment deterioration in the tunnel that the pernicious gas that produces causes in the diesel machine operation process, more and more become the engineering constraint progress, affect the healthy key factor of operating personnel in duration of a project and the harm hole.
Tunnel ventilation is the critical process that drilling and blasting method is built the tunnel, and the quality of this operation construction technology will directly have influence on integral layout and the economic effect of constructing tunnel, be the key of engineering construction success or failure.The form of tunnel ventilation has various at home, only forced construction ventilation is one of technological difficulties during long tunnel is built always, along with improving constantly of ventilation theory and technical equipment, the distance of only forced construction ventilation is also more and more longer, the optimum efficiency of only construction ventilation of guarantee how, it is the direction that construction is updated and studied, and the air compartment relay only head driving application in long of ventilating in trackless transportation speciality inclined shaft and super long tunnel, similar successful case is less at home, even other relay ventilation method is arranged, its ventilation effect is not good, and construction and maintenance be difficulty, and construction cost is larger.
Summary of the invention
The range of application of air compartment relay ventilation method of the present invention relates to the solely relay of head driving tunnel ventilation of long distance, and main application scenarios has following three kinds:
The first application scenarios: two-wire list hole is imported and exported solely head driving without auxiliary cavern by the tunnel, can take steel plate to be divided into air compartment in the section certain limit on the tunnel.Referring to Fig. 1.
The second application scenarios: the two holes of two-wire are imported and exported solely head driving without auxiliary cavern by the tunnel, can take steel plate to be divided into air compartment in the section certain limit on the tunnel.When air compartment is used, be advisable not affect the work plane construction, particularly the air compartment place can ensure normally and be open to traffic, and prevents from going here and there wind during ventilation.Referring to Fig. 2.
The third application scenarios: two-wire list hole or the construction of two-wire double-hole tunnel, the situation of two scope of operations, three scope of operations or four scope of operations are advanced in inclined shaft or horizontal hole.Can take the method described in detail in the specific embodiment for three scope of operations, utilize the positive hole of certain-length that air compartment is set, can on the tunnel, take steel plate to be divided into air compartment in the section certain limit for two scope of operations or four scope of operations, referring to Fig. 3 and Fig. 4.When air compartment is used, be advisable not affect the work plane construction, particularly the air compartment place can ensure normally and be open to traffic, and prevents from going here and there wind during ventilation.
According to an aspect of the present invention, only driving tunnel air compartment relay ventilation method of long distance may further comprise the steps: preparation of construction; Air compartment construction is taked steel plate to be divided into air compartment on the tunnel or is utilized the positive hole of certain-length that air compartment is set in the section certain limit; Air compartment ventilates, and utilizes air chimney and blower fan that fresh air is delivered to air compartment, again by air compartment draw fresh air to the tunnel each work plane; The ventilation effect inspection of each work plane when ventilation effect does not satisfy the work plane needs, is analyzed ventilation system, revises the ventilation parameter, checks wind chamber sealing situation and air pipeline; When ventilation effect satisfies the work plane needs, increase the excavation mileage.
Further, when to be two-wire list hole without auxiliary cavern, the two holes of two-wire advance the situation of two scope of operations in two-wire list hole or the two holes of two-wire or four scope of operations without auxiliary cavern or inclined shaft or horizontal hole in the tunnel, on the tunnel, take steel plate to be divided into air compartment in the section certain limit.
Further, when the tunnel is the situation of inclined shaft or horizontal hole three scope of operations entering the two holes of two-wire, utilize the positive hole of certain-length that air compartment is set.Further, in the air compartment construction sequence, at first construct inclined shaft or horizontal hole, construction the first transverse passage-way that links to each other with inclined shaft or horizontal hole is offered the second transverse passage-way at the primary importance place apart from the first transverse passage-way certain distance, and is entered right line construction from left line thus, after right line and the perforation of the first transverse passage-way, turn to the right line end work plane of construction, construction is to being that the second place place of certain distance opens the 3rd transverse passage-way apart from the first transverse passage-way, utilizes the positive hole of right line between the first transverse passage-way and the 3rd transverse passage-way as air compartment.Distance between the first transverse passage-way and the second transverse passage-way is 88m, and the distance between the first transverse passage-way and the 3rd transverse passage-way is 888m.Air compartment length is 860m, and cross-sectional area is 104.18m 2
Further, air compartment storage air quantity is greater than 2000m 3
For guaranteeing the solely wind supply quantity of head driving tunnel front of long distance, the applicant has carried out scientific and technical innovation, has adopted air chimney to add the method for air compartment relay, has greatly improved the face-airing situation.The method is utilized air compartment end blower fan swabbing action, produces pressure differential, so that air flows in the air compartment, reaches the purpose of ventilation.By this principle, with the increase of tunnel piercing length always can enlarge forward, prolong air compartment length, and air leak rate of air curtain is almost nil in air compartment, can greatly improve only Excavation Length.And technique is simple, and constructing operation is convenient; Energy consumption is low, and construction cost is low, and ventilation effect is good; Performance of mixtures is simplified, and has reduced a large amount of airducts and has installed, and the facilities such as air door, air channel, Ventilator Room need be set, and installs simply, and workable, maintenance is convenient.
Description of drawings
Fig. 1 is that schematic diagram is arranged without the auxiliary tunnel chamber ventilated in two-wire list hole;
Fig. 2 is that schematic diagram is arranged without the auxiliary tunnel chamber ventilated in the two holes of two-wire;
Fig. 3 is the ventilation layout schematic diagram that two scope of operation situations in the two holes of two-wire are advanced in inclined shaft or horizontal hole;
Fig. 4 is the ventilation layout schematic diagram that four scope of operation situations in the two holes of two-wire are advanced in inclined shaft or horizontal hole;
Fig. 5 is air compartment ventilation construction flow chart;
Fig. 6 is the ventilation layout schematic diagram that three scope of operation situations in the two holes of two-wire are advanced in inclined shaft or horizontal hole;
Fig. 7 is positive hole brattice schematic diagram.
Among the figure: 1-2 platform 2 * 132KW ventilation fan; The 2-inclined shaft; The 3-air chimney; The 4-jet blower; The dirty wind of 5-is discharged direction; 6-shaft bottom transverse passage-way brattice; The left line of 7-Chongqing end ventilation fan; The left line of 8-Chongqing end; The right line of 9-Chongqing end; 10-the first transverse passage-way; The 11-air compartment; 12-the second transverse passage-way; 13-the second transverse passage-way brattice; The left line of 14-Lanzhou end ventilation fan; The positive hole of the right line of 15-brattice; The right line of 16-Lanzhou end ventilation fan; The right line of 17-Lanzhou end; 18-the 3rd transverse passage-way; The positive hole of 19-air chimney; The left line of 20-Lanzhou end; 21-ventilation fan shaped steel frame; 22-tunnel center line; 23-leaves a door unlocked in advance; H1=5000mm; H2=8290mm.
The specific embodiment
In order to improve the effect of long inclined shaft longer face-airing of only head driving in super long tunnel, the applicant is large for this project edpth of tunnel in Lan Yu Railway WEST QINLING super long tunnel engineering sieve family reason inclined shaft of undertaking the construction of ventilates construction, left line construction 5016.95m, right line 2637.05m, positive hole becomes 85 ° 58 ' 58 with inclined shaft " intersect; and inclined shaft plagioclase 2473m, discrepancy in elevation 278m.Simultaneously to three air supply of working faces, the air feed effect directly affects construction safety and progress to construction ventilation by the shaft bottom air compartment.Below, just take the concrete construction method of applicant in Lan Yu Railway WEST QINLING super long tunnel engineering sieve family reason inclined shaft ventilates construction as example, describe inclined shaft of the present invention or horizontal hole in detail and advance the air compartment relay ventilation method of three scope of operation situations in the two holes of two-wire, referring to Fig. 5 and Fig. 6.
One, preparation of construction
1, with similar slope construction, the comparison of investigating, research and design ventilation scheme.
2, with according to on-site actual situations, consider windage, invisible waste, the oxygen demand such as the manpower that is equipped with according to the scene, machinery are utilized the theoretical wind supply quantity of empirical formula evaluation work face, guarantee enough oxygen-supplying amounts of constructor.
3, according to result of calculation, the air compartment size of making rational planning for, the preparation human and material resources carry out air compartment and perform.
4, buy gas detecting instrument, spot-check at any time the ventilation effect of work plane, special ventilation teams and groups are set, carry out regular maintenance and the maintenance of air pipeline, and strengthen the patrol of air compartment, check the situation such as firm of air compartment partition wall.
Two, air compartment construction
The construction inclined shaft 2 that faces down from ground, coupled construction the first transverse passage-way 10.Ventilate for strengthening, offering the second transverse passage-way 12 apart from the first transverse passage-way 10 for the primary importance place of 88m, and enter right line construction from left line thus, after right line and 10 perforations of the first transverse passage-way, turn to the right line end work plane of construction, construction extremely distance the first transverse passage-way 10 utilizes the positive hole of right line of 18 of the first transverse passage-way 10 and the 3rd transverse passage-ways as air compartment 11 for the second place place of 888m opens the 3rd transverse passage-way 18.It is emphasized that, in Lan Yu Railway WEST QINLING super long tunnel engineering sieve family reason inclined shaft ventilated construction, the distance between the first transverse passage-way 10 and the second transverse passage-way 12 was 88m, and the distance between the first transverse passage-way 10 and the 3rd transverse passage-way 18 is 888m, air compartment length is 860m, and cross-sectional area is 104.18m 2But the first transverse passage-way 10, the second transverse passage-way 12 and the 3rd transverse passage-way 18 distance each other are to determine according to the concrete condition of job site, and the foundation of determining is exactly to guarantee that air compartment storage air quantity is greater than 2000m 3
Lay the twice air chimney of diameter 1.8m at the inclined shaft vault, by a plurality of transverse passage-ways of construction, fresh air is delivered to air compartment in the shaft bottom, draw fresh air to each work plane from air compartment.
Air compartment adopts to grout with steel plate is combined, and with grouting the shutoff with the cavern, top 3mm steel plate, steel plate and country rock contact surface be with shutoff such as cotton yarns at construction transverse passage-way place, and seals with mortar or sprayed mortar; Positive hole section is directly made air door with steel plate, and sealing is with the construction transverse passage-way, and blower rack is located on the shaped steel frame, firm supporting; In the air chimney corner, be made into air chimney with steel plate, smooth-going excessive, reduce resistance.
In the shaft bottom the left line end of the first transverse passage-way with mortar flag stone with its shutoff to haunch, with the vault sealing, and reserve three holes with the steel plate 6 of 3mm, two place's holes are with twice air chimney access of inclined shaft, another place installs blower fan 7.The positive hole of right line end air compartment utilizes the steel plate 15 of 3mm with the full section sealing in positive hole, stays the conduct a survey passage of the situations such as blast in the air compartment, blower fan of an iron gate 6 usefulness, reserves two holes as ventilation fan position 14 and 16.
Three, air compartment ventilates
After air compartment forms, blower fan 7 at left line end construction transverse passage-way place draws fresh air and supplies left line end work plane, at right line air compartment brattice place, one group of ventilation fan 14 carries out left line end 20 face-airings by the 3rd transverse passage-way 18, and another group ventilation fan 16 directly carries out right line end 17 face-airings.Along with the forward driving of work plane, continuous spreading air chimney, and according to the length of only driving, suitably increase air compartment.
Four, ventilation effect inspection
Utilize the equipment such as Digital Dust Testing Instrument, KT-601 type gas detection alarm (oxygen), telaire-7001 type carbon dioxide detector, Z-700 type nitrogen oxide detector, check the ventilation effect of each work plane, specifically see Table 1 and table 2.
Gas detects summary sheet 1
Figure BSA00000385290900071
Anemometry table 2
Figure BSA00000385290900081
Five, ventilation does not meet the demands
When the face-airing situation is poor, analyze ventilation system, revise the ventilation parameter.Begin to check from air compartment, check the sealing situation of air compartment, whether have leak out, loosening phenomenon, whether enlarge air compartment, reduce air chimney length, resistance; Whether check air pipeline, whether the irregularity place is arranged, increase flowing resistance, have airduct to break, leaking out affects air supply of working face.
Six, increase the excavation mileage
Ventilation effect satisfies the work plane needs, then increases the excavation mileage.By this principle, with the increase of tunnel piercing length always can enlarge forward, prolong air compartment length, and air leak rate of air curtain is almost nil in air compartment, can greatly improve only Excavation Length.
Although the above has been described with reference to the drawings embodiments of the invention, it will be understood by those skilled in the art that in the situation that does not break away from the scope of the invention and spirit, can make various modifications and variations to the present invention.Therefore, should be appreciated that the above embodiments are not restrictions, but the illustrating of various aspects.

Claims (7)

1. only driving tunnel of long distance air compartment relay ventilation method may further comprise the steps:
Preparation of construction;
Air compartment construction is taked steel plate to be divided into air compartment on the tunnel or is utilized the positive hole of certain-length that air compartment is set in the section certain limit;
Air compartment ventilates, and utilizes air chimney and blower fan that fresh air is delivered to air compartment, again by air compartment draw fresh air to the tunnel each work plane;
The ventilation effect inspection of each work plane when ventilation effect does not satisfy the work plane needs, is analyzed ventilation system, revises the ventilation parameter, checks wind chamber sealing situation and air pipeline; When ventilation effect satisfies the work plane needs, increase the excavation mileage.
2. air compartment relay ventilation method according to claim 1, wherein when to be two-wire list hole without auxiliary cavern, the two holes of two-wire advance the situation of two scope of operations in two-wire list hole or the two holes of two-wire or four scope of operations without auxiliary cavern or inclined shaft or horizontal hole in the tunnel, on the tunnel, take steel plate to be divided into air compartment in the section certain limit.
3. air compartment relay ventilation method according to claim 1 wherein when the tunnel is the situation of inclined shaft or horizontal hole three scope of operations entering the two holes of two-wire, utilizes the positive hole of certain-length that air compartment is set.
4. air compartment relay ventilation method according to claim 3, wherein in the air compartment construction sequence, at first construct inclined shaft or horizontal hole, construction the first transverse passage-way links to each other with inclined shaft or horizontal hole, offer the second transverse passage-way at the primary importance place apart from the first transverse passage-way certain distance, and enter right line construction from left line thus, after right line and the perforation of the first transverse passage-way, turn to the right line end work plane of construction, construction is to being that the second place place of certain distance opens the 3rd transverse passage-way apart from the first transverse passage-way, utilizes the positive hole of right line between the first transverse passage-way and the 3rd transverse passage-way as air compartment.
5. the described air compartment relay ventilation method of any one in 4 according to claim 1, wherein air compartment storage air quantity is greater than 2000m 3
6. air compartment relay ventilation method according to claim 4, wherein the distance between the first transverse passage-way and the second transverse passage-way is 88m, the distance between the first transverse passage-way and the 3rd transverse passage-way is 888m.
7. air compartment relay ventilation method according to claim 4, wherein air compartment length is 860m, cross-sectional area is 104.18m 2
CN 201010587780 2010-12-15 2010-12-15 Tunnel wind room relay ventilation method for long blind heading Expired - Fee Related CN102080560B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010587780 CN102080560B (en) 2010-12-15 2010-12-15 Tunnel wind room relay ventilation method for long blind heading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010587780 CN102080560B (en) 2010-12-15 2010-12-15 Tunnel wind room relay ventilation method for long blind heading

Publications (2)

Publication Number Publication Date
CN102080560A CN102080560A (en) 2011-06-01
CN102080560B true CN102080560B (en) 2013-03-13

Family

ID=44086725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010587780 Expired - Fee Related CN102080560B (en) 2010-12-15 2010-12-15 Tunnel wind room relay ventilation method for long blind heading

Country Status (1)

Country Link
CN (1) CN102080560B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806281B (en) * 2015-03-04 2017-02-22 中铁十七局集团第二工程有限公司 Inclined shaft ventilation based high pressure air supply system in long tunnel hole
CN107387145B (en) * 2017-08-04 2023-09-15 西南交通大学 Long-long tunnel ventilation system with long-distance air supply function
CN109667614B (en) * 2018-12-18 2021-03-12 中铁十六局集团有限公司 Relay type ventilation method for long-distance tunnel
CN111677542A (en) * 2020-04-05 2020-09-18 中铁二院工程集团有限责任公司 Integral special-shaped air duct for long-distance tunnel construction ventilation and construction method
CN113482690B (en) * 2021-08-16 2022-08-05 中铁第六勘察设计院集团有限公司 Calculation method for air distribution of tunnel ventilation system of ramp air exhaust type single-ramp highway
CN113685218B (en) * 2021-08-31 2023-06-16 中铁二院工程集团有限责任公司 Tunnel air supply system based on oxygen-enriched air storage air oxygenation
CN113685219B (en) * 2021-08-31 2023-07-25 中铁二院工程集团有限责任公司 Tunnel push-in type ventilation relay system
CN113898395B (en) * 2021-11-09 2024-10-08 中煤第三建设(集团)有限责任公司 Ventilating method and ventilating system for special inclined shaft of coal mine
CN116357373B (en) * 2023-04-28 2024-08-20 中铁四局集团有限公司 Method for ventilating tunnel cross tunnel construction in high-altitude area

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB487138A (en) * 1937-01-23 1938-06-15 Albred Bartholomaei Improvements in or relating to ventilating installations in tunnels
RU2228442C1 (en) * 2002-10-29 2004-05-10 Общество с ограниченной ответственностью "МЗ Трейдинг" Method for venting dead end chambers during boring-auger coal extraction and device realizing said method
CN2742139Y (en) * 2004-10-11 2005-11-23 苏在林 Ventilation pipe passing through type building vehicle
CN101225746A (en) * 2008-02-01 2008-07-23 中铁十七局集团第四工程有限公司 Laneway type ventilating technique for long and large tunnel
CN101368483A (en) * 2008-10-14 2009-02-18 中铁一局集团有限公司 Ventilation construction method for pressure regulating distribution chamber in tunnel auxiliary pilot pit
KR100886350B1 (en) 2008-07-15 2009-03-03 (주)비엔텍아이엔씨 Intelligent selective supply and exhaust system for tunnel ventilation
CN201250807Y (en) * 2008-07-03 2009-06-03 南阳防爆集团有限公司 Underground explosion-proof ventilating fan cooling ventilation circuit for coal mine
CN201424950Y (en) * 2009-05-14 2010-03-17 煤炭科学研究总院重庆研究院 Mining extraction type local ventilator

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0559900A (en) * 1991-08-28 1993-03-09 Mitsubishi Heavy Ind Ltd Tunnel

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB487138A (en) * 1937-01-23 1938-06-15 Albred Bartholomaei Improvements in or relating to ventilating installations in tunnels
RU2228442C1 (en) * 2002-10-29 2004-05-10 Общество с ограниченной ответственностью "МЗ Трейдинг" Method for venting dead end chambers during boring-auger coal extraction and device realizing said method
CN2742139Y (en) * 2004-10-11 2005-11-23 苏在林 Ventilation pipe passing through type building vehicle
CN101225746A (en) * 2008-02-01 2008-07-23 中铁十七局集团第四工程有限公司 Laneway type ventilating technique for long and large tunnel
CN201250807Y (en) * 2008-07-03 2009-06-03 南阳防爆集团有限公司 Underground explosion-proof ventilating fan cooling ventilation circuit for coal mine
KR100886350B1 (en) 2008-07-15 2009-03-03 (주)비엔텍아이엔씨 Intelligent selective supply and exhaust system for tunnel ventilation
CN101368483A (en) * 2008-10-14 2009-02-18 中铁一局集团有限公司 Ventilation construction method for pressure regulating distribution chamber in tunnel auxiliary pilot pit
CN201424950Y (en) * 2009-05-14 2010-03-17 煤炭科学研究总院重庆研究院 Mining extraction type local ventilator

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
JP特开平5-059900A 1993.03.09
唐金仕.长大隧道独头掘进施工通风技术.《山西建筑》.2009,第35卷(第28期),第331-333页. *
李永红.北天山长大隧道8km独头掘进通风技术.《铁道建筑技术》.2009,(第5期),第119-121页. *
马红章 *

Also Published As

Publication number Publication date
CN102080560A (en) 2011-06-01

Similar Documents

Publication Publication Date Title
CN102080560B (en) Tunnel wind room relay ventilation method for long blind heading
CN104405430B (en) Ventilation system and ventilation method for single-cavern large-section extra-long tunnel construction
CN104514577B (en) The method of coal seam large area spontaneous combustion in goaf is hidden in a kind of efficient improvement shallow embedding
CN202391447U (en) Single-head tunneling no-air-door roadway type ventilation structure of super-long tunnel
CN101571044B (en) Subway shield gas tunnel construction method
CN115182737B (en) Vertical orthogonal ejection type air duct structure of deeply buried subway station and construction method
CN201723246U (en) Ventilating structure for pumping and exhausting gas at coal face
CN102536250B (en) Construction method for tunnels with karst and gas simultaneously
CN203097922U (en) Multiple-working face ventilation structure for long and large tunnel
CN105240040B (en) The method of ventilation of the double hole constructions of inclined shaft auxiliary
CN102102527A (en) Single inclined shaft double positive hole jetting and ventilation technology
CN104612739A (en) Small-section tunnel single-head long-distance ventilation construction method
CN102116171B (en) Method for rapid discharge of gas in tunnel
CN106593508A (en) Plateau high-gas extra long separating type tunnel construction ventilation method
CN112012782B (en) Advanced closed area gas prevention and control technology for air inlet and return roadway of fully mechanized caving face
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN205689234U (en) A kind of ventilation transportation system of monocline well many faces constructing tunnel
CN204126663U (en) A kind of single hole big cross section Extra Long Tunnel Construction ventilation system
CN211737183U (en) Ventilation system for underground factory building in construction period
CN211008711U (en) Novel water sump capable of achieving independent ventilation in underground coal mine
CN116044476A (en) Negative pressure air seal induction type pipe jacking operation environment control system
CN116146278A (en) Roof-cutting gob-side entry retaining goaf air curtain wall flexible plugging device and method
CN213450462U (en) Long-distance small-section single-head tunnel ventilation system based on BIM technology
US11674392B2 (en) Split air cabin ventilation system for construction of tunnel inclined shaft and ventilation method using same
CN114046170A (en) Construction ventilation system for simultaneously operating four faces of ultra-long tunnel by using transverse channel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Dou Xiaotian

Inventor after: Yang Yanling

Inventor after: Zhao Jintian

Inventor after: Chen Qinghuai

Inventor after: He Zhihong

Inventor after: Li Zhankui

Inventor after: Hu Yongqiang

Inventor after: Li Zhijun

Inventor after: Chen Dajun

Inventor after: Zhang Xuejun

Inventor before: Dou Xiaotian

Inventor before: Zhao Jintian

Inventor before: Chen Qinghuai

Inventor before: He Zhihong

Inventor before: Li Zhankui

Inventor before: Hu Yongqiang

Inventor before: Chen Dajun

Inventor before: Zhang Xuejun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: DOU XIAOTIAN ZHAO JINTIAN CHEN QINGHUAI HE ZHIHONG LI ZHANKUI HU YONGQIANG CHEN DAJUN ZHANG XUEJUN TO: DOU XIAOTIAN ZHAO JINTIAN CHEN QINGHUAI HE ZHIHONG LI ZHANKUI HU YONGQIANG LI ZHIJUN CHEN DAJUN ZHANG XUEJUN YANG YANLING

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20191215