CN102080452A - 不规则自应力张拉单元螺栓球穿芯节点施工工艺 - Google Patents
不规则自应力张拉单元螺栓球穿芯节点施工工艺 Download PDFInfo
- Publication number
- CN102080452A CN102080452A CN 201010581197 CN201010581197A CN102080452A CN 102080452 A CN102080452 A CN 102080452A CN 201010581197 CN201010581197 CN 201010581197 CN 201010581197 A CN201010581197 A CN 201010581197A CN 102080452 A CN102080452 A CN 102080452A
- Authority
- CN
- China
- Prior art keywords
- draw
- stretch
- unit
- bar
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了自应力索杆结构螺栓球穿芯节点连接的施工工艺,1)杆单元装配;2)杆单元与球节点安装;3)整体张拉;4)索杆长度及节点坐标检查。本发明通过螺栓球穿芯节点的方式,对钢拉索多次施加预应力进行张拉,连接构造简单稳定,保证了工程需求。
Description
技术领域
本发明属于整体张拉自应力索杆结构体系中的节点连接方法,具体是一种螺栓球穿芯节点连接施工工艺。
背景技术
整体张拉自应力索杆结构体系是当今国际空间领域最前沿的研究课题之一。它主要是由不连续的压杆和连续的钢拉索组成的高次超静定空间结构。作为一种自应力的网状体系,整体张拉自应力索杆结构以其造型美观、用钢量少、适应性强、造价低、应用前景广阔而颇具有吸引力。对建筑师和结构师而言,该体系所特有的透视效果和建筑造型将为他们的设计提供全新的灵感。这种体系潜在的优势在于它刚柔相济并自成一体,可覆盖如膜、轻型屋面板等轻质屋面材料而无需强大的下部支撑体系,从而极具经济效益,这就为新型建筑提供了新思路和新技术。
发明内容
本发明的目的是提供了不规则自应力张拉单元螺栓球穿芯节点施工工艺,通过螺栓球穿芯节点的方式,对钢拉索多次施加预应力进行张拉,连接构造简单稳定,保证了工程需求。
本发明的技术方案如下:
不规则自应力张拉单元螺栓球穿芯节点施工工艺,包括有以下施工步骤:
1)、杆单元装配,单元压杆和拉杆的配件按装配图及材料表装配成杆单元;
2)、杆单元与球节点安装,索杆结构可按设计文件要求分片分段安装,按配装图中球节点与杆单元的位置关系,将球节点和杆单元摆放至相应的安装位置,安装宜按先安装下弦杆后安装上弦和腹弦杆,先安装压杆单元后安装拉杆单元的顺序安装,拉杆分张拉拉杆和非张拉拉杆,非张拉杆杆的一端带有旋拧机构,安装过程中控制安装长度及螺栓的深度,安装长度允许偏差按设计文件要求,螺栓拧入深度不小于螺栓直径的1.1倍,拉杆安装先连接其固定端且拧紧到位,再安装另一端,为保证结构的大致型式,另一端安装先不拉紧,待安装完成三个网格以上时,依次由起始端开始成梯次对称顺序紧固;
3)、整体张拉,张拉根据结构型式、面积、分段分片情况、张拉点的数量等采用不同的张拉分式,对于一般结构可采取整体张拉、二次施加预应力,对于复杂或大型结构,应制定张拉的技术方案,对张拉工艺进设计验算,安装完毕后,检查各索与节点连接处是否有未连接牢固部位,检查完毕,进行结构整体张拉,张拉时采用呈几何对称张拉,边张拉边测量拉索长度及变形、控制球节点的空间坐标,首次张拉为最终张拉值的30%;
4)、索杆长度及节点坐标检查
安装过程中质量控制,控制要点有拉杆施加预应力大小控制,张拉时拉杆长度控制,球节点坐标控制,首次张拉后,对以上环节进行即时监控,并记录数据与设计进行比对。
所述结构安装宜几何对称施工,对复杂的结构型式或大型结构中,应在分段分片处设置临时支撑结构或固定架,以控制总体结构变形。
附图说明
图1为本发明的结构示意图。
具体实施方式:
参见附图,不规则自应力张拉单元螺栓球穿芯节点施工工艺,包括有以下施工步骤:
1、杆单元装配
单元压杆和拉杆的配件按装配图及材料表装配成杆单元。
2、杆单元与球节点安装
索杆结构可按设计文件要求分片分段安装。
按配装图中球节点与杆单元的位置关系,将球节点和杆单元摆放至相应的安装位置,安装宜按先安装下弦杆后安装上弦和腹弦杆,先安装压杆单元后安装拉杆单元的顺序安装。
拉杆分张拉拉杆和非张拉拉杆。非张拉杆杆的一端带有旋拧机构,安装过程中控制安装长度及螺栓的深度,安装长度允许偏差按设计文件要求,螺栓拧入深度不小于螺栓直径的1.1倍。
拉杆安装先连接其固定端且拧紧到位,再安装另一端。为保证结构的大致型式,另一端安装先不拉紧,待安装完成三个网格以上时,依次由起始端开始成梯次对称顺序紧固。
所有杆单元、球节点的螺纹宜在安装前清除污垢。结构安装宜几何对称施工,对复杂的结构型式或大型结构中,应在分段分片处设置临时支撑结构或固定架,以控制总体结构变形。
3、整体张拉
张拉根据结构型式、面积、分段分片情况、张拉点的数量等采用不同的张拉分式。对于一般结构可采取整体张拉、二次施加预应力。对于复杂或大型结构,应制定张拉的技术方案,对张拉工艺进设计验算。
安装完毕后,检查各索与节点连接处是否有未连接牢固部位,检查完毕,进行结构整体张拉,张拉时采用呈几何对称张拉,边张拉边测量拉索长度及变形、控制球节点的空间坐标,首次张拉为最终张拉值的30%。
4、索杆长度及节点坐标检查
安装过程中质量控制,控制要点有拉杆施加预应力大小控制,张拉时拉杆长度控制,球节点坐标控制,首次张拉后,对以上环节进行即时监控,并记录数据与设计进行比对。
自应力索杆结构螺栓球穿芯节点连接构造,包括有第一螺栓球1、第二螺栓球2、钢拉索3、Ⅰ型压接锚头4、加长型Ⅰ型压接锚头5、螺母6、平垫7。第二螺栓球2、钢拉索3、Ⅰ型压接锚头4、加长型Ⅰ型压接锚头5组成单元拉杆。其特征在于:所述的拉杆一端Ⅰ型压接锚头4螺合固定于第二螺栓球2内,另一端加长型Ⅰ型压接锚头5穿芯于第一螺栓球1内并在用螺母6螺合连接施加预应力。
整体张拉自应力索杆结构体系中穿芯节点张拉连接装置。
本发明中,加长型Ⅰ型压接锚头5穿芯于第一螺栓球1内并可自由滑动,通过旋拧螺母6张拉单元拉杆,调节第一螺栓球1和第二螺栓球2之间的距离,从而对拉杆施工预应力,节占构造简单稳定,保证了工程需求。
Claims (2)
1.不规则自应力张拉单元螺栓球穿芯节点施工工艺,其特征在于:包括有以下施工步骤:
1)、杆单元装配,单元压杆和拉杆的配件按装配图及材料表装配成杆单元;
2)、杆单元与球节点安装,索杆结构可按设计文件要求分片分段安装,按配装图中球节点与杆单元的位置关系,将球节点和杆单元摆放至相应的安装位置,安装宜按先安装下弦杆后安装上弦和腹弦杆,先安装压杆单元后安装拉杆单元的顺序安装,拉杆分张拉拉杆和非张拉拉杆,非张拉杆杆的一端带有旋拧机构,安装过程中控制安装长度及螺栓的深度,安装长度允许偏差按设计文件要求,螺栓拧入深度不小于螺栓直径的1.1倍,拉杆安装先连接其固定端且拧紧到位,再安装另一端,另一端安装先不拉紧,待安装完成三个网格以上时,依次由起始端开始成梯次对称顺序紧固;
3)、整体张拉,张拉根据结构型式、面积、分段分片情况、张拉点的数量等采用不同的张拉分式,对于一般结构可采取整体张拉、二次施加预应力,对于复杂或大型结构,应制定张拉的技术方案,对张拉工艺进设计验算,安装完毕后,检查各索与节点连接处是否有未连接牢固部位,检查完毕,进行结构整体张拉,张拉时采用呈几何对称张拉,边张拉边测量拉索长度及变形、控制球节点的空间坐标,首次张拉为最终张拉值的30%;
4)、索杆长度及节点坐标检查
安装过程中质量控制,控制要点有拉杆施加预应力大小控制,张拉时拉杆长度控制,球节点坐标控制,首次张拉后,对以上环节进行即时监控,并记录数据与设计进行比对。
2.根据权利要求1所述的不规则自应力张拉单元螺栓球穿芯节点施工工艺,其特征在于:所述结构安装宜几何对称施工,对复杂的结构型式或大型结构中,应在分段分片处设置临时支撑结构或固定架,以控制总体结构变形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105811974A CN102080452B (zh) | 2010-12-10 | 2010-12-10 | 不规则自应力张拉单元螺栓球穿芯节点施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105811974A CN102080452B (zh) | 2010-12-10 | 2010-12-10 | 不规则自应力张拉单元螺栓球穿芯节点施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102080452A true CN102080452A (zh) | 2011-06-01 |
CN102080452B CN102080452B (zh) | 2012-08-15 |
Family
ID=44086619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105811974A Active CN102080452B (zh) | 2010-12-10 | 2010-12-10 | 不规则自应力张拉单元螺栓球穿芯节点施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102080452B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111255160A (zh) * | 2018-03-29 | 2020-06-09 | 李园园 | 一种自应力预紧索杆结构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2504129Y (zh) * | 2001-11-01 | 2002-08-07 | 柳州市建筑机械总厂 | 悬索桥主缆与吊杆的连接装置 |
FR2874256A1 (fr) * | 2004-08-13 | 2006-02-17 | Freyssinet Internat Stup Soc P | Procede pour suivre les pertes de tension des cables dans un ouvrage precontraint |
CN101603370A (zh) * | 2009-07-04 | 2009-12-16 | 中铁四局集团有限公司 | 一种自应力预紧索杆结构 |
CN201517247U (zh) * | 2009-07-04 | 2010-06-30 | 中铁四局集团有限公司 | 一种自应力预紧索杆结构 |
-
2010
- 2010-12-10 CN CN2010105811974A patent/CN102080452B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2504129Y (zh) * | 2001-11-01 | 2002-08-07 | 柳州市建筑机械总厂 | 悬索桥主缆与吊杆的连接装置 |
FR2874256A1 (fr) * | 2004-08-13 | 2006-02-17 | Freyssinet Internat Stup Soc P | Procede pour suivre les pertes de tension des cables dans un ouvrage precontraint |
CN101603370A (zh) * | 2009-07-04 | 2009-12-16 | 中铁四局集团有限公司 | 一种自应力预紧索杆结构 |
CN201517247U (zh) * | 2009-07-04 | 2010-06-30 | 中铁四局集团有限公司 | 一种自应力预紧索杆结构 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111255160A (zh) * | 2018-03-29 | 2020-06-09 | 李园园 | 一种自应力预紧索杆结构 |
Also Published As
Publication number | Publication date |
---|---|
CN102080452B (zh) | 2012-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103321430A (zh) | 预应力碳纤维片材加固大跨混凝土结构的施工方法 | |
CN102296829A (zh) | 三向索网幕墙施工方法以及用于该方法的节点接驳件 | |
CN103334593A (zh) | 索网点式玻璃幕墙施工工艺 | |
CN104846747A (zh) | 一种基于自平衡体系的自锚式悬索桥吊杆张拉工艺 | |
CN109750599A (zh) | 缓粘结低回缩预应力短索体系及计算、张拉方法 | |
US20190119913A1 (en) | Prefabricated structural bamboo system for slabs and roofs | |
CN102425099B (zh) | 大悬臂波-桁组合pc桥梁及其制造方法 | |
CN102080452B (zh) | 不规则自应力张拉单元螺栓球穿芯节点施工工艺 | |
CN211286765U (zh) | 一种钢绞线环形加固装置 | |
CN205918183U (zh) | 折角组装式停车棚 | |
CN219952744U (zh) | 一种基于单向sma的预应力碳纤维筋张拉装置 | |
CN201517247U (zh) | 一种自应力预紧索杆结构 | |
CN101603370B (zh) | 一种自应力预紧索杆结构 | |
CN204455823U (zh) | 一种悬索桥刚性拉杆锚固系统 | |
CN204385941U (zh) | 预应力屈曲约束支撑 | |
US20070151089A1 (en) | Tension positioning apparatus and method of use for manufacturing poles and columns | |
CN206052574U (zh) | 预应力钢丝绳张拉系统 | |
CN105332514A (zh) | 螺栓球穿芯节点施工工艺 | |
CN203174889U (zh) | 挤压螺杆锚具 | |
CN216921608U (zh) | 一种帐篷用高强度主梁 | |
CN105220609B (zh) | 组合梁自锚式悬索桥及其施工工艺 | |
CN202064450U (zh) | 不规则自应力张拉单元结构形式 | |
CN211114410U (zh) | 一种预应力组合钢结构构件 | |
CN210712513U (zh) | 塔梁临时固结结构 | |
CN208094486U (zh) | 一种基于预应力索桁架的零扰度大跨度光伏支架结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |