CN102425099B - 大悬臂波-桁组合pc桥梁及其制造方法 - Google Patents
大悬臂波-桁组合pc桥梁及其制造方法 Download PDFInfo
- Publication number
- CN102425099B CN102425099B CN201110301594.6A CN201110301594A CN102425099B CN 102425099 B CN102425099 B CN 102425099B CN 201110301594 A CN201110301594 A CN 201110301594A CN 102425099 B CN102425099 B CN 102425099B
- Authority
- CN
- China
- Prior art keywords
- purlin
- concrete
- steel
- bridge
- large cantilever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 7
- 238000000034 method Methods 0.000 title claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 132
- 239000010959 steel Substances 0.000 claims abstract description 132
- 238000010276 construction Methods 0.000 claims abstract description 8
- 210000001015 abdomen Anatomy 0.000 claims description 58
- 230000007547 defect Effects 0.000 abstract description 4
- 238000010008 shearing Methods 0.000 abstract 2
- 150000001875 compounds Chemical class 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 241001484259 Lacuna Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110301594.6A CN102425099B (zh) | 2011-09-30 | 2011-09-30 | 大悬臂波-桁组合pc桥梁及其制造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110301594.6A CN102425099B (zh) | 2011-09-30 | 2011-09-30 | 大悬臂波-桁组合pc桥梁及其制造方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102425099A CN102425099A (zh) | 2012-04-25 |
CN102425099B true CN102425099B (zh) | 2013-12-25 |
Family
ID=45959125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110301594.6A Expired - Fee Related CN102425099B (zh) | 2011-09-30 | 2011-09-30 | 大悬臂波-桁组合pc桥梁及其制造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102425099B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013044496A1 (zh) * | 2011-09-30 | 2013-04-04 | Li Yong | 大悬臂波-桁钢-混凝土组合结构pc桥梁 |
CN103276662B (zh) * | 2013-05-13 | 2015-09-16 | 中交第二航务工程局有限公司 | 大悬臂钢腹板脊骨箱梁节段 |
CN103741582B (zh) * | 2013-12-30 | 2016-08-17 | 郑州大学 | 一种波形钢腹板pc组合箱梁及其施工方法 |
WO2015120621A1 (zh) * | 2014-02-14 | 2015-08-20 | 李勇 | 大跨度波-桁组合结构桥梁 |
CN104631305B (zh) * | 2014-12-22 | 2016-06-15 | 郑州市交通规划勘察设计研究院 | 一种波形钢腹板斜拉桥的桁架式钢横隔板 |
CN110282573B (zh) * | 2019-07-10 | 2023-10-03 | 深圳市迈睿迈特环境科技有限公司 | 具有动力弓的地埋站四柱滑轮抬举装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004137686A (ja) * | 2002-10-15 | 2004-05-13 | Nippon Steel Corp | 合成パネル構造およびパネル橋梁構造ならびに連続合成桁橋の施工方法 |
JP2007016594A (ja) * | 2006-10-26 | 2007-01-25 | Nippon Steel Corp | 合成パネル構造およびパネル橋梁構造ならびに連続合成桁橋の施工方法 |
CN101012636A (zh) * | 2007-02-15 | 2007-08-08 | 四川省交通厅公路规划勘察设计研究院 | 钢-混凝土组合桥面板 |
CN201678946U (zh) * | 2009-12-30 | 2010-12-22 | 中铁二局股份有限公司 | 一种现浇刚架桥顶板砼的移动式贝雷梁钢支架 |
CN101936054A (zh) * | 2010-08-19 | 2011-01-05 | 李勇 | 钢桁腹组合pc梁及其施工方法 |
CN201873937U (zh) * | 2010-10-22 | 2011-06-22 | 广东省公路勘察规划设计院股份有限公司 | 一种具有自抗裂功能的组合桥梁 |
-
2011
- 2011-09-30 CN CN201110301594.6A patent/CN102425099B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004137686A (ja) * | 2002-10-15 | 2004-05-13 | Nippon Steel Corp | 合成パネル構造およびパネル橋梁構造ならびに連続合成桁橋の施工方法 |
JP2007016594A (ja) * | 2006-10-26 | 2007-01-25 | Nippon Steel Corp | 合成パネル構造およびパネル橋梁構造ならびに連続合成桁橋の施工方法 |
CN101012636A (zh) * | 2007-02-15 | 2007-08-08 | 四川省交通厅公路规划勘察设计研究院 | 钢-混凝土组合桥面板 |
CN201678946U (zh) * | 2009-12-30 | 2010-12-22 | 中铁二局股份有限公司 | 一种现浇刚架桥顶板砼的移动式贝雷梁钢支架 |
CN101936054A (zh) * | 2010-08-19 | 2011-01-05 | 李勇 | 钢桁腹组合pc梁及其施工方法 |
CN201873937U (zh) * | 2010-10-22 | 2011-06-22 | 广东省公路勘察规划设计院股份有限公司 | 一种具有自抗裂功能的组合桥梁 |
Also Published As
Publication number | Publication date |
---|---|
CN102425099A (zh) | 2012-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102425099B (zh) | 大悬臂波-桁组合pc桥梁及其制造方法 | |
CN205024907U (zh) | 预应力空心楼板与翼缘不等宽工字钢梁的连接构造 | |
CN101597918B (zh) | 一种预应力巨型支撑-框架结构 | |
CN104131630B (zh) | 多管格构式屈曲约束支撑 | |
CN202202577U (zh) | 预应力托梁拆柱结构 | |
CN104912321B (zh) | 一种用于悬空结构的钢桁架模板支撑结构及其安装方法 | |
CN103883054B (zh) | 一种索杆肋梁组合楼盖及其施工方法 | |
CN102061742B (zh) | 防震钢筋混凝土仿古建筑结构体系 | |
CN202787047U (zh) | 一种上承式三角桁架钢桁结合梁 | |
WO2013044496A1 (zh) | 大悬臂波-桁钢-混凝土组合结构pc桥梁 | |
CN103898834A (zh) | 一种钢管混凝土组合梁与桁架式索塔斜拉桥及其施工方法 | |
CN106284838A (zh) | 一种格构式蜂窝梁节段和大跨度格构式钢梁及其制作安装方法 | |
CN204081070U (zh) | 一种大跨度钢骨梁悬挑结构 | |
CN205907812U (zh) | 带拉杆的大悬挑钢框架结构 | |
CN206090272U (zh) | 一种可提升整体抗裂性能的波形钢腹板梁桥 | |
CN204780559U (zh) | 钢结构箱梁与混凝土桥面板组合桥梁 | |
CN205330202U (zh) | 一种抽柱悬索加固结构 | |
CN205171343U (zh) | 组合梁自锚式悬索桥 | |
CN102900191A (zh) | 搭接筋式预应力双向叠合板及施工方法 | |
CN105155400A (zh) | 混凝土梁-波形钢腹板梁组合连续梁桥 | |
CN105220609B (zh) | 组合梁自锚式悬索桥及其施工工艺 | |
CN204081120U (zh) | 多管格构式屈曲约束支撑 | |
CN208009645U (zh) | 一种改进的用于型钢混凝土结构梁柱连接的节点 | |
CN201268918Y (zh) | 框架结构的暗柱竖向钢筋 | |
CN202730633U (zh) | 独柱塔平行空间主缆自锚式悬索桥 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: CHEN YIYAN Effective date: 20130315 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Yong Inventor after: Zhang Jiandong Inventor after: Sun Tianming Inventor after: Guo Shuai Inventor after: Li Min Inventor after: Li Jun Inventor before: Li Yong Inventor before: Li Jixiang Inventor before: Chen Yiyan Inventor before: Qin Shunquan Inventor before: Fang Qinhan Inventor before: Zhu Hongping Inventor before: Liu Nianqin Inventor before: Wang Xianqian Inventor before: Li Hai Inventor before: Shi Ming |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LI YONG CHEN YIYAN QIN SHUNQUAN FANG QINHAN ZHU HONGPING LIU NIANQIN WANG XIANQIAN LI HAI SHI MING LI JIXIANG TO: LI YONG ZHANG JIANDONG SUN TIANMING GUO SHUAI LI MIN LI JUN |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20130315 Address after: 518089 Guangdong city of Shenzhen province Futian District 105 Meihua road Meilin Li science and Technology Industrial Park building 1003 Applicant after: Li Yong Address before: 518089 Guangdong city of Shenzhen province Futian District 105 Meihua road Meilin Li science and Technology Industrial Park building 1003 Applicant before: Li Yong Applicant before: Chen Yiyan |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Yong Inventor after: Zhang Jiandong Inventor after: Sun Tianming Inventor after: Guo Caixia Inventor after: Chen Zengshun Inventor after: Zhong Rumian Inventor before: Li Yong Inventor before: Zhang Jiandong Inventor before: Sun Tianming Inventor before: Guo Shuai Inventor before: Li Min Inventor before: Li Jun |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171218 Address after: No. 413, No. two, Guangda We Valley, No. 413, No. 2, Guangda We Valley, No. 413, Guangdong Songshan Lake high tech Industrial Development Zone, No. 413 Co-patentee after: SHENZHEN QIAOBO DESIGN & RESEARCH INSTITUTE Co.,Ltd. Patentee after: Qiao Bo Building Technology (Dongguan) Co.,Ltd. Address before: 518089 Guangdong city of Shenzhen province Futian District 105 Meihua road Meilin Li science and Technology Industrial Park building 1003 Patentee before: Li Yong |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220929 Address after: 518060 No. 3688 Nanhai Road, Shenzhen, Guangdong, Nanshan District Patentee after: SHENZHEN University Patentee after: SHENZHEN QIAOBO DESIGN & RESEARCH INSTITUTE Co.,Ltd. Address before: 523808 no.413, building A3, Guangda wegu 1st District, No.2, headquarters 2nd Road, Songshanhu hi tech Industrial Development Zone, Dongguan, Guangdong Province Patentee before: Qiao Bo Building Technology (Dongguan) Co.,Ltd. Patentee before: SHENZHEN QIAOBO DESIGN & RESEARCH INSTITUTE Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131225 |