CN102080392B - High-powered crawler type bulldozer S-shaped oil tube mounting structure - Google Patents
High-powered crawler type bulldozer S-shaped oil tube mounting structure Download PDFInfo
- Publication number
- CN102080392B CN102080392B CN2010105763773A CN201010576377A CN102080392B CN 102080392 B CN102080392 B CN 102080392B CN 2010105763773 A CN2010105763773 A CN 2010105763773A CN 201010576377 A CN201010576377 A CN 201010576377A CN 102080392 B CN102080392 B CN 102080392B
- Authority
- CN
- China
- Prior art keywords
- retainer
- shape oil
- shaped oil
- oil pipe
- mounting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- General Details Of Gearings (AREA)
Abstract
The invention discloses a high-powered crawler type bulldozer S-shaped oil tube mounting structure which is used for positioning the upper end of S-shaped oil tubes in a steering pipeline when a high-powered crawler type bulldozer is assembled. A seat plate, a bearing seat, an S-shaped oil tube, a retainer and a steering valve are assembled sequentially; the retainer is embedded into two small grooves of the seat plate for positioning; and the upper end of the left S-shaped oil tube and the upper end of the right S-shaped oil tube penetrate through the retainer to be positioned. When the position between the steering valve and the seat plate is aligned with a mounting hole, a left oil outlet and a right oil outlet of the steering valve are respectively aligned with the upper end of the left S-shaped oil tube and the right S-shaped oil tube, the oil outlet aligning process is simplified when the steering valve is assembled, the damage of an O-ring sleeved on the upper ends of the S-shaped oil tubes can be avoided effectively in the mounting and aligning process, and the reliability of the high-powered bulldozer can be improved.
Description
Technical field
The present invention relates to a kind of device that the high-power crawler dozer keeps S shape oil pipe installation site that is used for, relate in particular to a kind of high-power crawler dozer that is used for and turn to fixedly S shape oil pipe upper end mounting structure of pipeline.
Background technology
At present, the known domestic and international high-power crawler dozer method that turns in the pipeline S shape oil pipe that flows to steering cluth from switching valve all to adopt pipe clamp that left S shape oil pipe and right S shape oil pipe are clamped is simultaneously fixed.When follow-up assembling switching valve and/or maintenance dismounting switching valve; The left and right S shape oil pipe upper end mouth of pipe could be installed switching valve after must aiming at and being positioned at two spill oil-outs in switching valve bottom and insertion smoothly; But; The left and right S shape oil pipe upper end mouth of pipe only connects fixing with pipe clamp; Can't confirm in advance and the left and right S shape oil pipe upper end nozzle position of two spill oil-outs installation site, switching valve bottom coupling that the assembly crewman is difficult to two oil-outs in switching valve bottom are aimed at the left and right S shape oil pipe upper end mouth of pipe.In alignment procedures, destructive envelope produces oil leakage phenomenon at the O shape circle of S shape oil pipe upper end easily, causes bulldozer malfunctioning fault in the operation driving process, to occur turning to.
Summary of the invention
Technical problem to be solved by this invention is; Overcome the problem that exists in the prior art; A kind of high-power crawler dozer S shape oil pipe mounting structure is provided, and this structure can guarantee that two the spill oil-outs in switching valve bottom accurately aim at the left and right S shape oil pipe upper end mouth of pipe when mounted.
In order to address the above problem technical scheme of the present invention is such:
Cancel original pipe clamp; A kind of high-power crawler dozer S shape oil pipe mounting structure comprises left and right two S shape oil pipes, and mate with the installation site at two spill oil-out centers of switching valve bottom left and right two S shape oil pipes upper end; The bearing support oil-in is inserted in left and right two S shape oil pipe lower ends; It is characterized in that left and right two S shape oil pipes upper end mouth of pipe is provided with the retainer of a location, is useful on two through holes that S shape oil pipe passes on the retainer; Retainer embeds and is installed on the seat board of a switching valve, and seat board is through being bolted on the rear axle box.
Two through holes of retainer are vertically passed in left and right two S shape oil pipes upper end, and the through hole on the retainer all overlaps with left and right two S shape oil pipes upper end center line.
The both sides of retainer are provided with two alices, and seat board is provided with the sulculus that is used to embed alice.
The invention has the beneficial effects as follows; The hydraulic fluid port alignment procedures shortens installation time when simplifying the switching valve assembling, and retainer is simple in structure; Fitting operation is easy; Can effectively avoid the O shape circle of destructive envelope on S shape oil pipe in the installing and aligning process, thereby reduce malfunctioning fault appears turning in the high-power bulldozer in the operation driving process probability, improve high-power bulldozer reliability.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is further specified.
Fig. 1 a is a retainer master TV structure sketch map of the present invention.
Fig. 1 b is a retainer plan structure sketch map of the present invention.
Fig. 2 a is a seat board plan structure sketch map of the present invention.
Fig. 2 b is a seat board A-A sectional structure sketch map of the present invention.
Fig. 3 is the assembling schematic diagram of high-power crawler dozer S shape oil pipe mounting structure of the present invention.
Among the figure: 1. left shaft holder, 2. retainer, 3. left S shape oil pipe, 4. right S shape oil pipe, 5. seat board, 6. right bearing seat, 7. rear axle box, 21. left through holes, 22. right through holes, 51. sulculuses.
The specific embodiment
For technological means, creation characteristic that the present invention is realized, reach purpose and effect and be easy to understand and understand, below in conjunction with the specific embodiment, further set forth the present invention.
In Fig. 1 a and Fig. 1 b, the left and right through hole 21,22 of retainer 2 is used for the location, upper end with left and right S shape oil pipe 3,4.And the both sides of retainer 2 are provided with two alices.
In Fig. 2 a and 2b, seat board 5 is provided with the sulculus 51 that is used to embed retainer 2 alices, is used for retainer 2 location.
In Fig. 3, left and right S shape oil pipe 3, the 4 upper end mouths of pipe are located with retainer 2.Two through holes 21,22 are arranged on the retainer 2, when retainer 2 is installed, make left and right S shape oil pipe 3,4 upper ends vertically pass two through holes of retainer, again retainer 2 embeddings are installed in the sulculus 51 of seat board 5.After the installation; Two through holes 21,22 of retainer 2 are all vertical with left and right S shape oil pipe 3,4 upper end center lines and overlap; And be positioned installation site, two spill oil-out centers, switching valve bottom, the installation site coupling at two through hole center and switching valve bottom two spill oil-outs center of retainer after guaranteeing to install.
Said seat board 5 is installed in rear axle box 7 upper plane through bolt; Switching valve is installed on the seat board 5, and said left and right S shape oil pipe 3, the 4 lower end mouths of pipe insert the bearing support oil-in, and said bearing support communicates with the steering cluth oil circuit; Said bearing support and steering cluth are installed in the rear axle box; Said rear axle box is the part of vehicle frame, and said vehicle frame is the skeleton of high-power bulldozer, and integral body is weldment.
More than show and described basic principle of the present invention, principal character and advantage of the present invention.The technician of the industry should understand; The present invention is not restricted to the described embodiments; That describes in the foregoing description and the manual just explains principle of the present invention; The present invention also has various changes and modifications under the prerequisite that does not break away from spirit and scope of the invention, and these variations and improvement all fall in the scope of the invention that requires protection.The present invention requires protection domain to be defined by appending claims and equivalent thereof.
Claims (3)
1. high-power crawler dozer S shape oil pipe mounting structure; Comprise left and right two S shape oil pipes; Mate with the installation site at two spill oil-out centers of switching valve bottom left and right two S shape oil pipes upper end, and the bearing support oil-in is inserted in left and right two S shape oil pipe lower ends, it is characterized in that; Left and right two S shape oil pipes upper end mouth of pipe is provided with the retainer of a location; Be useful on two through holes that S shape oil pipe passes on the retainer, retainer embeds and is installed on the seat board of a switching valve, and seat board is through being bolted on the rear axle box.
2. a kind of high-power crawler dozer S shape oil pipe mounting structure according to claim 1; It is characterized in that; Two through holes of retainer are vertically passed in left and right two S shape oil pipes upper end, and the through hole on the retainer all overlaps with left and right two S shape oil pipes upper end center line.
3. a kind of high-power crawler dozer S shape oil pipe mounting structure according to claim 1 is characterized in that the both sides of retainer are provided with two alices, and seat board is provided with the sulculus that is used to embed alice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105763773A CN102080392B (en) | 2010-12-07 | 2010-12-07 | High-powered crawler type bulldozer S-shaped oil tube mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105763773A CN102080392B (en) | 2010-12-07 | 2010-12-07 | High-powered crawler type bulldozer S-shaped oil tube mounting structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102080392A CN102080392A (en) | 2011-06-01 |
CN102080392B true CN102080392B (en) | 2012-07-04 |
Family
ID=44086563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105763773A Expired - Fee Related CN102080392B (en) | 2010-12-07 | 2010-12-07 | High-powered crawler type bulldozer S-shaped oil tube mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102080392B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107985408B (en) * | 2017-12-28 | 2023-05-12 | 东风商用车有限公司 | Commercial vehicle steering device and periphery assembly double-layer arrangement frame |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1556286A (en) * | 2004-01-02 | 2004-12-22 | 三一重工股份有限公司 | Full hydraulic pushdozer |
JP4418401B2 (en) * | 2005-05-27 | 2010-02-17 | キャタピラージャパン株式会社 | Cylinder guard mounting structure |
CN101736765A (en) * | 2009-12-10 | 2010-06-16 | 同济大学 | Full hydraulic transmission-based crawler bulldozer |
CN201952828U (en) * | 2010-12-07 | 2011-08-31 | 上海彭浦机器厂有限公司 | S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3585627B2 (en) * | 1996-03-06 | 2004-11-04 | ヤンマー株式会社 | Earth removal equipment |
-
2010
- 2010-12-07 CN CN2010105763773A patent/CN102080392B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1556286A (en) * | 2004-01-02 | 2004-12-22 | 三一重工股份有限公司 | Full hydraulic pushdozer |
JP4418401B2 (en) * | 2005-05-27 | 2010-02-17 | キャタピラージャパン株式会社 | Cylinder guard mounting structure |
CN101736765A (en) * | 2009-12-10 | 2010-06-16 | 同济大学 | Full hydraulic transmission-based crawler bulldozer |
CN201952828U (en) * | 2010-12-07 | 2011-08-31 | 上海彭浦机器厂有限公司 | S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer |
Non-Patent Citations (3)
Title |
---|
JP特开平9-242112A 1997.09.16 |
JP特许第4418401号B2 2010.02.17 |
丁立新等.小松PC200挖掘机液压油管爆管原因分析与处理.《科技信息》.2010,(第25期),542-543. * |
Also Published As
Publication number | Publication date |
---|---|
CN102080392A (en) | 2011-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102080392B (en) | High-powered crawler type bulldozer S-shaped oil tube mounting structure | |
CN201952828U (en) | S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer | |
US20090223582A1 (en) | Apparatus for fixing hydraulic pipes for construction equipment | |
CN103672097A (en) | Valve assembly for holing in pipeline | |
CN203888825U (en) | Integrated locomotive brake cabinet easy to assemble and disassemble | |
CN201339703Y (en) | Oil return channel device of electric wheel gear box on power drive truck | |
CN204415377U (en) | A kind of rear brake duct road mounting structure and a kind of automobile | |
CN105197064A (en) | Air cylinder drainage spraying-proof structure of railway vehicle | |
CN203162101U (en) | Vent valve of automotive transmission | |
CN103639622B (en) | A kind of central water supply air supply system of new automobile welding line | |
CN210532062U (en) | Vehicle-mounted hydrogen supply system pipeline system | |
CN209586835U (en) | Steering engine for ship connects valve plate device | |
CN105387029A (en) | Oil filter overhauling device | |
CN101251133A (en) | Novel hydraulic motor transmission control valve group | |
CN110792538A (en) | Fuel oil device for automobile | |
JP5766099B2 (en) | Mounting structure of fuel injection pump and fuel pipe | |
CN219160112U (en) | High-speed magnetic suspension rail air cylinder module for vehicle | |
CN204801493U (en) | New forms of energy passenger train actuating mechanism's cooling system | |
CN217455660U (en) | Fuel tank filling pipe fixing structure | |
CN210564730U (en) | Exhaust pipe structure | |
CN204432378U (en) | A kind of ventilation structure for fuel tank | |
CN219492777U (en) | Hydraulic clamp control device | |
CN206487610U (en) | A kind of push-in water supply pump configuration for water purifier system | |
CN216829261U (en) | Water and gas source processor for welding workstation | |
CN201703245U (en) | Metal fuel pipe assembly mounting structure of automobile fuel system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120704 Termination date: 20211207 |
|
CF01 | Termination of patent right due to non-payment of annual fee |