CN102080392B - High-powered crawler type bulldozer S-shaped oil tube mounting structure - Google Patents

High-powered crawler type bulldozer S-shaped oil tube mounting structure Download PDF

Info

Publication number
CN102080392B
CN102080392B CN2010105763773A CN201010576377A CN102080392B CN 102080392 B CN102080392 B CN 102080392B CN 2010105763773 A CN2010105763773 A CN 2010105763773A CN 201010576377 A CN201010576377 A CN 201010576377A CN 102080392 B CN102080392 B CN 102080392B
Authority
CN
China
Prior art keywords
retainer
shape oil
shaped oil
oil pipe
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010105763773A
Other languages
Chinese (zh)
Other versions
CN102080392A (en
Inventor
李奇林
王胜强
王健
杨树金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai PengPu Machine Building Plant Co Ltd
Original Assignee
Shanghai PengPu Machine Building Plant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai PengPu Machine Building Plant Co Ltd filed Critical Shanghai PengPu Machine Building Plant Co Ltd
Priority to CN2010105763773A priority Critical patent/CN102080392B/en
Publication of CN102080392A publication Critical patent/CN102080392A/en
Application granted granted Critical
Publication of CN102080392B publication Critical patent/CN102080392B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • General Details Of Gearings (AREA)

Abstract

The invention discloses a high-powered crawler type bulldozer S-shaped oil tube mounting structure which is used for positioning the upper end of S-shaped oil tubes in a steering pipeline when a high-powered crawler type bulldozer is assembled. A seat plate, a bearing seat, an S-shaped oil tube, a retainer and a steering valve are assembled sequentially; the retainer is embedded into two small grooves of the seat plate for positioning; and the upper end of the left S-shaped oil tube and the upper end of the right S-shaped oil tube penetrate through the retainer to be positioned. When the position between the steering valve and the seat plate is aligned with a mounting hole, a left oil outlet and a right oil outlet of the steering valve are respectively aligned with the upper end of the left S-shaped oil tube and the right S-shaped oil tube, the oil outlet aligning process is simplified when the steering valve is assembled, the damage of an O-ring sleeved on the upper ends of the S-shaped oil tubes can be avoided effectively in the mounting and aligning process, and the reliability of the high-powered bulldozer can be improved.

Description

A kind of high-power crawler dozer S shape oil pipe mounting structure
Technical field
The present invention relates to a kind of device that the high-power crawler dozer keeps S shape oil pipe installation site that is used for, relate in particular to a kind of high-power crawler dozer that is used for and turn to fixedly S shape oil pipe upper end mounting structure of pipeline.
Background technology
At present, the known domestic and international high-power crawler dozer method that turns in the pipeline S shape oil pipe that flows to steering cluth from switching valve all to adopt pipe clamp that left S shape oil pipe and right S shape oil pipe are clamped is simultaneously fixed.When follow-up assembling switching valve and/or maintenance dismounting switching valve; The left and right S shape oil pipe upper end mouth of pipe could be installed switching valve after must aiming at and being positioned at two spill oil-outs in switching valve bottom and insertion smoothly; But; The left and right S shape oil pipe upper end mouth of pipe only connects fixing with pipe clamp; Can't confirm in advance and the left and right S shape oil pipe upper end nozzle position of two spill oil-outs installation site, switching valve bottom coupling that the assembly crewman is difficult to two oil-outs in switching valve bottom are aimed at the left and right S shape oil pipe upper end mouth of pipe.In alignment procedures, destructive envelope produces oil leakage phenomenon at the O shape circle of S shape oil pipe upper end easily, causes bulldozer malfunctioning fault in the operation driving process, to occur turning to.
Summary of the invention
Technical problem to be solved by this invention is; Overcome the problem that exists in the prior art; A kind of high-power crawler dozer S shape oil pipe mounting structure is provided, and this structure can guarantee that two the spill oil-outs in switching valve bottom accurately aim at the left and right S shape oil pipe upper end mouth of pipe when mounted.
In order to address the above problem technical scheme of the present invention is such:
Cancel original pipe clamp; A kind of high-power crawler dozer S shape oil pipe mounting structure comprises left and right two S shape oil pipes, and mate with the installation site at two spill oil-out centers of switching valve bottom left and right two S shape oil pipes upper end; The bearing support oil-in is inserted in left and right two S shape oil pipe lower ends; It is characterized in that left and right two S shape oil pipes upper end mouth of pipe is provided with the retainer of a location, is useful on two through holes that S shape oil pipe passes on the retainer; Retainer embeds and is installed on the seat board of a switching valve, and seat board is through being bolted on the rear axle box.
Two through holes of retainer are vertically passed in left and right two S shape oil pipes upper end, and the through hole on the retainer all overlaps with left and right two S shape oil pipes upper end center line.
The both sides of retainer are provided with two alices, and seat board is provided with the sulculus that is used to embed alice.
The invention has the beneficial effects as follows; The hydraulic fluid port alignment procedures shortens installation time when simplifying the switching valve assembling, and retainer is simple in structure; Fitting operation is easy; Can effectively avoid the O shape circle of destructive envelope on S shape oil pipe in the installing and aligning process, thereby reduce malfunctioning fault appears turning in the high-power bulldozer in the operation driving process probability, improve high-power bulldozer reliability.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is further specified.
Fig. 1 a is a retainer master TV structure sketch map of the present invention.
Fig. 1 b is a retainer plan structure sketch map of the present invention.
Fig. 2 a is a seat board plan structure sketch map of the present invention.
Fig. 2 b is a seat board A-A sectional structure sketch map of the present invention.
Fig. 3 is the assembling schematic diagram of high-power crawler dozer S shape oil pipe mounting structure of the present invention.
Among the figure: 1. left shaft holder, 2. retainer, 3. left S shape oil pipe, 4. right S shape oil pipe, 5. seat board, 6. right bearing seat, 7. rear axle box, 21. left through holes, 22. right through holes, 51. sulculuses.
The specific embodiment
For technological means, creation characteristic that the present invention is realized, reach purpose and effect and be easy to understand and understand, below in conjunction with the specific embodiment, further set forth the present invention.
In Fig. 1 a and Fig. 1 b, the left and right through hole 21,22 of retainer 2 is used for the location, upper end with left and right S shape oil pipe 3,4.And the both sides of retainer 2 are provided with two alices.
In Fig. 2 a and 2b, seat board 5 is provided with the sulculus 51 that is used to embed retainer 2 alices, is used for retainer 2 location.
In Fig. 3, left and right S shape oil pipe 3, the 4 upper end mouths of pipe are located with retainer 2.Two through holes 21,22 are arranged on the retainer 2, when retainer 2 is installed, make left and right S shape oil pipe 3,4 upper ends vertically pass two through holes of retainer, again retainer 2 embeddings are installed in the sulculus 51 of seat board 5.After the installation; Two through holes 21,22 of retainer 2 are all vertical with left and right S shape oil pipe 3,4 upper end center lines and overlap; And be positioned installation site, two spill oil-out centers, switching valve bottom, the installation site coupling at two through hole center and switching valve bottom two spill oil-outs center of retainer after guaranteeing to install.
Said seat board 5 is installed in rear axle box 7 upper plane through bolt; Switching valve is installed on the seat board 5, and said left and right S shape oil pipe 3, the 4 lower end mouths of pipe insert the bearing support oil-in, and said bearing support communicates with the steering cluth oil circuit; Said bearing support and steering cluth are installed in the rear axle box; Said rear axle box is the part of vehicle frame, and said vehicle frame is the skeleton of high-power bulldozer, and integral body is weldment.
Left shaft holder 1, right bearing seat 6 and seat board 5 all are fixedly connected with rear axle box 7, and left shaft holder 1 is installed in the interior car body center left hole of rear axle box, and right bearing seat 6 is installed in the right ports of the interior car body center of rear axle box.The left oil-out of the said switching valve of left through hole 21 insertions of retainer 2 is passed in left side S shape oil pipe 3 lower ends insertion left shaft holder 1 inlet, upper end, and the right oil-out of the said switching valve of right through hole 22 insertions of retainer 2 is passed in right S shape oil pipe 4 lower ends insertion right bearing seat 6 inlets, upper end.The installing hole that is connected with seat board 5 at switching valve is aimed at simultaneously, the left and right oil-out of said switching valve respectively with the upper end of left S shape oil pipe 3, right S shape oil pipe 4 with aim at.
More than show and described basic principle of the present invention, principal character and advantage of the present invention.The technician of the industry should understand; The present invention is not restricted to the described embodiments; That describes in the foregoing description and the manual just explains principle of the present invention; The present invention also has various changes and modifications under the prerequisite that does not break away from spirit and scope of the invention, and these variations and improvement all fall in the scope of the invention that requires protection.The present invention requires protection domain to be defined by appending claims and equivalent thereof.

Claims (3)

1. high-power crawler dozer S shape oil pipe mounting structure; Comprise left and right two S shape oil pipes; Mate with the installation site at two spill oil-out centers of switching valve bottom left and right two S shape oil pipes upper end, and the bearing support oil-in is inserted in left and right two S shape oil pipe lower ends, it is characterized in that; Left and right two S shape oil pipes upper end mouth of pipe is provided with the retainer of a location; Be useful on two through holes that S shape oil pipe passes on the retainer, retainer embeds and is installed on the seat board of a switching valve, and seat board is through being bolted on the rear axle box.
2. a kind of high-power crawler dozer S shape oil pipe mounting structure according to claim 1; It is characterized in that; Two through holes of retainer are vertically passed in left and right two S shape oil pipes upper end, and the through hole on the retainer all overlaps with left and right two S shape oil pipes upper end center line.
3. a kind of high-power crawler dozer S shape oil pipe mounting structure according to claim 1 is characterized in that the both sides of retainer are provided with two alices, and seat board is provided with the sulculus that is used to embed alice.
CN2010105763773A 2010-12-07 2010-12-07 High-powered crawler type bulldozer S-shaped oil tube mounting structure Expired - Fee Related CN102080392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105763773A CN102080392B (en) 2010-12-07 2010-12-07 High-powered crawler type bulldozer S-shaped oil tube mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105763773A CN102080392B (en) 2010-12-07 2010-12-07 High-powered crawler type bulldozer S-shaped oil tube mounting structure

Publications (2)

Publication Number Publication Date
CN102080392A CN102080392A (en) 2011-06-01
CN102080392B true CN102080392B (en) 2012-07-04

Family

ID=44086563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105763773A Expired - Fee Related CN102080392B (en) 2010-12-07 2010-12-07 High-powered crawler type bulldozer S-shaped oil tube mounting structure

Country Status (1)

Country Link
CN (1) CN102080392B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107985408B (en) * 2017-12-28 2023-05-12 东风商用车有限公司 Commercial vehicle steering device and periphery assembly double-layer arrangement frame

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556286A (en) * 2004-01-02 2004-12-22 三一重工股份有限公司 Full hydraulic pushdozer
JP4418401B2 (en) * 2005-05-27 2010-02-17 キャタピラージャパン株式会社 Cylinder guard mounting structure
CN101736765A (en) * 2009-12-10 2010-06-16 同济大学 Full hydraulic transmission-based crawler bulldozer
CN201952828U (en) * 2010-12-07 2011-08-31 上海彭浦机器厂有限公司 S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3585627B2 (en) * 1996-03-06 2004-11-04 ヤンマー株式会社 Earth removal equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556286A (en) * 2004-01-02 2004-12-22 三一重工股份有限公司 Full hydraulic pushdozer
JP4418401B2 (en) * 2005-05-27 2010-02-17 キャタピラージャパン株式会社 Cylinder guard mounting structure
CN101736765A (en) * 2009-12-10 2010-06-16 同济大学 Full hydraulic transmission-based crawler bulldozer
CN201952828U (en) * 2010-12-07 2011-08-31 上海彭浦机器厂有限公司 S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP特开平9-242112A 1997.09.16
JP特许第4418401号B2 2010.02.17
丁立新等.小松PC200挖掘机液压油管爆管原因分析与处理.《科技信息》.2010,(第25期),542-543. *

Also Published As

Publication number Publication date
CN102080392A (en) 2011-06-01

Similar Documents

Publication Publication Date Title
CN102080392B (en) High-powered crawler type bulldozer S-shaped oil tube mounting structure
CN201952828U (en) S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer
US20090223582A1 (en) Apparatus for fixing hydraulic pipes for construction equipment
CN103672097A (en) Valve assembly for holing in pipeline
CN203888825U (en) Integrated locomotive brake cabinet easy to assemble and disassemble
CN201339703Y (en) Oil return channel device of electric wheel gear box on power drive truck
CN204415377U (en) A kind of rear brake duct road mounting structure and a kind of automobile
CN105197064A (en) Air cylinder drainage spraying-proof structure of railway vehicle
CN203162101U (en) Vent valve of automotive transmission
CN103639622B (en) A kind of central water supply air supply system of new automobile welding line
CN210532062U (en) Vehicle-mounted hydrogen supply system pipeline system
CN209586835U (en) Steering engine for ship connects valve plate device
CN105387029A (en) Oil filter overhauling device
CN101251133A (en) Novel hydraulic motor transmission control valve group
CN110792538A (en) Fuel oil device for automobile
JP5766099B2 (en) Mounting structure of fuel injection pump and fuel pipe
CN219160112U (en) High-speed magnetic suspension rail air cylinder module for vehicle
CN204801493U (en) New forms of energy passenger train actuating mechanism's cooling system
CN217455660U (en) Fuel tank filling pipe fixing structure
CN210564730U (en) Exhaust pipe structure
CN204432378U (en) A kind of ventilation structure for fuel tank
CN219492777U (en) Hydraulic clamp control device
CN206487610U (en) A kind of push-in water supply pump configuration for water purifier system
CN216829261U (en) Water and gas source processor for welding workstation
CN201703245U (en) Metal fuel pipe assembly mounting structure of automobile fuel system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20211207

CF01 Termination of patent right due to non-payment of annual fee