CN201952828U - S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer - Google Patents
S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer Download PDFInfo
- Publication number
- CN201952828U CN201952828U CN2010206451632U CN201020645163U CN201952828U CN 201952828 U CN201952828 U CN 201952828U CN 2010206451632 U CN2010206451632 U CN 2010206451632U CN 201020645163 U CN201020645163 U CN 201020645163U CN 201952828 U CN201952828 U CN 201952828U
- Authority
- CN
- China
- Prior art keywords
- retainer
- oil pipe
- shape oil
- seat board
- shaped oil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Component Parts Of Construction Machinery (AREA)
Abstract
The utility model discloses an S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozers, which is used for positioning the upper end of the S-shaped oil pipe in a steering pipeline during the installation of high-horsepower crawler type bulldozers. According to the structure, a seat board, a bearing seat, S-shaped oil pipes, a retainer and a steering valve are successively assembled. The retainer is embedded inside the two small grooves of the seat board to be positioned. The upper ends of the left and right S-shaped oil pipes pass through the two through holes of the retainer to be positioned. When the installing hole of the steering valve is aligned with that of the seat board, the left and right oil outlets of the steering valve are respectively aligned with the upper ends of the left and right S-shaped oil pipes. Therefore, the oil outlet aligning process during the installation of the steering valve is simplified and O-shaped rings sleeved on the upper ends of the S-shaped oil pipes are effectively prevented from being damaged during the installation and aligning process. Meanwhile, the reliability of high-horsepower bulldozers is improved.
Description
Technical field
The utility model relates to a kind of device that the high-power crawler dozer keeps S shape oil pipe installation site that is used for, and relates in particular to a kind of high-power crawler dozer that is used for and turns to fixedly S shape oil pipe upper end mounting structure of pipeline.
Background technology
At present, the known domestic and international high-power crawler dozer method that turns in the pipeline S shape oil pipe that flows to steering cluth from switching valve all to adopt pipe clamp that left S shape oil pipe and right S shape oil pipe are clamped is simultaneously fixed.When follow-up assembling switching valve and/or maintenance dismounting switching valve, the left and right S shape oil pipe upper end mouth of pipe could be installed switching valve after must aiming at and being positioned at two spill oil-outs in switching valve bottom and insertion smoothly, but, the left and right S shape oil pipe upper end mouth of pipe only is connected and fixed with pipe clamp, can't determine in advance and the left and right S shape oil pipe upper end nozzle position of two spill oil-outs installation site, switching valve bottom coupling that the assembly crewman is difficult to two oil-outs in switching valve bottom are aimed at the left and right S shape oil pipe upper end mouth of pipe.In alignment procedures, destructive envelope produces oil leakage phenomenon at the O shape circle of S shape oil pipe upper end easily, causes bulldozer malfunctioning fault to occur turning in the operation driving process.
The utility model content
Technical problem to be solved in the utility model is, overcome problems of the prior art, a kind of high-power crawler dozer S shape oil pipe mounting structure is provided, and this structure can guarantee that two the spill oil-outs in switching valve bottom accurately aim at the left and right S shape oil pipe upper end mouth of pipe when mounted.
In order to address the above problem the technical solution of the utility model is such:
Cancel original pipe clamp, a kind of high-power crawler dozer S shape oil pipe mounting structure, comprise left and right two S shape oil pipes, mate with the installation site at two spill oil-out centers of switching valve bottom left and right two S shape oil pipes upper end, the bearing support oil-in is inserted in left and right two S shape oil pipe lower ends, it is characterized in that, left and right two S shape oil pipes upper end mouth of pipe is provided with the retainer of a location, be useful on two through holes that S shape oil pipe passes on the retainer, retainer embeds and is installed on the seat board of a switching valve, and seat board is by being bolted on the rear axle box.
Two through holes of retainer are vertically passed in left and right two S shape oil pipes upper end, and the through hole on the retainer all overlaps with left and right two S shape oil pipes upper end center line.
The both sides of retainer are provided with two alices, and seat board is provided with the sulculus that is used to embed alice.
The beneficial effects of the utility model are, hydraulic fluid port alignment procedures when simplifying the switching valve assembling, shorten installation time, retainer is simple in structure, fitting operation is easy, can effectively avoid installing the O shape circle of destructive envelope on S shape oil pipe in the alignment procedures, thereby reduce malfunctioning fault appears turning in the high-power bulldozer in the operation driving process probability, improve high-power bulldozer reliability.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is further specified.
Fig. 1 a is a retainer master TV structure schematic diagram described in the utility model.
Fig. 1 b is a retainer plan structure schematic diagram described in the utility model.
Fig. 2 a is a seat board plan structure schematic diagram described in the utility model.
Fig. 2 b is a seat board A-A sectional structure schematic diagram described in the utility model.
Fig. 3 is the assembling schematic diagram of high-power crawler dozer S shape oil pipe mounting structure described in the utility model.
Among the figure: 1. left shaft holder, 2. retainer, 3. left S shape oil pipe, 4. right S shape oil pipe, 5. seat board, 6. right bearing seat, 7. rear axle box, 21. left through holes, 22. right through holes, 51 sulculuses.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with the specific embodiment, further set forth the utility model.
In Fig. 1 a and Fig. 1 b, the left and right through hole 21,22 of retainer 2 is used for the location, upper end with left and right S shape oil pipe 3,4.And the both sides of retainer 2 are provided with two alices.
In Fig. 2 a and 2b, seat board 5 is provided with the sulculus 51 that is used to embed retainer 2 alices, is used for retainer 2 location.
In Fig. 3, left and right S shape oil pipe 3, the 4 upper end mouths of pipe are located with retainer 2.Two through holes 21,22 are arranged on the retainer 2, when retainer 2 is installed, make left and right S shape oil pipe 3,4 upper ends vertically pass two through holes of retainer, again retainer 2 embeddings are installed in the sulculus 51 of seat board 5.After the installation, two through holes 21,22 of retainer 2 are all vertical with left and right S shape oil pipe 3,4 upper end center lines and overlap, and be positioned installation site, two spill oil-out centers, switching valve bottom, the installation site coupling at two through hole center and switching valve bottom two spill oil-outs center of retainer after guaranteeing to install.
Described seat board 5 is installed in rear axle box 7 upper plane by bolt, switching valve is installed on the seat board 5, described left and right S shape oil pipe 3, the 4 lower end mouths of pipe insert the bearing support oil-in, described bearing support communicates with the steering cluth oil circuit, described bearing support and steering cluth are installed in the rear axle box, described rear axle box is the part of vehicle frame, and described vehicle frame is the skeleton of high-power bulldozer, and integral body is weldment.
Left shaft holder 1, right bearing seat 6 and seat board 5 are all fixedlyed connected with rear axle box 7, and left shaft holder 1 is installed in the interior car body center left hole of rear axle box, and right bearing seat 6 is installed in the right ports of the interior car body center of rear axle box.The left oil-out of the described switching valve of left through hole 21 insertions of retainer 2 is passed in left side S shape oil pipe 3 lower ends insertion left shaft holder 1 inlet, upper end, and the right oil-out of the described switching valve of right through hole 22 insertions of retainer 2 is passed in right S shape oil pipe 4 lower ends insertion right bearing seat 6 inlets, upper end.The installing hole that is connected with seat board 5 at switching valve is aimed at simultaneously, the left and right oil-out of described switching valve respectively with the upper end of left S shape oil pipe 3, right S shape oil pipe 4 with aim at.
More than show and described basic principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that describes in the foregoing description and the manual just illustrates principle of the present utility model; the utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these changes and improvements all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (3)
1. high-power crawler dozer S shape oil pipe mounting structure, comprise left and right two S shape oil pipes, mate with the installation site at two spill oil-out centers of switching valve bottom left and right two S shape oil pipes upper end, the bearing support oil-in is inserted in left and right two S shape oil pipe lower ends, it is characterized in that, left and right two S shape oil pipes upper end mouth of pipe is provided with the retainer of a location, be useful on two through holes that S shape oil pipe passes on the retainer, retainer embeds and is installed on the seat board of a switching valve, and seat board is by being bolted on the rear axle box.
2. a kind of high-power crawler dozer S shape oil pipe mounting structure according to claim 1, it is characterized in that, two through holes of retainer are vertically passed in left and right two S shape oil pipes upper end, and the through hole on the retainer all overlaps with left and right two S shape oil pipes upper end center line.
3. a kind of high-power crawler dozer S shape oil pipe mounting structure according to claim 1 is characterized in that the both sides of retainer are provided with two alices, and seat board is provided with the sulculus that is used to embed alice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206451632U CN201952828U (en) | 2010-12-07 | 2010-12-07 | S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206451632U CN201952828U (en) | 2010-12-07 | 2010-12-07 | S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201952828U true CN201952828U (en) | 2011-08-31 |
Family
ID=44496948
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206451632U Expired - Lifetime CN201952828U (en) | 2010-12-07 | 2010-12-07 | S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201952828U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080392A (en) * | 2010-12-07 | 2011-06-01 | 上海彭浦机器厂有限公司 | High-powered crawler type bulldozer S-shaped oil tube mounting structure |
-
2010
- 2010-12-07 CN CN2010206451632U patent/CN201952828U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080392A (en) * | 2010-12-07 | 2011-06-01 | 上海彭浦机器厂有限公司 | High-powered crawler type bulldozer S-shaped oil tube mounting structure |
CN102080392B (en) * | 2010-12-07 | 2012-07-04 | 上海彭浦机器厂有限公司 | High-powered crawler type bulldozer S-shaped oil tube mounting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201952828U (en) | S-shaped oil pipe mounting structure for high-horsepower crawler type bulldozer | |
CN102080392B (en) | High-powered crawler type bulldozer S-shaped oil tube mounting structure | |
CN201457460U (en) | Oil pump assembly for automobile power steering gear | |
CN103672097A (en) | Valve assembly for holing in pipeline | |
CN203888825U (en) | Integrated locomotive brake cabinet easy to assemble and disassemble | |
CN203162101U (en) | Vent valve of automotive transmission | |
CN201339703Y (en) | Oil return channel device of electric wheel gear box on power drive truck | |
CN105387028B (en) | Oil filter overhauling method | |
CN103639622B (en) | A kind of central water supply air supply system of new automobile welding line | |
CN210532062U (en) | Vehicle-mounted hydrogen supply system pipeline system | |
CN209586835U (en) | Steering engine for ship connects valve plate device | |
CN209026349U (en) | A kind of mounting device of high-pressure oil pipe | |
CN203796461U (en) | Diesel engine fuel tank | |
CN101251133A (en) | Novel hydraulic motor transmission control valve group | |
CN202413842U (en) | Gas path control device for brake system of motor train unit | |
CN103486382A (en) | Spherical pipe connector | |
CN219160112U (en) | High-speed magnetic suspension rail air cylinder module for vehicle | |
CN206487610U (en) | A kind of push-in water supply pump configuration for water purifier system | |
CN206849668U (en) | A kind of inflation attachment structure of current transformer | |
CN217455660U (en) | Fuel tank filling pipe fixing structure | |
CN203847489U (en) | Oil filtering device convenient to overhaul | |
CN220566339U (en) | Valve block for closed type precursor land leveller | |
CN102900858A (en) | Pressure relief type pipeline quick opening and closing device | |
CN210564730U (en) | Exhaust pipe structure | |
CN208750144U (en) | A kind of pneumatic operated valve connector being easily installed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20110831 Effective date of abandoning: 20120704 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20110831 Effective date of abandoning: 20120704 |