CN102063970A - 铠装电缆包裹钢带的连接方法 - Google Patents
铠装电缆包裹钢带的连接方法 Download PDFInfo
- Publication number
- CN102063970A CN102063970A CN 201010534155 CN201010534155A CN102063970A CN 102063970 A CN102063970 A CN 102063970A CN 201010534155 CN201010534155 CN 201010534155 CN 201010534155 A CN201010534155 A CN 201010534155A CN 102063970 A CN102063970 A CN 102063970A
- Authority
- CN
- China
- Prior art keywords
- steel band
- cable
- conductor
- opening
- mentioned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Insulated Conductors (AREA)
Abstract
本发明公开了一种铠装电缆包裹钢带的连接方法,该方法包括以下步骤:(1)首先,将双层钢带打开时,第一层钢带用尖刀从左边位置打开,第二层钢带用尖刀从右边位置打开;(2)将上述打开的两层钢带再向两边分开,然后剥去电缆内部的护套层和绝缘层,使其露出中心层的导体;(3)将上述开剥好的电缆,按照相序,各组电缆的导体与导体用C型夹连接;(4)进行恢复过程,采用绝缘带与热熔胶带包扎上述C型夹与各个导体,然后再将两边的钢带按照原来打开的方向重叠在一起;(5)最后用铁丝将上述左右两边的钢带与组合后的电缆捆扎在一起。本发明方法新颖,钢带恢复过程简单,衔接无缝,不存在多余的部分,不会造成绝缘不好或击穿。
Description
技术领域
本发明涉及电缆领域,尤其涉及铠装电缆包裹钢带的连接方法。
背景技术
铠装电缆是由不同的材料导体装在有绝缘材料的金属套管中,被加工成可弯曲的坚实组合体。铠装电缆机械保护层可以加到任何结构的电缆上,以增加电缆的机械强度,提高防侵蚀能力,是为易受机械破坏及易受侵蚀的地区而设计的。电缆加上铠装层的目的除了增强抗拉强度、抗压强度等机械保护延长使用寿命外,铠装电缆还有一定的抗外力性能,如防止老鼠撕咬,不至于透过铠装造成电力传输问题。
制作铠装电缆的过程中一般都需要进行钢带连接过程,参看图1与图2,以前常用的包裹钢带连接方法是在连接的过程中,取一段相同规格300mm-500mm的钢带,由点焊机把这一段的钢带与电缆连接体01左边的钢带02先焊接,再把右边钢带03也焊接,这样焊接会导致多余的钢带23存在于电缆连接体01的外面,然后再将多余的钢带23折叠在电缆连接体01上,最后用铁丝05将钢带23与电缆连接体01捆扎在一起。这种连接方法存在的弊病有:一是恢复过程麻烦,时间太长,生产进度跟不上;二是质量和效果都不好,在40T注塑压力下容易造成上述多余的钢带23与C型夹04的连接,从而导致在出厂试验中,造成绝缘不好和击穿。
发明内容
为了克服上述现有技术存在的缺陷,本发明提供一种在实际生产过程中自创的铠装电缆包裹钢带的连接方法,恢复过程简单,操作方便,避免了传统方法造成的弊病。
为了实现上述目的,本发明的技术方案如下:
铠装电缆包裹钢带的连接方法,主要包括以下步骤:
(1)首先,将双层钢带打开时,第一层钢带用尖刀从左边位置打开,第二层钢带用尖刀从右边位置打开;
(2)将上述打开的两层钢带再向两边分开,然后剥去电缆内部的护套层和绝缘层,使其露出中心层的导体;
(3)将上述开剥好的电缆,按照相序,导体与导体用C型夹夹紧,按分色要求对应连接好导体。
(4)进行恢复过程,采用绝缘带与热熔胶带包扎上述C型夹与各个导体,然后再将两边的钢带按照原来打开的方向重叠在一起;
(5)最后再用铁丝将左右两边的钢带与组合后的电缆捆扎在一起,就可以放在模具上进行下一步注塑连接体的工序了。
上述步骤(3)中,如果是五芯电缆接三芯分支时,那就按分色要求一相接火线,两相接地线和零线;
如果是五芯电缆接五芯分支时,那就每相按分色要求连接。
上述步骤(4)中将绝缘带与热熔胶包扎C型夹及各个导体时的要求是包扎严实,不能有松懈的地方或空留之处。
步骤(4)中所述两边的钢带按照原来打开的方向重叠也就是说,先将第二层右边的钢带包裹在电缆上,然后再将第一层左边的钢带包裹在电缆上。
上述步骤(5)中的铁丝厚度优先为1.5mm。
所述电缆连接体由两组电缆通过C型夹连接组成的,每组电缆由中心层的导体、包裹于所述导体外的绝缘层以及护套层构成,所述中心层的导体是由多根绝缘线芯绞合成的缆芯组成。
通过上述方案将所述两层钢带完全包裹在电缆连接体上,形成结构紧凑的铠装电缆,衔接无缝,不存在多余的部分,不会造成绝缘不好或击穿,效果良好。
本发明的有益效果是,方法新颖,恢复过程简单,操作方便;钢带与钢带之间接触面广,包裹平整,不会击穿。
附图说明
图1为改造前采用传统方法包裹钢带的示意图。
图2为实施传统方法包裹钢带后的效果图。
图3为采用本发明方法的实施例包裹钢带的示意图。
图4为实施本发明方法的实施例包裹钢带后的效果图。
图5为本发明包裹钢带的流程图。
具体实施方式:
为了使本发明的创作特征、技术手段与达成目的易于明白理解,以下结合具体实施例进一步阐述本发明。
实施例:
参看图3、图4与图5,铠装电缆包裹钢带的连接方法,主要包括以下步骤:
首先,进行步骤S1:将双层钢带打开时,第一层钢带2用尖刀从左边切割位置A处打开,第二层钢带3用尖刀从右边切割位置B处打开;
步骤S2:将上述两层钢带2、3打开向两边分开以后,接下来是剥去护套层和绝缘层,露出中心层的铜导体;
接着步骤S3:然后按照相序,铜导体与铜导体用C型夹4夹紧并连接,如果是五芯电缆连接三芯分支,那就按分色要求一相接火线,两相接地线和零线;
如果是五芯电缆连接五芯分支,那就每相按分色要求连接;
C型夹4将主电缆中心层的铜导体与分支电缆中心层的铜导体连接好后,就开始恢复过程;
再进行步骤S4:恢复过程中,采用绝缘带和热熔胶带包扎在上述C型夹4与铜导体上,要求包扎严实;
先将第二层右边的钢带3按照原来打开的方向包裹在电缆连接体1上,然后再将第一层左边的钢带2同样按照原来打开的方向包裹在电缆连接体1上;
步骤S5:最后将上述左右两边的钢带与组合后的电缆分别再扎上1.5mm的铁丝5就好了。
捆扎后就可以将电缆放在模具上注塑连接体了。
所述电缆连接体1由两组电缆通过C型夹4连接组成的,每组电缆由中心层的导体、包裹于所述导体外的绝缘层以及护套层构成,所述中心层的导体是由多根绝缘线芯绞合成的缆芯组成。
通过上述方案将两层钢带完全包裹在最终的组合电缆上,形成结构紧凑的铠装电缆,衔接无缝,不存在多余的部分,不会造成绝缘不好或击穿。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等同物界定。
Claims (4)
1.铠装电缆包裹钢带的连接方法,其特征在于,它包括以下步骤:
(1)首先,将双层钢带打开时,第一层钢带用尖刀从左边位置打开,第二层钢带用尖刀从右边位置打开;
(2)将上述打开的两层钢带再向两边分开,然后剥去电缆内部的护套层和绝缘层,使其露出中心层的导体;
(3)将上述开剥好的电缆,按照相序,各组电缆的导体与导体用C型夹夹紧,按分色要求对应连接好导体;
(4)进行恢复过程,采用绝缘带与热熔胶带包扎上述C型夹与各个导体,然后再将两边的钢带按照原来打开的方向重叠在一起;
(5)最后用铁丝将上述左右两边的钢带与组合后的电缆捆扎在一起。
2.根据权利要求1所述的铠装电缆包裹钢带的连接方法,其特征在于,上述步骤(5)所述铁丝的厚度优选为1.5mm。
3.根据权利要求1所述的铠装电缆包裹钢带的连接方法,其特征在于,上述步骤(3)连接导体时,如果是五芯电缆接三芯分支,按分色要求一相接火线,两相接地线和零线。
4.根据权利要求1所述的铠装电缆包裹钢带的连接方法,其特征在于,上述步骤(3)连接导体时,如果是五芯电缆接五芯分支时,那就每相按分色要求连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010534155 CN102063970A (zh) | 2010-11-05 | 2010-11-05 | 铠装电缆包裹钢带的连接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010534155 CN102063970A (zh) | 2010-11-05 | 2010-11-05 | 铠装电缆包裹钢带的连接方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102063970A true CN102063970A (zh) | 2011-05-18 |
Family
ID=43999203
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010534155 Pending CN102063970A (zh) | 2010-11-05 | 2010-11-05 | 铠装电缆包裹钢带的连接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102063970A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1722728A1 (ru) * | 1990-01-09 | 1992-03-30 | Всесоюзный научно-исследовательский и проектно-конструкторский институт геофизических исследований геологоразведочных скважин | Способ соединени отрезков бронированных каротажных кабелей |
CN101465527A (zh) * | 2008-12-12 | 2009-06-24 | 河南省电力公司信阳供电公司 | 电缆中间接头接地故障绕包抢修方法 |
CN101630828A (zh) * | 2009-06-26 | 2010-01-20 | 西安供电局 | 油浸电缆绕包中间接头工艺 |
-
2010
- 2010-11-05 CN CN 201010534155 patent/CN102063970A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1722728A1 (ru) * | 1990-01-09 | 1992-03-30 | Всесоюзный научно-исследовательский и проектно-конструкторский институт геофизических исследований геологоразведочных скважин | Способ соединени отрезков бронированных каротажных кабелей |
CN101465527A (zh) * | 2008-12-12 | 2009-06-24 | 河南省电力公司信阳供电公司 | 电缆中间接头接地故障绕包抢修方法 |
CN101630828A (zh) * | 2009-06-26 | 2010-01-20 | 西安供电局 | 油浸电缆绕包中间接头工艺 |
Non-Patent Citations (2)
Title |
---|
《水力采煤与管道运输》 20061231 戚云峰等 铠装电缆中端接头连接工艺 第46-47页 1-4 , 第4期 2 * |
《油气井测试》 20000331 丁强国 铠装电缆的连接 第68页 1-4 , 第1期 2 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10257967B2 (en) | Electromagnetic interference splice shield | |
CN101401170B (zh) | 同轴线缆跨接设备 | |
US7498519B2 (en) | Joint for superconducting cable | |
US20120090866A1 (en) | Shielded electrical cable and method of making | |
CN101834032B (zh) | 一种屏蔽线引线处理工艺 | |
JP2009070769A (ja) | ワイヤーハーネスおよびその製造方法ならびに絶縁電線の接続方法 | |
CN106575550B (zh) | 屏蔽电线 | |
EP3786982B1 (en) | Cunisi alloy cable sheathing | |
EP0688461A1 (en) | Multi-component cable assembly | |
WO2010126799A2 (en) | Multilayer cable jacket | |
CN103181064A (zh) | 用于电机的导体绝缘配置 | |
CN105144307B (zh) | 同轴电缆和使用该同轴电缆的线束 | |
US20110253414A1 (en) | Metal-clad cable assembly | |
CN102063970A (zh) | 铠装电缆包裹钢带的连接方法 | |
WO2014103496A1 (ja) | ワイヤハーネス | |
CN208674854U (zh) | 一种气、电、控组合一体电缆 | |
JP2014146506A (ja) | ワイヤハーネス | |
US8138420B2 (en) | Semi-bonded shielding in a coaxial cable | |
CN218569251U (zh) | 一种新型铝线连接机构 | |
CN211350139U (zh) | 一种分支电缆 | |
EP4002619A1 (en) | Reinforced water barrier over a joint | |
CN215450951U (zh) | 高速通讯线缆 | |
CN108879281B (zh) | 一种叉车电瓶引线制作工艺 | |
JP2014146488A (ja) | ワイヤハーネス | |
CN109167327A (zh) | 一种焊机专用一体式电缆及其制造方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110518 |