CN102051896A - 堤坝管涌抢险高聚物封闭注浆方法 - Google Patents

堤坝管涌抢险高聚物封闭注浆方法 Download PDF

Info

Publication number
CN102051896A
CN102051896A CN2009100663329A CN200910066332A CN102051896A CN 102051896 A CN102051896 A CN 102051896A CN 2009100663329 A CN2009100663329 A CN 2009100663329A CN 200910066332 A CN200910066332 A CN 200910066332A CN 102051896 A CN102051896 A CN 102051896A
Authority
CN
China
Prior art keywords
piping
high polymer
polymer material
cloth bag
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009100663329A
Other languages
English (en)
Other versions
CN102051896B (zh
Inventor
王复明
王建武
石明生
蔡迎春
李强
王小亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanfang engineering inspection and Repair Technology Institute
Original Assignee
ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd filed Critical ZHENGZHOU YOUTE INFRASTRUCTURE ENGINEERING MAINTAINANCE Co Ltd
Priority to CN2009100663329A priority Critical patent/CN102051896B/zh
Priority to US12/721,342 priority patent/US8293325B2/en
Publication of CN102051896A publication Critical patent/CN102051896A/zh
Application granted granted Critical
Publication of CN102051896B publication Critical patent/CN102051896B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)
  • Pipe Accessories (AREA)

Abstract

本发明公开了一种堤坝管涌抢险高聚物封闭注浆方法。在堤坝发生管涌险情时,向置于管涌通道口处的土工布袋内注射高聚物材料,材料发生反应后体积迅速膨胀并固化,从而快速封堵管涌通道入口;然后再通过微孔向管涌通道内注射高聚物材料,材料发生反应后体积迅速膨胀并固化,达到封堵管涌通道、加固坝体、提高坝体整体稳定性的目的。本发明具有加固效果好、施工快捷、利于抢险、针对性强、可控性好、自重轻等特点。本发明的高聚物封闭注浆技术为堤坝管涌快速抢险提供了一套先进、高效、经济、实用的新方法,对于堤坝除险加固具有重大应用价值。

Description

堤坝管涌抢险高聚物封闭注浆方法
技术领域
本发明属于大坝堤防防汛抢险加固技术,尤其涉及堤坝管涌抢险高聚物封闭注浆技术。
背景技术
近年来,我国水利基础设施建设安全保障受到各级政府的高度重视和全社会的广泛关注,工程安全形势十分严峻。在已建成的约8.7万座水库中,40%的小型水库、25%的大中型水库属于病险水库。1954年以来我国共发生大小溃坝事故约3500起。另外,全国已建成堤防工程约28万公里,但大量堤防存在多种病害。病险水库、病险堤防是每年汛期防洪安全的薄弱环节。
管涌是大坝和堤防常见的险情之一。
管涌是指堤坝在渗流作用下,无粘性土中的细小颗粒通过粗大颗粒的孔隙,发生移动或被水流带出的现象,是渗透侵蚀破坏的形式之一。管涌首先开始于土中性质突变的局部,如细粒、容重较轻的颗粒和裂缝分布的地方。土体中的颗粒先移动形成空隙,这个空隙渐渐的扩大,并且向下移动,形成不规则的管状通道。它发生的部位可在渗流逸出处,也可在土体内部。管涌发生后随着砂粒的不断析出流失,孔洞的直径逐渐增大,它的深度也逐渐向堤坝内部不断延伸增大。一旦与土体内部的已有孔洞连通,则迅速发展为管道内集中涌水淅土,其严重后果是堤坝土体内渗水通道塌陷,造成堤防不均匀沉降和整体失稳。
传统的堤坝管涌主要治理方法有:
(1)抛填反虑层法
该法先对发生管涌的位置抛填软塞和软帘,用以填堵通过管涌通道的水流,然后利用装满土石的土工袋压住管涌口,最后再沿着坝身抛填一定厚度的粘土,同时在管涌出口处设置围井导虑,保证管涌出逸口不遭渗流破坏,制止涌水带沙,保证渗透稳定。
(2)水泥粘土浆充砂灌浆
该法原理为:浆液凭借灌浆压力沿空隙、裂缝、洞穴延伸充填,挤压密实,形成凝结体。当浆液在较大漏水通道中流动时,随着距离的延伸,灌浆压力逐渐减小,受到摩擦阻力渐增,流动速度减慢,进而浆液沉淀、推移及沉积堵塞,封堵管涌通道。该方法利用水泥粘土浆液的凝集作用,保证灌入体有与受灌体有相近的弹性模量,达到灌浆堵漏的目的。
上述传统方法是目前处治堤坝管涌险情的主要方法,在堤坝抢险中被广泛采用。存在的主要缺陷有:
(1)时效性差。堤坝一旦出现管涌现象,就可能发生整体失稳,必须立即抢险。但是,不管是采用抛填反虑层法还是灌浆法,其实施周期均较长;
(2)管涌通道填堵效果差。抛填反虑层法主要用于封堵管涌的两个通道口,但不能有效填堵管涌通道,这将严重影响堤坝的整体性,并且极易导致在该位置处再一次发生管涌现象。灌浆法在一定程度上能够封堵整个管涌通道,但是当管涌通道内渗水流速大到足以冲走浆液最大颗粒的情况时,就不会产生颗粒沉淀堵塞作用,即出现了“灌不住”现象。
因此,传统的管涌封堵方法已不能满足堤坝抢险的要求,急需发展快速、高效的堤坝管涌快速抢修技术。
高聚物注浆技术是20世纪70年代发展起来的地基基础快速加固技术。该技术通过向地基中注射多组份高聚物材料,利用高聚物材料发生化学反应后体积迅速膨胀并固化的特性,达到加固地基、填充脱空或提升地板的目的。目前,高聚物注浆技术主要应用于工业与民用建筑的地基加固和道路维修,国内还未见堤坝管涌抢险高聚物注浆技术的相关报道。
发明内容
本发明针对目前堤坝管涌抢险技术存在的不足,开发了大坝堤防管涌快速抢险高聚物封闭注浆方法,目的在于为堤坝抢险和加固提供先进、高效、经济、实用的新技术。
本发明是通过以下技术方案实现的:
一种堤坝管涌抢险高聚物封闭注浆方法,在堤坝发生管涌险情时,向置于管涌通道口处的土工布袋内注射高聚物材料,材料发生反应后体积迅速膨胀并固化,从而快速封堵管涌通道入口;然后再通过微孔向管涌通道内注射高聚物材料,高聚物材料发生反应后体积迅速膨胀并固化,达到封堵管涌通道,加固坝体、提高坝体整体稳定性的目的。
具体实施步骤为:
(1)用环箍将土工布袋开口端固定在空心钢管一端;
(2)用胶带或细绳将土工布袋捆扎成条状;
(3)持空心钢管另一端,将捆扎成条状的土工布袋放入管涌通道入口内;
(4)在堤坝顶部通过空心钢管往土工布袋内注射高聚物材料,高聚物材料在土工布袋内迅速膨胀并固化,从而快速封堵管涌通道入口;
(5)在堤坝顶部钻微孔,微孔的深度到达管涌通道处,通过微孔向管涌通道及其附近区域内注射高聚物材料,高聚物材料在管涌通道内迅速膨胀并固化,即可快速封堵管涌通道。
土工布袋的直径和长度可以根据工程需要设计生产成多种规格;空心钢管直径20mm,长度根据工程需要而定,采用玛钢管件快速连接;根据钢管和土工布袋的直径,可选用不同规格的环箍。
与传统的堤坝管涌封堵方法相比,本发明具有以下优点:
(1)加固效果好。注射的高聚物材料防水性能优良,耐久性好,并具有较好的韧性,能够与土体密切结合。
(2)施工快捷,利于抢险。材料注射后几秒内即发生化学反应,体积迅速膨胀并固化,15分钟内可形成90%以上的强度。
(3)针对性强,可控性好。本发明专利利用高聚物材料发生化学反应后体积迅速膨胀并固化的特性,达到自行填充空隙、加固松散土体或软弱土体的目的,而且材料固化后其密度或强度可根据工程需要灵活调控。
(4)自重轻。高聚物材料发生化学反应后体积迅速膨胀,形成泡沫状弹性材料,其自重不到同体积水泥浆的10%,因而不会像水泥压浆那样给堤坝地基增加大量荷载。
综上所述,本发明开发的高聚物封闭注浆技术为堤坝管涌快速抢险提供了一套独特的新方法,对于堤坝除险加固具有重大应用价值。
附图说明
图1土工布袋固定于空心钢管一端示意图;
图2土工布袋捆扎成条状示意图;
图3将捆扎好的土工布袋放入管涌入口内示意图;
图4高聚物封闭注浆封堵管涌通道入口施工示意图;
图5高聚物封闭注浆填充渗漏通道施工示意图。
具体实施方式
实施例:本发明的堤坝管涌抢险高聚物封闭注浆方法包括以下内容:
在堤坝发生管涌险情时,向置于管涌通道口处的土工布袋内注射高聚物材料,材料发生反应后体积迅速膨胀并固化,从而快速封堵管涌通道入口;然后再通过微孔向管涌通道内注射高聚物材料,高聚物材料发生反应后体积迅速膨胀并固化,即可封堵管涌通道、加固坝体、提高坝体整体稳定性。
具体实施步骤为:
(1)用环箍2将土工布袋3开口端固定在空心钢管1一端,如图1所示。
(2)用胶带或细绳将土工布袋3捆扎成条状,如图2所示。
(3)持空心钢管1另一端,将捆扎成条状的土工布袋3放入管涌通道5入口内,如图3所示。
(4)在堤坝4顶部通过空心钢管1往土工布袋3内注射高聚物材料,高聚物材料在土工布袋3内迅速膨胀并固化,从而快速封堵管涌通道5入口,如图4所示。
(5)在堤坝4顶部钻微孔6,微孔6的深度到达管涌通道5处,通过微孔6向管涌通道及其附近区域内注射高聚物材料,高聚物材料在管涌通道5内迅速膨胀并固化,即可快速封堵管涌通道5,如图5所示。
上述土工布袋3的直径和长度可以根据工程需要设计生产成多种规格;空心钢管1的长度根据工程需要而定;可根据空心钢管1和土工布袋3的直径,选用不同规格的环箍2。

Claims (1)

1.一种堤坝管涌抢险高聚物封闭注浆方法,其特征在于:在堤坝发生管涌险情时,向置于管涌通道口处的土工布袋内注射高聚物材料,材料发生反应后体积迅速膨胀并固化,从而快速封堵管涌通道入口;然后再通过微孔向管涌通道内注射高聚物材料,高聚物材料发生反应后体积迅速膨胀并固化,达到封堵管涌通道、加固坝体、提高坝体整体稳定性的目的;
具体实施步骤为:
(1)用环箍将土工布袋开口端固定在空心钢管一端;
(2)用胶带或细绳将土工布袋捆扎成条状;
(3)持空心钢管另一端,将捆扎成条状的土工布袋放入管涌通道入口内;
(4)在堤坝顶部通过空心钢管往土工布袋内注射高聚物材料,高聚物材料在土工布袋内迅速膨胀并固化,从而快速封堵管涌通道入口;
(5)在堤坝顶部钻微孔,微孔的深度到达管涌通道处,通过微孔向管涌通道及其附近区域内注射高聚物材料,高聚物材料在管涌通道内迅速膨胀并固化,即可快速封堵管涌通道。
CN2009100663329A 2009-11-02 2009-11-02 堤坝管涌抢险高聚物封闭注浆方法 Active CN102051896B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2009100663329A CN102051896B (zh) 2009-11-02 2009-11-02 堤坝管涌抢险高聚物封闭注浆方法
US12/721,342 US8293325B2 (en) 2009-11-02 2010-03-10 Polymer injection method for blocking piping in dikes and dams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100663329A CN102051896B (zh) 2009-11-02 2009-11-02 堤坝管涌抢险高聚物封闭注浆方法

Publications (2)

Publication Number Publication Date
CN102051896A true CN102051896A (zh) 2011-05-11
CN102051896B CN102051896B (zh) 2012-04-18

Family

ID=43925726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100663329A Active CN102051896B (zh) 2009-11-02 2009-11-02 堤坝管涌抢险高聚物封闭注浆方法

Country Status (2)

Country Link
US (1) US8293325B2 (zh)
CN (1) CN102051896B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276699A (zh) * 2013-06-18 2013-09-04 安阳市力顺节水科技有限公司 用于江、河、水库等堤坝出现管涌时的应急处理装置
CN105421337A (zh) * 2015-11-25 2016-03-23 同济大学 一种用于动水岩溶管状裂隙丝瓜瓤注浆止水的方法
CN107542063A (zh) * 2017-03-29 2018-01-05 清华海峡研究院(厦门) 一种土石堤坝背水面动水岩化封堵方法
CN109163877A (zh) * 2018-07-12 2019-01-08 水利部交通运输部国家能源局南京水利科学研究院 土质堤坝管涌险情的大尺度现场试验模拟装置
CN109442130A (zh) * 2018-12-24 2019-03-08 北京市市政工程研究院 排水管道口袋形堵水装置与施工安装结构及堵水拆堵方法
CN111663555A (zh) * 2020-06-24 2020-09-15 浙江大学 基于膨胀高聚物的导管架桩靴密封系统及其密封方法
CN114108545A (zh) * 2021-12-01 2022-03-01 姜泽南 分段收束式管涌抢险用封堵机
CN114892602A (zh) * 2022-05-07 2022-08-12 中国安能集团第三工程局有限公司 一种基于水化颗粒材料的管涌入口快速封堵方法
CN117127559A (zh) * 2023-08-30 2023-11-28 湖南省水利水电科学研究院 一种堤坝管涌应急处理装置

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102930148B (zh) * 2012-10-22 2015-04-29 河海大学 一种基于随机起动的管涌渗透系数确定方法
US9045865B2 (en) * 2013-04-19 2015-06-02 SAFEKEY Engineering Technology(Zhengzhou), Ltd. Polymer grouting method for uplifting ballastless track of high-speed rail

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3425455A (en) * 1965-08-30 1969-02-04 Exxon Research Engineering Co Sprayed internally insulated pipe
NL7414214A (en) * 1974-10-31 1976-05-04 Peter Gertrud Selen Spray-gun for foam-filling cavity walls - with hardener feed pipe close to outlet, avoiding blockage of spray-gun
CN2386080Y (zh) * 1998-07-27 2000-07-05 彭继源 土质堤坝塑料防渗护坡板
CN1250126A (zh) * 1998-10-05 2000-04-12 张耀伦 灌注高水速凝固化材料根治管涌及用旋喷加固堤防的方法
CN1253199A (zh) * 1998-11-05 2000-05-17 史建新 江河堤坝管涌快速控制罩
CN1269445A (zh) * 1999-04-07 2000-10-11 史建新 江河堤坝管涌快速控制罩
CN1320744A (zh) * 2001-05-14 2001-11-07 刘彦芝 一种防洪堤坝漏洞及管涌的快速堵塞方法
CN1332199A (zh) * 2001-08-28 2002-01-23 罗萌 一种高分子速凝固化充填材料及其配制工艺
CN101261263B (zh) * 2007-03-09 2011-07-20 郑州优特基础工程维修有限公司 路基缺陷识别、高聚物注浆快速加固方法
CN100503982C (zh) * 2007-04-27 2009-06-24 许庆华 管涌膨胀袋
CN101328707A (zh) * 2008-08-02 2008-12-24 李新民 一种管涌封堵器及其封堵管涌方法

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276699A (zh) * 2013-06-18 2013-09-04 安阳市力顺节水科技有限公司 用于江、河、水库等堤坝出现管涌时的应急处理装置
CN103276699B (zh) * 2013-06-18 2015-06-24 安阳市力顺节水科技有限公司 用于江、河、水库堤坝出现管涌时的应急处理装置
CN105421337A (zh) * 2015-11-25 2016-03-23 同济大学 一种用于动水岩溶管状裂隙丝瓜瓤注浆止水的方法
CN105421337B (zh) * 2015-11-25 2017-07-28 同济大学 一种用于动水岩溶管状裂隙丝瓜瓤注浆止水的方法
CN107542063B (zh) * 2017-03-29 2023-10-27 清华海峡研究院(厦门) 一种土石堤坝背水面动水岩化封堵方法
CN107542063A (zh) * 2017-03-29 2018-01-05 清华海峡研究院(厦门) 一种土石堤坝背水面动水岩化封堵方法
CN109163877A (zh) * 2018-07-12 2019-01-08 水利部交通运输部国家能源局南京水利科学研究院 土质堤坝管涌险情的大尺度现场试验模拟装置
CN109442130A (zh) * 2018-12-24 2019-03-08 北京市市政工程研究院 排水管道口袋形堵水装置与施工安装结构及堵水拆堵方法
CN111663555A (zh) * 2020-06-24 2020-09-15 浙江大学 基于膨胀高聚物的导管架桩靴密封系统及其密封方法
CN111663555B (zh) * 2020-06-24 2021-10-22 浙江大学 基于膨胀高聚物的导管架桩靴密封系统及其密封方法
CN114108545A (zh) * 2021-12-01 2022-03-01 姜泽南 分段收束式管涌抢险用封堵机
CN114108545B (zh) * 2021-12-01 2023-08-08 重庆艺锦陶瓷有限公司 分段收束式管涌抢险用封堵机
CN114892602A (zh) * 2022-05-07 2022-08-12 中国安能集团第三工程局有限公司 一种基于水化颗粒材料的管涌入口快速封堵方法
CN114892602B (zh) * 2022-05-07 2024-04-16 中国安能集团第三工程局有限公司 一种基于水化颗粒材料的管涌入口快速封堵方法
CN117127559A (zh) * 2023-08-30 2023-11-28 湖南省水利水电科学研究院 一种堤坝管涌应急处理装置
CN117127559B (zh) * 2023-08-30 2024-03-19 湖南省水利水电科学研究院 一种堤坝管涌应急处理装置

Also Published As

Publication number Publication date
US20110104372A1 (en) 2011-05-05
CN102051896B (zh) 2012-04-18
US8293325B2 (en) 2012-10-23

Similar Documents

Publication Publication Date Title
CN102051896B (zh) 堤坝管涌抢险高聚物封闭注浆方法
CN103215952A (zh) 高聚物锚固注浆方法
CN102051869B (zh) 高聚物帷幕注浆方法
CN108193606B (zh) 一种桥墩局部冲刷的防护方法
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN109930606A (zh) 快速堵漏防渗灌浆施工方法
CN103696416A (zh) 一种地基处理新方法
CN208763033U (zh) 充砂土工管袋围堰
CN207513602U (zh) 衬砌背后空洞处理后的复合衬砌结构
CN103741651B (zh) 一种混凝土齿槽消力池及其施工方法
CN102108691B (zh) 高聚物帷幕注浆钻具及孔模施工方法
CN103205951A (zh) 淤泥性土联合子堤反压的筑堤方法
CN201495526U (zh) 一种高速水流水工建筑物变形缝结构
CN104695381B (zh) 江河岸坡仿水草消能防护结构
CN201495521U (zh) 河流抢险、防洪用铰链式大土工包
CN206844136U (zh) 封堵高速、大流量动水岩溶管道的控流系统
CN201292519Y (zh) 土工模袋
CN105569055A (zh) 一种防止山体滑坡的结构
CN111441775B (zh) 可灌性差、较难自稳地层隧洞开挖前快速灌浆成拱加固方法
CN210315400U (zh) 一种深陡坑涉水边坡加固结构
CN210636421U (zh) 一种砂砾层基础上船闸导航墙桩基的水下掏空缺陷修复装置
CN114197403A (zh) 一种浆砌石重力坝加高扩建防渗系统及施工方法
CN103397630B (zh) 一种带有注浆袋的加劲桩
CN203096696U (zh) 一种高低复合型壅水堰
CN207659918U (zh) 环保反滤复合土工布及其使用结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HENAN BOTE ENGINEERING PROTECTION CO., LTD.

Free format text: FORMER OWNER: ZHENGZHOU YOUTE FOUNDATION ENGINEERING MAINTENANCE CO., LTD.

Effective date: 20130620

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Fuming

Inventor after: Shi Mingsheng

Inventor after: Cai Yingchun

Inventor after: Li Qiang

Inventor after: Wang Xiaoliang

Inventor before: Wang Fuming

Inventor before: Wang Jianwu

Inventor before: Shi Mingsheng

Inventor before: Cai Yingchun

Inventor before: Li Qiang

Inventor before: Wang Xiaoliang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG FUMING WANG JIANWU SHI MINGSHENG CAI YINGCHUN LI QIANG WANG XIAOLIANG TO: WANG FUMING SHI MINGSHENG CAI YINGCHUN LI QIANG WANG XIAOLIANG

Free format text: CORRECT: ADDRESS; FROM: 450016 ZHENGZHOU, HENAN PROVINCE TO: 450000 ZHENGZHOU, HENAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130620

Address after: Bamboo high tech Development Zone in Henan Province, Zhengzhou City, 450000 street, No. 100 and No. 10 Liyuan Sheng Yuan Building 1 unit 8

Patentee after: Henan Bote Engineering Protection Co., Ltd.

Address before: 450016 A6 villa Green, No. 1369 East navigation road, Zhengzhou economic and Technological Development Zone, Zhengzhou, Henan

Patentee before: Zhengzhou Youte Infrastructure Engineering Maintainance Co., Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160601

Address after: 450000 Zhengzhou province Jinshui District, Henan Cultural Road, building 48, building 39, No. 33

Patentee after: Wang Fuming

Address before: Bamboo high tech Development Zone in Henan Province, Zhengzhou City, 450000 street, No. 100 and No. 10 Liyuan Sheng Yuan Building 1 unit 8

Patentee before: Henan Bote Engineering Protection Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170414

Address after: Chen Jiang Street office in Xuchang City, Henan province 452570 Yuzhou City Zhongkai high tech Zone Chen Jiang Cun Luo Qun Daxin District ninth area group

Patentee after: Nanfang engineering inspection and Repair Technology Institute

Address before: 450000 Zhengzhou province Jinshui District, Henan Cultural Road, building 48, building 39, No. 33

Patentee before: Wang Fuming

CP02 Change in the address of a patent holder

Address after: Chen Jiang Street office Guangdong province 516029 Huizhou City Zhongkai high tech Zone Chen Jiang Cun Luo Qun Daxin District ninth area group

Patentee after: Nanfang engineering inspection and Repair Technology Institute

Address before: Chen Jiang Street office in Xuchang City, Henan Province, Yuzhou City Zhongkai high tech Zone Chen Jiang Cun Luo Qun Daxin District ninth area group

Patentee before: Nanfang engineering inspection and Repair Technology Institute

CP02 Change in the address of a patent holder