CN103215952A - 高聚物锚固注浆方法 - Google Patents

高聚物锚固注浆方法 Download PDF

Info

Publication number
CN103215952A
CN103215952A CN2013101236680A CN201310123668A CN103215952A CN 103215952 A CN103215952 A CN 103215952A CN 2013101236680 A CN2013101236680 A CN 2013101236680A CN 201310123668 A CN201310123668 A CN 201310123668A CN 103215952 A CN103215952 A CN 103215952A
Authority
CN
China
Prior art keywords
high polymer
grouting
anchoring
construction
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101236680A
Other languages
English (en)
Inventor
王复明
石明生
郭成超
陈洪良
赵东凯
何雷英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN BOTE ENGINEERING PROTECTION Co Ltd
Original Assignee
HENAN BOTE ENGINEERING PROTECTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN BOTE ENGINEERING PROTECTION Co Ltd filed Critical HENAN BOTE ENGINEERING PROTECTION Co Ltd
Priority to CN2013101236680A priority Critical patent/CN103215952A/zh
Priority to US13/866,024 priority patent/US9004820B2/en
Publication of CN103215952A publication Critical patent/CN103215952A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种高聚物锚固注浆方法,其包括以下步骤:(1)锚杆杆体制作;(2)在锚杆杆体上绑扎土工布袋和注浆管;(3)槽孔施工;(4)高聚物注浆:a.封孔注浆,b.锚固注浆形成高聚物锚固体。本发明具有适用性强、无水施工、施工快捷、经济、构建的高聚物锚固体强度高、耐久性好等特点。具有膨胀特性的高聚物材料对周围岩土具有明显的挤密作用,增大了灌浆体与基体间的摩擦力;防水性能优良的高聚物材料有利于杆体的防腐及耐久性;高聚物材料具有较大的强度,有利于提高锚杆的极限抗拔力;高聚物材料的凝固时间短,且无需养护,有利于缩短施工工期。本发明为基坑、隧道、边坡支护提供了安全、先进、经济、实用的锚固新方法。

Description

高聚物锚固注浆方法
技术领域
 本发明属于基础设施加固技术领域,具体涉及建筑物基坑、隧道、边坡等基础工程的高聚物锚固注浆方法。
背景技术
我国岩土锚固技术的发展始于上世纪50年代后期,当时主要在矿山巷道等支护工程中采用。进入60年代,除了矿山巷道之外,我国也开始在铁道隧洞、水利工程、边坡工程、地下工程中大量采用锚固支护技术。从70年代起,深基坑支挡工程开始广泛采用土层锚杆。锚固技术的应用有效保证了岩土体内部的应力场的稳定、改善了岩土体自身内部的力学状态、抑制了塑性区的扩展,变传统的被动支护方式为主动支护,提高了岩土体和结构物的稳定性。另外,锚固技术的应用还可以降低工程造价,缩短工期,并能在工程完工后减少维护费用,具有在耐久性和稳定性方面一次到位的优点。目前,岩土锚固技术已在边坡、基坑、矿井、隧洞、地下工程、水工建筑物及抗浮等工程建设中获得了广泛应用。
在选择锚固材料时,要考虑围岩条件、使用目的等,以使在锚固长度上能够获得充分的锚固力。选择锚固材料的必要条件是充填性好,早期、长期的锚固力大并具有足够的耐久性,同时能与被锚固的基体胶结界面以及杆体牢固地粘结,且易于施工、经济效益好。目前常用的锚固材料有砂浆、水泥浆、树脂等。国内外现有的水泥基锚固材料,虽然在工程实际中得到了广泛应用,但在使用中仍然存在一些问题。如自含水式水泥卷加工复杂,成本较高,运输、贮存不方便,安装时需机械搅拌等。浸水式水泥卷由于外加剂混合于水泥之中,多为易潮解的物质,加速了水泥的吸湿变质,使水泥卷贮存期缩短、性能降低,以致失效,从而影响支护质量或造成浪费。此外,现有国内外水泥基锚固材料,都是采用固定的成分和配合比,难以在现场随时调节胶凝时间及其强度,不符合岩土工程性质多变的特点。而树脂粘结型的锚杆则由于树脂材料含毒、易燃、易老化、价格高,使其推广应用受到限制。
近年来,为改善灌浆体的物理力学性能,相继开发或引进了各种改性材料用于锚固,但它们多数属于改性水泥砂浆的范畴。事实上,在普通水泥砂浆灌浆体中掺入改性材料不能改变有水反应的本质,有水参与则必然会导致锚固材料发生干缩,抗震抗裂性能不足。因此其改良后的锚固力提高有限。随着基坑、隧道、边坡等工程的快速发展,锚固施工的岩土条件愈发变得复杂多样,工程标准也越来越严格,对于锚固的性能提出了越来越高的要求。由于现有水泥砂浆类锚固材料锚固力有限,力学性能一般,变形能力差,已很难适应锚固技术的发展需要。因此,开发使用无水反应锚固材料的新型锚固技术,对于改进锚固效果,扩大锚固的应用范围,满足复杂岩土环境的要求具有重要意义。
高聚物注浆技术是20世纪70年代发展起来的地基基础快速加固技术。该技术通过向地基中注射高聚物材料,利用高聚物材料发生化学反应后体积迅速膨胀并固化的特性,达到加固地基、填充脱空的目的。目前,高聚物注浆技术主要应用于工业与民用建筑的地基加固和道路维修。本发明人针对我国建筑物基坑、隧道、边坡锚固支护的发展需求与目前锚固技术存在的不足,将非水反应类双组份高聚物注浆材料与锚固技术相结合,发明一种新型高聚物注浆锚固技术。这一创新目前国内还未见相关报道。
发明内容
本发明的目的是针对我国基坑、隧道、边坡等基础工程锚固支护技术的发展需求和目前锚固技术存在的不足,提供一种快速、安全、轻质、高强的高聚物注浆锚固方法,利用该发明可实现锚固材料与杆体和周围岩土的良好固结,为基坑、隧道、边坡支护,尤其为不宜使用水泥基浆液作为锚固结材料的湿陷性黄土或具有遇水膨胀的岩土锚固提供了安全、先进、经济、实用的新方法。
为实现上述目的,本发明采用以下技术方案:
一种高聚物锚固注浆方法,其包括以下步骤:
(1)锚杆杆体制作:首先对杆体进行平直、除锈、防腐处理,按设计要求切割母材、焊接支架,并在杆体上每隔0.5m~2m设置一个对中支架;
(2)在锚杆杆体上绑扎土工布袋和注浆管:在杆体端部绑扎土工布袋和注浆管,绑扎时土工布袋底部位置位于设计锚固段和自由段的交接处;注浆管进浆管口处设置可拆卸式进浆阀,注浆管与注浆枪之间的连接接头使用喉箍紧固密封;注浆管设置两根,一根为封孔注浆管,出浆口在土工布袋内;另一根为锚固注浆管,其出浆口深入孔底;
(3)槽孔施工:在需要锚固的位置,按设计要求施工槽孔;
(4)高聚物注浆:
a.封孔注浆:用注浆装备把双组份膨胀性高聚物注浆材料注入土工布袋中,高聚物材料发生化学反应后体积迅速膨胀并固化,将孔封堵;
b.锚固注浆:锚固注浆管深入注浆孔底部,高聚物浆液自下而上填满孔内锚固段并固化,膨胀挤密孔壁岩土,与周围岩土充分结合,形成高聚物锚固体。
上述步骤(4)完成后,进行锚具加装,具体操作步骤如下:
a、根据锚杆体的材料和锁定力的大小选择张拉设备;
b、施工混凝土承台;
c、安装台座和锚具,待承压台的混凝土强度达到设计强度时进行张拉操作;张拉按设计张拉速度进行;正式张拉前进行二次预张拉,张拉力为设计拉力的10%~20%;正式张拉荷载分级逐步施加,保持15分钟后卸荷至锁定荷载进行锁定作业。
本发明所使用的锚固材料为无水反应类双组份发泡聚氨酯,与水反应类高聚物材料相比,非水反应类高聚物材料具有更强的自膨胀特性。与传统锚固灌浆材料相比,该高聚物材料还具有以下特点:(1)密度小:工程应用中高聚物的密度变化范围在200~300Kg/m3之间,无收缩,加固后产生的附加应力小;(2)施工速度快,无需养护:高聚物化学反应速度快,注浆后15分钟能够达到其抗压强度的90%,对施工干扰少;(3)反应时材料体积迅速膨胀,可达液体体积的10~20倍,能产生巨大的膨胀力,生成的高聚物材料物理力学性能优良;(4)注浆孔径小,对结构基本无破坏;(5)材料渗透系数小,防水性能优良;(6)耐久性和稳定性好,其凝固体在长期被水浸泡的情况下不会降解或者腐烂,对环境无污染。
将高聚物注浆技术应用于岩土锚固,具有膨胀特性的高聚物材料对周围岩土具有明显的挤密作用,有利于增大灌浆体与基体间的摩擦力;防水性能优良的高聚物材料对钢制杆体而言是隔水材料,有利于杆体的防腐及耐久性;高聚物材料有较大的强度,有利于提高单根锚杆的极限抗拔力;高聚物材料的凝固时间短,且无需养护,有利于缩短施工工期。
与现行的锚固技术相比,本发明具有以下优点:
(1)适用性强。不仅适用于一般岩土环境,而且适用于水泥基锚固材料不适宜的湿陷性黄土或遇水膨胀土层的锚固施工。
(2)无水施工。无水反应的高聚物材料不干缩,具有较强的抗拉性能和抗振抗裂性能,体积膨胀率大,锚固体形态饱满,能完全填充钻孔。
(3)强度高。高聚物注浆材料与周围岩土充分结合,形成的根系状胶结结构,具有极强的粘结力。与同等情况下的水泥锚固材料相比,锚固力提高近1倍。
(4)强度提高快、施工方便快捷。高聚物锚杆成孔、封孔、注浆连续作业,适用于大、中、小各类隧道、地基基础、边坡锚固施工和抢险抢修,施工快捷。材料反应后15分钟即形成90%左右的强度,无需养生,对于各类应急抢险锚固支护工程中尤其有利。
(5)经济。与其他岩土锚固技术相比,单根高聚物注浆锚固力高,工艺简单,可节省钢材及人工,节省造价50%以上。
(6)耐久性好。高聚物注浆材料性能稳定,无污染,柔韧性好,与岩土体紧密粘合,协调变形,渗透系数小,作为隔水层对钢筋有较好的防腐作用。
附图说明
图1为高聚物锚杆杆体结构示意图。
图2为成孔施工示意图。
图3为高聚物锚杆土工布袋封孔注浆示意图。
图4为高聚物锚杆锚固注浆示意图。
图5为预应力高聚物锚杆张拉示意图。
具体实施方式
下面结合附图,对本发明做进一步说明。
一种高聚物锚固注浆方法,其包括以下步骤:
(1)锚杆杆体制作:所用杆体1材料为钢筋、钢绞线或其他锚杆材料;首先对杆体1进行平直、除锈、防腐处理,在制作全过程中避免油脂、泥土等杂物污染锚杆杆体1;按设计要求使用砂轮锯或切割机切割母材、焊接支架,并在杆体上每隔0.5m~2m设置有对中支架2,可以每隔0.5m、1m、1.5或2m,即0.5~2m之间任意值设置一个对中支架;
(2)在锚杆杆体上绑扎土工布袋和注浆管:在杆体1端部绑扎土工布袋4和注浆管,绑扎时土工布袋4底部位置位于设计锚固段和自由段的交接处;注浆管进浆管口处设置可拆卸式进浆阀,注浆管与注浆枪之间的连接接头,使用喉箍紧固密封;注浆管设置两根,一根为封孔注浆管5,出浆口在土工布袋内;另一根为锚固注浆管3,其出浆口深入孔底,如图1所示;
(3)槽孔施工:在需要锚固的基坑、隧道、边坡等位置上,按设计要求布置槽孔,对于土质基坑、隧道、边坡采用洛阳铲6成孔,对于岩体则采用钻具7成孔,如图2所示;
(4)高聚物注浆:
a.封孔注浆:用注浆装备把双组份膨胀性高聚物注浆材料注入土工布袋中,高聚物材料发生化学反应后体积迅速膨胀并固化,将孔封堵,如图3所示;
b.锚固注浆:锚固注浆管深入注浆孔底部,高聚物浆液自下而上填满孔内锚固段并固化,膨胀挤密孔壁岩土,与周围岩土充分结合,形成高聚物锚固体9,如图4所示。
若锚杆需要施加预应力,则还应设置锚垫板等锚具,进行张拉、锁定操作,具体操作步骤如下:
a、根据锚杆体的材料和锁定力的大小选择张拉设备;
b、施工混凝土承台8,承台8按常规方法施工制作;
c、安装台座和锚具,待承台8的混凝土强度达到设计强度时进行张拉操作;张拉按设计张拉速度进行;正式张拉前进行二次预张拉,张拉力为设计拉力的10%~20%;正式张拉荷载分级逐步施加,保持15分钟后卸荷至锁定荷载进行锁定作业,如图5所示。

Claims (2)

1.一种高聚物锚固注浆方法,其特征在于:其包括以下步骤:(1)锚杆杆体制作:首先对杆体进行平直、除锈、防腐处理,按设计要求切割母材、焊接支架,并在杆体上每隔0.5m~2m设置一个对中支架;
(2)在锚杆杆体上绑扎土工布袋和注浆管:在杆体端部绑扎土工布袋和注浆管,绑扎时土工布袋底部位置位于设计锚固段和自由段的交接处;注浆管进浆管口处设置可拆卸式进浆阀,注浆管与注浆枪之间的连接接头使用喉箍紧固密封;注浆管设置两根,一根为封孔注浆管,出浆口在土工布袋内;另一根为锚固注浆管,其出浆口深入孔底;
(3)槽孔施工:在需要锚固的位置,按设计要求施工槽孔;
(4)高聚物注浆:
a.封孔注浆:用注浆装备把双组份膨胀性高聚物注浆材料注入土工布袋中,高聚物材料发生化学反应后体积迅速膨胀并固化,将孔封堵;
b.锚固注浆:锚固注浆管深入注浆孔底部,高聚物浆液自下而上填满孔内锚固段并固化,膨胀挤密孔壁岩土,与周围岩土充分结合,形成高聚物锚固体。
2.根据权利要求1所述的高聚物锚固注浆方法,其特征在于:还包括以下步骤:
上述步骤(4)完成后,进行锚具加装,具体操作步骤如下:
a、根据锚杆体的材料和锁定力的大小选择张拉设备;
b、施工混凝土承台;
c、安装台座和锚具,待承压台的混凝土强度达到设计强度时进行张拉操作;张拉按设计张拉速度进行;正式张拉前进行二次预张拉,张拉力为设计拉力的10%~20%;正式张拉荷载分级逐步施加,保持15分钟后卸荷至锁定荷载进行锁定作业。
CN2013101236680A 2013-04-11 2013-04-11 高聚物锚固注浆方法 Pending CN103215952A (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2013101236680A CN103215952A (zh) 2013-04-11 2013-04-11 高聚物锚固注浆方法
US13/866,024 US9004820B2 (en) 2013-04-11 2013-04-19 Grouting method for anchoring with polymer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101236680A CN103215952A (zh) 2013-04-11 2013-04-11 高聚物锚固注浆方法

Publications (1)

Publication Number Publication Date
CN103215952A true CN103215952A (zh) 2013-07-24

Family

ID=48814077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101236680A Pending CN103215952A (zh) 2013-04-11 2013-04-11 高聚物锚固注浆方法

Country Status (2)

Country Link
US (1) US9004820B2 (zh)
CN (1) CN103215952A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437354A (zh) * 2013-08-29 2013-12-11 湖南城市学院 排水锚杆及施工方法
CN103603683A (zh) * 2013-12-03 2014-02-26 河南理工大学 袋式注浆锚固装置和锚固方法
CN104005404A (zh) * 2014-05-16 2014-08-27 杭州江润科技有限公司 一种外包活性材料桩体的预应力管桩及施工方法
CN104696664A (zh) * 2015-02-09 2015-06-10 郑州安源工程技术有限公司 地下管道渗漏涌沙封堵高聚物复合注浆方法
CN106013141A (zh) * 2016-07-15 2016-10-12 周同和 一种聚氨酯锚杆及其施工工艺
CN108181178A (zh) * 2017-12-18 2018-06-19 山东科技大学 破碎围岩预应力锚注加固模拟试验装置及试验方法
CN108533271A (zh) * 2018-03-12 2018-09-14 中铁建大桥工程局集团第四工程有限公司 一种一孔双管隧道径向注浆施工方法
CN108797604A (zh) * 2018-06-13 2018-11-13 王海霖 一种防护网与液氮冻土墙复合支护实施方法及其支护结构
CN109519151A (zh) * 2019-01-07 2019-03-26 兰州理工大学 一种适用于湿陷性黄土场地的劈裂注浆封孔装置及方法
CN109723478A (zh) * 2018-12-13 2019-05-07 郑州大学 一种预应力锚杆支护锚固装置及方法
CN113529753A (zh) * 2021-07-09 2021-10-22 福建省地质工程勘察院 速凝高聚物注浆快速治理崩岗的施工方法

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863188A (zh) * 2015-04-23 2015-08-26 侨健新能源科技(苏州)有限公司 自压重式抗浮施工方法
CN105201525B (zh) * 2015-10-19 2017-09-12 河南理工大学 一种可修复的防治底鼓方法
CA2957748C (en) 2017-02-13 2018-05-01 Lyle Kenneth Adams Rock bolt seal
CN107326913B (zh) * 2017-05-23 2019-12-27 西北矿冶研究院 一种露天边坡的支护方法
CN107059864A (zh) * 2017-06-11 2017-08-18 贵州大学 一种管式预应力灌浆锚杆
CN107227962B (zh) * 2017-06-14 2023-09-22 中铁二院工程集团有限责任公司 一种动态变形可调的隧道加固结构及施工方法
CN107460790B (zh) * 2017-07-22 2023-07-18 中铁二院工程集团有限责任公司 一种无砟轨道铁路膨胀岩石路堑结构及施工方法
CN110005367B (zh) * 2019-03-26 2024-04-09 华昕设计集团有限公司 一种钻孔封孔的装置
CN110130335A (zh) * 2019-06-05 2019-08-16 贵州建工集团第六建筑工程有限责任公司 一种地下室填砾灌浆抗浮锚杆的施工方法
CN110130582B (zh) * 2019-06-18 2024-04-16 中国铁道科学研究院集团有限公司铁道建筑研究所 一种新型组合结构锚下垫板
CN110593259A (zh) * 2019-09-12 2019-12-20 中国五冶集团有限公司 一种抗浮锚杆施工结构及抗浮锚杆施工方法
CN110905598B (zh) * 2019-12-05 2023-08-29 中煤地质集团有限公司 一种立柱式高角度斜巷钻孔注浆封堵设备及方法
CN113027475A (zh) * 2019-12-09 2021-06-25 中国铁建大桥工程局集团有限公司 一种射流式洛阳铲大管棚成孔施工方法
CN111410821B (zh) * 2020-04-22 2023-05-02 黄河水利水电开发总公司监测维修分公司 一种针对集中渗漏水缺陷的灌浆材料及其灌浆方法
CN112177647B (zh) * 2020-09-23 2024-06-28 中铁第四勘察设计院集团有限公司 一种隧道拱部锚杆孔注浆排气与稳压装置及施工方法
CN112459056A (zh) * 2020-11-12 2021-03-09 华能澜沧江水电股份有限公司托巴水电工程建设管理局 一种新型帆布式止浆包及使用方法
CN113464183B (zh) * 2021-03-04 2024-02-09 淮北市平远软岩支护工程技术有限公司 一种针对于锚杆锚索盖板弹射问题的支护方法
CN113073690B (zh) * 2021-04-21 2024-05-28 西安建筑科技大学 一种用于土遗址加固的锚固系统及方法
CN113356889B (zh) * 2021-07-14 2022-07-15 哈尔滨工业大学 一种隧道正上方超前钻管的箱式加固方法
CN113882883A (zh) * 2021-09-30 2022-01-04 中国矿业大学 一种巷道顶板慢渗或淋水状态下定长锚固系统及方法
CN115053788B (zh) * 2022-07-18 2023-08-01 唐山中地地质工程有限公司 一种高陡边坡加固绿化装置与高陡边坡加固绿化方法
CN116122307B (zh) * 2022-09-19 2024-06-25 中国地质大学(武汉) 边坡应急多级加固方法
CN115538412A (zh) * 2022-09-23 2022-12-30 上海建工集团股份有限公司 既有建筑地下水平拓建过程中的建筑变位精确控制方法
CN116163300B (zh) * 2023-02-14 2023-12-22 江苏科技大学 一种全自动电动锚杆
CN116856434B (zh) * 2023-07-07 2024-03-26 江苏科技大学 一种边坡加固装置及其加固方法
CN117973154A (zh) * 2024-03-29 2024-05-03 四川省交通勘察设计研究院有限公司 脉冲型地震动作用下隧道式锚碇动力响应的分析方法、系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040046591A (ko) * 2002-11-28 2004-06-05 주식회사 제일종합통상 고압 그라우팅을 이용한 지중에의 앵커 시공방법
US20110103898A1 (en) * 2009-11-02 2011-05-05 Zhengzhou Uretek Technology Ltd. Directional fracture grouting method with polymer for seepage control of dikes and dams
CN102108873A (zh) * 2009-12-29 2011-06-29 郑州优特基础工程维修有限公司 隧道渗漏水快速处治高聚物注浆方法
CN102444128A (zh) * 2011-09-26 2012-05-09 郑州优特基础工程维修有限公司 超薄型高聚物防渗墙注浆方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2397492A1 (fr) * 1977-07-13 1979-02-09 Soletanche Dispositif d'ancrage dans le sol au moyen d'une armature ou tirant isolee du sol
US4126009A (en) * 1977-09-06 1978-11-21 E. I. Du Pont De Nemours And Company Inorganic cement grouting system for use in anchoring a bolt in a hole
JPS5457059A (en) * 1977-09-30 1979-05-08 Kubota Ltd Rock bolt
JPS5689700A (en) * 1979-12-18 1981-07-21 Kubota Ltd Locking bolt
DE3417252C1 (de) * 1984-05-10 1986-04-17 Bergwerksverband Gmbh, 4300 Essen Kombinierter starrer Profil- und Dehnanker
CA1286129C (en) * 1986-06-24 1991-07-16 Inco Limited Hardened material supported rock bolt and apparatus for installing same
US4830544A (en) * 1988-01-15 1989-05-16 Anderson Jr Roy R Tie-rod anchoring apparatus and method
JPH0765311B2 (ja) * 1993-02-25 1995-07-19 日清紡績株式会社 アンカーによる充填材の注入工法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040046591A (ko) * 2002-11-28 2004-06-05 주식회사 제일종합통상 고압 그라우팅을 이용한 지중에의 앵커 시공방법
US20110103898A1 (en) * 2009-11-02 2011-05-05 Zhengzhou Uretek Technology Ltd. Directional fracture grouting method with polymer for seepage control of dikes and dams
CN102108873A (zh) * 2009-12-29 2011-06-29 郑州优特基础工程维修有限公司 隧道渗漏水快速处治高聚物注浆方法
CN102444128A (zh) * 2011-09-26 2012-05-09 郑州优特基础工程维修有限公司 超薄型高聚物防渗墙注浆方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冶金部建筑研究总院: "《土层锚杆设计与施工规范 CECS 22:90》", 6 November 1990, article "土层锚杆施工" *
石明生等: "聚氨酯高聚物注浆材料锚固力试验研究", 《中国港湾建设》, no. 3, 25 June 2011 (2011-06-25) *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437354A (zh) * 2013-08-29 2013-12-11 湖南城市学院 排水锚杆及施工方法
CN103437354B (zh) * 2013-08-29 2015-11-25 湖南城市学院 排水锚杆及施工方法
CN103603683A (zh) * 2013-12-03 2014-02-26 河南理工大学 袋式注浆锚固装置和锚固方法
CN103603683B (zh) * 2013-12-03 2016-12-07 河南理工大学 袋式注浆锚固方法
CN104005404A (zh) * 2014-05-16 2014-08-27 杭州江润科技有限公司 一种外包活性材料桩体的预应力管桩及施工方法
CN104005404B (zh) * 2014-05-16 2016-01-13 德州市公路工程总公司 一种外包活性材料桩体的预应力管桩及施工方法
CN104696664A (zh) * 2015-02-09 2015-06-10 郑州安源工程技术有限公司 地下管道渗漏涌沙封堵高聚物复合注浆方法
CN106013141A (zh) * 2016-07-15 2016-10-12 周同和 一种聚氨酯锚杆及其施工工艺
CN108181178A (zh) * 2017-12-18 2018-06-19 山东科技大学 破碎围岩预应力锚注加固模拟试验装置及试验方法
CN108181178B (zh) * 2017-12-18 2020-02-21 山东科技大学 破碎围岩预应力锚注加固模拟试验装置及试验方法
CN108533271A (zh) * 2018-03-12 2018-09-14 中铁建大桥工程局集团第四工程有限公司 一种一孔双管隧道径向注浆施工方法
CN108797604A (zh) * 2018-06-13 2018-11-13 王海霖 一种防护网与液氮冻土墙复合支护实施方法及其支护结构
CN109723478A (zh) * 2018-12-13 2019-05-07 郑州大学 一种预应力锚杆支护锚固装置及方法
CN109519151A (zh) * 2019-01-07 2019-03-26 兰州理工大学 一种适用于湿陷性黄土场地的劈裂注浆封孔装置及方法
CN109519151B (zh) * 2019-01-07 2024-03-01 兰州理工大学 一种适用于湿陷性黄土场地的劈裂注浆封孔装置及方法
CN113529753A (zh) * 2021-07-09 2021-10-22 福建省地质工程勘察院 速凝高聚物注浆快速治理崩岗的施工方法

Also Published As

Publication number Publication date
US20140314503A1 (en) 2014-10-23
US9004820B2 (en) 2015-04-14

Similar Documents

Publication Publication Date Title
CN103215952A (zh) 高聚物锚固注浆方法
CN103215960B (zh) 高聚物垂直支护体系注浆方法
CN102518135B (zh) 水平旋喷土锚和灌注桩复合基坑支护施工工法
CN203741868U (zh) 一种带组合锚索的钢筋混凝土挡墙结构
CN102787595B (zh) 一种双重作用自应力组合抗拔桩及成桩方法
CN103741678B (zh) 带有桩袋的聚氨酯注浆微型桩及其施工方法和应用方法
CN103233468A (zh) 高聚物碎石桩注浆方法
CN101544022B (zh) 一种预留孔围护桩的制备方法
CN208219633U (zh) 一种抵抗地基隆起的复合加筋桩构造
CN110219300B (zh) 部分粘结预应力抗拔锚杆的施工工艺
CN108661069A (zh) 临近河道路面荷载下旧挡墙加固的墙桩锚组合结构及方法
CN104005404A (zh) 一种外包活性材料桩体的预应力管桩及施工方法
CN106192999A (zh) 抗拔桩的施工方法
CN104762949A (zh) 一种秸秆固化吹填淤泥桩的成形方法
CN100340723C (zh) 边坡加固方法
CN204753621U (zh) 送电线路铁塔用复合基础
CN203866852U (zh) 一种深层旋喷水泥土板与锚杆组合抗浮桩筏结构
CN204608813U (zh) 一种预应力锚杆嵌岩海上风机高桩承台基础
CN205776152U (zh) 预应力锚杆波形板桩支挡结构
CN201801865U (zh) 一种复合锚杆
CN203129163U (zh) 一种坝基加固框架结构
CN103397630B (zh) 一种带有注浆袋的加劲桩
CN221095160U (zh) 一种滑坡应急治理的装置
CN205205829U (zh) 一种软土基坑支护结构
CN112030870B (zh) 一种砂土地质下建筑垃圾增强河堤

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130724