CN102051879A - 土层锚杆施工工艺 - Google Patents

土层锚杆施工工艺 Download PDF

Info

Publication number
CN102051879A
CN102051879A CN 201010548024 CN201010548024A CN102051879A CN 102051879 A CN102051879 A CN 102051879A CN 201010548024 CN201010548024 CN 201010548024 CN 201010548024 A CN201010548024 A CN 201010548024A CN 102051879 A CN102051879 A CN 102051879A
Authority
CN
China
Prior art keywords
grouting
geotextiles
soil bolt
pull bar
geotextile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010548024
Other languages
English (en)
Other versions
CN102051879B (zh
Inventor
邢玉芳
刘世明
庄迎春
胡士兵
彭孔曙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN 201010548024 priority Critical patent/CN102051879B/zh
Publication of CN102051879A publication Critical patent/CN102051879A/zh
Application granted granted Critical
Publication of CN102051879B publication Critical patent/CN102051879B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种土层锚杆施工工艺。本发明所要解决的技术问题是提供一种工艺简单方便的土层锚杆施工工艺,以达到提高注浆体直径、保证加固效果,同时避免漏浆,减少注浆量,降低成本的目的。解决该问题的技术方案是:a、成孔并清孔;b、安放拉杆及土工布,在拉杆上均匀间隔布置一组对中架,然后利用土工布将拉杆和对中架包裹成一圆柱体后,整体送入钻孔底部;c、向土工布围成的圆柱形腔体内进行一次注浆;d、向土工布与孔壁之间进行二次注浆;e、向土工布与孔壁之间进行三次注浆。本发明主要用于各种水利水电工程以及市政工程中。

Description

土层锚杆施工工艺
技术领域
本发明涉及一种土层锚杆的施工工艺,主要适用于各种水利水电工程以及市政工程中。
背景技术
土层锚杆技术因其施工简便,经济合理,在基坑围护、边坡支护等工程中应用广泛。目前土层锚杆注浆方法主要有真空注浆、压力注浆、高密度注浆等,这些注浆方法一般采用一次注浆,对于较密实、强度较高的砂土、粉土,一次注浆效果基本可满足要求,但对于孔隙比较大的杂填土、强度较弱的淤泥质土,一次注浆有效加固范围不佳,同时存在局部漏浆的可能性,施工时经常一个注浆孔注了几吨浆液还是没有效果,原因是填土中非常容易漏浆,注浆工艺有待创新。
发明内容
本发明要解决的技术问题是:针对常规一次注浆工艺在杂填土、淤泥质土中运用时存在的不足,提供一种工艺简单方便的土层锚杆施工工艺,以达到提高注浆体直径、保证加固效果,同时避免漏浆,减少注浆量,降低成本的目的。
本发明所采用的技术方案是:土层锚杆施工工艺,其特征在于步骤如下:
a、成孔并将该钻孔清洗干净;
b、安放拉杆及土工布,在拉杆上均匀间隔布置一组对中架,然后利用土工布将拉杆和对中架包裹成一圆柱体后,整体送入钻孔底部;
c、一次注浆,采用常规工艺向土工布围成的圆柱形腔体内注浆,浆液为水灰比0.5的纯水泥浆,注浆压力不小于0.5MPa,注浆量为钻孔体积的70%-80%;
d、二次注浆,一次注浆完成3小时后,采用常规工艺向土工布与孔壁之间注浆,浆液为水灰比0.5的纯水泥浆,注浆压力不小于0.5MPa,注浆量为钻孔体积的20%-30%;
e、三次注浆,二次注浆完成3~5小时后,采用常规工艺向土工布与孔壁之间补注浆,各参数同二次注浆一致,待其凝固后即形成土层锚杆。
围成圆柱形的土工布一端伸入钻孔底部,另一端到土层锚杆锚固段最外端的距离为5m。
所述土工布的规格为200g/m2,其围成的圆柱形腔体最大直径为300mm。
所述钻孔的直径为150mm。
所述拉杆采用HRB400级钢筋制成。
本发明的有益效果是:本发明采用三次注浆,较之现有技术的一次注浆,显著提高了注浆体的直径(大于钻孔直径150mm),有效保证了加固效果;另外,在拉杆和对中架外包裹土工布,一次注浆时向土工布围成的圆柱形腔体内注浆,能够有效防止浆液外漏,彻底解决了现有技术中块石较多、孔隙比较大的回填土中及淤泥质土层注浆易渗漏的问题,大大减少了注浆量和注浆时间,节省了注浆成本,保证了施工进度。
附图说明
图1是本发明的结构图。
具体实施方式
如图1所示,本实施例的施工步骤如下:
a、机械成孔,其直径为150mm,并用清水把钻孔底部沉渣冲洗干净,直至孔口清水返出。
b、安放拉杆1,本例中拉杆1采用HRB400级钢筋制成,其直径为28mm;为使拉杆1位于钻孔的中心,即拉杆1与钻孔轴线重合,在拉杆1上每隔1-2m布置一个对中架2,然后利用规格为200g/m2的土工布3将拉杆1和对中架2包裹起来,形成一圆柱形腔体,并连同注浆管(包括一次注浆管5、二次注浆管6、三次注浆管7,其中一次注浆管5位于土工布围成的圆柱形腔体内,二次注浆管6和三次注浆管7则均位于土工布与孔壁之间,本例中二次注浆管6、三次注浆管7以及拉杆1位于同一平面上,各注浆管可采用钢管或PVC管,其直径为6分,二次注浆管6和三次注浆管7的出浆口均包有橡皮)一起送入钻孔中,各注浆管及拉杆1均需伸至钻孔底部。
c、一次注浆,采用常规工艺通过一次注浆管5向土工布3围成的圆柱形腔体内注浆,浆液为水灰比0.5的纯水泥浆(水泥浆应搅拌均匀,一次拌和的水泥浆应在初凝前用完),注浆压力不小于0.5MPa、同时不大于上覆土层的压力,注浆量为钻孔体积的70%-80%,注浆时从钻孔底部开始,直至整个钻孔充满浆液。
d、二次注浆,一次注浆完成3小时后,采用常规工艺通过二次注浆管6向土工布3与孔壁之间注浆,浆液为水灰比0.5的纯水泥浆,注浆压力不小于0.5MPa,同时不大于上覆土层的压力,注浆量为钻孔体积的20%-30%,注浆同样是从钻孔底部开始。
e、三次注浆,二次注浆完成3~5小时后,采用常规工艺三次注浆管7向土工布3与孔壁之间补注浆,注浆压力、浆液及注浆量均与二次注浆相同,待其凝固后即形成土层锚杆4。
为了保证三次注浆后注浆体的直径和质量,所述土工布3围成的圆柱体最大直径为300mm,使其能够包裹住更大体积的浆液,防止一次注浆后土工布3被撑开形成缺口,浆液外漏。
上述步骤c、d、e的注浆过程中,一次注浆管5和二次注浆管6是在注浆管伸至孔底的那一端开设出浆孔,边注浆边拔注浆管,最后将注浆管完全拔出;三次注浆管7的孔底的一端开设出浆孔或管壁上、沿其长度方向开设一组呈梅花形布置的出浆孔,注浆时该注浆管可不拔出。
施工完成后,注浆体直径大于150mm,土工布3(卷成圆柱形)一端伸入钻孔底部,另一端到土层锚杆4锚固段(注浆浆液凝固部分,即从孔底到围护桩8之间的部分)最外端(与围护桩8联结端)的距离为5m,即该土工布3的长度比土层锚杆4锚固段的长度小5m,宽度为π*0.15m。

Claims (5)

1.一种土层锚杆施工工艺,其特征在于步骤如下:
a、成孔并将该钻孔清洗干净;
b、安放拉杆(1)及土工布(3),在拉杆(1)上均匀间隔布置一组对中架(2),然后利用土工布(3)将拉杆(1)和对中架(2)包裹成一圆柱体后,整体送入钻孔底部;
c、一次注浆,采用常规工艺向土工布(3)围成的圆柱形腔体内注浆,浆液为水灰比0.5的纯水泥浆,注浆压力不小于0.5MPa,注浆量为钻孔体积的70%-80%;
d、二次注浆,一次注浆完成3小时后,采用常规工艺向土工布(3)与孔壁之间注浆,浆液为水灰比0.5的纯水泥浆,注浆压力不小于0.5MPa,注浆量为钻孔体积的20%-30%;
e、三次注浆,二次注浆完成3~5小时后,采用常规工艺向土工布(3)与孔壁之间补注浆,各参数同二次注浆一致,待其凝固后即形成土层锚杆(4)。
2.根据权利要求1所述的土层锚杆施工工艺,其特征在于:围成圆柱形的土工布(3)一端伸入钻孔底部,另一端到土层锚杆(4)锚固段最外端的距离为5m。
3.根据权利要求1或2所述的土层锚杆施工工艺,其特征在于:所述土工布(3)的规格为200g/m2,其围成的圆柱形腔体最大直径为300mm。
4.根据权利要求3所述的土层锚杆施工工艺,其特征在于:所述钻孔的直径为150mm。
5.根据权利要求1所述的土层锚杆施工工艺,其特征在于:所述拉杆(1)采用HRB400级钢筋制成。
CN 201010548024 2010-11-09 2010-11-09 土层锚杆施工工艺 Active CN102051879B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010548024 CN102051879B (zh) 2010-11-09 2010-11-09 土层锚杆施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010548024 CN102051879B (zh) 2010-11-09 2010-11-09 土层锚杆施工工艺

Publications (2)

Publication Number Publication Date
CN102051879A true CN102051879A (zh) 2011-05-11
CN102051879B CN102051879B (zh) 2012-07-04

Family

ID=43956653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010548024 Active CN102051879B (zh) 2010-11-09 2010-11-09 土层锚杆施工工艺

Country Status (1)

Country Link
CN (1) CN102051879B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168419A (zh) * 2011-05-31 2011-08-31 中冶集团武汉勘察研究院有限公司 土工布加筋复合锚杆方法
CN102392452A (zh) * 2011-11-29 2012-03-28 北京建工一建工程建设有限公司 土钉墙水冲成孔施工方法
CN102677669A (zh) * 2012-05-23 2012-09-19 中天建设集团有限公司 一种抗拔锚杆
CN104074190A (zh) * 2014-06-16 2014-10-01 成都四海岩土工程有限公司 一种二次高压注浆扩大头锚杆及施工方法
CN104452783A (zh) * 2014-11-14 2015-03-25 北京科技大学 露天矿高陡边坡分层多次高压注浆预应力锚固技术
CN106321125A (zh) * 2016-08-31 2017-01-11 浙江省隧道工程公司 一种软弱质岩层巷道主动支护方法
CN111910626A (zh) * 2020-08-13 2020-11-10 卓辉(福建)建设工程有限公司 一种土层锚杆施工工艺
CN113445519A (zh) * 2021-06-11 2021-09-28 中国水利水电第九工程局有限公司 一种用于支护边坡的注浆锚杆施工工艺

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1087063A1 (fr) * 1999-09-23 2001-03-28 Vincenzo Sibilla Dispositif de forage et d'ancrage et procédé de mise en place de tirants d'ancrage
JP2002061297A (ja) * 2000-08-23 2002-02-28 Emoto Kogyo Kk アンカー用のプラグ
CN101070702A (zh) * 2007-06-14 2007-11-14 北京科技大学 一种单孔复合锚固桩
CN201183956Y (zh) * 2008-03-20 2009-01-21 四川省交通厅公路规划勘察设计研究院 边坡生态防护复合构造
CN101550696A (zh) * 2009-05-07 2009-10-07 中国京冶工程技术有限公司 多重防腐型可控膨胀挤压土体锚杆及施工方法
CN201605590U (zh) * 2010-03-03 2010-10-13 东南大学 一种软土基坑土钉支护结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1087063A1 (fr) * 1999-09-23 2001-03-28 Vincenzo Sibilla Dispositif de forage et d'ancrage et procédé de mise en place de tirants d'ancrage
JP2002061297A (ja) * 2000-08-23 2002-02-28 Emoto Kogyo Kk アンカー用のプラグ
CN101070702A (zh) * 2007-06-14 2007-11-14 北京科技大学 一种单孔复合锚固桩
CN201183956Y (zh) * 2008-03-20 2009-01-21 四川省交通厅公路规划勘察设计研究院 边坡生态防护复合构造
CN101550696A (zh) * 2009-05-07 2009-10-07 中国京冶工程技术有限公司 多重防腐型可控膨胀挤压土体锚杆及施工方法
CN201605590U (zh) * 2010-03-03 2010-10-13 东南大学 一种软土基坑土钉支护结构

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168419A (zh) * 2011-05-31 2011-08-31 中冶集团武汉勘察研究院有限公司 土工布加筋复合锚杆方法
CN102168419B (zh) * 2011-05-31 2012-10-03 中冶集团武汉勘察研究院有限公司 土工布加筋复合锚杆方法
CN102392452A (zh) * 2011-11-29 2012-03-28 北京建工一建工程建设有限公司 土钉墙水冲成孔施工方法
CN102677669A (zh) * 2012-05-23 2012-09-19 中天建设集团有限公司 一种抗拔锚杆
CN104074190A (zh) * 2014-06-16 2014-10-01 成都四海岩土工程有限公司 一种二次高压注浆扩大头锚杆及施工方法
CN104074190B (zh) * 2014-06-16 2016-10-05 成都四海岩土工程有限公司 一种二次高压注浆扩大头锚杆及施工方法
CN104452783A (zh) * 2014-11-14 2015-03-25 北京科技大学 露天矿高陡边坡分层多次高压注浆预应力锚固技术
CN106321125A (zh) * 2016-08-31 2017-01-11 浙江省隧道工程公司 一种软弱质岩层巷道主动支护方法
CN106321125B (zh) * 2016-08-31 2018-06-05 浙江省隧道工程公司 一种软弱质岩层巷道主动支护方法
CN111910626A (zh) * 2020-08-13 2020-11-10 卓辉(福建)建设工程有限公司 一种土层锚杆施工工艺
CN113445519A (zh) * 2021-06-11 2021-09-28 中国水利水电第九工程局有限公司 一种用于支护边坡的注浆锚杆施工工艺

Also Published As

Publication number Publication date
CN102051879B (zh) 2012-07-04

Similar Documents

Publication Publication Date Title
CN102051879B (zh) 土层锚杆施工工艺
CN101333812B (zh) 桩侧后注浆注浆装置及其施工方法
CN103526766B (zh) 一种深基坑减压井封堵方法
KR101026188B1 (ko) 그라우팅공법을 이용한 현장타설 말뚝 및 그 시공방법
CN103953365A (zh) 一种隧道单、双液浆交替注浆加固工艺及其装置
CN204112308U (zh) 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置
CN103924987B (zh) 一种smw工法桩盾构洞门防渗水结构及其施工方法
CN103277120A (zh) 一种非全深冻结立井解冻后的涌水防治方法
CN105201448A (zh) 一种高压大流量涌水通道内阻水注浆封堵方法
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN105386435B (zh) 一种用于水泥与水玻璃溶液的双液注浆系统及其施工工艺
CN104499479A (zh) 一种穿越砂砾石回填层的挖孔桩施工方法
CN103362117A (zh) 注浆段全段注浆的方法
CN106894428A (zh) 一种厚大筏板基础降水井的多道防水封堵方法
CN103603335A (zh) 一种减少土表堆载对临近桩基影响的加翼钢管隔离桩
CN204491646U (zh) 一种高水位地区围护体堵漏装置
CN114109442B (zh) 隧道岩溶破碎带溜塌半断面帷幕前进式注浆加固处理方法
CN110185453A (zh) 一种盾构区间端头水平加固的施工方法
CN103911993A (zh) 一种pha锚杆及其施工方法
CN113266417A (zh) 一种溶洞桩基的施工方法
CN104141304B (zh) 一种挤压成形预制桩劲芯水泥土y形桩的施工方法
CN202969370U (zh) 一种新型钢管桩
CN108411895A (zh) 管排泵泥注浆地基处理方法
CN206157860U (zh) 一种排水管道
CN105672329B (zh) 深基坑大尺寸预制围护结构及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant