CN102035260B - Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system - Google Patents

Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system Download PDF

Info

Publication number
CN102035260B
CN102035260B CN2010105930206A CN201010593020A CN102035260B CN 102035260 B CN102035260 B CN 102035260B CN 2010105930206 A CN2010105930206 A CN 2010105930206A CN 201010593020 A CN201010593020 A CN 201010593020A CN 102035260 B CN102035260 B CN 102035260B
Authority
CN
China
Prior art keywords
fault
intelligent
control system
supervisory control
reasoning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105930206A
Other languages
Chinese (zh)
Other versions
CN102035260A (en
Inventor
张春晓
朱松林
许祖锋
王磊
张劲
黄晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Nari Technology Co Ltd
Zhejiang Electric Power Co
Original Assignee
Nari Technology Co Ltd
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, Zhejiang Electric Power Co filed Critical Nari Technology Co Ltd
Priority to CN2010105930206A priority Critical patent/CN102035260B/en
Publication of CN102035260A publication Critical patent/CN102035260A/en
Application granted granted Critical
Publication of CN102035260B publication Critical patent/CN102035260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to an intelligent warning and fault analysis realizing method applied to an intelligent transformer substation monitoring system, which belongs to the technical field of transformer substation automation. An intelligent warning and fault analyzing module is used for analyzing various pieces of information reported by a measurement and control device, a protective device and a fault recorder, generating a fault analysis report by combining topology with every fault in an automatic identification fault reasoning model, and submitting the generated fault analysis report to a scheduling master station at a master station end. The workload of personnel on duty is greatly reduced, and the fault processing efficiency is improved. The requirement of an intelligent transformer substation on an intelligent warning and fault analysis system can be met, faults can be quickly judged and analyzed, and processing schemes can be provided so as to assist the personnel on duty in quickly processing the faults, and reduce the loss caused by the faults.

Description

Intelligent substation supervisory control system intelligent alarm and accident analysis implementation method
Technical field
The invention belongs to automation of transformation substations technical field, relate in particular to electric substation automation system intelligent alarm and accident analysis implementation method.
Background technology
At present; State Grid Corporation of China is carrying forward vigorously the construction of intelligent grid; Various advanced persons' sensing measurement technology, mechanics of communication, computer information technology and control technology and physics grid height are integrated; The following operation of power networks control that brings thus is strict more, and the technical difficulty of substation operation operation continues to increase, and the efficient of running job needs further to improve.In present substation operation operation, the traditional hand operation still occupies very big proportion, and along with the popularization of digital transformer substation; The semaphore of transformer station is more and more, but operating experience shows, in the bulk information of in substation accident and severely subnormal process, exporting; Major part all has been information or a redundant information auxiliary, the evidence effect; When breaking down, various signalizing activities are frequent, and person on duty's monitor task is heavier; Be easy to omit the significant alarm signal, incur loss through delay processing and cause the accident.Therefore; Be necessary very much to sum up transformer station's common faults type and failure criterion thereof; When breaking down, has this fault by the computer software automated reasoning; Make the operations staff be able to snatch accident analysis result: comprise that faulty equipment, trip switch, protection action message, fault are separate, fault current, fault localization, nature of trouble, treatment measures etc., this is significant for speed, efficient, quality of improving accident treatment.
Summary of the invention
The purpose of this invention is to provide a kind of electric substation automation system intelligent alarm and accident analysis implementation method; Can be used as an ADVANCED APPLICATIONS module of intelligent substation supervisory control system; Accomplish to judge rapidly and analysis of failure, provide in the far also and send dispatching patcher, processing scheme is provided to the operator on duty; Assist its rapid handling failure, reduce the loss that fault is brought.
The present invention adopts following technical scheme:
Intelligent substation supervisory control system intelligent alarm and accident analysis implementation method is characterized in that may further comprise the steps:
This method is embedded in the intelligent substation supervisory control system with the mode of software module; Obtain information such as the warning information that needs, remote measurement value, equipment state, protection information, failure wave-recording file from the intelligent substation integrated information platform, can effectively guarantee in time to obtain various failure criterions.
(1) the corresponding one or more fault initiating signals of every kind of fault type of transformer station after inference machine software is received enabling signal, start corresponding fault type inference logic;
(2) substation equipment is carried out topology and connect analysis; Charged situation according to equipment; Obtain the running status of current enabling signal corresponding device, such as current the switch which switch moves, is connected with circuit, switch of each side of main transformer etc. being arranged on the bus;
(3) location status of the remote signalling in a period of time before and after the enabling signal time of origin, remote measurement, protection information, switch etc. is carried out analyzing and processing, with reference to the associated device that obtains in the step (2), whether inspection satisfies inference logic;
(4) as satisfying the fault type inference logic in the step (3), wait for the record ripple HDR file that wave recording device is sent up, therefrom obtain information such as fault is separate, fault current, fault localization;
(5) from knowledge base, get the corresponding troubleshooting prediction scheme of this fault type, the information of integrating step (4) generates far and is saved in history library;
(6) Trouble Report is sent to scheduling through telecontrol system with IEC104 amplifying message form, simultaneously local history library is deposited in far and supplied the user to have access to and print.
For the most common failure of transformer station, generation reason, processing method that the operations staff grasps every kind of fault are crucial, but also are miscellaneous simultaneously, often need go to consult prediction scheme.In view of the more and more standardization of design of transformer station now; The network configuration of the transformer station of identical electric pressure and equipment situation are all similar; This method has been summed up the fault reasoning model of a design inference machine software; It has contained transformer station's common faults type and criterion thereof, and the fault type of support has: the single-phase transient fault of circuit, the single-phase permanent fault of circuit, circuit is alternate and three-phase fault, circuit accept far away jump signal tripping operation, circuit hand close in fault, circuit reclosure time, transform transform fault outside fault, the circuit reclosure time, circuit single-phase fault fault is mutually malfunctioning, the non-fault of mutually malfunctioning, the single-phase permanent fault switch of circuit phase-to phase fault switch fault is mutually malfunctioning, busbar fault, the busbar fault fault is mutually malfunctioning, the non-fault of busbar fault is mutually malfunctioning, main transformer fault, main transformer breakdown switch fault are mutually malfunctioning, the heavy gas action of main transformer internal fault, capacitor fault, reactor fault, stand with accident barrier, direct current disappearance fault etc.Therefore inference machine software can be discerned these faults automatically and report the fault reasoning result at the bulletin window fault reasoning page.This method summary the occurrence condition of most common failure type of transformer station, but automated reasoning and report the most common failure of transformer station does not need the user to import complicated logic, have safeguard simple, the characteristics of highly versatile.
For distinguishing different remote signalling as failure criterion; Be provided with a remote signalling type field in the remote signalling definition list of this method in intelligent substation supervisory control system database remote signalling is divided into different types; The type is used to discern the remote signalling of participating in reasoning from logic, mainly contain route protection jump A, route protection jump B, route protection jump C, route protection action, female differential work, malfunctioning action, reclosing, main transformer main protection action, main transformer backup protection action, this body weight of main transformer gas, switch protection action, capacitor protection action, reactor protection action, stand with become protect move, three-phase is inconsistent, protect far beat work, discriminating gear action on the spot, direct current disappearance, the position of the switch, switch A phase position, switch B phase position, switch C phase position etc.Find out useful signal numerous remote signalling that inference machine software is received according to these remote signalling types and participate in fault judgement after breaking down.
To accurately judge a fault; Need be in the signal damping district that the intelligent substation supervisory control system is received the signal of a timeslice of intercepting as the reasoning foundation; Only information and the equipment state received in this timeslice are carried out reasoning and judging, this timeslice is called " window fault time "." window fault time " will be striden certain fault type enabling signal each a period of time of front and back of receiving." window fault time " is too short to leak the reasoning condition easily, caused and failed to judge, but oversizely cause erroneous judgement again easily.This time window can be set according to transformer station's actual conditions by the user flexibly, and generally can adjust is 5~15 seconds, and can adjust flexibly according to on-the-spot time ruuning situation.
Formulate simple and practical knowledge base structure, comprised fault title, fault level, fault diagram, affiliated scheduling, failure cause, treatment measures etc.
The knowledge base territory is set in the remote signalling definition list, and this knowledge base territory is used for the record of index knowledge base table, and the user can access the content that the intelligent alarm window shows this knowledge base according to warning information on the alarm window.
Topological analysis has fully taken into account the various modes of connection of existing transformer station and operational mode, when running status changes, and the also corresponding adjustment of fault judgement logic; Such as; When judging busbar fault, only the circuit with current operation adds decision logic, and the circuit of power failure is not then participated in logic determines.
Only after the enabling signal of receiving a certain fault type, just begin the reasoning and judging of this fault type; As satisfy condition; The reasoning results can be presented at an independent The reasoning results page of alarm window, and highlight indication and audio alert are arranged, so that the rapid handling failure of user.
The information that has combined failure wave-recording when generating Trouble Report can show information such as fault current, the fault when fault takes place is separate, fault localization.
Far is sent to the main website end through telecontrol system, so that the dispatcher obtains the details of transformer station's fault the very first time, replaces traditional phone and reports.
The beneficial effect that the present invention reached:, after in the past breaking down, need substation operation personnel combing from the numerous information of alarm window to go out Useful Information for dispatching terminal; Join protection information, failure wave-recording file analysis-by-synthesis could be put the analysis report that is out of order in order again; To the scheduling report, not only time-consuming but also require great effort then, back automatic generation far can take place and be sent to scheduling in clearly in fault; Alleviate operator on duty's work load greatly, improve troubleshooting efficient.For unattended operation transformer station, this function is very necessary especially.
Description of drawings
Fig. 1 is a network structure of the present invention;
Fig. 2 is 500kV typical wiring figure;
Fig. 3 is a program flow diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing the present invention is further described.Following examples only are used for technical scheme of the present invention more clearly is described, and can not limit protection scope of the present invention with this.
Be illustrated in figure 1 as network structure of the present invention.Transformer station's end comprises parts such as intelligent substation supervisory control system, measure and control device, protective device, fault wave recording device; Intelligent alarm and failure analysis module are as an ADVANCED APPLICATIONS module of intelligent substation supervisory control system; Be responsible for analyzing the various information that measure and control device, protective device, fault wave recording device etc. are sent up; In conjunction with topologies and every kind of fault discerning automatically in the fault reasoning model, generate the scheduling station of delivering to the main website end in the far also.
As shown in Figure 2 is example with 500kV typical wiring figure, in conjunction with Fig. 3 program realization flow of the present invention figure, for example rational analysis process of the present invention is described with fault " 500kV circuit one A phase transient fault, successful reclosing ".
Inference machine can not stop the type of received signal is done inspection; When detecting type and be the signal of " route protection jump A "; Can start a timer immediately, window finishes to wait for fault time, guarantees that the signal that this fault should be received all receives; Start the fault type reasoning module of " circuit A phase transient fault, successful reclosing " immediately.Circuit generally can be joined two cover route protections, and the route protection of any cover protection is jumped a-signal all can start this fault type reasoning module.This fault type reasoning module can carry out topological analysis; Obtain having the circuit breaker of annexation with it according to the circuit under the enabling signal; According to the mode of connection and running status difference might be one or two circuit breaker; Should obtain circuit breaker 5011 and circuit breaker 5012 corresponding to this example; Then inference machine in corresponding to the signal damping district of this of window fault time according to the signal corresponding device and the remote signalling type judges circuit breaker 5011 and circuit breaker 5012 whether A phase separating brake has taken place in chronological order and A closes a floodgate mutually; The reclosing signal whether circuit breaker 5011 and circuit breaker 5012 are arranged satisfies above condition and then reports " 500kV circuit A phase transient fault, successful reclosing " at the fault reasoning page of alarm window.Then inference machine is waited for uploading of failure wave-recording file; Behind the failure wave-recording HDR file of receiving this route protection, information such as fault current, the fault that can therefrom take out this fault is separate, fault localization finds the knowledge base record corresponding to this fault again from knowledge base; Generate the far of this fault; Exist in the history library, wait the person on duty to have access to or print, and can be with this far through giving scheduling on the kinematic system.
The reasoning and judging process of other fault type and this example are similar, are that concrete decision logic is different.For those skilled in the art, under the prerequisite that does not break away from know-why of the present invention, can also make some improvement and distortion, these improvement and distortion also should be regarded as protection scope of the present invention.

Claims (9)

1. intelligent substation supervisory control system intelligent alarm and accident analysis implementation method may further comprise the steps:
(1) the corresponding one or more fault initiating signals of every kind of fault type of transformer station after inference machine software is received said fault initiating signal, start corresponding fault type inference logic;
(2) substation equipment is carried out topology and connect analysis,, obtain the running status of current said fault initiating signal corresponding device according to the charged situation of equipment;
Remote signalling before and after when (3) said fault initiating signal being taken place in a period of time, remote measurement, protection information are or/and the location status relevant information of switch is carried out analyzing and processing; With reference to the equipment that obtains in the step (2); Information and this equipment state to receiving in this time period are carried out reasoning and judging, and whether inspection satisfies said fault type inference logic;
(4) as satisfying the fault type inference logic in the step (3), wait for the record ripple HDR file that wave recording device is sent up, obtain therefrom that fault is separate, fault current is or/and the fault localization relevant information;
(5) from knowledge base, transfer the corresponding troubleshooting prediction scheme of this fault type, the information of integrating step (4) generates far and is saved in history library;
(6) with far through sending scheduling on the telecontrol system, deposit far in local history library simultaneously and supply the user to have access to and print.
2. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method is characterized by: this method comprises the occurrence condition of the most common failure type of transformer station, and automated reasoning is also reported the most common failure of transformer station.
3. according to claim 1 described intelligent substation supervisory control system intelligent alarm and accident analysis implementation method; It is characterized by: in the remote signalling definition list of this method in intelligent substation supervisory control system database the remote signalling type field is set; Remote signalling is divided into different types, is used to discern the remote signalling of participating in reasoning from logic.
4. intelligent substation supervisory control system intelligent alarm according to claim 3 and accident analysis implementation method; It is characterized by: the knowledge base territory is set in the remote signalling definition list; This knowledge base territory is used for the record of index knowledge base table, and the user accesses the content that the intelligent alarm window shows this knowledge base according to warning information on the alarm window.
5. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: the structure of said knowledge base comprises that fault title, fault level, fault diagram, affiliated scheduling, failure cause are or/and treatment measures.
6. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method is characterized by: topological analysis is according to the existing various modes of connection of transformer station and operational mode, corresponding adjustment fault judgement logic.
7. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: the signal of a timeslice of intercepting is as the reasoning foundation in the buffering area of the signal that said system is received; Set one fault time window; Only information and the equipment state received in this time window are carried out reasoning and judging, this timeslice is set according to transformer station's actual conditions by the user.
8. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: the reasoning and judging of fault type is started by the enabling signal of this fault type; The reasoning results is presented at an independent The reasoning results page of alarm window, and highlight indication and audio alert prompting user processing fault are arranged.
9. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: combine the information of failure wave-recording to generate far, show that fault current, the fault when fault takes place is separate or/and the fault localization relevant information.
CN2010105930206A 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system Active CN102035260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105930206A CN102035260B (en) 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105930206A CN102035260B (en) 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system

Publications (2)

Publication Number Publication Date
CN102035260A CN102035260A (en) 2011-04-27
CN102035260B true CN102035260B (en) 2012-08-15

Family

ID=43887760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105930206A Active CN102035260B (en) 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system

Country Status (1)

Country Link
CN (1) CN102035260B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235240A (en) * 2013-04-25 2013-08-07 国家电网公司 Alarm diagnosis method and system based on protection message
CN103368266A (en) * 2013-07-29 2013-10-23 深圳供电局有限公司 Method and device for remote omnidirectional monitoring on faults and warning information of substation

Families Citing this family (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102255384B (en) * 2011-05-20 2013-10-09 国电南瑞科技股份有限公司 Data communication method for distributed fault diagnosis
CN102290865A (en) * 2011-08-22 2011-12-21 国电南瑞科技股份有限公司 Integrated intelligent unit of intelligent substation
CN102355060B (en) * 2011-10-10 2014-10-08 国电南瑞科技股份有限公司 Intelligent interlocking system of transformer substation
CN102497024B (en) * 2011-12-16 2014-01-29 广东电网公司茂名供电局 Intelligent warning system based on integer programming
CN102497027B (en) * 2011-12-20 2013-09-18 浙江省电力公司 Automatic modeling method of digital fault recorder
CN102931644B (en) * 2011-12-27 2015-07-15 许继电气股份有限公司 Regional power grid fault isolation and recovery method
CN102523433A (en) * 2011-12-27 2012-06-27 浙江省电力公司 Video monitoring system and data acquisition monitoring system linkage equipment and method thereof
CN103293401A (en) * 2012-02-28 2013-09-11 鹤岗电业局 Transformer substation failure analysis device
CN103376784A (en) * 2012-04-23 2013-10-30 长沙日晶电器科技开发有限公司 Intelligent remote transformer substation monitoring system
CN102707199B (en) * 2012-06-29 2015-03-18 广东电网公司佛山供电局 Intelligent diagnosis method and system of dispatching warning message of power grid
CN102789223A (en) * 2012-08-31 2012-11-21 河南省电力公司鹤壁供电公司 Intelligent auxiliary real-time monitoring system of iSaSCADA transformer substation
JP2014067399A (en) * 2012-09-10 2014-04-17 Ricoh Co Ltd Report generation device, report generation system, and program
CN102967780B (en) * 2012-11-21 2015-04-08 国电南瑞科技股份有限公司 Modeling method for substation intelligent alarm
CN103197200B (en) * 2013-02-05 2015-05-13 广东电网公司佛山供电局 Method and system for rapidly collecting and transmitting fault ranging information of power grid line
CN203930461U (en) * 2013-03-12 2014-11-05 阿斯科动力科技公司 For the system of infrastructure Monitoring and Controlling
CN103259333B (en) * 2013-03-30 2016-01-27 国家电网公司 Intelligent alarm and comprehensive analysis of fault system
CN103281410B (en) * 2013-06-14 2016-08-31 江苏省广电有线信息网络股份有限公司南京分公司 Broadcast television network intelligent obstacle pretreatment method and system
CN104424602A (en) * 2013-08-19 2015-03-18 国家电网公司 Online on-off operation checking method based on maintenance plan
CN103903107A (en) * 2014-04-22 2014-07-02 国网重庆市电力公司永川供电分公司 Intelligent real-time alarming method for energy management system
CN104064001B (en) * 2014-06-19 2016-03-30 国家电网公司 A kind of intelligent substation alarm inference method
CN104111988A (en) * 2014-07-03 2014-10-22 国家电网公司 Building method of alarm reasoning knowledge base of intelligent transformer substation
CN104125103B (en) * 2014-08-13 2017-02-22 国家电网公司 Intelligent transformer substation process layer network communication fault locating method based on list of proof
CN104242470A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Signal power source monitoring device
CN104318394B (en) * 2014-10-27 2017-12-15 南京磐能电力科技股份有限公司 Communication processor intelligent warning system and method based on more action alert modes
CN104459474B (en) * 2014-12-22 2017-05-17 国网上海市电力公司 Intelligent distribution network fault recognition method
CN105015565B (en) * 2015-07-31 2018-03-20 株洲南车时代电气股份有限公司 A kind of train fault information automatic displaying method
CN105139158A (en) * 2015-10-10 2015-12-09 国家电网公司 Power grid abnormal information intelligent alarming and assistant decision-making method
CN105762932B (en) * 2015-12-01 2018-11-09 许继集团有限公司 A kind of intelligent substation intelligent warning system based on Plugin Mechanism
CN105911424B (en) * 2016-04-08 2018-11-27 国网福建省电力有限公司 A kind of recognition methods based on fault detector false positive signal
CN105914894A (en) * 2016-06-27 2016-08-31 柳州电器科学研究所有限公司 Fault monitoring sub-system for substation relay protection
CN106329728B (en) * 2016-09-09 2019-03-15 国家电网公司 A kind of power supply management method and system
CN106505740B (en) * 2016-12-06 2019-01-15 嘉兴凯蒂市场营销策划有限公司 Intelligent monitoring device, system and the intelligent control system of power equipment
CN106707101A (en) * 2016-12-09 2017-05-24 云南电力试验研究院(集团)有限公司 Distribution network operating state monitoring device with four-remote function
CN106771841B (en) * 2017-03-30 2019-02-22 西安西热节能技术有限公司 A kind of through-flow system of substation S type and method
CN107069966A (en) * 2017-04-18 2017-08-18 广州供电局有限公司 A kind of transformer station's remote online monitoring and status assessing system
CN107069975B (en) * 2017-06-20 2019-08-02 国网山东省电力公司诸城市供电公司 A kind of distribution transmission facility status data feedback system and its method
CN107276085B (en) * 2017-07-26 2019-12-20 广东电网有限责任公司东莞供电局 Method for realizing intelligent alarm of telemechanical
CN107689886A (en) * 2017-08-11 2018-02-13 北京小度信息科技有限公司 Data-interface fault handling method, device and electronic equipment
CN107357237A (en) * 2017-08-31 2017-11-17 北京蓝海华业科技股份有限公司 A kind of system of intelligent monitoring transformer station
CN107658980B (en) * 2017-09-29 2020-12-18 国网浙江省电力公司 Analysis method and system for rechecking power grid monitoring alarm information
CN107861000A (en) * 2017-11-01 2018-03-30 南京国电南自电网自动化有限公司 A kind of method of automatic test substation intelligent alarm function
CN108280278A (en) * 2018-01-12 2018-07-13 中国电力科学研究院有限公司 A kind of high voltage direct current equals the emulation mode and system of anti-gas dynamic characteristic
CN108399579B (en) * 2018-01-15 2021-04-02 国网天津市电力公司 Intelligent analysis system for monitoring data signals of substation equipment
CN108537344B (en) * 2018-02-01 2021-09-14 贵州电网有限责任公司 Secondary equipment intelligent operation and maintenance method based on closed-loop knowledge management
CN108512223B (en) * 2018-04-11 2020-07-03 江苏电力信息技术有限公司 Intelligent auxiliary studying and judging method for switching tripping of substation in power transmission and transformation operation and detection control platform
CN109255445A (en) * 2018-08-22 2019-01-22 中国南方电网有限责任公司 A kind of intelligent periodical inspection method of the protective device based on multi-source data analysis
CN109387740A (en) * 2018-09-18 2019-02-26 中国路桥工程有限责任公司 A kind of railway distribution net fault message diagnostic system and method
CN109633250A (en) * 2018-11-09 2019-04-16 国网浙江省电力有限公司台州供电公司 One kind prejudging system for protection supervisory equipment terminal block current potential automatic collection in substation
CN109696591B (en) * 2018-11-30 2021-07-30 南京国电南自电网自动化有限公司 Testing method for intelligently acquiring fault recording based on ATS automatic testing platform
CN110854843B (en) * 2019-10-15 2023-08-18 保定市冀能电力自动化设备有限公司 Intelligent power distribution network metering and fault protection demarcation switch controller control calculation method
CN114710390A (en) * 2022-02-18 2022-07-05 联通沃悦读科技文化有限公司 Monitoring alarm method, system, equipment and medium for internet system
CN117294004B (en) * 2023-09-13 2024-04-09 国网江苏省电力有限公司淮安供电分公司 Intelligent identification system and method for relay protection operation mode of transformer substation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799512B (en) * 2009-12-31 2011-12-28 清华大学 Single-terminal failure wave-recording and distance-measuring device facing single space in transformer substation
CN101752908B (en) * 2010-01-19 2012-10-03 华北电网有限公司 Method for distributed wave recording of intelligent substation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235240A (en) * 2013-04-25 2013-08-07 国家电网公司 Alarm diagnosis method and system based on protection message
CN103235240B (en) * 2013-04-25 2015-08-05 国家电网公司 Based on the warning diagnostic method and system of protection message
CN103368266A (en) * 2013-07-29 2013-10-23 深圳供电局有限公司 Method and device for remote omnidirectional monitoring on faults and warning information of substation

Also Published As

Publication number Publication date
CN102035260A (en) 2011-04-27

Similar Documents

Publication Publication Date Title
CN102035260B (en) Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system
CN101820185B (en) Power grid fault judgment method based on IEC61850 signal semantic logic
KR102218268B1 (en) Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios
CN101551440B (en) Generator transformer unit faults recorder analysis device
CN102035202B (en) Network reconfiguration system
CN111208385A (en) Online fault layered diagnosis method for power grid
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN110110856B (en) Power grid fault diagnosis method and system based on multi-source information deep reasoning
CN104753178A (en) Power grid fault handling system
CN109188195A (en) A kind of distribution small current grounding fault localization method and system
CN103326467A (en) Protection action report implementation method based on information protection main station device recorded information
CN103490392A (en) Fault handling method of power distribution network comprising distributed power supplies and microgrids
CN105093063A (en) Online power grid fault diagnosis method based on multisource data characteristic unit combination judgment
CN107994551A (en) The fast quick-recovery processing method of failure based on transmission & distribution collaboration
CN107944655A (en) Event level method for diagnosing faults based on Expert Rules storehouse and multi-source fault message
CN103543384A (en) Method for determining bus ground faults
CN103490514A (en) Rural power distribution grid electricity leakage protection device monitoring, controlling and fault detecting method
CN102185297A (en) Method for controlling system recovery based on network reconfiguration
CN112421615A (en) Power distribution station self-healing control method and system based on intelligent breaker action
CN113193549A (en) System and method for regulating and controlling transaction perception and fault co-processing
CN105871645A (en) Automatic collecting and publishing device for grid fault information
CN106199337A (en) A kind of grid fault analytical method combining judgement based on analog quantity and switching value
CN107609788A (en) A kind of method and system of automatic identification of electric network fault signal with associating prediction scheme
Kawano et al. Intelligent protection relay system for smart grid
CN108828344B (en) Pressing plate detection warning method and device for transformer substation line protection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant