CN104424602A - Online on-off operation checking method based on maintenance plan - Google Patents

Online on-off operation checking method based on maintenance plan Download PDF

Info

Publication number
CN104424602A
CN104424602A CN201310362080.0A CN201310362080A CN104424602A CN 104424602 A CN104424602 A CN 104424602A CN 201310362080 A CN201310362080 A CN 201310362080A CN 104424602 A CN104424602 A CN 104424602A
Authority
CN
China
Prior art keywords
maintenance plan
plan
maintenance
turnaround plan
structuring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310362080.0A
Other languages
Chinese (zh)
Inventor
倪秋龙
叶琳
项中明
周生苗
饶明军
周慧忠
徐红泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUZHOU POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Original Assignee
QUZHOU POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUZHOU POWER SUPPLY BUREAU, State Grid Corp of China SGCC, Zhejiang Electric Power Co filed Critical QUZHOU POWER SUPPLY BUREAU
Priority to CN201310362080.0A priority Critical patent/CN104424602A/en
Publication of CN104424602A publication Critical patent/CN104424602A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

An online on-off operation checking method based on a maintenance plan relates to an online checking method. At present, scheduling personnel can confirm on-off operation by manually searching the maintenance plan, which is low in efficiency. The method comprises the following steps: 1) structuring the maintenance plan: standardizing the maintenance plan according to structuring requirements, and structuring maintenance plan service stop date, plan approving time, factory names and main work content in the maintenance plan; 2) capturing switch displacement warning information: when a switch displacement signal is generated, transmitting the switch displacement warning signal according to a naming structure; 3) carrying out online checking on the on-off action based on the maintenance plan: scanning the maintenance plan items and matching the on-off action; and 4) outputting the maintenance plan items corresponding to the on-off action: when the on-off action is caused by maintenance, outputting the maintenance item. The technical scheme provides support for the scheduling personnel to identify reasons of the on-off action and make a timely and correct decision.

Description

A kind of method of checking online based on the switching manipulation of turnaround plan
Technical field
The present invention relates to a kind of online check method.
Background technology
Dispatcher in power system monitor process, need to distinguish switch actuating signals be cause due to scheduled overhaul or electric network fault causes, thus take different Mea-sure and countermeasure.Existing technology departs from due to turnaround plan and switch motion warning information, and switch warning information cannot show and relation between turnaround plan, and dispatcher needs to be confirmed switch motion by manual type retrieval turnaround plan, and efficiency is low.
Summary of the invention
The technical assignment of the technical problem to be solved in the present invention and proposition carries out improving to prior art and improves, and provides a kind of method of checking online based on the switching manipulation of turnaround plan, to reach online check, and the object of raising the efficiency.For this reason, the present invention takes following technical scheme.
A kind of method of checking online based on the switching manipulation of turnaround plan is characterized in that it comprises the following steps:
1) structuring turnaround plan:
According to structuring requirement, carry out specification to turnaround plan, the turnaround plan in structuring turnaround plan stops labour date, plan approval time, plant stand title, working contents;
2) switch changed position warning information is caught:
When switch changed position signal occurs, transmit switch changed position alarm signal according to name structure;
3) the online check based on turnaround plan is carried out to switch motion:
Scanning turnaround plan item, mates switch motion;
4) the turnaround plan item corresponding with switch motion is exported:
If this switch motion causes due to maintenance, then export this maintenance item.
Beneficial effect: by structuring turnaround plan, catch switch warning information, Auto-matching switch motion and turnaround plan item in real time, export the turnaround plan item corresponding with switch motion, for yardman's identification switch action reason, make correct decisions in time and provide support; Improve reliability, the stability of operation of power networks, prevent erroneous judgement.
Accompanying drawing explanation
Fig. 1 is process flow diagram of the present invention.
Embodiment
Below in conjunction with Figure of description, technical scheme of the present invention is described in further detail.
Before introducing the various embodiments of the application in detail, first the individual concept that the application relates to is briefly introduced:
(1) SCADA:SCADA (Supervisory Control And Data Acquisition) system, i.e. data acquisition and supervisor control.The application of SCADA system is very wide, and it can be applied to data acquisition and the numerous areas such as Monitor and Control and process control in the fields such as electric system, water supply system, oil, chemical industry.Also known as telecontrol system in electric system and electric railway.SCADA system is the production run control and scheduling automated system based on computing machine.It can carry out monitoring and controlling to the operational outfit at scene, to realize the various functions such as data acquisition, equipment control, measurement, parameter adjustment and various types of signal warning.
(2) switch changed position alarm: refer to the information that Switch equipment state (divide, close a floodgate) changes, this category information directly reflects the change of power system operating mode, is the important informations needing monitoring in real time.
As shown in Figure 1, the present invention includes following steps:
1) structuring turnaround plan:
Turnaround plan structuring is the basis that switching manipulation is checked online, need first according to structuring requirement, specification is carried out to turnaround plan, comprises turnaround plan in structuring turnaround plan and stop the continuous item such as labour date, plan approval time, plant stand title, working contents.
2) switch changed position warning information is caught:
Conveniently grid equipment warning information exchange with share, from the alarm signal code requirement life name of SCADA, as in OPEN3000 according to following name structure: electrical network. plant stand/voltage. interval. equipment/parts. attribute.When switch changed position signal occurs, transmit switch changed position alarm signal according to name structure.
3) the online check based on turnaround plan is carried out to switch motion:
Scanning turnaround plan item, mates switch motion.
4) the turnaround plan item corresponding with switch motion is exported:
If this switch motion causes due to a certain maintenance, then export this maintenance item.
As 19:10:41 second on July 28th, 2012, capture certain power supply enterprise 220kV Quzhou and become the positive female switch separating brake of #1 main transformer, find it is the switching manipulation that scheduled overhaul causes through overscanning turnaround plan item, export corresponding turnaround plan item content:
Date <120728> overhauls < Quzhou and becomes > content <#1 main transformer 110kV main transformer plug-in strip, positive female plug-in strip, secondary female plug-in strip replacing >
According to the embodiment of the present invention, by catching switching manipulation action message, carry out the check based on maintenance item to switch motion, the reason of effective identification switch action, for yardman's decision-making provides support.
A kind of method of checking online based on the switching manipulation of turnaround plan shown in above Fig. 1 is specific embodiments of the invention; substantive distinguishing features and marked improvement that the present invention gives prominence to are embodied; can according to the use needs of reality; under enlightenment of the present invention; equivalent modifications is carried out to it, all at the row of the protection domain of this programme.

Claims (1)

1., based on the method that the switching manipulation of turnaround plan is checked online, it is characterized in that it comprises the following steps:
1) structuring turnaround plan:
According to structuring requirement, carry out specification to turnaround plan, the turnaround plan in structuring turnaround plan stops labour date, plan approval time, plant stand title, working contents;
2) switch changed position warning information is caught:
When switch changed position signal occurs, transmit switch changed position alarm signal according to name structure;
3) the online check based on turnaround plan is carried out to switch motion:
Scanning turnaround plan item, mates switch motion;
4) the turnaround plan item corresponding with switch motion is exported:
If this switch motion causes due to maintenance, then export this maintenance item.
CN201310362080.0A 2013-08-19 2013-08-19 Online on-off operation checking method based on maintenance plan Pending CN104424602A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310362080.0A CN104424602A (en) 2013-08-19 2013-08-19 Online on-off operation checking method based on maintenance plan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310362080.0A CN104424602A (en) 2013-08-19 2013-08-19 Online on-off operation checking method based on maintenance plan

Publications (1)

Publication Number Publication Date
CN104424602A true CN104424602A (en) 2015-03-18

Family

ID=52973497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310362080.0A Pending CN104424602A (en) 2013-08-19 2013-08-19 Online on-off operation checking method based on maintenance plan

Country Status (1)

Country Link
CN (1) CN104424602A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102035260A (en) * 2010-12-17 2011-04-27 国电南瑞科技股份有限公司 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system
CN102393929A (en) * 2011-11-28 2012-03-28 江苏方天电力技术有限公司 State overhauling control method of distribution network equipment state assessment system
CN102820703A (en) * 2011-06-09 2012-12-12 北京市电力公司 Method and system for determining switch deflection in real time
CN102855533A (en) * 2011-06-30 2013-01-02 北京市电力公司 Method and device for outputting power distribution network maintenance plan based on load sharing algorithm
CN103177403A (en) * 2013-04-10 2013-06-26 国家电网公司 Control method of integrative interruption maintenance plan

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102035260A (en) * 2010-12-17 2011-04-27 国电南瑞科技股份有限公司 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system
CN102820703A (en) * 2011-06-09 2012-12-12 北京市电力公司 Method and system for determining switch deflection in real time
CN102855533A (en) * 2011-06-30 2013-01-02 北京市电力公司 Method and device for outputting power distribution network maintenance plan based on load sharing algorithm
CN102393929A (en) * 2011-11-28 2012-03-28 江苏方天电力技术有限公司 State overhauling control method of distribution network equipment state assessment system
CN103177403A (en) * 2013-04-10 2013-06-26 国家电网公司 Control method of integrative interruption maintenance plan

Similar Documents

Publication Publication Date Title
CN103427417B (en) Based on the distribution network failure processing method of Multi-source Information Fusion
CN204203734U (en) Based on the information acquisition of power transformation main equipment and the management system of electric power Internet of Things
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN106990328A (en) The analysis of distribution repairing abnormal data, fault location system and method
CN107180314B (en) Operation and maintenance business model modeling method based on primary and secondary system incidence relation
CN109639477B (en) Secondary equipment online monitoring and analyzing system and method
CN202586506U (en) Automated long-distance network destitution system
CN108537344A (en) Secondary device intelligence O&M method based on closed loop information management
CN109450098A (en) Power regulation integral system warning information optimization method
CN205231849U (en) Intelligent substation fortune is holded together all
CN102193555A (en) Panoramic-state monitoring system for centralized control centers
CN108710099A (en) Capacitance type potential transformer monitoring alarm method and system
CN105654393A (en) Energy efficiency management service system of power distribution network area
CN103236745A (en) Distinguishing method of misreported remote signaling and correct remote signaling of transformer substation
CN107302264A (en) A kind of substation secondary automation equipment stable operation management-control method
CN107832946A (en) A kind of power energy monitoring and controlling for workshop and management method and system
CN104063761A (en) SCADA data development system based on smart grid
CN111667143A (en) Method for realizing fusion of real-time monitoring data and service management data in power grid dispatching
CN109934730A (en) A kind of real-time control analysis system of visualization
CN107545519B (en) Power grid enterprise operation and inspection management and control method
CN210422883U (en) Multi-wind-field fan electric centralized control system based on c/s framework
CN106022582A (en) Work order control system service automatic analyzing and processing method and system
CN109581115B (en) Power distribution network low-voltage diagnosis system and diagnosis method
CN205389136U (en) Cable branch case standard management system
CN103280887B (en) A kind of transformer station and control centre&#39;s intelligent alarm and fault diagnosis system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150318

WD01 Invention patent application deemed withdrawn after publication