CN205389136U - Cable branch case standard management system - Google Patents

Cable branch case standard management system Download PDF

Info

Publication number
CN205389136U
CN205389136U CN201521133603.5U CN201521133603U CN205389136U CN 205389136 U CN205389136 U CN 205389136U CN 201521133603 U CN201521133603 U CN 201521133603U CN 205389136 U CN205389136 U CN 205389136U
Authority
CN
China
Prior art keywords
module
cable branch
branch box
management system
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521133603.5U
Other languages
Chinese (zh)
Inventor
陈允营
王鹏飞
马磊
李玉宁
杨慧
张国林
类金
郝建园
张振东
王帅
闵建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Co Of City Of Guo Wang Qingzhou In Shandong Province
State Grid Corp of China SGCC
Original Assignee
Electric Co Of City Of Guo Wang Qingzhou In Shandong Province
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Co Of City Of Guo Wang Qingzhou In Shandong Province, State Grid Corp of China SGCC filed Critical Electric Co Of City Of Guo Wang Qingzhou In Shandong Province
Priority to CN201521133603.5U priority Critical patent/CN205389136U/en
Application granted granted Critical
Publication of CN205389136U publication Critical patent/CN205389136U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Monitoring And Testing Of Transmission In General (AREA)

Abstract

The utility model provides a cable branch case standard management system, its characterized in that: including touing operation module, equipment monitoring module, computer protective film piece, environment state monitoring module, intelligent integrated data standard management module and wireless communication module. The utility model discloses cable branch case standard management system is running into not in place, incorrect, the cable branch incasement cable terminal high temperature of operation of cable branch case operation maintainer tour, when the high urgent unexpected circumstances is crossed to inside humidity, gas strength, the utility model provides a cable branch case standard management system can in time monitor each information and automatic quick the warning, has improved cable branch case fortune dimension ability, hidden danger investigation and failure isolation prescription to the maintenance cost and the personnel intensity of labour that reduce make the cable branch case firm more reliable, improve and join in marriage net service reliability.

Description

Cable branch box standard information management system
Technical field
This utility model relates to power system device management system, specifically, relates to a kind of cable branch box standard information management system.
Background technology
Power distribution network is the important step in power system directly facing power customer, at present, a large amount of 10kV overhead distributions are transform as distribution cable circuit by urban distribution network transformation, adopt cable branch box to carry out the contact between cable and distribution, and then meet the requirement of many power supplys ring network power supply, multichannel outlet.Thus causing, current cable branch box number is many, distribution is wide, distance far and not to cable branch box operation maintenance situation, internal medium marks management system, personnel that cable branch box is maked an inspection tour make an inspection tour situation, internal unit operation conditions and internal medium state and artificial tour record can only be relied on to ensure, the tour situation simultaneously for operations staff also cannot be carried out real-time monitoring.Along with being continuously increased of electricity consumption of resident, add cable branch box equipment and lack necessary standard management monitoring system, safeguard only by making an inspection tour personnel's periodical inspection, and then make due to cable terminal heating or humidity is excessive and the cable branch box that causes runs hidden danger and can not find in time, and then likely cable branch box fault, cause bigger loss.
Therefore, how effectively monitoring the tour situation of operations staff, the change of cable branch box internal medium and equipment condition information and also quickly detect each information automatic Rapid Alarm simultaneously simultaneously, improving cable branch box O&M ability, hidden troubles removing and Fault Isolation timeliness is the problem that those skilled in the art need to solve.
Utility model content
The purpose of this utility model is in that to overcome the weak point of above-mentioned conventional art, there is provided a kind of and the change of cable branch box O&M situation, status of equipment and internal medium is accomplished, and monitoring and detect the also automatic fast reaction of each information in time reports to the police, and improves the cable branch box standard information management system of cable branch box O&M ability, hidden troubles removing and Fault Isolation timeliness.
The technical solution of the utility model is:
Cable branch box standard information management system, it is characterised in that: include
Make an inspection tour operation module, be used for monitoring operations staff and to the daily tour situation of cable branch box and cable branch box is stopped power transmission operation sequence be acquired;
Monitoring of equipment module, for gathering the voltage of cable branch box equipment, electric current, sulfur hexafluoride gas pressure and cable terminal temperature;
Protection Module, for gathering the fault current of cable branch box internal fault equipment;
Ambient condition monitoring modular, for being acquired the environment parameter in cable branch box;
Intelligent comprehensive data standard management module; respectively with make an inspection tour operation module, monitoring of equipment module, Protection Module, Protection Module are connected, be used for receiving, monitor and store data that above-mentioned module gathers and send alarm signal according to data value selectivity;
Wireless communication module, manages module with intelligent comprehensive data standard and is connected, be used for transmitting data to scheduling station system, and the data sent include the intelligent comprehensive data standard management data that receive of module and intelligent comprehensive data standard manages the alarm signal of module.
The data that above-mentioned module gathers can be uploaded to intelligent comprehensive data standard management module by LAN, and it is individually separate relation, can realizing monitoring operations staff's O&M situation in real time, stopping power transmission operational circumstances, internal medium amount and internal unit electric current, voltage, pressure and temperature, environment parameter includes the temperature of electric current feeder pillar environment, gas concentration, humidity.Data are contrasted by intelligent comprehensive data standard management module, when O&M situation, stop power transmission operational circumstances and when cable branch box equipment voltage, electric current, pressure, temperature signal and environment parameter signal at least one of which exceed its threshold values, order is sent for the signal beyond threshold values, control corresponding alarm equipment alarm, send corresponding alarm signal.
A kind of concrete prioritization scheme, makes an inspection tour operation module and includes subscriber authentication sensor and operation sensor.
Subscriber authentication sensor: be used for gathering tour personal information and tour personnel make an inspection tour situation, and the information gathered is uploaded to intelligent comprehensive data standard management module;
Operation sensor: be used for recording operator and stop power transmission operation information, and the information gathered is uploaded to intelligent comprehensive data standard management module.
A kind of concrete prioritization scheme, monitoring of equipment module includes current sensor, voltage sensor, pressure transducer and cable terminal temperature monitoring module.
Current sensor: for described current signal is acquired, and the current signal collected is uploaded to intelligent comprehensive data standard management module;
Voltage sensor: for described voltage signal is acquired, and the voltage signal collected is uploaded to intelligent comprehensive data standard management module;
Pressure transducer: for described sulfur hexafluoride gas pressure signal is acquired, and the voltage signal collected is uploaded to intelligent comprehensive data standard management module;
Cable terminal temperature monitoring module: for cable terminal temperature is acquired, and the cable terminal temperature signal collected is uploaded to intelligent comprehensive data standard management module.
A kind of concrete prioritization scheme, cable terminal temperature monitoring module includes optical fiber induction installation, temperature measurement data transfer station and temperature control main frame.
Optical fiber induction installation: be used for monitoring and gathering cable terminal temperature, and the cable terminal temperature signal collected is uploaded to temperature measurement data transfer station;
Temperature measurement data transfer station: be sent to temperature control main frame for described signal will be collected;
Temperature control main frame: for extracting cable terminal temperature signal from described data signal, and the cable terminal temperature signal collected is uploaded to intelligent comprehensive data standard management module.
A kind of concrete prioritization scheme, Protection Module includes short circuit current sensor and zero sequence current sensor.
Protection Module needs fault current (including zero-sequence current) produced by fault; then the fault current (including zero-sequence current) collected is uploaded to intelligent comprehensive data standard management module, with this quick failure judgement equipment and fault type and quickly isolate faulty equipment.
Short circuit current sensor: for described short circuit current signal is acquired, and the current signal collected is uploaded to intelligent comprehensive data standard management module;
Zero sequence current sensor: for described zero sequence current signal is acquired, and the current signal collected is uploaded to intelligent comprehensive data standard management module.
A kind of concrete prioritization scheme, ambient condition monitoring modular includes humidity sensor, temperature sensor and concentration of sulfur hexafluoride sensor.
Humidity sensor: for described moisture signal is acquired, and the moisture signal collected is uploaded to intelligent comprehensive data standard management module;
Temperature sensor: for described temperature signal is acquired, and the temperature signal collected is uploaded to intelligent comprehensive data standard management module;
Concentration of sulfur hexafluoride sensor: for described concentration of sulfur hexafluoride signal is acquired, and the concentration of sulfur hexafluoride signal collected is uploaded to intelligent comprehensive data standard management module.
A kind of concrete prioritization scheme, wireless communication module includes DTP_S09F module.
DTP_S09F module: the synthetic data and the alarm signals that receive intelligent comprehensive data standard management module are sent to scheduling station system.DTP_S09F module is known wireless terminal, the signal of intelligent comprehensive data standard management module collection, process can be sent to scheduling station.
A kind of concrete prioritization scheme, intelligent comprehensive data standard management module includes alarm.
A kind of concrete prioritization scheme, alarm is audible-visual annunciator.
A kind of concrete prioritization scheme, intelligent comprehensive data standard management module includes display and memorizer.
Display: for the data received and relevant comparative graph are showed operations staff;
Memorizer: for the data received being stored, and relevant historical data and relevant comparative graph can be showed operations staff.
This utility model cable branch box standard information management system is maked an inspection tour not in place running into cable branch box operation maintenance personnel, operate incorrect, cable branch box inner cable terminals temperature is too high, interior humidity, when gas concentration crosses high urgent fortuitous event, the cable branch box standard information management system that this utility model provides can monitor each information automatic Rapid Alarm in time, improve cable branch box O&M ability, hidden troubles removing and Fault Isolation timeliness, thus the maintenance cost reduced and personnel labor intensity, make cable branch box more solid and reliable, improve Reliability of Power Supplying Net Work.
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model cable branch box standard information management system;
Detailed description of the invention
In order to be illustrated more clearly that the technical scheme in this utility model embodiment, the accompanying drawing used required in prior art and embodiment being briefly described explanation below, the accompanying drawing in the following describes is only embodiments more of the present utility model.
Embodiment 1: as it is shown in figure 1, cable branch box standard information management system, including
Make an inspection tour operation module 6, be used for monitoring operations staff and to the daily tour situation of cable branch box and cable feeder pillar is stopped power transmission operation sequence be acquired;
Monitoring of equipment module 5, for gathering the voltage of cable branch box equipment, electric current, sulfur hexafluoride gas pressure and cable terminal temperature;
Protection Module 4, for gathering the fault current of cable branch box internal fault equipment;
Ambient condition monitoring modular 3, for being acquired the environment parameter in cable branch box;
Intelligent comprehensive data standard management module 1; respectively with make an inspection tour operation module 6, monitoring of equipment module 5, Protection Module 4, Protection Module 4 are connected, for receiving, monitor and store data that above-mentioned module gathers and sending alarm signal according to data value selectivity;
Wireless communication module 2, manage module 1 with intelligent comprehensive data standard to be connected, for transmitting data to scheduling station system, the data sent include the intelligent comprehensive data standard management data that receive of module 1 and the alarm signal of intelligent comprehensive data standard management module 1.
Make an inspection tour operation module 6 and include subscriber authentication sensor and operation sensor.
Monitoring of equipment module 5 includes current sensor, voltage sensor, pressure transducer and cable terminal temperature monitoring module.
Cable terminal temperature monitoring module includes optical fiber induction installation, temperature measurement data transfer station and temperature control main frame.
Protection Module 4 includes short circuit current sensor and zero sequence current sensor.
Ambient condition monitoring modular 3 includes humidity sensor, temperature sensor and concentration of sulfur hexafluoride sensor.
Wireless communication module 2 includes DTP_S09F module.
Intelligent comprehensive data standard management module 1 includes alarm.Alarm is audible-visual annunciator.
Intelligent comprehensive data standard management module 1 includes display and memorizer.

Claims (10)

1. cable branch box standard information management system, it is characterised in that: include
Make an inspection tour operation module (6), be used for monitoring operations staff and to the daily tour situation of cable branch box and cable feeder pillar is stopped power transmission operation sequence be acquired;
Monitoring of equipment module (5), for gathering the voltage of cable branch box equipment, electric current, sulfur hexafluoride gas pressure and cable terminal temperature;
Protection Module (4), for gathering the fault current of cable branch box internal fault equipment;
Ambient condition monitoring modular (3), for being acquired the environment parameter in cable branch box;
Intelligent comprehensive data standard management module (1); respectively with make an inspection tour operation module (6), monitoring of equipment module (5), Protection Module (4), Protection Module (4) are connected, be used for receiving, monitor and store data that above-mentioned module gathers and send alarm signal according to data value selectivity;
Wireless communication module (2), manage module (1) with intelligent comprehensive data standard to be connected, for transmitting data to scheduling station system, the data sent include the alarm signal of intelligent comprehensive data standard management module (1) data that receive and intelligent comprehensive data standard management module (1).
2. cable branch box standard information management system according to claim 1, it is characterised in that: make an inspection tour operation module (6) and include subscriber authentication sensor and operation sensor.
3. cable branch box standard information management system according to claim 1, it is characterised in that: monitoring of equipment module (5) includes current sensor, voltage sensor, pressure transducer and cable terminal temperature monitoring module.
4. cable branch box standard information management system according to claim 3, it is characterised in that: cable terminal temperature monitoring module includes optical fiber induction installation, temperature measurement data transfer station and temperature control main frame.
5. cable branch box standard information management system according to claim 1, it is characterised in that: Protection Module (4) includes short circuit current sensor and zero sequence current sensor.
6. cable branch box standard information management system according to claim 1, it is characterised in that: ambient condition monitoring modular (3) includes humidity sensor, temperature sensor and concentration of sulfur hexafluoride sensor.
7. cable branch box standard information management system according to claim 1, it is characterised in that: wireless communication module (2) includes DTP_S09F module.
8. cable branch box standard information management system according to claim 1, it is characterised in that: intelligent comprehensive data standard management module (1) includes alarm.
9. cable branch box standard information management system according to claim 8, it is characterised in that: alarm is audible-visual annunciator.
10. cable branch box standard information management system according to claim 1, it is characterised in that: intelligent comprehensive data standard management module (1) includes display and memorizer.
CN201521133603.5U 2015-12-30 2015-12-30 Cable branch case standard management system Expired - Fee Related CN205389136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521133603.5U CN205389136U (en) 2015-12-30 2015-12-30 Cable branch case standard management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521133603.5U CN205389136U (en) 2015-12-30 2015-12-30 Cable branch case standard management system

Publications (1)

Publication Number Publication Date
CN205389136U true CN205389136U (en) 2016-07-20

Family

ID=56381258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521133603.5U Expired - Fee Related CN205389136U (en) 2015-12-30 2015-12-30 Cable branch case standard management system

Country Status (1)

Country Link
CN (1) CN205389136U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149195A (en) * 2018-10-17 2019-01-04 四川睿华新新能源科技有限公司 A kind of quick transfer box of cable connector
CN111697695A (en) * 2020-06-02 2020-09-22 国网河北省电力有限公司涉县供电分公司 Distribution cable branch box state monitoring system
CN113394728A (en) * 2021-05-07 2021-09-14 天津市渤海新能科技有限公司 Intelligent branch box
CN113421709A (en) * 2021-06-15 2021-09-21 南京纪壹电子科技有限公司 Intelligent comprehensive wiring cable convenient for intelligently monitoring line operation condition

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149195A (en) * 2018-10-17 2019-01-04 四川睿华新新能源科技有限公司 A kind of quick transfer box of cable connector
CN111697695A (en) * 2020-06-02 2020-09-22 国网河北省电力有限公司涉县供电分公司 Distribution cable branch box state monitoring system
CN113394728A (en) * 2021-05-07 2021-09-14 天津市渤海新能科技有限公司 Intelligent branch box
CN113421709A (en) * 2021-06-15 2021-09-21 南京纪壹电子科技有限公司 Intelligent comprehensive wiring cable convenient for intelligently monitoring line operation condition

Similar Documents

Publication Publication Date Title
CN205389136U (en) Cable branch case standard management system
CN205407823U (en) Optical cable fibre core intelligent monitoring system
CN110336379A (en) Transformer Substation Online Monitoring System and terminal device based on Internet of Things
CN103569623B (en) Load-transfer device fault length of run diagnostic system and method
CN204497848U (en) A kind of based on man-machine interface LV Distribution Monitoring System
CN203117742U (en) Intelligent substation safety monitoring and early warning system
CN208059944U (en) Substation's remote intelligent monitoring system based on PLC
CN204789798U (en) Distribution lines running state monitoring device and monitoring system
CN103280887B (en) A kind of transformer station and control centre's intelligent alarm and fault diagnosis system
CN205622325U (en) Remote intelligent power dispatching automation equipment examine monitoring system
CN107546856A (en) A kind of ring-main unit comprehensive monitoring system
CN208984742U (en) A kind of full production cycle automatic test device of distribution terminal
CN204631168U (en) A kind of industrial current transformer remote diagnosis and maintenance system
CN101750985B (en) Remote temperature sensing and monitoring system and method for 0.4kV low voltage switch
CN208571705U (en) A kind of 500kV substation fault recording teletransmission data monitoring system
CN206378569U (en) A kind of voltage relay abnormal detector
CN204883296U (en) Unattended system of transformer substation based on PLC controlling means
CN209589132U (en) A kind of full factory in power station based on big data monitors system
CN104678255A (en) Intelligent electrical measuring instrument control system
CN203465012U (en) Passive, wireless and hierarchical-distribution power transformation switch cabinet temperature measurement online monitoring system
CN202197149U (en) Transformer station safety early warning system
CN207459830U (en) A kind of ring-main unit comprehensive monitoring system
CN102478616A (en) Intelligent overhead line failure alarm with self-adaptive function
CN105186696A (en) Intelligent multifunctional monitoring system
CN202231489U (en) Temperature and humidity monitoring system for switching station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160720

Termination date: 20171230