CN208984742U - A kind of full production cycle automatic test device of distribution terminal - Google Patents

A kind of full production cycle automatic test device of distribution terminal Download PDF

Info

Publication number
CN208984742U
CN208984742U CN201821783954.4U CN201821783954U CN208984742U CN 208984742 U CN208984742 U CN 208984742U CN 201821783954 U CN201821783954 U CN 201821783954U CN 208984742 U CN208984742 U CN 208984742U
Authority
CN
China
Prior art keywords
data
test device
measured body
production cycle
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821783954.4U
Other languages
Chinese (zh)
Inventor
张文博
张峻岭
郑宇虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821783954.4U priority Critical patent/CN208984742U/en
Application granted granted Critical
Publication of CN208984742U publication Critical patent/CN208984742U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The utility model discloses a kind of full production cycle automatic test devices of distribution terminal, including test device, measured body and intelligent terminal, test device includes main controller, data processing, data acquisition and monitoring and power management, main controller signal connects data processing, and data processing is that signal connects with data acquisition and monitoring.Pass through an intelligent terminal connecting test device and measured body, realize the portable control of test device, it is connected by alarm system with the signal that data are analyzed, when data analysis unit analyzes the fault message and geography information of measured body, in time by the data feedback to alarm system, if not within the scope of the preset secure data of alarm system, then alarm system starts, staff is reminded to pay attention to, at the same time, the system that restores electricity starting, the automatic failure for excluding measured body, bring advantage to the user experience, main controller is then convenient for related personnel to be managed and call the data of whole system.

Description

A kind of full production cycle automatic test device of distribution terminal
Technical field
The utility model relates to distribution terminal correlative technology field, specially a kind of full production cycle automation of distribution terminal Test device.
Background technique
Distribution Automation Technology is the important technology for serving the construction of town and country distribution network transform, and power distribution automation includes feeder line Automation and Distribution Management System, the communication technology are the key that power distribution automations.Currently, China's power distribution automation carried out it is more Pilot has been gained universal acceptance by the three-decker that distribution main website, substation and line feed terminals are constituted, and fiber optic communication is as backbone network Communication mode also known together.The realization of feeder automation is also fully able to establish on the basis of fiber optic communication, this makes Line feed terminals can rapidly communicate with one another, common to realize the feeder automation with higher performance.Power distribution automation system System (DAS) is that one kind can make distribution enterprise monitor, coordinate in real time fashion in the distance and the Department of Automation of operation controller switching equipment System;Its content includes electric distribution network data collection and monitoring (SCADA system), distribution GIS-Geographic Information System (GIS) and demand side pipe Manage the several parts (DSM).
The period automatic test device of existing distribution terminal is unable to analyze starting system in time according to data after re-test The system that restores electricity of system is offered convenience with debugging to the user of distribution terminal.
Utility model content
The purpose of this utility model is to provide a kind of full production cycle automatic test devices of distribution terminal, on solving State the problem of proposing in background technique.
To achieve the above object, the utility model provides the following technical solutions: a kind of distribution terminal full production cycle is automatic Change test device, including test device, measured body and intelligent terminal, the test device include main controller, data processing, Data acquisition and monitoring and power management, the main controller signal connect data processing, the data processing and data acquisition with Monitoring is that signal connects, and the measured body includes GIS-Geographic Information System, and the data acquisition and monitoring and measured body are signal company It connects, the intelligent terminal includes alarm system and the system that restores electricity, and the alarm system and the system of restoring electricity pass through Cable signal connection, the system that restores electricity also is that signal connects with measured body.
Preferably, the data processing includes data analysis and data storage, and the data analysis and alarm system are letter Number connection.
Preferably, the data acquisition and monitoring includes four-remote system, and the four-remote system includes telemetering, remote signalling, remote control And remote regulating.
Preferably, the data acquisition and monitoring and measured body be that single-board slot connect, single device to test position connects or The connection of complete machine fixture system.
Preferably, the intelligent terminal is plate or mobile phone.
Compared with prior art, the utility model has the beneficial effects that the full production cycle automatic test of the distribution terminal Device realizes the portable control of test device, passes through report by an intelligent terminal connecting test device and measured body Alert system is connected with the signal that data are analyzed, when data analysis unit analyzes the fault message and geography information of measured body, In time by the data feedback to alarm system, if not within the scope of the preset secure data of alarm system, alarm system Starting reminds staff note that at the same time, the system that restores electricity starting, the automatic failure for excluding measured body, to user with It is experienced to facilitate, main controller is then convenient for related personnel to be managed and call the data of whole system.
Detailed description of the invention
Fig. 1 is the utility model module principle structural schematic diagram.
In figure: 1, test device, 2, measured body, 3, intelligent terminal, 4, main controller, 5, data processing, 6, data adopt Collection and monitoring, 7, power management, 8, GIS-Geographic Information System, 9, alarm system, 10, restore electricity system.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, a kind of embodiment provided by the utility model: a kind of full production cycle automatic test of distribution terminal Device, including test device 1, measured body 2 and intelligent terminal 3, test device 1 include main controller 4, data processing 5, data Acquisition and monitoring 6 and power management 7,4 signal of main controller connect data processing 5, and data processing 5 and data acquisition and monitoring 6 are Signal connection, measured body 2 include GIS-Geographic Information System 8, and data acquisition and monitoring 6 is that signal connects with measured body 2, intelligent terminal Equipment 3 includes alarm system 9 and the system 10 that restores electricity, and alarm system 9 is connected with the system of restoring electricity 10 by cable signal, The system that restores electricity 10 is also connected with measured body 2 for signal.
In the present embodiment, data processing 5 includes data analysis and data storage, and data analysis and alarm system 9 are letter Number connection.
In the present embodiment, data acquisition and monitoring 6 include four-remote system, four-remote system include telemetering, remote signalling, remote control and Remote regulating.
In the present embodiment, data acquisition and monitoring 6 is that single-board slot connects, single device to test position connects with measured body 2 Or complete machine fixture system connection.
In the present embodiment, intelligent terminal 3 is plate or mobile phone.
Working principle: data acquisition and monitoring Unit 6 is connected by single-board slot, single device to test position connects or complete machine Fixture system connection acquires the information of measured body 2 in time, and by its data information transfer to data processing Unit 5, this information is also Including the geographical location where each data, data analysis unit analyzes the data of storage in time, is analyzed result Alarm system 9 is transferred to by signal, and the storage of data and analysis are also transferred to main controller simultaneously, inside alarm system 9 A set of secure data range is preset, if data analysis result exceeds this secure data, alarm system 9 starts, and reminds work Make personnel, at the same time, the system that restores electricity 10 starts, and the location information provided according to GIS-Geographic Information System 8 is timely automated Debugging, bring advantage to the user experience, and main controller is then convenient for related personnel to be managed and adjust the data of whole system With.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (5)

1. a kind of full production cycle automatic test device of distribution terminal, including test device (1), measured body (2) and intelligence are eventually End equipment (3), it is characterised in that: the test device (1) includes main controller (4), data processing (5), data acquisition and monitoring (6) and power management (7), main controller (4) signal connects data processing (5), the data processing (5) and data acquire and Monitor (6) be signal connect, the measured body (2) includes GIS-Geographic Information System (8), the data acquisition and monitoring (6) and by Body (2) are surveyed as signal connection, the intelligent terminal (3) includes alarm system (9) and the system that restores electricity (10), the report Alert system (9) are connected with the system of restoring electricity (10) by cable signal, the system that restores electricity (10) and measured body (2) For signal connection.
2. the full production cycle automatic test device of a kind of distribution terminal according to claim 1, it is characterised in that: described Data processing (5) includes data analysis and data storage, and the data analysis is that signal connects with alarm system (9).
3. the full production cycle automatic test device of a kind of distribution terminal according to claim 1, it is characterised in that: described Data acquisition and monitoring (6) includes four-remote system, and the four-remote system includes telemetering, remote signalling, remote control and remote regulating.
4. the full production cycle automatic test device of a kind of distribution terminal according to claim 1, it is characterised in that: described Data acquisition and monitoring (6) is that single-board slot connects, single device to test position connection or complete machine fixture system connect with measured body (2) It connects.
5. the full production cycle automatic test device of a kind of distribution terminal according to claim 1, it is characterised in that: described Intelligent terminal (3) is plate or mobile phone.
CN201821783954.4U 2018-10-31 2018-10-31 A kind of full production cycle automatic test device of distribution terminal Expired - Fee Related CN208984742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821783954.4U CN208984742U (en) 2018-10-31 2018-10-31 A kind of full production cycle automatic test device of distribution terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821783954.4U CN208984742U (en) 2018-10-31 2018-10-31 A kind of full production cycle automatic test device of distribution terminal

Publications (1)

Publication Number Publication Date
CN208984742U true CN208984742U (en) 2019-06-14

Family

ID=66789807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821783954.4U Expired - Fee Related CN208984742U (en) 2018-10-31 2018-10-31 A kind of full production cycle automatic test device of distribution terminal

Country Status (1)

Country Link
CN (1) CN208984742U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110531713A (en) * 2019-08-07 2019-12-03 北京全路通信信号研究设计院集团有限公司 Automatic production test method and system for train control single board based on industrial robot
CN113922501A (en) * 2021-09-17 2022-01-11 广西英利源盛建设工程有限公司 Photovoltaic power plant remote diagnosis platform based on Internet of things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110531713A (en) * 2019-08-07 2019-12-03 北京全路通信信号研究设计院集团有限公司 Automatic production test method and system for train control single board based on industrial robot
CN113922501A (en) * 2021-09-17 2022-01-11 广西英利源盛建设工程有限公司 Photovoltaic power plant remote diagnosis platform based on Internet of things

Similar Documents

Publication Publication Date Title
CN103248122A (en) Active reporting system for power failure
CN112736959A (en) System and method for monitoring distributed photovoltaic power station
CN102931731A (en) Integrated intelligent monitoring system applicable to substation direct-current power supply
CN208984742U (en) A kind of full production cycle automatic test device of distribution terminal
CN104077934A (en) Integrated training platform for intelligent substation secondary system
CN203632354U (en) Electricity consumption information acquisition abnormity positioning system in electric network
CN103066693A (en) Intelligent terminal for power distribution network
CN203135590U (en) Intelligent power grid integrated data acquisition system
CN202856468U (en) Integrated intelligent monitoring system suitable for substation direct current power supply
CN205540221U (en) Power station remote monitering system based on thing networking
CN204906004U (en) Distributed intelligent regional power grid of network layering
CN110690756A (en) Intelligent management and control system for grounding wire of power transmission line
CN205389136U (en) Cable branch case standard management system
CN108933482A (en) Distribution power automation terminal equipment off-line analysis of causes method based on wireless network signal strength big data
CN204631168U (en) A kind of industrial current transformer remote diagnosis and maintenance system
CN207802397U (en) A kind of mobile phone signal repeater or base station monitoring-controlling system
CN203552454U (en) Centralized meter reading terminal for realization of power distribution and power utilization information collection
CN102790427A (en) Electric monitoring and management system for intelligent distribution network
CN204789872U (en) Distribution system trouble on -line monitoring system
CN205647036U (en) Electric power distribution network distribution equipment fault monitoring system
CN205246753U (en) Equipment with ammeter function
CN203894972U (en) Integrated training platform for secondary system of intelligent transformer station
CN209589132U (en) A kind of full factory in power station based on big data monitors system
CN202721503U (en) Intelligent wireless electric power monitor terminal
CN104092301B (en) Controller switching equipment accumulator remote centralized online monitoring system and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190614

Termination date: 20191031

CF01 Termination of patent right due to non-payment of annual fee