CN102031872B - 地采暖卫生间门口处阻水模具及用其阻水的方法 - Google Patents
地采暖卫生间门口处阻水模具及用其阻水的方法 Download PDFInfo
- Publication number
- CN102031872B CN102031872B CN2010105431354A CN201010543135A CN102031872B CN 102031872 B CN102031872 B CN 102031872B CN 2010105431354 A CN2010105431354 A CN 2010105431354A CN 201010543135 A CN201010543135 A CN 201010543135A CN 102031872 B CN102031872 B CN 102031872B
- Authority
- CN
- China
- Prior art keywords
- mould
- water
- blocking
- doorway
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
- Building Environments (AREA)
Abstract
一种地采暖卫生间门口处阻水模具及用其阻水的方法,属于建筑施工用工具和方法。该模具是截面呈矩形上下贯通的筒状结构,筒状结构前后筒壁的底部分别设置有多个与地暖管对应的豁口。浇筑混凝土地面时将模具放置在卫生间门口处,然后浇注混凝土;浇筑后取下模具,模具处形成拱形豁口;在拱形豁口处做一遍防水,待拱形豁口防水层形成后,浇筑混凝土;拱形豁口防水层形成阻水路线;闭水试验时卫生间内的水被阻挡不能进入起居室。本模具结构简单,设计科学。将其放置在卫生间的出口处,按步骤施工,本方法将地暖管与混凝土接触部位的微小缝隙密闭封严,有效克服了卫生间水源利用采暖管与混凝土接触不密实的漏洞进入到起居室内的弊端,方法简单实用。
Description
技术领域
本发明涉及一种建筑施工用模具和施工方法,具体地说是一种地采暖卫生间门口处阻水模具及用其阻水的方法。
背景技术
目前,根据国家新颁布的建筑节能法要求,地采暖已逐步代替原有暖气片采暖方式,相应的卫生间建筑地面做法也发生改变,由原有的①找平层②防水层③防水保护层④细石混凝土地面,变更为①找平层②防水层③20厚聚苯板(上铺设反射膜)④地暖管⑤细石混凝土地面。
地暖管按照规范要求,每一户不能设有接头,因此,进入卫生间的地暖管只能从门洞口穿过(如能设有接头,可从墙体穿过,然后使用堵漏灵封堵),按照原有操作程序,铺设完地暖管后,进行混凝土浇筑。由于地暖管与混凝土接触不密实,闭水时水顺着地暖管与混凝土之间的微小缝隙从卫生间门口流入起居室。目前还没有专门用于控制地暖管的水流的工具和控制方法。
发明内容
本发明的发明目的一是提供一种结构简单操作方便的地采暖卫生间门口处阻水模具,二是提供一种用所述模具在地采暖卫生间门口处的阻水方法。用该模具按照步骤施工操作,彻底解决了水源从卫生间进入到起居室的问题。
实现上述发明目的采用以下技术方案:
一种地采暖卫生间门口处阻水模具,所述模具是截面呈矩形上下贯通的筒状结构,该筒状结构的前后筒壁的底部分别设置有多个与地暖管对应的豁口。
一种用权利要求1所述的地采暖卫生间门口处阻水模具进行阻水的方法,按下述步骤操作:
首先浇筑混凝土地面时将模具放置在卫生间门口处,然后浇注混凝土;
浇筑后取下模具,模具处形成拱形豁口;
在拱形豁口处做一遍防水,待拱形豁口防水层形成后,浇筑混凝土;
拱形豁口防水层形成阻水路线;
闭水试验。
采用上述技术方案,本模具结构简单,设计科学,模具上拱形豁口的设置,增加了防水层,该防水层形成阻水路线,避免卫生间水源进入到起居室内。将本模具放置在卫生间的出口处,然后再按步骤施工浇注混凝土,将地暖管与混凝土接触部位的微小缝隙密闭封严,阻水效果显著,操作简单,实用。
附图说明
图1是模具结构示意图。
具体实施方式
本发明的设计思想是:制作建筑模具。用该模具浇注混凝土实施防水功能。
本实施例1是一种地采暖卫生间门口处阻水模具,见图1,模具采用木质多层板、塑料板、钢板、竹胶板等可锯割的材料制成。本发明采用木质多层板,其结构是:用木质多层板制作截面呈矩形上下贯通的筒状模具,其长边1(前后壁)的尺寸等于门洞口的宽度,短边2(左右壁)的长度等于墙体的宽度。该筒状结构的下口即前后筒壁的底部分别按照地采暖管的设计位置锯出多个与地暖管对应的豁口3。为了便于刷涂防水层,豁口3设计为拱形结构。
用本发明提供的模具在地采暖卫生间门口处防水的技术步骤如下:
1、将地暖管按照要求的间距铺设好,然后将上述模具固定在卫生间门口处的地面上。2.进行混凝土浇筑。3.浇筑后取下模具,模具处形成拱形豁口,在拱形豁口处涂刷聚氨酯防水涂料做一遍防水。4.最后对此部位进行混凝土浇筑。拱形豁口防水层形成阻水路线,闭水试验时卫生间内的水被阻挡不能进入起居室。
Claims (1)
1.一种用地采暖卫生间门口处阻水模具进行阻水的方法,所述的模具是截面呈矩形上下贯通的筒状结构,该筒状结构的前后筒壁的底部分别设置有多个与地暖管对应的拱形豁口,其特征在于,阻水方法按下述步骤操作:
(1)首先浇筑混凝土地面时将模具放置在卫生间门口处,然后浇筑混凝土;
(2)浇筑后取下模具,模具处形成拱形豁口;
(3)在拱形豁口处做一遍防水,待拱形豁口防水层形成后,浇筑混凝土;
(4)拱形豁口防水层形成阻水路线;
(5)闭水试验。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105431354A CN102031872B (zh) | 2010-11-12 | 2010-11-12 | 地采暖卫生间门口处阻水模具及用其阻水的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105431354A CN102031872B (zh) | 2010-11-12 | 2010-11-12 | 地采暖卫生间门口处阻水模具及用其阻水的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102031872A CN102031872A (zh) | 2011-04-27 |
CN102031872B true CN102031872B (zh) | 2012-03-28 |
Family
ID=43885267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105431354A Active CN102031872B (zh) | 2010-11-12 | 2010-11-12 | 地采暖卫生间门口处阻水模具及用其阻水的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102031872B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322131B (zh) * | 2011-06-28 | 2013-08-21 | 郭春未 | 一种住宅防水施工的隔断拦水方法 |
CN104481034A (zh) * | 2014-11-18 | 2015-04-01 | 北京合建志洋装饰工程有限公司 | 一种防水施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2085349A (en) * | 1980-10-22 | 1982-04-28 | Delmagyarorszagi Magas Es Mely | Process for the production of ducts in structural members |
CN2494861Y (zh) * | 2000-12-28 | 2002-06-12 | 何玉良 | 拼装式模板 |
CN201446620U (zh) * | 2009-07-15 | 2010-05-05 | 江苏省建筑工程集团有限公司 | Cl网板垫块浇筑用模具 |
CN101725097A (zh) * | 2009-12-02 | 2010-06-09 | 中铁八局集团第一工程有限公司 | 一种板式无砟轨道底座伸缩缝的施工方法及伸缩缝模板 |
CN201605807U (zh) * | 2009-12-03 | 2010-10-13 | 山西四建集团有限公司 | 卫生间管道预留洞模具 |
-
2010
- 2010-11-12 CN CN2010105431354A patent/CN102031872B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2085349A (en) * | 1980-10-22 | 1982-04-28 | Delmagyarorszagi Magas Es Mely | Process for the production of ducts in structural members |
CN2494861Y (zh) * | 2000-12-28 | 2002-06-12 | 何玉良 | 拼装式模板 |
CN201446620U (zh) * | 2009-07-15 | 2010-05-05 | 江苏省建筑工程集团有限公司 | Cl网板垫块浇筑用模具 |
CN101725097A (zh) * | 2009-12-02 | 2010-06-09 | 中铁八局集团第一工程有限公司 | 一种板式无砟轨道底座伸缩缝的施工方法及伸缩缝模板 |
CN201605807U (zh) * | 2009-12-03 | 2010-10-13 | 山西四建集团有限公司 | 卫生间管道预留洞模具 |
Also Published As
Publication number | Publication date |
---|---|
CN102031872A (zh) | 2011-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103790382A (zh) | 混凝土结构外墙螺杆洞的快速封堵方法及结构 | |
CN204703312U (zh) | 一种外剪力墙螺栓孔封堵结构 | |
CN207177063U (zh) | 一种预埋空调冷凝水排水管套管的预制砌块 | |
CN102031872B (zh) | 地采暖卫生间门口处阻水模具及用其阻水的方法 | |
CN102767218B (zh) | 卫生间沉箱用框架、卫生间沉箱及施工方法 | |
CN112325005B (zh) | 一种承插式柔性接口钢筋混凝土排水管及其加工工艺 | |
CN112227598A (zh) | 一种设有内置空腔的预制板及制作方法 | |
CN102465570A (zh) | 一种新型保温板及其使用方法 | |
CN201377121Y (zh) | 一种整体浇注混凝土房屋 | |
CN103835421B (zh) | 防渗漏楼板及防渗漏施工方法 | |
WO2018037147A1 (es) | Sistema para la realización de elementos resistentes en construcción | |
CN102864791A (zh) | 预溶模液体膨胀橡胶止水带的施工方法 | |
CN205002203U (zh) | 暖气管道出水通路设备及楼体 | |
CN203446331U (zh) | 猪圈 | |
CN207879352U (zh) | 一种盾构隧道的复合管片环 | |
CN204328234U (zh) | 一种下水管组件 | |
CN104947935B (zh) | 组合式厨卫的建筑施工方法 | |
CN205002202U (zh) | 暖气管道供水通路设备及楼体 | |
CN204225340U (zh) | 一种凹凸斜缝多孔砖 | |
CN204098040U (zh) | 一种多通道可重复注浆管 | |
CN206457736U (zh) | 一种多仓共同沟混凝土预制方涵 | |
CN104131580A (zh) | 一种插接式现场拼装检查井体 | |
CN104314052B (zh) | 造槽机端肋模板脱模方法 | |
CN205002206U (zh) | 暖气管道循环系统及楼体 | |
CN103821109A (zh) | 水池伸缩缝漏水修复方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |