CN102022124B - Method for connecting shield tunnel duct piece and prefabricated flue header sheet - Google Patents
Method for connecting shield tunnel duct piece and prefabricated flue header sheet Download PDFInfo
- Publication number
- CN102022124B CN102022124B CN200910195742.3A CN200910195742A CN102022124B CN 102022124 B CN102022124 B CN 102022124B CN 200910195742 A CN200910195742 A CN 200910195742A CN 102022124 B CN102022124 B CN 102022124B
- Authority
- CN
- China
- Prior art keywords
- shield tunnel
- prefabricated
- prefabricated flue
- header sheet
- duct pieces
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention discloses a method for connecting a shield tunnel duct piece and a prefabricated flue header sheet. The connection method is characterized by comprising the following steps of: a, pre-embedding a connecting reinforcing steel bar and connectors in the shield tunnel duct piece; b, prefabricating a flue header sheet; c, connecting the pre-embedded connectors and a connecting bolt in the shield tunnel duct piece, and arranging positioning steel wedge blocks; d, transporting the prefabricated flue header sheet to a site after completing the construction of the shield tunnel duct piece, positioning through the steel wedge blocks, allowing the connecting bolt to pass through a prepared hole of the flue header sheet, and connecting the prefabricated flue header sheet and the connectors which are pre-embedded in the shield tunnel duct piece by using bolts and nuts; e, pouring fine stone concrete into gaps formed after the prefabricated flue header sheet is connected with the connectors in the shield tunnel duct piece for filling; and f, sealing all the exposed iron pieces with a fire-resistant material (FS3000 expansion joint fire-resistant glue) to position and assemble the shield tunnel duct piece and the flue header sheet. By the method, fast construction of connection between the dust piece and the prefabricated flue header sheet can be guaranteed; the connection method is economic, safe and reliable and brings convenience to construction; and by the method, the flue header sheet can be quickly positioned.
Description
Technical field:
The present invention relates to arrange in shield tunnel smoke vent technical field, be exactly specifically the method that duct pieces of shield tunnel positions, is connected with prefabricated flue header sheet.
Background technology:
Along with the development in city, adopt highway tunnel distance more and more longer of shield construction, and the requirement of fire disaster escaping is also more and more higher.In shield tunnel, smoke vent will be set, and smoke vent is constructed after shield tunnel construction completes, as adopt cast-in-place mode to construct, can greatly affect the construction period.
Summary of the invention:
The method that the object of the present invention is to provide high, economic, the safe section of jurisdiction of a kind of efficiency to be connected with prefabricated flue plate, meeting fast, the requirement of economy, safe construction.
To achieve these goals, technical scheme of the present invention is: the method for attachment of a kind of duct pieces of shield tunnel and prefabricated flue header sheet, is characterized in that: described method of attachment comprises the following steps: a, pre-buried connecting reinforcement and connector in duct pieces of shield tunnel; B, prefabricated flue plate (< < Standard for quality inspection and asswssment of precast concrete members > >, < < concrete structure and prefabricated component detection, defect repair are reinforced new technology and check evaluation criterion > >); C, in duct pieces of shield tunnel, by connecting bolt, be connected with pre-buried connector, then location steel voussoir is set; D is after duct pieces of shield tunnel has been constructed, prefabricated flue sheet is transported to behind scene, by gad piece, locate, by gad piece, locate, then pass the preformed hole of flue sheet and by nut, prefabricated flue plate be connected with connector pre-buried in duct pieces of shield tunnel by connecting bolt; E, prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete and fill, (requirement of strength of fine-stone concrete is C20); F, by all, expose location, the installation that just completes duct pieces of shield tunnel and flue sheet after fire proofing material for ironware (FS3000 shrinkage joint Waterproof gum) packing again.
The present invention adopt the on-the-spot location and installation of prefabricated flue plate can be more fast, economy, safety.It is a kind of comparatively desirable reliable method of attachment of location, convenient construction, economic security that completes fast flue sheet.
Accompanying drawing explanation:
Fig. 1 is the flue sheet connecting joint point diagram in the present invention
Fig. 2 flue sheet connects plane of arrangement figure
The specific embodiment:
Below in conjunction with drawings and Examples, the invention will be further described.
The present invention is the method for attachment of a kind of duct pieces of shield tunnel and prefabricated flue header sheet, it is characterized in that: described method of attachment comprises the following steps: a, at the interior pre-buried connecting reinforcement 1 of duct pieces of shield tunnel 11 and connector 2; B, reinforced concrete prefabricated flue sheet 5, specifically undertaken prefabricated by < < Standard for quality inspection and asswssment of precast concrete members > >, < < concrete structure and prefabricated component detection, defect repair reinforcing new technology and check evaluation criterion > >; C, in duct pieces of shield tunnel, be connected with pre-buried connector 2 by connecting bolt 3, and location steel voussoir 4 is set in duct pieces of shield tunnel; D, after duct pieces of shield tunnel has been constructed, prefabricated flue sheet 5 is transported to behind scene, by gad piece 4 location, then the preformed hole 7 through flue sheet 5 is also connected prefabricated flue plate with nut by bolt 6 with connector 2 pre-buried in duct pieces of shield tunnel by connecting bolt 6; E, prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete 8 and fill, (requirement of strength of fine-stone concrete is C20); F, by all, expose location, the installation that just completes duct pieces of shield tunnel and flue sheet after fire proofing material 9 for ironware (FS3000 shrinkage joint Waterproof gum) packing again.During enforcement in the every endless tube sheet 11 of shield tunnel at least pre-buried 8 connector connecting bolts 6, and 4 location steel voussoirs 4 are set, connector 2 is connected with connecting bolt; Location steel voussoir 4 is connected with the angle steel 10 that is embedded in prefabricated flue plate 5 places, each location steel voussoir is equidistant distribution, distance between two location steel voussoirs is 500-1000 millimeter, in the outer end of prefabricated flue plate, be provided with fire proofing material 12, the fireprotection layer that this fire proofing material adopts commercially available PLASTIC LAMINATED or consists of FS3000 shrinkage joint Waterproof gum.Concrete erection sequence is, pre-buried connecting reinforcement and connector in section of jurisdiction; Prefabricated flue plate again, pre-buried angle steel on its angle; Be ready to connecting bolt, nut, location steel voussoir; Transporting prefabricated flue plate puts in place; With location steel voussoir, carry out the location of prefabricated flue plate; With connecting bolt, nut, be connected with the pre-buried connector in section of jurisdiction; Prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete 8 and fill; By all, complete installation after exposing fire proofing material 9 for ironware (FS3000 shrinkage joint Waterproof gum) packing again.
Claims (4)
1. a method of attachment for duct pieces of shield tunnel and prefabricated flue header sheet, is characterized in that: described method of attachment comprises the following steps: a, pre-buried connecting reinforcement and connector in duct pieces of shield tunnel; B, prefabricated flue plate; C, in duct pieces of shield tunnel inner side, by connecting bolt, be connected with pre-buried connector, then inside the section of jurisdiction of prefabricated flue plate and joint, section of jurisdiction, location steel voussoir be set; D, after duct pieces of shield tunnel has been constructed, prefabricated flue sheet is transported to behind scene, by gad piece, locate, then pass the preformed hole of flue sheet and by nut, prefabricated flue plate be connected with connector pre-buried in duct pieces of shield tunnel by connecting bolt; E, prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete and fill; F, by all, expose the location, the installation that just complete duct pieces of shield tunnel and flue sheet after fire proofing material packing for ironware again.
2. duct pieces of shield tunnel according to claim 1 and prefabricated flue header sheet method of attachment, it is characterized in that: at least pre-buried 8 connector connecting screw rods in the every endless tube sheet of shield tunnel, and 4 location steel voussoirs are set, with connector, be connected with connecting screw rod; Location steel voussoir is connected with the angle steel being embedded on prefabricated flue plate, and each location steel voussoir is equidistant distribution, and the distance between two location steel voussoirs is 500-1000 millimeter.
3. duct pieces of shield tunnel according to claim 1 and 2 and prefabricated flue header sheet method of attachment, is characterized in that: the structure of prefabricated flue plate is ordinary reinforced concrete structure, and the requirement of strength of fine-stone concrete is C20.
4. duct pieces of shield tunnel according to claim 1 and 2 and prefabricated flue header sheet method of attachment, is characterized in that: fire proofing material is FS3000 shrinkage joint Waterproof gum.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910195742.3A CN102022124B (en) | 2009-09-16 | 2009-09-16 | Method for connecting shield tunnel duct piece and prefabricated flue header sheet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910195742.3A CN102022124B (en) | 2009-09-16 | 2009-09-16 | Method for connecting shield tunnel duct piece and prefabricated flue header sheet |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102022124A CN102022124A (en) | 2011-04-20 |
CN102022124B true CN102022124B (en) | 2014-02-05 |
Family
ID=43863855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910195742.3A Active CN102022124B (en) | 2009-09-16 | 2009-09-16 | Method for connecting shield tunnel duct piece and prefabricated flue header sheet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102022124B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107100661A (en) * | 2017-04-28 | 2017-08-29 | 上海城建物资有限公司 | A kind of prefabricated assembled ultra-high performance concrete flue sheet structure |
CN109440544A (en) * | 2018-11-05 | 2019-03-08 | 中铁四院集团西南勘察设计有限公司 | A kind of track girder and the connection structure of shield duct piece and attaching method thereof |
CN110344872A (en) * | 2019-08-22 | 2019-10-18 | 中南大学 | Shield tunnel tilts ceiling smoke discharging structure and its construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19837695C2 (en) * | 1998-08-19 | 2002-11-14 | Aestuver Sued Bauplatten Gmbh | Process for producing a ventilation and / or smoke extraction ceiling in a tunnel-shaped traffic system and module therefor |
CN1865662A (en) * | 2006-06-20 | 2006-11-22 | 浙江省交通规划设计研究院 | Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device |
CN200949473Y (en) * | 2006-06-20 | 2007-09-19 | 浙江省交通规划设计研究院 | Tunnel ventilating system with separate smoke exhauster |
CN101509391A (en) * | 2009-03-13 | 2009-08-19 | 上海市隧道工程轨道交通设计研究院 | Highway tunnel exhaust port setup structure |
CN101509392A (en) * | 2009-03-13 | 2009-08-19 | 上海市隧道工程轨道交通设计研究院 | Highway tunnel exhaust port opening method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003343193A (en) * | 2002-05-30 | 2003-12-03 | Ohbayashi Corp | Method and device for preventing diffusion of smoke |
KR100763026B1 (en) * | 2006-12-19 | 2007-10-02 | 한국철도기술연구원 | Partition walls near twin portals of double bore tunnels |
-
2009
- 2009-09-16 CN CN200910195742.3A patent/CN102022124B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19837695C2 (en) * | 1998-08-19 | 2002-11-14 | Aestuver Sued Bauplatten Gmbh | Process for producing a ventilation and / or smoke extraction ceiling in a tunnel-shaped traffic system and module therefor |
CN1865662A (en) * | 2006-06-20 | 2006-11-22 | 浙江省交通规划设计研究院 | Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device |
CN200949473Y (en) * | 2006-06-20 | 2007-09-19 | 浙江省交通规划设计研究院 | Tunnel ventilating system with separate smoke exhauster |
CN101509391A (en) * | 2009-03-13 | 2009-08-19 | 上海市隧道工程轨道交通设计研究院 | Highway tunnel exhaust port setup structure |
CN101509392A (en) * | 2009-03-13 | 2009-08-19 | 上海市隧道工程轨道交通设计研究院 | Highway tunnel exhaust port opening method |
Non-Patent Citations (1)
Title |
---|
JP特开2003-343193A 2003.12.03 |
Also Published As
Publication number | Publication date |
---|---|
CN102022124A (en) | 2011-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256838B (en) | Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery | |
CN105839666A (en) | Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof | |
CN105862916A (en) | Superimposed assembled type underground pipe gallery system and construction and manufacturing process | |
CN205662947U (en) | Coincide assembled underground pipe gallery system | |
KR101018086B1 (en) | Process of reinforcing conscruction by using reinforced plastic segment lining method | |
CN106801436B (en) | A kind of construction method overlapping assembled underground pipe gallery | |
CN103104041A (en) | Assembled framework beam-column joint adopting transverse connection and construction method thereof | |
CN205171549U (en) | Piping lane prefab and prefabricated formula utility tunnel | |
CN108385871A (en) | The precast wall body of fabricated structure | |
CN204098215U (en) | A kind of novel prefabricated concrete building structures | |
CN211257077U (en) | Prefabricated assembly and cast-in-place utility tunnel who mixes construction | |
CN102022124B (en) | Method for connecting shield tunnel duct piece and prefabricated flue header sheet | |
CN109653246A (en) | A kind of assembly concrete comprehensive pipe gallery structure and construction method | |
CN111441604A (en) | Old house wall body reinforcing device and construction process thereof | |
CN106481347B (en) | A kind of anti-internal water pressure composite shield section of jurisdiction | |
CN113833162B (en) | Shear wall structure system with high prefabrication rate and low cost and construction method | |
CN205243063U (en) | Masonry structure is consolidated to prefabricated wallboard | |
CN113279414A (en) | Octagonal working pit supporting member and installation and construction method thereof | |
CN210421154U (en) | Prefabricated assembled steel-concrete combined underground complex | |
CN103968186A (en) | Repair construction method for water supply pre-stressed concrete cylinder pipe | |
US20150211230A1 (en) | Module for building facades and method of use in construction | |
CN206338075U (en) | A kind of anti-internal water pressure composite shield section of jurisdiction | |
CN105113701B (en) | The precast wall body of fabricated structure | |
CN110409496B (en) | Method for determining structure size of middle box culvert | |
CN104563281B (en) | A kind of prefabricated balcony structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |