CN102022124B - Method for connecting shield tunnel duct piece and prefabricated flue header sheet - Google Patents

Method for connecting shield tunnel duct piece and prefabricated flue header sheet Download PDF

Info

Publication number
CN102022124B
CN102022124B CN200910195742.3A CN200910195742A CN102022124B CN 102022124 B CN102022124 B CN 102022124B CN 200910195742 A CN200910195742 A CN 200910195742A CN 102022124 B CN102022124 B CN 102022124B
Authority
CN
China
Prior art keywords
shield tunnel
prefabricated
prefabricated flue
header sheet
duct pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910195742.3A
Other languages
Chinese (zh)
Other versions
CN102022124A (en
Inventor
杜一鸣
程斌
周质炎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN200910195742.3A priority Critical patent/CN102022124B/en
Publication of CN102022124A publication Critical patent/CN102022124A/en
Application granted granted Critical
Publication of CN102022124B publication Critical patent/CN102022124B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for connecting a shield tunnel duct piece and a prefabricated flue header sheet. The connection method is characterized by comprising the following steps of: a, pre-embedding a connecting reinforcing steel bar and connectors in the shield tunnel duct piece; b, prefabricating a flue header sheet; c, connecting the pre-embedded connectors and a connecting bolt in the shield tunnel duct piece, and arranging positioning steel wedge blocks; d, transporting the prefabricated flue header sheet to a site after completing the construction of the shield tunnel duct piece, positioning through the steel wedge blocks, allowing the connecting bolt to pass through a prepared hole of the flue header sheet, and connecting the prefabricated flue header sheet and the connectors which are pre-embedded in the shield tunnel duct piece by using bolts and nuts; e, pouring fine stone concrete into gaps formed after the prefabricated flue header sheet is connected with the connectors in the shield tunnel duct piece for filling; and f, sealing all the exposed iron pieces with a fire-resistant material (FS3000 expansion joint fire-resistant glue) to position and assemble the shield tunnel duct piece and the flue header sheet. By the method, fast construction of connection between the dust piece and the prefabricated flue header sheet can be guaranteed; the connection method is economic, safe and reliable and brings convenience to construction; and by the method, the flue header sheet can be quickly positioned.

Description

The method of attachment of a kind of duct pieces of shield tunnel and prefabricated flue header sheet
Technical field:
The present invention relates to arrange in shield tunnel smoke vent technical field, be exactly specifically the method that duct pieces of shield tunnel positions, is connected with prefabricated flue header sheet.
Background technology:
Along with the development in city, adopt highway tunnel distance more and more longer of shield construction, and the requirement of fire disaster escaping is also more and more higher.In shield tunnel, smoke vent will be set, and smoke vent is constructed after shield tunnel construction completes, as adopt cast-in-place mode to construct, can greatly affect the construction period.
Summary of the invention:
The method that the object of the present invention is to provide high, economic, the safe section of jurisdiction of a kind of efficiency to be connected with prefabricated flue plate, meeting fast, the requirement of economy, safe construction.
To achieve these goals, technical scheme of the present invention is: the method for attachment of a kind of duct pieces of shield tunnel and prefabricated flue header sheet, is characterized in that: described method of attachment comprises the following steps: a, pre-buried connecting reinforcement and connector in duct pieces of shield tunnel; B, prefabricated flue plate (< < Standard for quality inspection and asswssment of precast concrete members > >, < < concrete structure and prefabricated component detection, defect repair are reinforced new technology and check evaluation criterion > >); C, in duct pieces of shield tunnel, by connecting bolt, be connected with pre-buried connector, then location steel voussoir is set; D is after duct pieces of shield tunnel has been constructed, prefabricated flue sheet is transported to behind scene, by gad piece, locate, by gad piece, locate, then pass the preformed hole of flue sheet and by nut, prefabricated flue plate be connected with connector pre-buried in duct pieces of shield tunnel by connecting bolt; E, prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete and fill, (requirement of strength of fine-stone concrete is C20); F, by all, expose location, the installation that just completes duct pieces of shield tunnel and flue sheet after fire proofing material for ironware (FS3000 shrinkage joint Waterproof gum) packing again.
The present invention adopt the on-the-spot location and installation of prefabricated flue plate can be more fast, economy, safety.It is a kind of comparatively desirable reliable method of attachment of location, convenient construction, economic security that completes fast flue sheet.
Accompanying drawing explanation:
Fig. 1 is the flue sheet connecting joint point diagram in the present invention
Fig. 2 flue sheet connects plane of arrangement figure
The specific embodiment:
Below in conjunction with drawings and Examples, the invention will be further described.
The present invention is the method for attachment of a kind of duct pieces of shield tunnel and prefabricated flue header sheet, it is characterized in that: described method of attachment comprises the following steps: a, at the interior pre-buried connecting reinforcement 1 of duct pieces of shield tunnel 11 and connector 2; B, reinforced concrete prefabricated flue sheet 5, specifically undertaken prefabricated by < < Standard for quality inspection and asswssment of precast concrete members > >, < < concrete structure and prefabricated component detection, defect repair reinforcing new technology and check evaluation criterion > >; C, in duct pieces of shield tunnel, be connected with pre-buried connector 2 by connecting bolt 3, and location steel voussoir 4 is set in duct pieces of shield tunnel; D, after duct pieces of shield tunnel has been constructed, prefabricated flue sheet 5 is transported to behind scene, by gad piece 4 location, then the preformed hole 7 through flue sheet 5 is also connected prefabricated flue plate with nut by bolt 6 with connector 2 pre-buried in duct pieces of shield tunnel by connecting bolt 6; E, prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete 8 and fill, (requirement of strength of fine-stone concrete is C20); F, by all, expose location, the installation that just completes duct pieces of shield tunnel and flue sheet after fire proofing material 9 for ironware (FS3000 shrinkage joint Waterproof gum) packing again.During enforcement in the every endless tube sheet 11 of shield tunnel at least pre-buried 8 connector connecting bolts 6, and 4 location steel voussoirs 4 are set, connector 2 is connected with connecting bolt; Location steel voussoir 4 is connected with the angle steel 10 that is embedded in prefabricated flue plate 5 places, each location steel voussoir is equidistant distribution, distance between two location steel voussoirs is 500-1000 millimeter, in the outer end of prefabricated flue plate, be provided with fire proofing material 12, the fireprotection layer that this fire proofing material adopts commercially available PLASTIC LAMINATED or consists of FS3000 shrinkage joint Waterproof gum.Concrete erection sequence is, pre-buried connecting reinforcement and connector in section of jurisdiction; Prefabricated flue plate again, pre-buried angle steel on its angle; Be ready to connecting bolt, nut, location steel voussoir; Transporting prefabricated flue plate puts in place; With location steel voussoir, carry out the location of prefabricated flue plate; With connecting bolt, nut, be connected with the pre-buried connector in section of jurisdiction; Prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete 8 and fill; By all, complete installation after exposing fire proofing material 9 for ironware (FS3000 shrinkage joint Waterproof gum) packing again.

Claims (4)

1. a method of attachment for duct pieces of shield tunnel and prefabricated flue header sheet, is characterized in that: described method of attachment comprises the following steps: a, pre-buried connecting reinforcement and connector in duct pieces of shield tunnel; B, prefabricated flue plate; C, in duct pieces of shield tunnel inner side, by connecting bolt, be connected with pre-buried connector, then inside the section of jurisdiction of prefabricated flue plate and joint, section of jurisdiction, location steel voussoir be set; D, after duct pieces of shield tunnel has been constructed, prefabricated flue sheet is transported to behind scene, by gad piece, locate, then pass the preformed hole of flue sheet and by nut, prefabricated flue plate be connected with connector pre-buried in duct pieces of shield tunnel by connecting bolt; E, prefabricated flue plate with in space after connector in duct pieces of shield tunnel is connected, water fine-stone concrete and fill; F, by all, expose the location, the installation that just complete duct pieces of shield tunnel and flue sheet after fire proofing material packing for ironware again.
2. duct pieces of shield tunnel according to claim 1 and prefabricated flue header sheet method of attachment, it is characterized in that: at least pre-buried 8 connector connecting screw rods in the every endless tube sheet of shield tunnel, and 4 location steel voussoirs are set, with connector, be connected with connecting screw rod; Location steel voussoir is connected with the angle steel being embedded on prefabricated flue plate, and each location steel voussoir is equidistant distribution, and the distance between two location steel voussoirs is 500-1000 millimeter.
3. duct pieces of shield tunnel according to claim 1 and 2 and prefabricated flue header sheet method of attachment, is characterized in that: the structure of prefabricated flue plate is ordinary reinforced concrete structure, and the requirement of strength of fine-stone concrete is C20.
4. duct pieces of shield tunnel according to claim 1 and 2 and prefabricated flue header sheet method of attachment, is characterized in that: fire proofing material is FS3000 shrinkage joint Waterproof gum.
CN200910195742.3A 2009-09-16 2009-09-16 Method for connecting shield tunnel duct piece and prefabricated flue header sheet Active CN102022124B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910195742.3A CN102022124B (en) 2009-09-16 2009-09-16 Method for connecting shield tunnel duct piece and prefabricated flue header sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910195742.3A CN102022124B (en) 2009-09-16 2009-09-16 Method for connecting shield tunnel duct piece and prefabricated flue header sheet

Publications (2)

Publication Number Publication Date
CN102022124A CN102022124A (en) 2011-04-20
CN102022124B true CN102022124B (en) 2014-02-05

Family

ID=43863855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910195742.3A Active CN102022124B (en) 2009-09-16 2009-09-16 Method for connecting shield tunnel duct piece and prefabricated flue header sheet

Country Status (1)

Country Link
CN (1) CN102022124B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100661A (en) * 2017-04-28 2017-08-29 上海城建物资有限公司 A kind of prefabricated assembled ultra-high performance concrete flue sheet structure
CN109440544A (en) * 2018-11-05 2019-03-08 中铁四院集团西南勘察设计有限公司 A kind of track girder and the connection structure of shield duct piece and attaching method thereof
CN110344872A (en) * 2019-08-22 2019-10-18 中南大学 Shield tunnel tilts ceiling smoke discharging structure and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19837695C2 (en) * 1998-08-19 2002-11-14 Aestuver Sued Bauplatten Gmbh Process for producing a ventilation and / or smoke extraction ceiling in a tunnel-shaped traffic system and module therefor
CN1865662A (en) * 2006-06-20 2006-11-22 浙江省交通规划设计研究院 Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device
CN200949473Y (en) * 2006-06-20 2007-09-19 浙江省交通规划设计研究院 Tunnel ventilating system with separate smoke exhauster
CN101509391A (en) * 2009-03-13 2009-08-19 上海市隧道工程轨道交通设计研究院 Highway tunnel exhaust port setup structure
CN101509392A (en) * 2009-03-13 2009-08-19 上海市隧道工程轨道交通设计研究院 Highway tunnel exhaust port opening method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003343193A (en) * 2002-05-30 2003-12-03 Ohbayashi Corp Method and device for preventing diffusion of smoke
KR100763026B1 (en) * 2006-12-19 2007-10-02 한국철도기술연구원 Partition walls near twin portals of double bore tunnels

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19837695C2 (en) * 1998-08-19 2002-11-14 Aestuver Sued Bauplatten Gmbh Process for producing a ventilation and / or smoke extraction ceiling in a tunnel-shaped traffic system and module therefor
CN1865662A (en) * 2006-06-20 2006-11-22 浙江省交通规划设计研究院 Smoke emission method in tunnel and tunnel ventilation system with separate smoke-emission device
CN200949473Y (en) * 2006-06-20 2007-09-19 浙江省交通规划设计研究院 Tunnel ventilating system with separate smoke exhauster
CN101509391A (en) * 2009-03-13 2009-08-19 上海市隧道工程轨道交通设计研究院 Highway tunnel exhaust port setup structure
CN101509392A (en) * 2009-03-13 2009-08-19 上海市隧道工程轨道交通设计研究院 Highway tunnel exhaust port opening method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2003-343193A 2003.12.03

Also Published As

Publication number Publication date
CN102022124A (en) 2011-04-20

Similar Documents

Publication Publication Date Title
CN105256838B (en) Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery
CN105839666A (en) Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN205662947U (en) Coincide assembled underground pipe gallery system
KR101018086B1 (en) Process of reinforcing conscruction by using reinforced plastic segment lining method
CN106801436B (en) A kind of construction method overlapping assembled underground pipe gallery
CN103104041A (en) Assembled framework beam-column joint adopting transverse connection and construction method thereof
CN205171549U (en) Piping lane prefab and prefabricated formula utility tunnel
CN108385871A (en) The precast wall body of fabricated structure
CN204098215U (en) A kind of novel prefabricated concrete building structures
CN211257077U (en) Prefabricated assembly and cast-in-place utility tunnel who mixes construction
CN102022124B (en) Method for connecting shield tunnel duct piece and prefabricated flue header sheet
CN109653246A (en) A kind of assembly concrete comprehensive pipe gallery structure and construction method
CN111441604A (en) Old house wall body reinforcing device and construction process thereof
CN106481347B (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN113833162B (en) Shear wall structure system with high prefabrication rate and low cost and construction method
CN205243063U (en) Masonry structure is consolidated to prefabricated wallboard
CN113279414A (en) Octagonal working pit supporting member and installation and construction method thereof
CN210421154U (en) Prefabricated assembled steel-concrete combined underground complex
CN103968186A (en) Repair construction method for water supply pre-stressed concrete cylinder pipe
US20150211230A1 (en) Module for building facades and method of use in construction
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN105113701B (en) The precast wall body of fabricated structure
CN110409496B (en) Method for determining structure size of middle box culvert
CN104563281B (en) A kind of prefabricated balcony structure and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant