CN101985839B CN2010105508375A CN201010550837A CN101985839B CN 101985839 B CN101985839 B CN 101985839B CN 2010105508375 A CN2010105508375 A CN 2010105508375A CN 201010550837 A CN201010550837 A CN 201010550837A CN 101985839 B CN101985839 B CN 101985839B
Authority
CN
China
Prior art keywords
bearing
reinforced concrete
load
ballast
steel reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105508375A
Other languages
Chinese (zh)
Other versions
CN101985839A (en
Inventor
彭彪
李继荣
刘光宗
杨永菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Institute of Building Research
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction Engineering Group Co ltd
YUNNAN INSTITUTE OF BUILDING RESEARCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Engineering Group Co ltd, YUNNAN INSTITUTE OF BUILDING RESEARCH filed Critical Yunnan Construction Engineering Group Co ltd
Priority to CN2010105508375A priority Critical patent/CN101985839B/en
Publication of CN101985839A publication Critical patent/CN101985839A/en
Application granted granted Critical
Publication of CN101985839B publication Critical patent/CN101985839B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses a large tonnage pile static loading test ballasting platform counter-force device and a mounting method thereof. In the device, rectangular steel-concrete bearing bedplates with frames (1a) are staggered and stacked to form an inverted pyramidal cascade ballasting platform counter-force device seat (2); the center of each steel-concrete bearing bedplate is provided with a sunk lock hole (3), and four corners of the steel-concrete bearing bedplate are provided with a quarter sunk lock hole respectively; and adjacent steel-concrete bearing bedplates are in limited connection through a latch (4) in the horizontal direction, and are fixed through bolts through the sunk lock holes or anchored by a steel cable in the vertical direction. The mounting method comprises the following steps of: treating a foundation, and mounting a static bearing pedestal; assembling the ballasting platform counter-force device seat; and stacking cuboid ballast boxes on the ballasting platform counter-force device seat in a staggered way to form a ballasting platform counter-force device counterweight body. Construction members for erecting a piled weight platform are convenient to manufacture and transport, can be erected into the piled weight platform in the field of the building site; the structure is simple and safe, and the manufacturing cost is low; and the mounting method is simple and safe, and is easy to implement.

Description

A kind of large-tonnage dead load test on pile foundation ballast platform counterforce device and mounting method
Technical field
The present invention relates to building pile foundation static loading test device and mounting method technical field.
Background technology
Dead load test on pile foundation is one of important content of pile foundation quality detection.So-called dead load test on pile foundation; Be meant function of use by stake; Apply step by step on stake top respectively axial compression, axially uplift force or in the pile foundation support table bottom surface absolute altitude is consistent locates to apply horizontal force; The sedimentation that the respective detection point of observation stake produces in time, on pull out displacement or horizontal movement, according to the test method of relation (being Q~S curve) judgement corresponding single pile vertical resistance pressure bearing capacity, single-pile vertical orientation anti-pulling capacity or the horizontal bearing capacity of single pile of load and displacement.
It is the counterforce device base that existing dead load test on pile foundation need be built the heavy platform of heap usually, and jack is arranged between counterforce device base and the stake top, on the counterforce device base, places mass such as sand pocket, precast concrete block and makes an experiment.And the counterforce device base all is to adopt the heavy section steel winding to form.Along with highrise building, particularly a large amount of constructions of super highrise building, it is also increasing that static loading test is surveyed the bearing capacity tonnage, and the counterforce device base that need build is also increasing.In the face of the dead load test on pile foundation project of a large amount of thousands of tons of magnitudes, on the counterforce device base, place the traditional method of mass such as sand pocket, precast concrete block, that realizes technically at present is difficult increasing.It at first is the counterforce device base heavy of building; Not only cost is high; Intensity is difficult to reach requirement; Problem on deformation is difficult to solve, and will the counterforce device base of heavy or the large-scale component that make up the counterforce device base be moved very difficulty of building site, and landed cost is high and dangerous.Secondly, make the high material consumption of mass, the waste resource, the loading of mass and cost of transportation are also very high.In addition, load counterforce device structural performance and consequent uncontrollable factor and brought bigger potential safety hazard to test.
Summary of the invention
The objective of the invention is to solve the deficiency of prior art; Provide that a kind of member of building the heavy platform of heap is convenient to make, transportation, can assemble on site the heavy platform of heap, simple in structure, safety, large-tonnage dead load test on pile foundation ballast platform counterforce device that cost of manufacture is low in the building site.The present invention also provides the mounting method of this counterforce device.
The objective of the invention is to realize through following technical scheme:
A kind of large-tonnage dead load test on pile foundation ballast platform counterforce device, this counterforce device is staggeredly stacked to form inverted pyramid shape staged ballast platform counterforce device base by the cuboid steel reinforced concrete load-bearing platen that has frame; Be manufactured with a countersunk head lockhole every steel reinforced concrete load-bearing platen center, four angles of every block of steel reinforced concrete load-bearing platen are 1/4th countersunk head lockholes, the common countersunk head lockhole that forms of four jiaos of amalgamations of four blocks of steel reinforced concrete load-bearing platens; Between the adjacent steel reinforced concrete load-bearing platen of horizontal direction through the spacing connection of snap close; Between the adjacent steel reinforced concrete load-bearing platen of vertical direction through the countersunk head lockhole with bolt or cable wire anchoring, the steel reinforced concrete load-bearing platen that is staggeredly stacked is connect the ballast platform counterforce device base that forms the stiff assembly structure.
The present invention is provided with the static load-bearing bearing of the stairstepping that raises successively from the inside to the outside in staged ballast platform counterforce device base bottom.
A kind of mounting method of large-tonnage dead load test on pile foundation ballast platform counterforce device, its mounting process step is:
1. the ground of static load-bearing bearing will be installed handles smooth;
2. static load-bearing bearing is installed successively;
3. be staggeredly stacked with cuboid steel reinforced concrete load-bearing platen and be assembled into inverted pyramid shape staged ballast platform counterforce device base; Between the steel reinforced concrete load-bearing platen that horizontal direction is adjacent with the spacing connection of snap close, between the adjacent steel reinforced concrete load-bearing platen of vertical direction through the countersunk head lockhole with bolt or cable wire anchoring;
4. dispose the cuboid ballast box in addition, the cuboid ballast box is staggeredly stacked forms ballast platform counterforce device balance weight body on ballast platform counterforce device base.
The length of cuboid ballast box of the present invention is long consistent with steel reinforced concrete bearing platform edges of boards, and width is 1/2nd of a length.Form the staggered from inside to outside symmetry arrangement of each layer of assembly cuboid ballast box of balance weight body, arranging between layer and the layer, half-twist is staggered to laminate.The counterweight material that loads in the cuboid ballast box is solid mass or liquid ballast thing.
The present invention adopts the combination of cuboid steel reinforced concrete load-bearing platen to make up the form of structure of the heavy platform of heap; Scattered cuboid steel reinforced concrete load-bearing platen is convenient to the transportation carrying; It is also very convenient that the heavy platform of heap is built in on-the-spot combination; Both solved the difficulty of transporting heavy platform of large-scale heap or heavy section steel structure, also solved the high of the field fabrication of employing heavy section steel and the difficulty of dismantling the heavy platform construction of huge heap, the very long and cost of duration, and also solved large-scale steel and piled the problem that weighs platform intensity and distortion.Laterally pass through the spacing connection of snap close between the adjacent steel reinforced concrete load-bearing platen; It is fit vertically to have constituted rigid group through bolt or cable wire anchoring; In conjunction with the supporting role of set static load-bearing bearing, can effectively solve uncontrollable factor to detecting the potential threat that safety produces.Adopt the cuboid ballast box directly to load mass such as building waste, earth and constitute balance weight body, reduced loading and cost of transportation, source and the sand material loss waste of mass at building-site.Device of the present invention can utilize mass, on-the-spot quick-assembling to connect on the spot, and steel reinforced concrete load-bearing platen, cuboid ballast box etc. can repeatedly use repeatedly, thereby can practice thrift experimentation cost significantly, increase work efficiency.
Mounting method handy and safe of the present invention, easy to implement.
Further set forth content of the present invention below in conjunction with Figure of description.
Description of drawings
Fig. 1 is a steel reinforced concrete bearing platform plated construction sketch map;
Fig. 2 is Fig. 1 vertical view;
Fig. 3 is a structural representation of the present invention;
Fig. 4 is Fig. 3 vertical view;
Fig. 5 is that the present invention is used for the trystate sketch map;
Fig. 6 is Fig. 5 vertical view;
Fig. 7 is a cuboid ballast box structural representation;
Fig. 8 is the vertical view of Fig. 7.
The specific embodiment
The present invention is staggeredly stacked to form Fig. 3, inverted pyramid shape staged ballast platform counterforce device base 2 shown in Figure 4 by the cuboid steel reinforced concrete load-bearing platen 1 of Fig. 1, band edge frame 1a shown in Figure 2.Be manufactured with a countersunk head lockhole 3 at every steel reinforced concrete load-bearing platen 1 center, four angles of every block of steel reinforced concrete load-bearing platen 1 are 1/4th countersunk head lockholes, the common countersunk head lockhole that forms of four jiaos of amalgamations of four blocks of steel reinforced concrete load-bearing platens.Between the adjacent steel reinforced concrete load-bearing platen of horizontal direction through snap close 4 spacing connections; Between the adjacent steel reinforced concrete load-bearing platen of vertical direction through the countersunk head lockhole with bolt or cable wire anchoring, the steel reinforced concrete load-bearing platen that is staggeredly stacked is connect the ballast platform counterforce device base 2 that forms the stiff assembly structure.Steel reinforced concrete load-bearing platen can utilize ripe steel and concrete structure structure manufacture technology to make.
Apparatus of the present invention are installed when carrying out the large-tonnage dead load test on pile foundation, like Fig. 5, shown in Figure 6, the ground that static load-bearing bearing 6 will be installed handle smooth after, the static load-bearing bearing 6 of the stairstepping that raises step by step from inside to outside is installed successively.Be staggeredly stacked with cuboid steel reinforced concrete load-bearing platen 1 then and be assembled into inverted pyramid shape staged ballast platform counterforce device base 2; Between the steel reinforced concrete load-bearing platen that horizontal direction is adjacent with snap close 4 spacing connections, between the adjacent steel reinforced concrete load-bearing platen of vertical direction through the countersunk head lockhole with bolt or cable wire anchoring.The corresponding supplemental support of each grade bearing is positioned at the one-level base of its top, the safety when testing with raising the present invention.In ballast platform counterforce device base 2 bottoms jack 5 is set, the stake top is positioned at the jack bottom.Then, on ballast platform counterforce device base 2, be staggeredly stacked and form ballast platform counterforce device balance weight body 8 like Fig. 7, cuboid ballast box shown in Figure 87.The cuboid ballast box adopts ripe metal bar section process technology, rivet welding technology, application techniques to make.Take building waste or earth or rubble or priming petock at the scene, building site and be packed in the cuboid ballast box, both reduced the cost of transportation of counterweight material, solved problems such as counterweight material source and sand material loss waste again.The staggered from inside to outside symmetry arrangement of each layer of cuboid ballast box, the half-twist of arranging between layer and the layer interlocks and laminates, and the huge frictional force that makes the rectangular build ballast box that is staggeredly stacked utilize self gravitation between layer and layer, to produce forms the entire combination structure.Cuboid ballast box length is general consistent with steel reinforced concrete load-bearing platen 1 length of side, and width is 1/2nd of a length, and height loads the calculating of loading optimised by vehicle size and cuboid ballast box and confirms.This physical dimension setting can conveniently form the staggered tooled joint packing structure of the ballast platform counterforce device base that is combined to form with steel reinforced concrete load-bearing platen.Balance weight body is staggeredly stacked to form the entire combination structure through lifting cuboid ballast box, has both improved operating rate and efficient, has also reduced the potential safety hazard of testing.
The static load-bearing bearing of the present invention method for processing foundation can adopt the method for People's Republic of China's industry standard " building lot treatment technology rules " (JGJ 79) regulation, and the bearing capacity of foundation soil after requiring to handle every square metre should be greater than 1.2-2.5 times of every square metre of maximum load amount of counterforce device.Static load-bearing bearing mounting method adopts direct ballast to load according to test or anchor is pressed the associating loading, can adopt not fixed arrangement mounting method and fixed arrangement mounting method respectively.Ballast platform counterforce device base 2 assembling methods adopt and successively laminate the amalgamation installation from lower to upper.The employing of balance weight body 8 assembling methods successively laminates amalgamation from lower to upper and lays.
Embodiment one:
Certain construction work need be carried out 5000 tons of dead load test on pile foundation, requires to constitute ballast platform counterforce device with steel reinforced concrete load-bearing platen.
Adopt prior art to make steel reinforced concrete load-bearing platen, steel reinforced concrete load-bearing platen physical dimension (long * wide * thick) is 4 * 4 * 0.5 (m 3), adopt the brigade steel to constitute steel reinforced concrete bearing platform edges of boards frame and by center countersunk head lockhole to extraradial bearing plate muscle, be aided with reinforcing steel bar after the welding processing moulding, pouring high strength commercial concrete and maintenance typing.
Adopt prior art to make cuboid ballast box 7 and static load-bearing bearing 6: according to steel reinforced concrete load-bearing platen physical dimension, supporting cuboid ballast box profile physical dimension (length * wide * height) also is set at 4 * 2 * 4 (m 3), adopt T-steel to constitute cuboid ballast box framework, adopt the welding of thick reinforcement steel plate of 5mm and framework to constitute cuboid ballast box all around four sides and bottom surface, form cuboid ballast box finished product behind the rust preventive painting; Supporting static load-bearing bearing is according to steel reinforced concrete load-bearing platen physical dimension, and 10 bearings of inner ring (long * wide) are 1 * 1 (m 2), height is confirmed as 1.5m according to jack minimum constructive height and the outstanding ground level of pile foundation, and respectively enclosing bearing (long * wide) beyond the inner ring is 2 * 2 (m 2); Height increases 0.5m according to the static load-bearing height of support of inner ring from coil to coil; Adopt T-steel to constitute static load-bearing support frame; Be aided with bearing diagonal T-steel member and strengthen weight capacity, adopt the welding of thick reinforcement steel plate of 5mm and static load-bearing bearing upper and lower surface to constitute load-bearing and supporting surface, form static load-bearing bearing finished product behind the rust preventive painting.
Mounting method is following:
(1) static load-bearing bearing ground is handled.Can be according to the building-site different situations; Method or several different methods combination according to People's Republic of China's industry standard " building lot treatment technology rules " (JGJ 79) regulation are handled, according to dead load test on pile foundation tonnage (5000 tons) and ballast platform counterforce device design area (400m 2) require to reach 20T/m 2Do not produce sedimentation and deformation.
(2) static load-bearing bearing is installed.According to bearing platform counterforce device structure, on treated smooth ground, from inside to outside, enclose row in proper order to height and lay the load-bearing bearing, form look round bench-type spill bearing array from short.
(3) ballast platform counterforce device base assembly unit.Adopt successively to laminate the amalgamation installation from lower to upper, spacing fixing on each layer steel reinforced concrete bearing platform plate level direction through snap close, pass through the countersunk head lockhole at last in vertical direction with bolt or cable wire anchoring.Requirement is before the jack pressurized operation, and the gravity that the ballast platform transmits downwards all should bear by static load-bearing bearing.
(4) the cuboid ballast box loads mass.According to the building-site condition, can use manual work or mechanical loading solid mass (building waste, earth, rubble) or liquid ballast thing (water).
(5) balance weight body assembly unit.Employing successively laminates amalgamation from lower to upper and lays; Each layer cuboid ballast box tooled joint is from inside to outside arranged in proper order; Arranging between layer and the layer, half-twist is staggered to laminate, and the huge frictional force of utilizing self gravitation between layer and layer, to produce through the cuboid ballast box that is staggeredly stacked forms the entire combination structure.
According to dead load test on pile foundation tonnage (5000 tons) and cuboid ballast box proportion (establishing weight proportion is 1.5); According to People's Republic of China's industry standard " architecture foundation pile detection technique rules " (JGJ 106), the test of this example needs 55 steel reinforced concrete bearing platforms and 250 cuboid ballast boxes.
Embodiment two:
Certain construction work need be carried out 7000 tons of dead load test on pile foundation, requires to constitute ballast platform counterforce device with steel reinforced concrete load-bearing platen.
Device is made identical with embodiment one.
Mounting method is following:
(1) static load-bearing bearing ground is handled.Can be according to the building-site different situations; Method or several different methods combination according to People's Republic of China's industry standard " building lot treatment technology rules " (JGJ 79) regulation are handled, according to dead load test on pile foundation tonnage (7000 tons) and ballast platform counterforce device design area (400m 2) require to reach 25T/m 2Do not produce sedimentation and deformation.
(2) static load-bearing bearing is installed.According to bearing platform counterforce device structure, on treated smooth ground, from inside to outside, enclose row in proper order to height and lay the load-bearing bearing, form look round bench-type spill bearing array from short.
(3) ballast platform counterforce device base assembly unit.Adopt successively to laminate the amalgamation installation from lower to upper, spacing fixing on each layer steel reinforced concrete bearing platform plate level direction through snap close, pass through the countersunk head lockhole at last in vertical direction with bolt or cable wire anchoring.Requirement is before the jack pressurized operation, and the gravity that the ballast platform transmits downwards all should bear by static load-bearing bearing.
(4) the cuboid ballast box loads mass.According to the building-site condition, can use manual work or mechanical loading solid mass (building waste, earth, rubble) or liquid ballast thing (water).
(5) balance weight body assembly unit.Employing successively laminates amalgamation from lower to upper and lays; Each layer cuboid ballast box tooled joint is from inside to outside arranged in proper order; Arranging between layer and the layer, half-twist is staggered to laminate, and the huge frictional force of utilizing self gravitation between layer and layer, to produce through the cuboid ballast box that is staggeredly stacked forms the entire combination structure.
According to dead load test on pile foundation tonnage (7000 tons) and cuboid ballast box proportion (establishing weight proportion is 1.5); According to People's Republic of China's industry standard " architecture foundation pile detection technique rules " (JGJ 106), the test of this example needs 55 steel reinforced concrete bearing platforms and 350 cuboid ballast boxes.
Embodiment three:
Certain construction work need be carried out 10000 tons of dead load test on pile foundation, requires to constitute ballast platform counterforce device or constitute anchor pressure associating counterforce device with steel reinforced concrete load-bearing platen with steel reinforced concrete load-bearing platen.
Device is made with embodiment one.
Mounting method is following:
(1) static load-bearing bearing ground is handled.Can be according to the building-site different situations; According to the method for People's Republic of China's industry standard " building lot treatment technology rules " (JGJ 79) regulation and combine reinforcement CFG stake to handle (the CFG stake considers that 5m is dark), according to dead load test on pile foundation tonnage (10000 tons) and ballast platform counterforce device design area (400m 2), and consider anchor pressure associating counterforce device structure, require to reach 25T/m 2Do not produce sedimentation and deformation.The CFG stake is arranged according to static load-bearing bearing arranging rule is corresponding, and the installation connecting bolt of formation and static load-bearing bearing.
(2) static load-bearing bearing is installed.According to bearing platform counterforce device structure; On treated smooth ground; From inside to outside, enclose row in proper order to height the load-bearing bearing is installed from short, form look round bench-type spill bearing array, static load-bearing bearing requires with reinforcement CFG stake connecting bolt to be installed and firmly links also and can carry 10T/m 2Uplift force.
(3) ballast platform counterforce device base assembly unit.Adopt successively to laminate the amalgamation installation from lower to upper, spacing fixing on each layer steel reinforced concrete bearing platform plate level direction through snap close, through the countersunk head lockhole static load-bearing bearing one is reinstated bolt or cable wire anchoring in vertical direction at last.Requirement before the jack pressurized operation, the issuable huge downward active force of static load-bearing bearing that the gravity that the ballast platform transmits downwards all should bear by static load-bearing bearing and correspondence will be able to be born in the solid or anchor connection position of bolt when jack work.
(4) the cuboid ballast box loads mass.According to the building-site condition, can use manual work or mechanical loading solid mass (building waste, earth, rubble) or liquid ballast thing (water).
(5) balance weight body assembly unit.Employing successively laminates amalgamation from lower to upper and lays; Each layer cuboid ballast box tooled joint is from inside to outside arranged in proper order; Arranging between layer and the layer, half-twist is staggered to laminate, and the huge frictional force of utilizing self gravitation between layer and layer, to produce through the cuboid ballast box that is staggeredly stacked forms the entire combination structure.
According to dead load test on pile foundation tonnage (10000 tons) and cuboid ballast box proportion (establishing weight proportion is 1.5); According to People's Republic of China's industry standard " architecture foundation pile detection technique rules " (JGJ 106), the test of this example needs 55 steel reinforced concrete bearing platforms and 350 cuboid ballast boxes.

Claims (6)

1. a large-tonnage dead load test on pile foundation ballast platform counterforce device is characterized in that this counterforce device is staggeredly stacked to form inverted pyramid shape staged ballast platform counterforce device base (2) by the cuboid steel reinforced concrete load-bearing platen (1) that has frame (1a); Be manufactured with a countersunk head lockhole (3) at every block of steel reinforced concrete load-bearing platen (1) center, four angles of every block of steel reinforced concrete load-bearing platen (1) are 1/4th countersunk head lockholes, the common countersunk head lockhole that forms of four jiaos of amalgamations of four blocks of steel reinforced concrete load-bearing platens; Between the adjacent steel reinforced concrete load-bearing platen of horizontal direction through the spacing connection of snap close (4); Between the adjacent steel reinforced concrete load-bearing platen of vertical direction through the countersunk head lockhole with bolt or cable wire anchoring, the steel reinforced concrete load-bearing platen that is staggeredly stacked is connect the ballast platform counterforce device base (2) that forms the stiff assembly structure.
2. a kind of large-tonnage dead load test on pile foundation ballast platform counterforce device according to claim 1 is characterized in that, is provided with the static load-bearing bearing (6) of the stairstepping that raises successively from the inside to the outside in staged ballast platform counterforce device base (2) bottom.
3. the mounting method of a large-tonnage dead load test on pile foundation ballast platform counterforce device is characterized in that its mounting process step is:
The ground of static load-bearing bearing (6) 1. will be installed to be handled smooth;
Static load-bearing bearing (6) 2. is installed successively;
3. use cuboid steel reinforced concrete load-bearing platen (1) to be staggeredly stacked and be assembled into inverted pyramid shape staged ballast platform counterforce device base (2); Between the steel reinforced concrete load-bearing platen that horizontal direction is adjacent with the spacing connection of snap close (4), between the adjacent steel reinforced concrete load-bearing platen of vertical direction through the countersunk head lockhole with bolt or cable wire anchoring;
4. dispose cuboid ballast box (7) in addition, cuboid ballast box (7) is staggeredly stacked goes up formation ballast platform counterforce device balance weight body (8) in ballast platform counterforce device base (2).
4. the mounting method of a kind of large-tonnage dead load test on pile foundation ballast platform counterforce device according to claim 3 is characterized in that the length of cuboid ballast box (7) is consistent with steel reinforced concrete load-bearing platen (1) length of side, and width is 1/2nd of a length.
5. according to the mounting method of claim 3 or 4 described a kind of large-tonnage dead load test on pile foundation ballast platform counterforce devices; It is characterized in that; Form the staggered from inside to outside symmetry arrangement of each layer of assembly cuboid ballast box (7) of balance weight body (8), arranging between layer and the layer, half-twist is staggered to laminate.
6. the mounting method of a kind of large-tonnage dead load test on pile foundation ballast platform counterforce device according to claim 3 is characterized in that, the counterweight material that loads in the cuboid ballast box (7) is solid mass or liquid ballast thing.
CN2010105508375A 2010-11-19 2010-11-19 Large tonnage pile static loading test ballasting platform counter-force device and mounting method thereof Active CN101985839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105508375A CN101985839B (en) 2010-11-19 2010-11-19 Large tonnage pile static loading test ballasting platform counter-force device and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105508375A CN101985839B (en) 2010-11-19 2010-11-19 Large tonnage pile static loading test ballasting platform counter-force device and mounting method thereof

Publications (2)

Publication Number Publication Date
CN101985839A CN101985839A (en) 2011-03-16
CN101985839B true CN101985839B (en) 2012-07-25

Family

ID=43710230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105508375A Active CN101985839B (en) 2010-11-19 2010-11-19 Large tonnage pile static loading test ballasting platform counter-force device and mounting method thereof

Country Status (1)

Country Link
CN (1) CN101985839B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107121338A (en) * 2017-06-21 2017-09-01 中冶沈勘工程技术有限公司 A kind of variable cross-section CFG pile composite foundation static tests self-balancing combination unit and method
CN115897685B (en) * 2022-12-27 2023-09-29 湖南元天检测技术有限公司 Vertical resistance to compression static load test device of foundation pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2284673A (en) * 1993-12-08 1995-06-14 Precision Monitoring & Control Testing,in situ,the static load-bearing capacity of a pile
GB2433125A (en) * 2005-12-12 2007-06-13 Terrain Geotechnical Consultan A pile test apparatus
CN201196616Y (en) * 2008-05-19 2009-02-18 佛山市南海区石华强石油化工设备厂 Dead-load pile-load type test apparatus for engineering pile
CN201258494Y (en) * 2008-08-27 2009-06-17 湖南省第六工程有限公司 Loading unit for single-pile vertical anti-pulling static load test
CN101560779A (en) * 2009-05-13 2009-10-21 中冶成工建设有限公司 Foundation pile static test loading counterforce test method and weight boxes used by same
CN201865128U (en) * 2010-11-19 2011-06-15 云南省建筑科学研究院 Weight platform counterforce device for large-tonnage pile foundation static test

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004324352A (en) * 2003-04-28 2004-11-18 Geotop Corp Weight for rapid load test of pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2284673A (en) * 1993-12-08 1995-06-14 Precision Monitoring & Control Testing,in situ,the static load-bearing capacity of a pile
GB2433125A (en) * 2005-12-12 2007-06-13 Terrain Geotechnical Consultan A pile test apparatus
CN201196616Y (en) * 2008-05-19 2009-02-18 佛山市南海区石华强石油化工设备厂 Dead-load pile-load type test apparatus for engineering pile
CN201258494Y (en) * 2008-08-27 2009-06-17 湖南省第六工程有限公司 Loading unit for single-pile vertical anti-pulling static load test
CN101560779A (en) * 2009-05-13 2009-10-21 中冶成工建设有限公司 Foundation pile static test loading counterforce test method and weight boxes used by same
CN201865128U (en) * 2010-11-19 2011-06-15 云南省建筑科学研究院 Weight platform counterforce device for large-tonnage pile foundation static test

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP特开2004-324352A 2004.11.18
刘建峡.千吨级桩基静载试验方法.《西部探矿工程》.1999,第11卷(第3期),第30-32页. *
戴国亮等.桥梁大吨位桩基新静载试验方法的工程应用.《东南大学学报》.2001,第31卷(第4期),第54-57页. *

Also Published As

Publication number Publication date
CN101985839A (en) 2011-03-16

Similar Documents

Publication Publication Date Title
US10704286B2 (en) Method and apparatus for erecting tower with hydraulic cylinders
CN101619630B (en) Mounting method of steel chimney and implementary jacking device
CN101298277A (en) Wood pier combined supporting pier for boatyard
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
CN101985839B (en) Large tonnage pile static loading test ballasting platform counter-force device and mounting method thereof
CN202347529U (en) Metal assembly type tower foundation
CN107696005B (en) lifting operation platform for building construction
CN206680994U (en) Assembled steel reinforced cage descending frame
CN104499706A (en) Elevator well template platform and construction method thereof
CN104314354B (en) High tension electric tower pedestal
CN206844181U (en) Monoblock type granular media jumbo bag preloading device
CN205500636U (en) Water conservancy project component handling device
CN106517009A (en) Large decorated archway lifting tool and construction method thereof
CN201865128U (en) Weight platform counterforce device for large-tonnage pile foundation static test
CN205527291U (en) A frame type frame for hoisting two superimposed sheets
CN201158825Y (en) Lattice type steel column tower crane foundation seat
CN203392111U (en) Prefabricated concrete wall plate transporting device
CN201704698U (en) Detachable tower footing
CN207176719U (en) Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch
CN205990748U (en) A kind of fabricated scaffold constructing device
CN219568602U (en) Assembled temporary ground anchor and ground anchor weight device
CN213267983U (en) Assembled combined tower crane foundation
CN211713706U (en) Large cantilever prefabricated bent cap installation lattice support device
CN220284900U (en) Large-tonnage pile-loading extension type ballast platform for foundation piles
CN115420630B (en) Composite vertical loading mechanism for field load and direct shear test and loading method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170327

Address after: 650223 Kunming, Yunnan, Wuhua District Road, No. 150

Patentee after: Yunnan Institute of Building Research

Patentee after: Yunnan Construction Investment Holding Group Co., Ltd.

Address before: 650023 Kunming City, Yunnan Province University Road, No. 150

Patentee before: Yunnan Institute of Building Research

Patentee before: Yunnan Construction Engineering Group Co., Ltd.