CN101963360A - 一种改善电站输煤系统堵塞的方法 - Google Patents

一种改善电站输煤系统堵塞的方法 Download PDF

Info

Publication number
CN101963360A
CN101963360A CN 201010525339 CN201010525339A CN101963360A CN 101963360 A CN101963360 A CN 101963360A CN 201010525339 CN201010525339 CN 201010525339 CN 201010525339 A CN201010525339 A CN 201010525339A CN 101963360 A CN101963360 A CN 101963360A
Authority
CN
China
Prior art keywords
coal
slag
boiler
handling system
power station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010525339
Other languages
English (en)
Other versions
CN101963360B (zh
Inventor
李文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Lee and Man Paper Manufacturing Co Ltd
Original Assignee
Guangdong Lee and Man Paper Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Lee and Man Paper Manufacturing Co Ltd filed Critical Guangdong Lee and Man Paper Manufacturing Co Ltd
Priority to CN2010105253395A priority Critical patent/CN101963360B/zh
Publication of CN101963360A publication Critical patent/CN101963360A/zh
Application granted granted Critical
Publication of CN101963360B publication Critical patent/CN101963360B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

本发明属于输煤系统技术领域,具体涉及一种改善电站输煤系统堵塞的方法,包括以下步骤:a、煤在锅炉中燃烧产生的炉渣经冷渣管排入冷渣机,炉渣在冷渣机内进行冷却;b、冷却后的炉渣经输渣设备送入渣库;c、用运输车辆将渣库内的炉渣送往磅房进行称重;d、将称重后的炉渣送至煤棚,炉渣与水份超标的原煤按比例混合均匀;e、利用输煤设备将混合均匀的煤输送至煤仓;f、利用给煤机将混合均匀的煤从煤仓送至锅炉。本发明采用煤燃烧产生的炉渣,能保证炉渣的数量和质量;煤燃烧产生的炉渣有一定的含碳量,具有热值,可循环利用;本发明采用的方法简单、可靠,不会影响正常的生产,能有效降低电厂原煤水份,进而改善电站输煤系统堵塞。

Description

一种改善电站输煤系统堵塞的方法
技术领域
本发明属于输煤系统技术领域,具体涉及一种改善电站输煤系统堵塞的方法。
背景技术
输煤系统是火力发电厂的重要组成部分,因此保证输煤系统的正常运行是非常重要的。输煤系统极易发生堵塞,而且每逢雨季的时候堵塞更容易发生,输煤系统堵塞后,轻则需要人工疏通输煤通道,劳动强度大、费时费力,降低输煤系统生产率;严重则损坏输煤设备,中断上煤,影响正常生产。经分析发现,影响输煤系统堵塞的原因主要有以下几点:一是输煤设备的结构设计得不合理;二是原煤性质(颗粒度、水份、煤中矿物质成分等)的影响。
针对以上两点原因,目前采取的防止输煤系统堵塞的方法主要有:进行设备改造,如在输煤下煤斗加装振动器、空气炮等装置或在仓壁敷设高分子聚乙烯板;加强煤质监督,严格控制入厂原煤水份在8%以下,增加干煤棚储煤量。
但是设备改造周期长,费用高,在改造过程中需停运有关设备,影响正常生产;加强入厂原煤煤质监督,但由于煤炭市场、储运方式及气候天气等原因影响,在实际实施中效果甚微。
发明内容
本发明的目的是提供一种改善电站输煤系统堵塞的方法,该方法简单、可靠,可有效降低电厂原煤水份。
本发明的目的是这样实现的。
一种改善电站输煤系统堵塞的方法,包括以下步骤。 
a、煤在锅炉中燃烧产生的炉渣经冷渣管排入冷渣机,炉渣在冷渣机内进行冷却。
b、冷却后的炉渣经输渣设备送入渣库。
c、用运输车辆将渣库内的炉渣送往磅房进行称重。
d、将称重后的炉渣送至煤棚,炉渣与水份超标的原煤按比例混合均匀,在满足保证锅炉燃烧技术要求的前提下,最大限度降低燃煤水份,减少原煤黏结矿物的相对量。
e、利用输煤设备将混合均匀的煤输送至煤仓。
f、最后利用给煤机将混合均匀的煤从煤仓送至锅炉。
其中,所述步骤a中炉渣取自循环流化床锅炉燃烧后的炉渣。
其中,所述步骤a中煤燃烧产生的炉渣的温度为850-900℃,炉渣的含碳量为1%-3%。
其中,所述步骤a中炉渣在冷渣机内冷却至80-120℃。
其中,所述步骤d中水份超标的原煤的含水量在8%-20%。
其中,所述步骤d中炉渣与水份超标的原煤混合的质量比为1:10-50。
本发明的有益效果为:本发明采用煤燃烧产生的炉渣,来源稳定,能保证炉渣的数量和质量;煤燃烧产生的炉渣有一定的含碳量,具有热值,可循环利用,达到节能减排的目的;本发明采用的方法简单、可靠,不会影响正常的生产,能有效降低电厂原煤水份,进而改善电站输煤系统堵塞。
具体实施方式
下面通过实施例对本发明作进一步说明,但本发明的实施范围并不限于此。
实施例1。
一种改善电站输煤系统堵塞的方法,包括以下步骤。
a、煤在循环流化床锅炉中燃烧产生的炉渣,温度为850℃,炉渣的含碳量为1%,经冷渣管排入冷渣机,炉渣在冷渣机内进行冷却至80℃。
b、冷却后的炉渣经输渣设备送入渣库。
c、用运输车辆将渣库内的炉渣送往磅房进行称重。
d、将称重后的炉渣送至煤棚,炉渣与水份超标的原煤按1:10的质量比混合均匀,其中,水份超标的原煤的含水量在8%,在满足保证锅炉燃烧技术要求的前提下,最大限度降低燃煤水份,减少原煤黏结矿物相对量。
e、利用输煤设备将混合均匀的煤输送至煤仓。
f、利用给煤机将混合均匀的煤从煤仓送至锅炉,未发生输煤系统堵塞的现象。
实施例2。
一种改善电站输煤系统堵塞的方法,包括以下步骤。
a、煤在循环流化床锅炉中燃烧产生的炉渣,温度为860℃,炉渣的含碳量为2%,经冷渣管排入冷渣机,炉渣在冷渣机内进行冷却至100℃。
b、冷却后的炉渣经输渣设备送入渣库。
c、用运输车辆将渣库内的炉渣送往磅房进行称重。
d、将称重后的炉渣送至煤棚,炉渣与水份超标的原煤按1:20的质量比混合均匀,其中,水份超标的原煤的含水量在10%,在满足保证锅炉燃烧技术要求的前提下,最大限度降低燃煤水份,减少原煤黏结矿物相对量。
e、利用输煤设备将混合均匀的煤输送至煤仓。
f、利用给煤机将混合均匀的煤从煤仓送至锅炉,未发生输煤系统堵塞的现象。
实施例3。
一种改善电站输煤系统堵塞的方法,包括以下步骤。
a、煤在循环流化床锅炉中燃烧产生的炉渣,温度为900℃,炉渣的含碳量为3%,经冷渣管排入冷渣机,炉渣在冷渣机内进行冷却至120℃。
b、冷却后的炉渣经输渣设备送入渣库。
c、用运输车辆将渣库内的炉渣送往磅房进行称重。
d、将称重后的炉渣送至煤棚,炉渣与水份超标的原煤按1:50的质量比混合均匀,其中,水份超标的原煤的含水量在20%,在满足保证锅炉燃烧技术要求的前提下,最大限度降低燃煤水份,减少原煤黏结矿物相对量。
e、利用输煤设备将混合均匀的煤输送至煤仓。
f、利用给煤机将混合均匀的煤从煤仓送至锅炉,未发生输煤系统堵塞的现象。
实施例4。
一种改善电站输煤系统堵塞的方法,包括以下步骤。
a、煤在锅炉中燃烧产生的炉渣,温度为700℃,炉渣的含碳量为1%,经冷渣管排入冷渣机,炉渣在冷渣机内进行冷却至100℃。
b、冷却后的炉渣经输渣设备送入渣库。
c、用运输车辆将渣库内的炉渣送往磅房进行称重。
d、将称重后的炉渣送至煤棚,炉渣与水份超标的原煤按1:30的质量比混合均匀;其中,水份超标的原煤的含水量在15%,在满足保证锅炉燃烧技术要求的前提下,最大限度降低燃煤水份,减少原煤黏结矿物相对量。
e、利用输煤设备将混合均匀的煤输送至煤仓。
f、利用给煤机将混合均匀的煤从煤仓送至锅炉,未发生输煤系统堵塞的现象。
以上所述仅是本发明的较佳实施方式,故凡依本发明专利申请范围所述的构造、特征及原理所做的等效变化或修饰,均包括于本发明专利申请范围内。

Claims (6)

1.一种改善电站输煤系统堵塞的方法,其特征在于:包括以下步骤:    
a、煤在锅炉中燃烧产生的炉渣经冷渣管排入冷渣机,炉渣在冷渣机内进行冷却;
b、冷却后的炉渣经输渣设备送入渣库;
c、用运输车辆将渣库内的炉渣送往磅房进行称重;
d、将称重后的炉渣送至煤棚,炉渣与水份超标的原煤按比例混合均匀;
e、利用输煤设备将混合均匀的煤输送至煤仓;
f、利用给煤机将混合均匀的煤从煤仓送至锅炉。
2.据权利要求1所述的一种改善电站输煤系统堵塞的方法,其特征在于:所述步骤a中炉渣取自循环流化床锅炉燃烧后的炉渣。
3.根据权利要求1所述的一种改善电站输煤系统堵塞的方法,其特征在于:所述步骤a中煤燃烧产生的炉渣的温度为850-900℃,炉渣的含碳量为1%-3%。
4.根据权利要求1所述的一种改善电站输煤系统堵塞的方法,其特征在于:所述步骤a中炉渣在冷渣机内冷却至80-120℃。
5.根据权利要求1至4任一项所述的一种改善电站输煤系统堵塞的方法,其特征在于:所述步骤d中水份超标的原煤的含水量在8%-20%。
6.根据权利要求5所述的一种改善电站输煤系统堵塞的方法,其特征在于:所述步骤d中炉渣与水份超标的原煤混合的质量比为1:10-50。
CN2010105253395A 2010-10-30 2010-10-30 一种改善电站输煤系统堵塞的方法 Active CN101963360B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105253395A CN101963360B (zh) 2010-10-30 2010-10-30 一种改善电站输煤系统堵塞的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105253395A CN101963360B (zh) 2010-10-30 2010-10-30 一种改善电站输煤系统堵塞的方法

Publications (2)

Publication Number Publication Date
CN101963360A true CN101963360A (zh) 2011-02-02
CN101963360B CN101963360B (zh) 2012-07-25

Family

ID=43516347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105253395A Active CN101963360B (zh) 2010-10-30 2010-10-30 一种改善电站输煤系统堵塞的方法

Country Status (1)

Country Link
CN (1) CN101963360B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61174297A (ja) * 1985-01-29 1986-08-05 Sumitomo Metal Ind Ltd スラグ熱利用の水素、一酸化炭素製造方法
US6883443B2 (en) * 2002-09-09 2005-04-26 Aptech Engineering Services, Inc. Method for reduction of slagging and fouling of the waterwalls and of the firebox and superheater and reheater of steam boilers with coal combustion
CN101097063A (zh) * 2007-07-17 2008-01-02 郑州锅炉有限责任公司 掺烧吹风气的循环流化床锅炉
CN101162087A (zh) * 2007-11-27 2008-04-16 云南省电力设计院 300mw循环流化床锅炉岛装置
CN101575053A (zh) * 2009-06-10 2009-11-11 煤炭科学研究总院 一种无脉动煤粉供给装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61174297A (ja) * 1985-01-29 1986-08-05 Sumitomo Metal Ind Ltd スラグ熱利用の水素、一酸化炭素製造方法
US6883443B2 (en) * 2002-09-09 2005-04-26 Aptech Engineering Services, Inc. Method for reduction of slagging and fouling of the waterwalls and of the firebox and superheater and reheater of steam boilers with coal combustion
CN101097063A (zh) * 2007-07-17 2008-01-02 郑州锅炉有限责任公司 掺烧吹风气的循环流化床锅炉
CN101162087A (zh) * 2007-11-27 2008-04-16 云南省电力设计院 300mw循环流化床锅炉岛装置
CN101575053A (zh) * 2009-06-10 2009-11-11 煤炭科学研究总院 一种无脉动煤粉供给装置

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《中氮肥》 20050531 许清波 恩德粉煤气化炉灰渣再利用分析 第31-32页 1-6 , 第3期 2 *
《广东电力》 20080630 林介团 输煤系统堵塞原因分析及对策 第55-57页 1-6 第21卷, 第6期 2 *
《电力安全技术》 20050331 李国军 锅炉输煤系统防堵改造措施 第34-36页 1-6 第7卷, 第3期 2 *
《电力建设》 19970630 隆威 火电厂输煤系统堵塞原因分析及治理措施 第8-11页 1-6 , 第6期 2 *

Also Published As

Publication number Publication date
CN101963360B (zh) 2012-07-25

Similar Documents

Publication Publication Date Title
CN102827969A (zh) 一种干式粒化液态熔渣的余热回收系统及方法
CN111023845A (zh) 一种环冷机烧结矿余热的利用方法
CN101963360B (zh) 一种改善电站输煤系统堵塞的方法
CN101899344A (zh) 烟叶烘烤用的生物质型煤及其制备方法
CN104073319B (zh) 一种褐煤添加剂及褐煤脱水处理方法
CN101598342A (zh) 生物质燃料推进式给料装置
CN105463139A (zh) 熔融炉渣显热回收方法及装置
CN103564042A (zh) 一种利用高压电蓄热的粮食干燥系统及其干燥方法
CN106520241A (zh) 一种绿色环保生物质颗粒燃料
CN103396095A (zh) 湖泊淤泥制砖工艺
CN102206527B (zh) 一种生物质燃料及其制备方法
CN102827992A (zh) 转炉烟气的能量回收方法
CN202902880U (zh) 一种改进的水泥熟料箅冷机的热风管道
CN102506434B (zh) 电站循环流化床锅炉掺烧药渣工艺
CN109370695A (zh) 一种作物渣腐化颗粒燃料及其制备方法
Feng et al. Discussion of blast furnace slag recycling of a factory
CN202170356U (zh) 无前床鼓风炉炉腹水箱风嘴
CN201339013Y (zh) 可利用焦炉废气的焦炭预热装置
CN210568381U (zh) 新型生物质循环流化床锅炉分离器输灰及余热回收装置
CN203258968U (zh) 一种改进的粉煤灰烘干装置
CN103862564B (zh) 一种生产塑性隔墙条板的流水线
CN202769696U (zh) 一种生物质发电炉前给料装置用防火装置
CN209508048U (zh) 一种水泥生产线水泥配料装置
CN204779741U (zh) 一种改进型除铅渣回炼炉
CN105961075A (zh) 一种高效生态农业养殖循环系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for improving blockage of coal handling system of power station

Effective date of registration: 20190327

Granted publication date: 20120725

Pledgee: China Co truction Bank Corp Dongguan branch

Pledgor: Guangdong Lee & Man Paper Factory Co., Ltd.

Registration number: 2019440000122