CN101957940A - 在线价值工程程序处理系统 - Google Patents
在线价值工程程序处理系统 Download PDFInfo
- Publication number
- CN101957940A CN101957940A CN201010226153XA CN201010226153A CN101957940A CN 101957940 A CN101957940 A CN 101957940A CN 201010226153X A CN201010226153X A CN 201010226153XA CN 201010226153 A CN201010226153 A CN 201010226153A CN 101957940 A CN101957940 A CN 101957940A
- Authority
- CN
- China
- Prior art keywords
- handling system
- value
- value engineering
- project
- team
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Mathematical Physics (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2009-0065939 | 2009-07-20 | ||
KR1020090065939A KR100944760B1 (ko) | 2009-07-20 | 2009-07-20 | 온라인 가치공학 프로세스 처리 시스템 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101957940A true CN101957940A (zh) | 2011-01-26 |
Family
ID=42182780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010226153XA Pending CN101957940A (zh) | 2009-07-20 | 2010-07-14 | 在线价值工程程序处理系统 |
Country Status (3)
Country | Link |
---|---|
KR (1) | KR100944760B1 (ko) |
CN (1) | CN101957940A (ko) |
WO (1) | WO2011010815A2 (ko) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101332354B1 (ko) * | 2013-06-12 | 2013-11-22 | (주)아이엠기술단 | 다자간 의사결정을 지원하는 가치공학 다단계 성능평가 처리 방법 |
KR101484450B1 (ko) * | 2014-07-30 | 2015-01-23 | 단국대학교 산학협력단 | QFD(Quality Function Deployment development)-HOQ(House of Quality) 기반의 시설물 자동 품질 평가 관리 시스템 및 방법 |
KR101690211B1 (ko) | 2014-12-29 | 2016-12-28 | (주)아이티엠 코퍼레이션 건축사사무소 | Bim-기반 건설 가치공학 수행 시스템 |
CN104820901A (zh) * | 2015-05-18 | 2015-08-05 | 中原工学院 | 基于生产现场数据的服装一线员工技能评价方法 |
KR102042048B1 (ko) * | 2018-06-05 | 2019-11-08 | (주)에스텍씨엔씨 | 설계 가치공학의 아이디어 평가방법 및 평가시스템 |
KR102320662B1 (ko) * | 2019-12-27 | 2021-11-02 | 주식회사 드림이엔지 | Ve기반 프로젝트 관리 방법 및 이를 수행하는 프로그램이 저장된 기록매체 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070093258A (ko) * | 2006-03-13 | 2007-09-18 | (주)아이엠기술단 | 의사결정지원을 위한 기능분석계통도 작성방법 및 이를수행하기 위한 장치 |
KR20070047255A (ko) * | 2007-03-19 | 2007-05-04 | (주)아보컨설팅 | 네트워크를 이용한 학습 조직 활동을 통해 경영 혁신 및인적자원을 개발시키는 학습 기업 구축 시스템 및 그 방법 |
-
2009
- 2009-07-20 KR KR1020090065939A patent/KR100944760B1/ko not_active IP Right Cessation
-
2010
- 2010-07-05 WO PCT/KR2010/004362 patent/WO2011010815A2/ko active Application Filing
- 2010-07-14 CN CN201010226153XA patent/CN101957940A/zh active Pending
Also Published As
Publication number | Publication date |
---|---|
WO2011010815A3 (ko) | 2011-06-23 |
WO2011010815A2 (ko) | 2011-01-27 |
KR100944760B1 (ko) | 2010-03-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dhiravidamani et al. | Implementation of lean manufacturing and lean audit system in an auto parts manufacturing industry–an industrial case study | |
Soltan et al. | Lean and agile performance framework for manufacturing enterprises | |
Amaravadi et al. | The dimensions of process knowledge | |
US20150149257A1 (en) | Systems and methods for enterprise profit optimization | |
CN101957940A (zh) | 在线价值工程程序处理系统 | |
CN113807747A (zh) | 一种企业预算管理成熟度测评系统 | |
US20150347952A1 (en) | Partner analytics management tool | |
Tavan et al. | Comparison and analysis of PMBOK 2013 and ISO 21500 | |
Harikrishnan et al. | Productivity improvement in poly-cover packing line through line balancing and automation | |
Babkin et al. | Selection of tools of automation of business processes of a manufacturing enterprise | |
CN117557078B (zh) | 一种基于时间节点的智能生产计划管理方法及系统 | |
Jin et al. | Research issues and trends in industrial productivity over 44 years | |
Darby et al. | Joint ventures, universities, and success in the advanced technology program | |
Santos et al. | Prioritizing stakeholders to boost collaborative R&I projects benefits: an analytic network process approach | |
Vukšić et al. | The role of alignment for the impact of business intelligence maturity on business process performance in Croatian and Slovenian companies | |
Ifrim et al. | Improving the performance of organizational innovation processes by applying the Six Sigma methodology | |
Jarmin et al. | Evaluating government technology programmes: The case of manufacturing extension | |
Park et al. | Multi-factor analysis of firm-level performance through feed-forward, feed-back relationships | |
Pacana et al. | Analysis of the use of agile methods, tools and techniques in foundry enterprises | |
Malvar et al. | Creating Continuous Improvement in Agile Software Development Using Lean Six Sigma | |
Monier-Vinard et al. | Bank on it | |
Hussain et al. | Application of six sigma approach for delay analysis in construction project | |
Molina Cordero | Designing a Standardized Process Flow for Regulatory R&D Service Center: A Design for Lean Six Sigma DMADV Case Study | |
Yanlun | Research on the Impact of Project Management Scheme Selection on Project Economic Achievements Based on Information Construction | |
KUCIŃSKA-LANDWÓJTOWICZ et al. | Improvement Projects-Characteristics and Classification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110126 |