CN101949208B - 一种建筑施工中墙壁抹灰贴设灰饼的施工方法 - Google Patents

一种建筑施工中墙壁抹灰贴设灰饼的施工方法 Download PDF

Info

Publication number
CN101949208B
CN101949208B CN2010102776517A CN201010277651A CN101949208B CN 101949208 B CN101949208 B CN 101949208B CN 2010102776517 A CN2010102776517 A CN 2010102776517A CN 201010277651 A CN201010277651 A CN 201010277651A CN 101949208 B CN101949208 B CN 101949208B
Authority
CN
China
Prior art keywords
ash cake
sticked
wall
metope
need
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102776517A
Other languages
English (en)
Other versions
CN101949208A (zh
Inventor
肖营
陈志龙
郭宁
张宇航
谭锦辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Construction (Group) Co Ltd
Original Assignee
Shenzhen Construction (Group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Construction (Group) Co Ltd filed Critical Shenzhen Construction (Group) Co Ltd
Priority to CN2010102776517A priority Critical patent/CN101949208B/zh
Publication of CN101949208A publication Critical patent/CN101949208A/zh
Application granted granted Critical
Publication of CN101949208B publication Critical patent/CN101949208B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

一种建筑施工中墙壁抹灰贴设灰饼的施工方法,解决人工吊线确定灰饼的厚度满足全部灰饼在同一垂直平面内具有准确性差,效率低的技术的不足。采用的方法是,(1)、墙面前的地面进行清理。(2)、弹出距墙面设计距离的控制线。(3)、将自动安平激光扫平仪设置在控制线上方。(4)、自动安平激光扫平仪发射出垂直激光幕。(5)、控制灰饼垂直平面与激光幕之间的距离,该距离需满足墙壁抹灰厚度的设计要求。本发明的优点是,由于自动安平激光扫平仪形成的垂直激光幕,垂直激光幕作为测量基准,精度准确统一,墙壁上设置的灰饼与垂直激光幕的距离控制方便,施工简单,效率高。特别是解决了面积较小的墙壁灰饼设置困难的技术不足。

Description

一种建筑施工中墙壁抹灰贴设灰饼的施工方法
技术领域
本发明属于一种建筑施工方法,特别是借助于自动安平激光扫平仪实现建筑施工中墙壁抹灰标准灰饼的施工方法。
背景技术
在墙壁抹灰施工中,特别是采用机械设备进行墙壁抹灰施工中,首先需要在墙壁上按设计的墙壁抹灰厚度,在设计的面积内设置多个标准灰饼,每个不同位置上的灰饼厚度,即为该位置墙壁的抹灰厚度,现有技术中灰饼的设置是采用人工的办法,即按设计墙壁抹灰厚度,在规定的面积内设置三个以上灰饼,通过三点成面的原理,人工吊线的办法,校正灰饼的厚度满足全部灰饼在同一垂直平面内。灰饼区域内墙壁抹灰厚度按灰饼厚度进行施工。
现有技术的缺点是,人工吊线的办法准确性差,效率低,没有统一的测量基准,特别是对于门头、短墙和端墙等面积较小的墙壁,由于灰饼之间的距离有限,准确性更差。
发明内容
为克服现有技术在墙壁抹灰施工中,采用人工吊线的办法,确定灰饼的厚度满足全部灰饼在同一垂直平面内具有准确性差,效率低,没有统一的测量基准,特别是对于面积较小的墙壁,由于灰饼之间的距离有限,准确性更差的缺点,本发明公开一种建筑施工中墙壁抹灰标准灰饼的施工方法,克服现有技术的不足。
本发明实现发明目的采用的技术方案是:
建筑施工中墙壁抹灰贴设灰饼的施工方法,该方法是在借助于自动安平激光扫平仪实现的,该方法包括以下步骤:
(1)、对需贴设灰饼墙面前的地面进行清理:
(2)、在需贴设灰饼墙面的两边按要求分别弹出距墙面设计距离的控制线:
(3)、将自动安平激光扫平仪设置在需贴设灰饼墙面前地面的控制线上方:
(4)、调整好自动安平激光扫平仪位置后通电打开,自动安平激光扫平仪在需贴设灰饼墙面前形成与需贴设灰饼墙面具有设计距离的垂直激光幕:
(5)、在需贴设灰饼墙面上贴设灰饼,控制灰饼垂直面与步骤(4)形成激光幕之间的距离,该距离需满足墙壁抹灰厚度的设计要求。
本发明的有益效果是,由于自动安平激光扫平仪形成的垂直激光幕,垂直激光幕作为测量基准,精度准确统一,墙壁上设置的灰饼与垂直激光幕的距离控制方便,施工简单,效率高。特别是解决了面积较小的墙壁灰饼设置困难的技术不足。
下面结合附图对本发明进行详细说明。
附图1为本发明墙壁上灰饼设置正面示意图。
附图2为本发明实施例示意图。
附图中,1自动安平激光扫平仪,2灰饼,3、需设置灰饼的墙面,4激光幕。
具体实施方式
参看附图,建筑施工中墙壁抹灰标准灰饼的施工方法,该方法是在借助于自动安平激光扫平仪1实现的,该方法包括以下步骤:
(1)、对需贴设灰饼墙面前的地面进行清理:,清理干净地面的积水和杂物,便于施工和自动安平激光扫平仪1调整和工作。
(2)、在需贴设灰饼墙面的两边按要求分别弹出距墙面设计距离的控制线,用于确定调整自动安平激光扫平仪1的位置。
(3)、将自动安平激光扫平仪设置在需贴设灰饼墙面前地面的控制线上方。
(4)、调整自动安平激光扫平仪1位置并通电打开,自动安平激光扫平仪1在需设置灰饼墙面3前形成与需设置灰饼墙面3具有设计距离的垂直激光幕4,并效验垂直激光幕4与需设置灰饼墙面3的距离。
(5)、在需贴设灰饼墙面上贴设灰饼墙面3上设置灰饼2,控制灰饼2垂直面与步骤(3)形成激光幕4之间的距离,该距离需满足墙壁抹灰厚度的设计要求。如墙壁抹灰厚度为A,垂直激光幕4与需设置灰饼墙面3的距离H,灰饼2与垂直激光幕4的距离等于H-A。
本发明实施例中,需贴设灰饼墙面两边控制线距离需贴设灰饼墙面距离为30cm。即H=30cm。取得了满意的效果。

Claims (2)

1.一种建筑施工中墙壁抹灰贴设灰饼的施工方法,该方法是在借助于自动安平激光扫平仪实现的,该方法包括以下步骤:
(1)、对需贴设灰饼墙面前的地面进行清理:
(2)、在需贴设灰饼墙面的两边按要求分别弹出距墙面设计距离的控制线:
(3)、将自动安平激光扫平仪设置在需贴设灰饼墙面前地面的控制线上方:
(4)、调整好自动安平激光扫平仪位置后通电打开,自动安平激光扫平仪在需贴设灰饼墙面前形成与需贴设灰饼墙面具有设计距离的垂直激光幕:
(5)、在需贴设灰饼墙面上贴设灰饼,控制灰饼垂直面与步骤(4)形成激光幕之间的距离,该距离需满足墙壁抹灰厚度的设计要求。
2.根据权利要求1所述的一种建筑施工中墙壁抹灰贴设灰饼的施工方法,其特征在于:该方法步骤(3)中,需贴设灰饼墙面两边控制线距离需贴设灰饼墙面距离为30cm。
CN2010102776517A 2010-09-08 2010-09-08 一种建筑施工中墙壁抹灰贴设灰饼的施工方法 Active CN101949208B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102776517A CN101949208B (zh) 2010-09-08 2010-09-08 一种建筑施工中墙壁抹灰贴设灰饼的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102776517A CN101949208B (zh) 2010-09-08 2010-09-08 一种建筑施工中墙壁抹灰贴设灰饼的施工方法

Publications (2)

Publication Number Publication Date
CN101949208A CN101949208A (zh) 2011-01-19
CN101949208B true CN101949208B (zh) 2012-09-05

Family

ID=43452823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102776517A Active CN101949208B (zh) 2010-09-08 2010-09-08 一种建筑施工中墙壁抹灰贴设灰饼的施工方法

Country Status (1)

Country Link
CN (1) CN101949208B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888977B (zh) * 2012-10-26 2014-11-26 深圳广田装饰集团股份有限公司 一种内墙冲筋方法
CN102995899A (zh) * 2012-12-27 2013-03-27 中国建筑一局(集团)有限公司 一种建筑施工竖向构件尺寸的测量控制方法
CN106013645A (zh) * 2016-06-23 2016-10-12 中铁建设集团有限公司 一种采用多台自动调平激光投线仪配合墙面贴灰饼的方法
CN108797929A (zh) * 2018-05-31 2018-11-13 中联世纪建设集团有限公司 生态石材施工工法
CN112343272B (zh) * 2020-10-22 2022-02-25 中建桥梁有限公司 一种弧形段墙面抹灰方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0291132A1 (en) * 1987-05-12 1988-11-17 Redexim B.V. Auxiliary tool for carefully levelling finishing floors
CN2884146Y (zh) * 2006-01-08 2007-03-28 周培银 一种自动安平的激光扫平仪
CN201217936Y (zh) * 2007-11-14 2009-04-08 黄效红 抹灰机调直线装置的信号发生结构
EP2090716A1 (de) * 2008-02-15 2009-08-19 Guido Berger Produktmanagement GmbH Messanordnung und Verfahren zum Ausrichten von Halterungen für Verkleidungselemente

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0291132A1 (en) * 1987-05-12 1988-11-17 Redexim B.V. Auxiliary tool for carefully levelling finishing floors
CN2884146Y (zh) * 2006-01-08 2007-03-28 周培银 一种自动安平的激光扫平仪
CN201217936Y (zh) * 2007-11-14 2009-04-08 黄效红 抹灰机调直线装置的信号发生结构
EP2090716A1 (de) * 2008-02-15 2009-08-19 Guido Berger Produktmanagement GmbH Messanordnung und Verfahren zum Ausrichten von Halterungen für Verkleidungselemente

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姜晨光.自动激光扫平仪的发展现状与应用.《施工技术》.1993,(第07期), *
洪善义.JP电子自动安平激光扫平仪.《建筑机械化》.1985,(第06期), *

Also Published As

Publication number Publication date
CN101949208A (zh) 2011-01-19

Similar Documents

Publication Publication Date Title
CN101949208B (zh) 一种建筑施工中墙壁抹灰贴设灰饼的施工方法
CN102071792A (zh) 一种抹灰工程中采用激光贴饼的方法
CN202770600U (zh) 建筑幕墙空气渗透、雨水渗漏、抗风压性能测试设备
CN100570099C (zh) 一种建筑抹灰找平方法及其建筑墙体
CN202090569U (zh) 一种抹灰冲筋模板
CN106013645A (zh) 一种采用多台自动调平激光投线仪配合墙面贴灰饼的方法
CN107859332B (zh) 预制配电箱线管预埋的施工方法
CN102605938B (zh) 建筑粉墙抹灰找平或地面找平用靠尺及配套冲筋条
CN106088541A (zh) 升降式砂浆条筋靠模及可用于高大墙体的条筋形成工艺
CN203905236U (zh) 生态环保窗下墙
CN204597304U (zh) 一种配电箱体安装固定装置
CN203961226U (zh) 墙面抹灰用阳角冲筋杆
CN209817177U (zh) 一种可控可调整的建筑节能保温框架墙体结构
CN203145419U (zh) 可循环使用的粉墙抹灰找平装置
CN104018651B (zh) 墙面抹灰用阳角冲筋杆及其使用方法
CN204850478U (zh) 混凝土楼层厚度浇筑控制装置
CN203296356U (zh) 墙体刮角器
CN204238529U (zh) 建筑工地用抹灰机
CN203547388U (zh) 蒸压加气混凝土整体窗台构件
CN103291063B (zh) 墙体刮角器
CN203613989U (zh) 单元体隐框百叶型材
CN206542144U (zh) 一种预制集成线盒建筑构件
CN203905496U (zh) 成排接线盒精准定位装置
CN203347170U (zh) 卡拉撑连接件
CN109208851A (zh) 一种用于墙面安装的型材组件

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant