CN101942827B - 超软弱地基筏式工作垫层施工方法 - Google Patents

超软弱地基筏式工作垫层施工方法 Download PDF

Info

Publication number
CN101942827B
CN101942827B CN2010105065860A CN201010506586A CN101942827B CN 101942827 B CN101942827 B CN 101942827B CN 2010105065860 A CN2010105065860 A CN 2010105065860A CN 201010506586 A CN201010506586 A CN 201010506586A CN 101942827 B CN101942827 B CN 101942827B
Authority
CN
China
Prior art keywords
bamboo
raft
sandy soil
cushion layer
bamboo raft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105065860A
Other languages
English (en)
Other versions
CN101942827A (zh
Inventor
董志凌
李俊伟
钱维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil Aviation Airport Construction Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN2010105065860A priority Critical patent/CN101942827B/zh
Publication of CN101942827A publication Critical patent/CN101942827A/zh
Application granted granted Critical
Publication of CN101942827B publication Critical patent/CN101942827B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明提供一种超软弱地基筏式工作垫层施工方法,该方法包括以下步骤:在超软弱地基上,先铺设一层单面防水编织布,所述防水编织布上铺设一层间距为40*40cm方格状的竹排,所述竹排上再铺两层竹笆,最后在上面进行长丝土工织物的覆盖,再进行吹填砂性土作业,吹填砂性土作业分两次或多次吹填,吹填砂性土层,形成工作垫层,为下步塑板桩的打设做基础;所述防水编织布、长丝土工织物铺设时进行的搭接,所述竹排用10#铅丝绑扎,竹笆铺放在竹排上交错搭接并与竹排绑扎形成整体;吹填砂性土工作业。本发明的效果是该工作垫层完全承受砂性土的荷载压力。确保了塑板桩打设后无泥浆益出。节约工期、成本,使超软地基做到一次加固处理、一次成型。

Description

超软弱地基筏式工作垫层施工方法
技术领域
本发明涉及一种超软弱地基筏式工作垫层施工方法,用于天津临港产业区港池吹填完成后,立即在泥面上进行工作垫层施工的方法。
背景技术
为了适应天津临港产业区的快速发展,一些港池吹泥完成后须立即进行地基加固处理,但地基土均为超软弱地基。传统施工做法:待港池内淤泥晾晒达到1-2年,土质达到一定硬度后,再进行传统地基加固的施工工艺处理,但这样就过大拖延了此港池用地的后期投入及使用时间。如果采用二次处理的方法,同样也增加了人工插板的施工工期,以及在人工费、材料费又是一种双重浪费。故本发明以此为背景基础,通过搭建整体筏式的工作垫层,改进施工工艺,从而做到一次处理,一次成型的效果。
发明内容
为解决上述工期与技术中存在的问题,本发明的目的是提供一种超软弱地基筏式工作垫层施工方法,施工工作垫层并完成吹砂,要求其既加快施工进度,又降低工程造价的施工方法。
为实现上述目的,本发明采用的技术方案是提供一种超软弱地基筏式工作垫层施工方法,该方法包括以下步骤:
(1)在含水饱和、无承载力、流状淤泥层厚为7~8m的超软弱地基上,先铺设一层150g/m2单面防水编织布,所述单面防水编织布上铺设一层间距为40*40cm方格状的竹排,所述竹排上再铺两层竹笆,最后在上面进行长丝土工织物的覆盖,再进行吹填砂性土作业,吹填砂性土作业分两次或多次吹填,吹填砂性土层厚度在1米以上,形成工作垫层,为下步塑板桩的打设做基础;
(2)所述单面防水编织布、长丝土工织物铺设时进行的搭接,在现场机械缝制,搭接宽度不小于10cm;所述竹排用10#铅丝绑扎,绑扎间距为40*40cm方格状的竹排;竹笆铺放在竹排上交错搭接并与竹排绑扎形成整体;
(3)吹填砂性土工作垫层操作时层厚均匀,无沉降、翻浆和坑洼积水,平整度控制在±20cm。
根据施工的外边界红线,由外向内依次进行上述的铺设、绑扎、铺设交错施工,使整个工作垫层牢固绑扎成筏式整体。
本发明的效果是工作垫层完全承受砂性土的荷载压力。控制吹砂厚度,最小不低于1m,确保了塑板桩打设后无泥浆益出。在工期的缩短及成本控制上得到节约,使超软地基做到一次加固、一次成型,加大工作垫层的承载力及对吹砂厚度的控制。不仅缩短了工期,并且节约了工程成本。
附图说明
图1为本发明的竹排绑扎间距及搭接平面示意图;
图2为本发明的整体筏式工作垫层斜剖面示意图。
图中:
1、双股交错绑扎的     10#铅丝        2、单面防水编织布
3、竹排               4、竹笆        5、长丝土工织物
具体实施方式
结合实例效果对本发明的超软弱地基筏式工作垫层施工方法加以说明。
如图1、2所示,本发明的超软弱地基筏式工作垫层施工方法,该方法包括以下步骤:
(1)含水饱和、无承载力、流状淤泥层厚为7~8m的超软弱地基,该地基表层为浮泥,厚度均在2m以上,均为细颗粒水、泥混合的粘粒。在这种地基上先铺设一层150g/m2单面防水编织布2,所述防水编织布上铺设一层间距为40*40cm方格状的竹排3,所述竹排3上再铺两层竹笆4,最后在上面进行长丝土工织物5的覆盖,再进行吹填砂性土作业,吹填砂性土作业分两次或多次吹填,吹填砂性土层厚度在1米以上,形成工作垫层,为下步塑板桩的打设做基础;
(2)所述单面防水编织布2、长丝土工织物5铺设时进行的搭接,在现场机械缝制,搭接宽度不小于10cm;所述竹排3用10#铅丝绑扎,绑扎间距为40*40cm方格状的竹排3;竹笆4铺放在竹排3上交错搭接并与竹排3绑扎形成整体;
(3)吹填砂性土工作垫层操作时层厚均匀,无沉降、翻浆和坑洼积水,平整度控制在±20cm。
根据施工的外边界红线,由外向内依次进行上述的铺设、绑扎、铺设交错施工,使整个工作垫层牢固绑扎成筏式整体。
本发明的超软弱地基筏式工作垫层施工方法是这样实现的:按以下步骤操作:
1、工作垫层施工
1)铺设编织布
在施工前,将区内积水排除干净,排除部分浮泥,并保证在后续的施工中,区内无积水。
采用150g/m2单面防水编织布2。现场人工进行铺设,接缝处现场进行缝合,铺设过程中,避免编织布被刺破。铺设一层竹排,在编织布上铺设一层间距40cm*40cm的竹排,用双股交错绑扎的10#铅丝1绑扎成整体,如图1所示。
3)铺设二层竹笆
用人工进行铺设,采用铅丝进行绑扎,将二层竹笆4均与竹排3连成整体。
4)铺设无纺土工布
长丝土工织物5材料采用300g/m2长丝,现场人工进行铺设,接缝处现场进行缝合。
在长丝土工织物5铺设完成后,保证施工人员能在其上面行走。
2、吹填砂性土施工
1)施工方法
根据现场的地质、地形情况,吹填砂性土,平均厚度2200mm,且最小厚度不低于1000mm。根据现场情况分层吹填及人工填筑相结合施工。吹填的厚度以能够满足后续的各项施工为准,分三次吹填到位。
3、工艺流程
根据施工的外边界红线,经排水,在浮泥层上铺设编织布,再铺设一层竹排、铺设二层竹笆,铺设一层无纺土工布,然后吹填砂性土,进行整平。施工期间铺设、绑扎、铺设等工序交错施工,流水作业,使整个工作垫层牢固绑扎成筏式整体。
本发明的超软弱地基筏式工作垫层施工方法,首次应用于天津临港产业区中外运码头地基处理工程。
在天津临港产业区中外运码头地基处理施工中,经过整体筏式工作垫层及砂性土吹填施工后,有效的解决了超软弱地基无法一次处理的难题。砂性土施工完成后,很好的承受了排水板打桩机自身压力及施工打设的压力。从而节约了工期及施工成本,也为超弱软地基加固施工开辟了一条新的道路。

Claims (1)

1.一种超软弱地基筏式工作垫层施工方法,该方法包括以下步骤:
(1)在含水饱和、无承载力、流状淤泥层厚为7~8m的超软弱地基上,先铺设一层150g/m2单面防水编织布,所述单面防水编织布上铺设一层间距为40*40cm方格状的竹排,所述竹排上再铺两层竹笆,最后在上面进行300g/m2长丝土工织物的覆盖,再进行吹填砂性土作业,吹填砂性土作业分多次吹填,吹填砂性土层平均厚度2200mm,且最小厚度不低于1000mm,形成工作垫层,为下步塑板桩的打设做基础;
(2)所述单面防水编织布、长丝土工织物铺设时进行的搭接,在现场机械缝制,搭接宽度不小于10cm;所述竹排用10#铅丝绑扎,绑扎间距为40*40cm方格状的竹排;竹笆铺放在竹排上交错搭接并与竹排绑扎形成筏式整体;
(3)吹填砂性土工作垫层操作时分三次吹填到位,层厚均匀,无沉降、翻浆和坑洼积水,平整度控制在±20cm。
CN2010105065860A 2010-10-14 2010-10-14 超软弱地基筏式工作垫层施工方法 Active CN101942827B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105065860A CN101942827B (zh) 2010-10-14 2010-10-14 超软弱地基筏式工作垫层施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105065860A CN101942827B (zh) 2010-10-14 2010-10-14 超软弱地基筏式工作垫层施工方法

Publications (2)

Publication Number Publication Date
CN101942827A CN101942827A (zh) 2011-01-12
CN101942827B true CN101942827B (zh) 2012-05-30

Family

ID=43435012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105065860A Active CN101942827B (zh) 2010-10-14 2010-10-14 超软弱地基筏式工作垫层施工方法

Country Status (1)

Country Link
CN (1) CN101942827B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696414A (zh) * 2012-09-28 2014-04-02 上海宝冶集团有限公司 海边滩涂区域超深度塑料排水板施工方法
CN103397655B (zh) * 2013-08-03 2015-11-25 朱奎 预应力筏板基础施工方法
CN107476160B (zh) * 2017-06-29 2020-04-24 中交一航局第四工程有限公司 一种红土沙砾路面基层的改良方法
CN110747839A (zh) * 2019-09-19 2020-02-04 国网浙江省电力有限公司建设分公司 一种软弱滩涂地基上回填土施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302756A (zh) * 2008-03-03 2008-11-12 张伯谦 一种新型土工格栅
CN101429763A (zh) * 2008-12-17 2009-05-13 中交第一航务工程勘察设计院有限公司 竹篙格架超软土地基表层处理结构
EP2065517A1 (de) * 2007-11-27 2009-06-03 Huesker Synthetic GmbH Dichtungsmatte, insbesondere für den Deichbau
CN101591905A (zh) * 2009-06-03 2009-12-02 叶凝雯 新吹填淤泥质土软地基草垫预压加固法
CN101672031A (zh) * 2009-09-24 2010-03-17 中交一航局第四工程有限公司 网状排水垫层替代满铺砂垫层施工方法
CN101684649A (zh) * 2009-08-21 2010-03-31 中山大学 在大面积超软土场地上施工作业的方法及所用的钢架系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2065517A1 (de) * 2007-11-27 2009-06-03 Huesker Synthetic GmbH Dichtungsmatte, insbesondere für den Deichbau
CN101302756A (zh) * 2008-03-03 2008-11-12 张伯谦 一种新型土工格栅
CN101429763A (zh) * 2008-12-17 2009-05-13 中交第一航务工程勘察设计院有限公司 竹篙格架超软土地基表层处理结构
CN101591905A (zh) * 2009-06-03 2009-12-02 叶凝雯 新吹填淤泥质土软地基草垫预压加固法
CN101684649A (zh) * 2009-08-21 2010-03-31 中山大学 在大面积超软土场地上施工作业的方法及所用的钢架系统
CN101672031A (zh) * 2009-09-24 2010-03-17 中交一航局第四工程有限公司 网状排水垫层替代满铺砂垫层施工方法

Also Published As

Publication number Publication date
CN101942827A (zh) 2011-01-12

Similar Documents

Publication Publication Date Title
CN101270571B (zh) 分层自重、预压排水固结联合强夯软土地基加固方法
CN102817354B (zh) 吹填加固并举的疏浚软土地基处理方法
CN102839630B (zh) 淤泥质土充填袋筑堤施工方法
CN102817348B (zh) 新近吹填淤泥地基处理方法
CN106120823B (zh) 一种临时围堰组合防渗结构及快速施工方法
CN101225656B (zh) 超软弱土浅表层快速加固方法
CN101942827B (zh) 超软弱地基筏式工作垫层施工方法
CN106759223B (zh) 可控刚性桩+排水体+加筋垫层组合型复合地基
CN101718089A (zh) 联合真空预压法地基处理施工方法
CN204530732U (zh) 一种基于地下室电梯井积水坑的降水构造
CN101666083A (zh) 软土地基处理加筋方法及其装置
CN205636721U (zh) 滤井真空预压加固深厚软土地基的设备
CN109610436A (zh) 一种分块式吹填场地处理方法
CN102493396A (zh) 围海造陆分层吹泥施工方法
CN101831898B (zh) 水平向浅层负压固结工作垫层的方法
CN106065627A (zh) 建筑底板排水系统及其施工方法
CN107419628A (zh) 一种在吹填土地基上快速构建道路的施工方法
CN104452665B (zh) 一种深海区海堤砂被铺设方法
CN207277284U (zh) 一种组合抽屉式护岸结构
CN205502020U (zh) 一种止水放坡基坑支护结构
CN113322932B (zh) 一种真空预压联合土工膜袋装置堆载加固地基的方法
CN106284415B (zh) 一种取水头沉箱的吊浮式施工方法
CN101812853B (zh) 游泳池基础主动抗浮施工方法
CN105256763A (zh) 一种竹排架结构的筑堤方法
CN204457863U (zh) 井字形防排水板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300456 No. two, No. 173, Xingang Road, Tanggu District, Tianjin

Patentee after: Civil Aviation Airport Construction Engineering Co., Ltd

Address before: 300456 No. two, No. 173, Xingang Road, Tanggu District, Tianjin

Patentee before: No.4 Engineering Company Ltd. of CCCC

CP01 Change in the name or title of a patent holder