CN101935984B CN2010102749524A CN201010274952A CN101935984B CN 101935984 B CN101935984 B CN 101935984B CN 2010102749524 A CN2010102749524 A CN 2010102749524A CN 201010274952 A CN201010274952 A CN 201010274952A CN 101935984 B CN101935984 B CN 101935984B
Authority
CN
China
Prior art keywords
track
girder erection
erection crane
longeron
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102749524A
Other languages
Chinese (zh)
Other versions
CN101935984A (en
Inventor
李军堂
秦顺全
涂满明
毛伟琦
张爱花
姚发海
张瑞霞
姚森
彭颇
李海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN2010102749524A priority Critical patent/CN101935984B/en
Publication of CN101935984A publication Critical patent/CN101935984A/en
Application granted granted Critical
Publication of CN101935984B publication Critical patent/CN101935984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a traveling device of frame beam crane of steel truss girder of a cable-stayed bridge; the traveling device comprises traveling rails and a driving mechanism; the traveling rail comprises beams of the rails, carlings of the rails, and gliders; the number of the beams of the rails is at least three; one of the beams of the rails used as the beam of a switching rail is installed at the upper surface of carlings of the left and the right rails and is positioned behind the frame beam crane; two ends of the rest beams of the rails are respectively anchored on a left and a right upper chord members of a main truss; the carling of the rail comprises left and right carlings of the rail which are respectively anchored on the upper surface of the rest beams of the rail and are parallel with the left and the right upper chord members of the main truss; the lower ends of front left and right, back left and right gliders are respectively installed on carlings of the left and the right rails; and upper ends thereof are respectively fixed on the leg of the frame beam crane and are driven by the driving mechanism comprising a left and a right traveling cylinders. The carlings of the rails can prevent suspension cable anchor structure on the main truss sot that the frame beam crane travels on the steel truss girder along the carling of the rail smoothly.

Description

The running gear and the method for using of cable stayed bridge steel truss girder girder erection crane
Technical field
The present invention relates to the bridge construction device, be specifically related to the running gear and the method for using of cable stayed bridge steel truss girder girder erection crane.
Background technology
Along with the fast development of China's infrastructure, large span stayed-cable bridge emerges like the mushrooms after rain, and steel truss girder cable-stayed bridge especially is big with its span ability, bearing load heavy and become the main flow of present Railway Cable-stayed Bridge.The at present general girder erection crane symmetry cantilever erection that adopts of steel truss girder cable-stayed bridge places the piston shoes of girder erection crane on the main couple upper chord, and the flexible operation through the traveling oil cylinder makes the loop wheel machine reach.
In recent years, because anchor drawplate type anchor structure cost is low on the suspension cable, anchor point is stressed clearly, maintain characteristics such as convenient, some large span stayed-cable bridges have been widely used in.But when the suspension cable anchor structure of using anchor arm-tie or other form on the main truss caused on the steel truss girder upper chord obstruction being arranged, the traveling form of construction work of traditional girder erection crane was infeasible.
Summary of the invention
Technical problem to be solved by this invention is the problem that solves the suspension cable anchor structure restriction girder erection crane traveling on the steel truss girder cable-stayed bridge main truss.
In order to solve the problems of the technologies described above, the technical scheme that the present invention adopted provides a kind of running gear of cable stayed bridge steel truss girder girder erection crane, comprises walking rails and driving mechanism, and said walking rails comprises:
At least three track cross beams, respectively perpendicular to the left and right upper chord setting of cable stayed bridge main truss, wherein track cross beam is switched in a conduct, and the two ends of all the other track cross beams are anchored at respectively on the left and right upper chord of main truss;
Left and right track longeron; Be formed by connecting with bolt each other in twos a plurality of sections respectively; The suspension cable anchor structure that said left and right track longeron is separately positioned on the main truss is inboard; Parallel with the left and right upper chord of main truss and be anchored at respectively on above-mentioned all the other track cross beam upper surfaces, switch the rear that track cross beam is arranged on the left and right track longeron upper surface and is positioned at girder erection crane;
Before left and right and back left and right four piston shoes, the lower end of above-mentioned four piston shoes is separately positioned on the left and right track longeron, the upper end is separately fixed on the supporting leg of girder erection crane.
Said driving mechanism comprises left and right traveling oil cylinder, be separately positioned between forward and backward left piston shoes and the forward and backward right piston shoes, the two ends of said left and right traveling oil cylinder be anchored at respectively left and right track longeron with before on the left and right piston shoes.
In said apparatus, said left and right track longeron by before, during and after three sections form, and any two sections length sum is greater than the distance between a forward and backward left side and the forward and backward right piston shoes.
The present invention also provides the method for using of the running gear of above-mentioned cable stayed bridge steel truss girder girder erection crane, may further comprise the steps:
A10, girder erection crane are installed on the left and right track longeron, and will switch the rear that track cross beam is placed on the left and right track longeron upper surface and is positioned at girder erection crane;
After steel truss girder in the A20, girder erection crane the place ahead one sections all installs, 180 ° of girder erection crane revolutions will switch track cross beam lift by crane girder erection crane the place ahead and with the left and right upper chord anchoring of main truss;
A30, the track longeron at girder erection crane rear and the anchoring between the track cross beam are removed; And through girder erection crane revolution lifting; Respectively the track longeron is winched to girder erection crane the place ahead and is anchored at and switch on the track cross beam, be connected with the track longeron bolt at its rear simultaneously;
Anchor connection between A40, releasing girder erection crane and the track longeron through the expanding-contracting action of traveling oil cylinder, makes the girder erection crane reach;
After the reach of A50, girder erection crane puts in place,, and turn round 180 ° and lift by crane the track cross beam at its rears and be placed on the track longeron as the new track cross beam of switching again with itself and the anchoring of track longeron.
The present invention, the track longeron is arranged on the suspension cable anchor structure inboard of anchor arm-tie or other form, avoids the suspension cable anchor structure on the main truss, makes girder erection crane smooth traveling of track longeron in the steel truss girder upper edge.
Description of drawings
Fig. 1 is a kind of specific embodiment structural representation of the present invention;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3-Fig. 5 is a method for using sketch map of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is made detailed explanation.
Fig. 1 is a kind of specific embodiment structural representation of the running gear of cable stayed bridge steel truss girder girder erection crane provided by the invention, and Fig. 2 is the vertical view of Fig. 1, and like Fig. 1, shown in Figure 2, the running gear of this girder erection crane comprises walking rails and driving mechanism.
Walking rails is made up of track cross beam, track longeron and piston shoes; Wherein track cross beam comprises first, second, third, fourth 4 track cross beams 41,42,43,44; The track longeron is made up of left and right track longeron 31,32; Above-mentioned four track cross beams are provided with perpendicular to the left and right upper chord 21,22 of main truss respectively, and the 4th track cross beam 44 is as switching track cross beam, and the two ends of all the other track cross beams 41,42,43 are anchored at respectively on the left and right upper chord 21,22 of main truss.
Left and right track longeron 31,32 is separately positioned on the suspension cable anchor structure inboard (being the inboard of main truss anchor arm-tie 51,52) on the main truss; Apart from about the 1.5m of main truss center; Parallel with the left and right upper chord of main truss 21,22 and be anchored at respectively on first, second, third track cross beam 41,42,43, be arranged on the upper surface of left and right track longeron 31,32 as the 4th track cross beam 44 of switching track cross beam and be positioned at the rear of girder erection crane.Left and right track longeron 31,32 comprises a plurality of sections respectively and is connected respectively by high-strength bolt, is example with right track longeron 32, and it is made up of first, second, third 321,322,323 3 sections, and each sections length is consistent with main truss sections length.
Girder erection crane has four supporting legs 11,12,13,14; Before left and right piston shoes 62,61 and the back left and right piston shoes 64,63 be separately fixed on above-mentioned four supporting legs; And the lower end is slidingly arranged in respectively on the left and right track longeron 31,32, and the length sum of any two segment of left and right track longeron 31,32 is greater than the distance between a forward and backward left side and the forward and backward right piston shoes.
Left and right traveling oil cylinder 71,72 is formed driving mechanism; Left and right traveling oil cylinder 71,72 is separately positioned on left forward and backward piston shoes 62,61 and right forward and backward piston shoes 64, between 63; The piston rod of left and right traveling oil cylinder 71,72 is anchored at respectively on the left and right track longeron 31,32, before cylinder body is separately fixed on the left and right piston shoes 62,64.
The present invention also provides the method for using of above-mentioned running gear, and concrete steps are following, referring to Fig. 3-Fig. 5:
A10, earlier with first, second, third track cross beam 41,42,43 and frame is good left and right upper chord 21,22 anchorings of main truss; Track longeron 321,322,323 passes through bolted on connection with first, second, third track cross beam 41,42,43 respectively before, during and after inciting somebody to action then; At last the left and right piston shoes 61,63 of left and right piston shoes 62,64 before the girder erection crane and back are placed on the track longeron and can before and after the track longeron, slide; And four supporting legs 11,12,13,14 are anchored at respectively on the track longeron; To be placed on left and right track longeron 31,32 upper surfaces and be positioned at the rear of girder erection crane as the 4th track cross beam 44 of switching track cross beam, as shown in Figure 3.After assembling is accomplished, check each anchoring with connect errorless after, can carry out the lifting operation of girder steel.
After steel truss girder in the A20, girder erection crane the place ahead one sections all installs, 180 ° of girder erection crane revolutions will switch track cross beam 44 lift by crane girder erection crane the place ahead and with left and right upper chord 21,22 anchorings of main truss;
A30, the track longeron 323 at girder erection crane rear and the anchoring between the track cross beam 43 are removed; And through girder erection crane revolution lifting; Respectively track longeron 323 is winched to girder erection crane the place ahead and is anchored at and switch on the track cross beam 44, simultaneously with track longeron 321 Bolt Connection at its rear; As shown in Figure 4.
A40, remove girder erection crane four supporting legs 11,12,13,14 and connect with anchoring between the track longeron, left and right piston shoes 62,64 before the flexible drive through left and right traveling oil cylinder 71,72 move forward girder erection crane;
After the reach of A50, girder erection crane puts in place,, and turn round 180 ° and lift by crane the track cross beam 43 at its rears and be placed on the track longeron as the new track cross beam of switching again with its four supporting legs 11,12,13,14 and the anchoring of track longeron, as shown in Figure 5.
At last, carry out the rigging of girder steel and install, after installing, next of carrying out steel truss girder striden installation work.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structural change of under enlightenment of the present invention, making, and every have identical or close technical scheme with the present invention, all falls within protection scope of the present invention.

Claims (3)

1. the running gear of cable stayed bridge steel truss girder girder erection crane comprises walking rails and driving mechanism, it is characterized in that, said walking rails comprises,
At least three track cross beams, respectively perpendicular to the left and right upper chord setting of cable stayed bridge main truss, wherein track cross beam is switched in a conduct, and the two ends of all the other track cross beams are anchored at respectively on the left and right upper chord of main truss;
Left and right track longeron; Be formed by connecting with bolt each other in twos a plurality of sections respectively; The suspension cable anchor structure that said left and right track longeron is separately positioned on the main truss is inboard; Parallel with the left and right upper chord of main truss and be anchored at respectively on above-mentioned all the other track cross beam upper surfaces, switch the rear that track cross beam is arranged on the left and right track longeron upper surface and is positioned at girder erection crane;
Before left and right and back left and right four piston shoes, the lower end of above-mentioned four piston shoes is slidingly arranged in respectively on the left and right track longeron, the upper end is separately fixed on the supporting leg of girder erection crane;
Said driving mechanism comprises left and right traveling oil cylinder, be separately positioned between forward and backward left piston shoes and the forward and backward right piston shoes, the two ends of said left and right traveling oil cylinder be anchored at respectively left and right track longeron with before on the left and right piston shoes.
2. the running gear of cable stayed bridge steel truss girder girder erection crane as claimed in claim 1, it is characterized in that said left and right track longeron by before, during and after three sections form, and any two sections length sum is greater than the distance between a forward and backward left side and the forward and backward right piston shoes.
3. the method for using of the running gear of cable stayed bridge steel truss girder girder erection crane is characterized in that may further comprise the steps:
A10, girder erection crane are installed on the left and right track longeron, and will switch the rear that track cross beam is placed on the left and right track longeron upper surface and is positioned at girder erection crane;
After A20, girder erection crane the place ahead one steel truss girder in striding all installs, 180 ° of girder erection crane revolutions will switch track cross beam lift by crane girder erection crane the place ahead and with the left and right upper chord anchoring of main truss;
A30, the track longeron at girder erection crane rear and the anchoring between the track cross beam are removed; And through girder erection crane revolution lifting; Respectively the track longeron at girder erection crane rear is winched to girder erection crane the place ahead and is anchored at and switch on the track cross beam, be connected with the track longeron bolt that is anchored at the track longeron rear of switching on the track cross beam simultaneously;
Anchor connection between A40, releasing girder erection crane and the track longeron through the expanding-contracting action of traveling oil cylinder, makes the girder erection crane reach;
After the reach of A50, girder erection crane puts in place,, and turn round 180 ° and lift by crane the track cross beam at its rears and be placed on the track longeron as the new track cross beam of switching again with itself and the anchoring of track longeron.
CN2010102749524A 2010-09-08 2010-09-08 Traveling device of frame beam crane of steel truss girder of cable-stayed bridge and use method thereof Active CN101935984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102749524A CN101935984B (en) 2010-09-08 2010-09-08 Traveling device of frame beam crane of steel truss girder of cable-stayed bridge and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102749524A CN101935984B (en) 2010-09-08 2010-09-08 Traveling device of frame beam crane of steel truss girder of cable-stayed bridge and use method thereof

Publications (2)

Publication Number Publication Date
CN101935984A CN101935984A (en) 2011-01-05
CN101935984B true CN101935984B (en) 2012-02-15

Family

ID=43389536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102749524A Active CN101935984B (en) 2010-09-08 2010-09-08 Traveling device of frame beam crane of steel truss girder of cable-stayed bridge and use method thereof

Country Status (1)

Country Link
CN (1) CN101935984B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795559B (en) * 2012-08-03 2015-06-03 中铁九桥工程有限公司 Frame mast crane
CN104018426B (en) * 2014-05-14 2016-09-14 中铁大桥勘测设计院集团有限公司 A kind of steel truss girder installation method
CN104727227B (en) * 2015-01-29 2016-05-11 中铁港航局集团有限公司 A kind of whole segmental erection method of uncovered lattice girder steel of half-through steel box tied arch bridge
CN105002831A (en) * 2015-08-13 2015-10-28 贵州路桥集团有限公司 Wheel-rail type loading and traveling cable crane
CN112095491A (en) * 2020-09-09 2020-12-18 中铁六局集团有限公司 Bidirectional cantilever erection construction process for Hualun type large-span steel truss girder bridge
CN112523090B (en) * 2020-11-11 2022-11-18 中交二航局第二工程有限公司 Initial internode installation mode of steel truss girder cable-stayed bridge
CN113668302A (en) * 2021-08-27 2021-11-19 中铁二十三局集团有限公司 Beam-on-beam conveying device suitable for double-line magnetic floating track beam and beam erecting method
CN116692525B (en) * 2023-08-03 2023-10-24 南通泰胜蓝岛海洋工程有限公司 Sea wind pipe pile bidirectional transferring equipment and ship-on transferring method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04323403A (en) * 1991-04-24 1992-11-12 Mitsubishi Heavy Ind Ltd Cable stayed bridge erection method
FR2693492A1 (en) * 1992-07-10 1994-01-14 Dumez Cable stayed bridge - comprises tower(s) with cables extending from top(s) to deck and longitudinal steel beams with deck slabs spanning between
CN101219755B (en) * 2007-12-14 2010-06-02 中铁大桥局股份有限公司 Crane with heavy frame beam
CN101210415A (en) * 2007-12-20 2008-07-02 中铁大桥局股份有限公司 Method for mounting bridge main tower cross beam top steel box girder segment
CN101195987B (en) * 2007-12-27 2010-06-09 中交第二航务工程局有限公司 Stayed-cable bridge midspan incremental launching auxiliary closure technique
CN101440605A (en) * 2008-12-26 2009-05-27 中铁大桥勘测设计院有限公司 Running and cable adjusting synchronous construction method for cable stayed bridge girder erection crane

Also Published As

Publication number Publication date
CN101935984A (en) 2011-01-05

Similar Documents

Publication Publication Date Title
CN101935984B (en) Traveling device of frame beam crane of steel truss girder of cable-stayed bridge and use method thereof
CN108330842B (en) Bridge girder erection machine for erection construction of large-span reinforced concrete composite girder and construction method
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN101377072B (en) Construction methods of hanging beam and assembling cantilever in the bottom of steel case beam
CN202064293U (en) Traction system used for steel trussed beam cantilever hauling construction
CN104018426B (en) A kind of steel truss girder installation method
CN105648916A (en) Bridge girder erection machine and erection method of bridge girder erection machine
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN104005338A (en) Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge
CN104328734A (en) Multi-connection and multi-span continuous steel truss girder bridge and construction method thereof
CN105317005A (en) Inspection trolley for bridge upper chord
CN110820602A (en) Single-segment box girder bridge girder erection machine and operation method thereof
CN110656570A (en) Telescopic pedestrian bridge, construction device and construction method
CN101481903A (en) Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling
CN105484166B (en) A kind of ladder type masts type cantilever loop wheel machine
CN102733321B (en) Suspension bracket system for existing bridge reinforcing and building method of suspension bracket system
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN104179123A (en) Bridge fabrication machine capable of building and assembling two bridge segments
CN112211112A (en) Steel box girder installation method adopting double-guide-girder erection machine on existing bridge
CN203947413U (en) A kind of bridge top chord check car
CN209338005U (en) A kind of mobile height leg gantry crane of erecting beam construction
KR101003403B1 (en) Moving bridge inspection equipment
CN111042004A (en) Hanging basket track beam traveling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant