CN101908739A - Trolley used for maintenance of electricity overhead power transmission line - Google Patents

Trolley used for maintenance of electricity overhead power transmission line Download PDF

Info

Publication number
CN101908739A
CN101908739A CN 201010239198 CN201010239198A CN101908739A CN 101908739 A CN101908739 A CN 101908739A CN 201010239198 CN201010239198 CN 201010239198 CN 201010239198 A CN201010239198 A CN 201010239198A CN 101908739 A CN101908739 A CN 101908739A
Authority
CN
China
Prior art keywords
transmission line
pulley
maintenance
power transmission
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010239198
Other languages
Chinese (zh)
Other versions
CN101908739B (en
Inventor
李振和
张树东
张剑虹
常国梁
迟作为
姜复亮
张吉林
李花顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JILIN POWER SUPPLY COMPANY JILIN ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
JILIN POWER SUPPLY COMPANY JILIN ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JILIN POWER SUPPLY COMPANY JILIN ELECTRIC POWER Co Ltd filed Critical JILIN POWER SUPPLY COMPANY JILIN ELECTRIC POWER Co Ltd
Priority to CN2010102391980A priority Critical patent/CN101908739B/en
Publication of CN101908739A publication Critical patent/CN101908739A/en
Application granted granted Critical
Publication of CN101908739B publication Critical patent/CN101908739B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to a trolley used for maintenance of electricity overhead power transmission line. The invention is characterized in that the trolley comprises a frame, the upper part of the frame is provided with a seton pulley rotating around a fixed axis, a charging port is arranged on the frame below the seton pulley, the lower part of the frame is provided with a coaxial fixed-axis rotating ladder head traction pulley and a back-up protection rope pulley, the top of the frame is hinged with a control rod; the lower end of the control rod is provided with a damping slow rope device, the damping slow rope device is in the structure that a support is fixedly connected with the lower end of the control rod, the support is internally provided with a fixed clamping piece and an opposite movable clamping piece, and a screw fixedly connected with the movable clamping piece is connected with a nut of the support. The invention has the advantages that structure is simple, operation is simple, use is safe and reliable, personnel and time are saved, live-wire work can be carried out, and operation efficiency is high.

Description

Trolley used for maintenance of electricity overhead power transmission line
Technical field
The present invention relates to the used for maintenance of electricity overhead power transmission line tool, is a kind of trolley used for maintenance of electricity overhead power transmission line.
Background technology
In daily electric power overhaul work, because of overhead transmission line is led, ground wire is bare wire and it is outdoor to be located in, be subject to various damage of external force, as: wind-force, thunderbolt, icing, kite, wild birds activity etc. and disconnected strand, stockbridge damper take place take off defectives such as race.Handle above defective, just need us to arrive operatingly to lead, carry out operation on the ground wire.Prior art adopts two kinds usually and goes out line method.
1. driving outlet: at first circuit has a power failure.At least need 6 operation personnel to arrive operation field, operating personnel 2 people on the tower wherein, ground cooperates personnel 4 people.The operating personnel is with and transmits rope and go up tower on the tower, and will transmit to restrict and hang on the suitable position of iron tower; The ground handling personnel pass to a ladder driving, two continuous ropes on the tower by transmitting rope; Operating personnel's cooperation ties up to a ladder correct position with two continuous ropes on the tower, to ensure that outlet personnel ladder head when returning iron tower can correctly be drawn, the outlet personnel are under the cooperation of personnel on the other tower, the ladder head that will have the control rope is suspended on the lead that needs operation, two continuous ropes that will draw are respectively given on the tower and ground cooperates personnel, the outlet personnel enter terraced head, the ground staff draws down and arrives setting and carry out operation then, after operation is finished, be back on the tower through reaching ground staff's traction on the tower.The operation that need have a power failure of this operational method drops into more man power and material, and it is longer to arrive the path of setting, has wasted a large amount of activity durations, and the loss that causes because of power failure is big.
2. rope ladder goes out collimation method: be applicable to line outage and charged situation.Need operating personnel 6 people.Operating personnel 1 people is with and transmits upward tower of rope, and the insulation rope tackle block is tied up to be needed to handle on the overhead ground wire of lead shelves; The ground handling personnel hang over rope ladder head on the lead that needs to handle by transmitting rope; The below operating personnel carries out steady job to the rope ladder afterbody, and to guarantee outlet personnel rope ladder stable in operation process, after preparation was carried out, the outlet operating personnel entered setting along rope ladder and carries out operation.This operational method needs more operating personnel sometimes with respect to the driving outlet, and the outlet operating personnel do not have reliable backup protection in the process of outlet, has higher potential safety hazard.
Summary of the invention
It is a kind of simple in structure, easy and simple to handle, safe and reliable that purpose of the present invention provides, saving personnel and time, can charged work, and the trolley used for maintenance of electricity overhead power transmission line that operating efficiency is high.
The objective of the invention is to realize: a kind of trolley used for maintenance of electricity overhead power transmission line by following technical scheme; it is characterized in that: it comprises framework; be equipped with the hanging wire pulley that dead axle rotates at framework upper; below being positioned at the hanging wire pulley side on the framework, be provided with introducing port; be equipped with a ladder hauling block and the backup protection rope pulley that coaxial dead axle rotates in the framework bottom, be hinged with control lever in frame roof.
Be provided with the damping slow rope device in described control lever lower end, the structure of described damping slow rope device is, comprises the bearing that is connected with the control lever lower end, is provided with in bearing and decides fixture block and opposed moving fixture block, and the screw rod that moving fixture block is connected is connected with the nut of bearing.
Trolley used for maintenance of electricity overhead power transmission line of the present invention, owing to be equipped with the hanging wire pulley that dead axle rotates at framework upper, below being positioned at the hanging wire pulley side on the framework, be provided with introducing port, adopt the mode of the solid weight throwing of pull rope system to throw on the overhead transmission line of setting top, this pull rope solderless wrapped connection hangs on the overhead transmission line hanging wire pulley being provided with introducing port by artificial traction and below by the hanging wire pulley side above the hanging wire pulley; Owing to be equipped with a ladder hauling block and the backup protection rope pulley that coaxial dead axle rotates in the framework bottom, the ladder head of the walking rope ladder of outlet personnel operation and protection outlet personnel's backup protection rope is respectively by a ladder hauling block and the traction of backup protection rope pulley; Since be hinged with control lever in frame roof, can be by the change of the relative framework angle of control lever, and realization hanging wire pulley hangs on the overhead transmission line and from overhead transmission line and takes off; The damping slow rope device is implemented clamping frictional force to pull rope, can realize the control of lifting hauling speed.
Compared with prior art, the operating personnel just can fulfil assignment by needing 6 people to be decreased to 4 people at least when using trolley used for maintenance of electricity overhead power transmission line outlet operation of the present invention; Activity duration was reduced to present 40 minutes by original average 2 hours operation times spent; And can be applied to the live line working of lead in the lower wire of vertical arrangement form reaches, be that power supply enterprise reduces interruption duration and efficient, improves power supply reliability; Reduce cargo handling operation on operating personnel's Shang Ta and the tower, greatly reduced operating personnel's labour intensity; Rope ladder is reached the standard grade conveniently, and the outlet personnel have the protection of backup protection rope; Have simple in structure, easy and simple to handle, safe and reliable, saving personnel and time, can charged work, the operating efficiency advantages of higher.
Description of drawings
Fig. 1 looks schematic diagram for trolley used for maintenance of electricity overhead power transmission line structure master.
Fig. 2 looks schematic diagram for the left side of Fig. 1.
Fig. 3 is an A-A cutaway view among Fig. 1.
Among the figure: 1 framework, 2 control levers, 3 damping slow rope devices, 4 bearings, 5 nuts, 6 decide fixture block, 7 moving fixture blocks, 8 screw rods, 9 hanging wire pulleys, 10 a ladder hauling block, 11 backup protection rope pulleys, 12 introducing ports.
Embodiment
The invention will be further described to utilize drawings and Examples below.
Trolley used for maintenance of electricity overhead power transmission line of the present invention comprises framework 1; be equipped with the hanging wire pulley 9 that dead axle rotates on framework 1 top; on framework 1, be positioned at hanging wire pulley 9 side-lowers and be provided with introducing port 12; be equipped with a ladder hauling block 10 and the backup protection rope pulley 11 that coaxial dead axle rotates in framework 1 bottom, be hinged with control lever 2 at framework 1 top.Be provided with damping slow rope device 3 in described control lever 2 lower ends, the structure of described damping slow rope device 3 is, comprise the bearing 4 that is connected with control lever 2 lower ends, in bearing 4, be provided with and decide fixture block 6 and opposed moving fixture block 7 that the screw rod 8 that moving fixture block 7 is connected is connected with the nut 5 of bearing 4.
When using trolley used for maintenance of electricity overhead power transmission line of the present invention: the operating personnel with the pull rope solderless wrapped connection on trolley used for maintenance of electricity overhead power transmission line hanging wire pulley 9, a ladder pull rope and backup protection rope respectively solderless wrapped connection on a ladder hauling block 10, backup protection rope pulley 11; The mode of the solid weight throwing of pull rope system was thrown on the overhead transmission line of setting top, and pull rope hangs on the overhead transmission line hanging wire pulley 9 by artificial traction and the introducing port 12 by the 9 side-lower settings of hanging wire pulley; The ground staff spurs a ladder pull rope through the 10 guiding tractions of a ladder hauling block, and the ladder head is hung on the overhead transmission line that needs to handle; The outlet operating personnel has dressed the labour protection apparatus, fasten the backup protection rope after, cooperate the lower edge rope ladder to enter setting the Ground Operation personnel; Operation is finished, and the operating personnel gets back to ground along rope ladder; The ground staff reaches ground by a ladder pull rope with the ladder head; Utilize the change of control lever 2 relative framework 1 angles, realization hanging wire pulley 9 hangs on the overhead transmission line and from overhead transmission line and takes off.

Claims (2)

1. trolley used for maintenance of electricity overhead power transmission line; it is characterized in that: it comprises framework; be equipped with the hanging wire pulley that dead axle rotates at framework upper; below being positioned at the hanging wire pulley side on the framework, be provided with introducing port; be equipped with a ladder hauling block and the backup protection rope pulley that coaxial dead axle rotates in the framework bottom, be hinged with control lever in frame roof.
2. trolley used for maintenance of electricity overhead power transmission line according to claim 1, it is characterized in that: be provided with the damping slow rope device in described control lever lower end, the structure of described damping slow rope device is, comprise the bearing that is connected with the control lever lower end, be provided with in bearing and decide fixture block and opposed moving fixture block, the screw rod that moving fixture block is connected is connected with the nut of bearing.
CN2010102391980A 2010-07-22 2010-07-22 Trolley used for maintenance of electricity overhead power transmission line Active CN101908739B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102391980A CN101908739B (en) 2010-07-22 2010-07-22 Trolley used for maintenance of electricity overhead power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102391980A CN101908739B (en) 2010-07-22 2010-07-22 Trolley used for maintenance of electricity overhead power transmission line

Publications (2)

Publication Number Publication Date
CN101908739A true CN101908739A (en) 2010-12-08
CN101908739B CN101908739B (en) 2012-06-27

Family

ID=43264108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102391980A Active CN101908739B (en) 2010-07-22 2010-07-22 Trolley used for maintenance of electricity overhead power transmission line

Country Status (1)

Country Link
CN (1) CN101908739B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162332A (en) * 2011-03-18 2011-08-24 辽宁省电力有限公司沈阳供电公司 Pulley insulating board ladder
CN103124054A (en) * 2013-03-19 2013-05-29 国家电网公司 One-way running routing pulley
CN103956685A (en) * 2014-05-21 2014-07-30 国家电网公司 Power transmission line grounding kite demounting device
CN112051282A (en) * 2020-08-18 2020-12-08 国网山东省电力公司临沂供电公司 Electrified X-ray flaw detection device and method for splicing sleeve of overhead transmission line
CN117134251A (en) * 2023-09-07 2023-11-28 国网四川省电力公司德阳供电公司 Unmanned aerial vehicle hoisting follow-up pulley for power transmission line maintenance

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10224931A (en) * 1997-02-10 1998-08-21 Kyoei Densetsu Kk Hanging object transfer braking device
CN201213208Y (en) * 2008-07-09 2009-03-25 成都电业局 Skyward pulley device
CN201260051Y (en) * 2008-08-22 2009-06-17 华中电网有限公司 Anti-dropping soft ladder for overhead line operation
CN201742028U (en) * 2010-07-22 2011-02-09 吉林省电力有限公司吉林供电公司 Pulley used for overhaul of overhead power transmission lines

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10224931A (en) * 1997-02-10 1998-08-21 Kyoei Densetsu Kk Hanging object transfer braking device
CN201213208Y (en) * 2008-07-09 2009-03-25 成都电业局 Skyward pulley device
CN201260051Y (en) * 2008-08-22 2009-06-17 华中电网有限公司 Anti-dropping soft ladder for overhead line operation
CN201742028U (en) * 2010-07-22 2011-02-09 吉林省电力有限公司吉林供电公司 Pulley used for overhaul of overhead power transmission lines

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162332A (en) * 2011-03-18 2011-08-24 辽宁省电力有限公司沈阳供电公司 Pulley insulating board ladder
CN102162332B (en) * 2011-03-18 2012-11-21 辽宁省电力有限公司沈阳供电公司 Pulley insulating board ladder
CN103124054A (en) * 2013-03-19 2013-05-29 国家电网公司 One-way running routing pulley
CN103956685A (en) * 2014-05-21 2014-07-30 国家电网公司 Power transmission line grounding kite demounting device
CN112051282A (en) * 2020-08-18 2020-12-08 国网山东省电力公司临沂供电公司 Electrified X-ray flaw detection device and method for splicing sleeve of overhead transmission line
CN112051282B (en) * 2020-08-18 2023-11-28 国网山东省电力公司临沂供电公司 Electrified X-ray flaw detection device and method for splicing sleeve of overhead transmission line
CN117134251A (en) * 2023-09-07 2023-11-28 国网四川省电力公司德阳供电公司 Unmanned aerial vehicle hoisting follow-up pulley for power transmission line maintenance

Also Published As

Publication number Publication date
CN101908739B (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN101908739B (en) Trolley used for maintenance of electricity overhead power transmission line
CN201742028U (en) Pulley used for overhaul of overhead power transmission lines
CN109586232B (en) Unmanned aerial vehicle system for deicing high-voltage and ultrahigh-voltage overhead transmission line and use method thereof
CN201829864U (en) Clearer for foreign matters on lead
CN106684762B (en) A kind of overhead transmission line twister remove device
CN204328407U (en) Based on the automatic lifting monitoring camera device of high pole lamp
CN105244815A (en) Electric power system power transmission line rod climbing method and corresponding device
CN203770987U (en) Automatic lifting device of closed-circuit camera based on lifting high-pole lamp
CN105305317B (en) Live wire hangs the instrument of insulated flexible ladder
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN204243627U (en) automatic drawing machine
CN206595631U (en) A kind of transmission line of electricity servicing unit
CN112152145A (en) Power line equipotential operation method based on high-altitude rope technology
CN204012451U (en) A kind of double bundle conductor conductor spacer is changed setting tool
CN204958320U (en) Building heavy object lifting machine
CN204927953U (en) Demolish bird's nest specialized tool
CN102709844B (en) Electric transmission line overhead wire outlet walker
CN205141535U (en) Live conductor hangs instrument of insulating rope ladder
CN201821045U (en) Double hook lifting insulating support rod
CN211456516U (en) Electrified wire feeding and discharging device of high-voltage overhead bare conductor insulation rubber coating robot
CN209210260U (en) A kind of boom hoisting applied to electric power tower equipment
CN209389560U (en) The safe throwing device of intelligent machine formula livewire work traction rope
CN202906291U (en) Operation rope ladder hanging equipment
CN203339566U (en) Live-line work limited track cabin
CN208401377U (en) A kind of inspection platform for power station high voltage switchyard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121129

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121129

Address after: 132001 No. 124, Jilin Avenue, Changyi District, Jilin, Jilin

Patentee after: Jilin Power Supply Company, Jilin Electric Power Company Limited

Patentee after: State Grid Corporation of China

Address before: 132001 Jilin power supply company, No. 124 Jilin street, Changyi District, Jilin, Jilin

Patentee before: Jilin Power Supply Company, Jilin Electric Power Company Limited