Pulley for maintenance of overhead power transmission lines Download PDFInfo
- Publication number
- CN101908739A CN101908739A CN 201010239198 CN201010239198A CN101908739A CN 101908739 A CN101908739 A CN 101908739A CN 201010239198 CN201010239198 CN 201010239198 CN 201010239198 A CN201010239198 A CN 201010239198A CN 101908739 A CN101908739 A CN 101908739A
- Authority
- CN
- China
- Prior art keywords
- pulley
- frame
- rope
- control rod
- clamp block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明是一种电力架空输电线路检修用滑车,其特点是:它包括框架,在框架上部置有定轴转动的挂线滑轮,在框架上位于挂线滑轮侧下方设有导入口,在框架下部置有同轴定轴转动的梯头牵引滑轮和后备保护绳滑轮,在框架顶部铰接有控制杆;在控制杆下端设有阻尼缓绳器,所述阻尼缓绳器的结构是,包括与控制杆下端固连的支座,在支座内设置定夹块和对置的动夹块,动夹块固连的螺杆与支座的螺母连接。具有结构简单,操作简便,使用安全可靠,节省人员和时间,可带电工作,作业效率高等优点。
The present invention is a trolley for overhauling electric power transmission line, which is characterized in that it includes a frame, on the upper part of the frame there is a hanging wire pulley which rotates at a fixed axis, on the frame there is an inlet under the side of the wire pulling pulley, on the frame The lower part is equipped with a coaxial and fixed axis rotation ladder head traction pulley and a backup protection rope pulley, and a control rod is hinged on the top of the frame; a damping rope slowing device is provided at the lower end of the control rod, and the structure of the damping rope slowing device is composed of: The support fixed to the lower end of the control rod is provided with a fixed clamp block and an opposite movable clamp block in the support, and the screw rod fixedly connected to the movable clamp block is connected with the nut of the support. It has the advantages of simple structure, easy operation, safe and reliable use, saving personnel and time, can work with live electricity, and high operating efficiency.
Description
技术领域technical field
本发明涉及电力架空输电线路检修用具,是一种电力架空输电线路检修用滑车。The invention relates to an appliance for overhauling an overhead electric power transmission line, in particular to a trolley for overhauling an overhead electric power transmission line.
背景技术Background technique
在日常的电力检修工作中,因架空输电线路导、地线均为裸线且地处室外,易受各种外力的破坏,如:风力、雷击、覆冰、风筝、野生鸟类活动等而发生断股、防震锤脱跑等缺陷。处理以上缺陷,就需要我们到达运行中的导、地线上进行作业。现有技术通常采用两种出线方法。In the daily power maintenance work, because the conductor and ground wire of the overhead transmission line are bare wires and are located outdoors, they are easily damaged by various external forces, such as: wind, lightning strikes, ice coating, kites, wild bird activities, etc. Defects such as broken strands and anti-vibration hammer falling off occur. To deal with the above defects, we need to go to the running guide and ground to do the work. The prior art usually adopts two methods of outlet.
1.飞车出线:首先线路进行停电。至少需要6名作业人员到达作业现场,其中塔上作业人员2人,地面配合人员4人。塔上作业人员带传递绳上塔,并将传递绳挂在铁塔合适的位置上;地面工作人员通过传递绳把梯头飞车、两根无极绳传到塔上;塔上作业人员配合将两根无极绳系在梯头合适位置,以保障出线人员在返回铁塔时梯头能够被正确牵引,出线人员在另外一名塔上人员的配合下,将带有控制绳索的梯头挂到需要作业的导线上,分别将牵引的两根无极绳交给塔上及地面配合人员,出线人员进入梯头,然后地面人员牵引下到达作业点进行作业,作业完成后,经塔上及地面人员牵引回至塔上。这种作业方法需要停电作业,投入较多的人力和物力,且到达作业点的路径较长,浪费了大量的作业时间,因停电造成的损失大。1. Speeding out of the line: First, the line is powered off. At least 6 operators are required to arrive at the operation site, including 2 operators on the tower and 4 on the ground. The operators on the tower take the transfer rope to the tower, and hang the transfer rope on the appropriate position of the iron tower; The infinite rope is tied to the appropriate position of the ladder head to ensure that the ladder head can be correctly pulled when the outgoing personnel return to the iron tower. On the wire, the two endless ropes towed are handed over to the tower and the ground cooperating personnel respectively. The outgoing personnel enter the ladder head, and then the ground personnel are pulled down to the operation point for operation. After the operation is completed, they are pulled back to the tower and ground personnel. on the tower. This method of operation needs power outage operation, more manpower and material resources are invested, and the path to the operation point is longer, wasting a lot of operation time, and the loss caused by power outage is large.
2.软梯出线法:适用于线路停电及带电情况。需要作业人员6人。作业人员1人带传递绳上塔,将绝缘绳滑车系在需要处理导线档的架空地线上;地面工作人员通过传递绳将软梯头挂在需要处理的导线上;下方作业人员对软梯尾部进行固定工作,以保证出线人员在作业过程中软梯的稳定,准备工作做好后,出线作业人员沿软梯进入作业点进行作业。这种作业方法相对于飞车出线有时需要更多的作业人员,而且出线作业人员在出线的过程中没有可靠的后备保护,存在较高的安全隐患。2. Soft ladder outlet method: suitable for power failure and electrification of the line. 6 workers are required. One worker goes up the tower with a transfer rope, and tie the insulating rope block to the overhead ground wire that needs to be processed; the ground staff hangs the soft ladder head on the wire to be processed through the transfer rope; Fixed work to ensure the stability of the soft ladder during the operation of the outgoing personnel. After the preparations are completed, the outgoing operators enter the operating point along the soft ladder to carry out operations. This method of operation sometimes requires more operators than the flying car, and the operators do not have reliable backup protection during the process of exiting the line, so there is a high potential safety hazard.
发明内容Contents of the invention
本发明的目的提供一种结构简单,操作简便,使用安全可靠,节省人员和时间,可带电工作,作业效率高的电力架空输电线路检修用滑车。The object of the present invention is to provide a trolley for overhauling electric power transmission lines with simple structure, easy operation, safe and reliable use, saving manpower and time, capable of live work and high working efficiency.
本发明的目的是由以下技术方案来实现的:一种电力架空输电线路检修用滑车,其特征是:它包括框架,在框架上部置有定轴转动的挂线滑轮,在框架上位于挂线滑轮侧下方设有导入口,在框架下部置有同轴定轴转动的梯头牵引滑轮和后备保护绳滑轮,在框架顶部铰接有控制杆。The purpose of the present invention is achieved by the following technical solutions: a trolley for overhauling electric power transmission lines, characterized in that it includes a frame, on the upper part of the frame there is a hanging wire pulley that rotates with a fixed axis, and on the frame is located The lower part of the pulley side is provided with an inlet, and a ladder head traction pulley and a backup protection rope pulley are arranged at the lower part of the frame, and a control rod is hinged at the top of the frame.
在所述的控制杆下端设有阻尼缓绳器,所述阻尼缓绳器的结构是,包括与控制杆下端固连的支座,在支座内设置定夹块和对置的动夹块,动夹块固连的螺杆与支座的螺母连接。A damping rope slowing device is provided at the lower end of the control rod. The structure of the damping rope slowing device is to include a support fixedly connected to the lower end of the control rod, and a fixed clamp block and an opposite movable clamp block are arranged in the support , the screw rod fixedly connected to the movable clamp block is connected with the nut of the support.
本发明的电力架空输电线路检修用滑车,由于在框架上部置有定轴转动的挂线滑轮,在框架上位于挂线滑轮侧下方设有导入口,采用牵引绳系固重物抛掷的方式抛过作业点上方架空输电线路上,此牵引绳绕接在挂线滑轮上方由人工牵引且通过挂线滑轮侧下方设有导入口使挂线滑轮挂在架空输电线路上;由于在框架下部置有同轴定轴转动的梯头牵引滑轮和后备保护绳滑轮,出线人员作业的行走软梯的梯头和保护出线人员的后备保护绳分别由梯头牵引滑轮和后备保护绳滑轮牵引;由于在框架顶部铰接有控制杆,能够通过控制杆相对框架夹角的改变,实现挂线滑轮挂在架空输电线路上和从架空输电线路上脱下来;阻尼缓绳器对牵引绳实施夹持摩擦力,可实现升降牵引速度的控制。The trolley for overhead power transmission line inspection and maintenance of the present invention is equipped with a wire pulley rotating at a fixed axis on the upper part of the frame, and an inlet is provided on the frame below the side of the wire pulley. Passing the overhead transmission line above the operation point, the traction rope is wound on the top of the hanging pulley for manual traction, and there is an inlet under the side of the hanging pulley to hang the hanging pulley on the overhead transmission line; The ladder head traction pulley and the backup protection rope pulley rotating on the coaxial fixed axis, the ladder head of the walking ladder for the outgoing personnel and the backup protection rope for protecting the outgoing personnel are respectively pulled by the ladder head traction pulley and the backup protection rope pulley; The control rod is hinged, and the hanging pulley can be hung on the overhead transmission line and taken off from the overhead transmission line through the change of the angle between the control rod and the frame; Lifting traction speed control.
使用本发明的电力架空输电线路检修用滑车出线作业时与现有技术相比,作业人员由至少需要6人减小至4人就能完成作业;作业时间由原来平均作业用时2小时缩减为现在的40分钟;且可以应用于在垂直排列形式的下导线及中导线的带电作业,为供电企业减少停电时间及效率,提高供电可靠率;减少了作业人员的上塔及塔上作业环节,大大降低了作业人员的劳动强度;软梯上线方便,出线人员有后备保护绳保护;具有结构简单,操作简便,使用安全可靠,节省人员和时间,可带电工作,作业效率高等优点。Compared with the prior art, when using the trolley for the maintenance of overhead power transmission lines of the present invention, the number of operators is reduced from at least 6 to 4 to complete the operation; the operation time is reduced from the original average operation time of 2 hours to the present 40 minutes; and it can be applied to the live operation of the vertically arranged lower conductors and middle conductors, which can reduce power outage time and efficiency for power supply companies, and improve power supply reliability; reduce the operation of operators on the tower and on the tower, greatly It reduces the labor intensity of operators; the ladder is easy to get on the line, and the people who go out of the line are protected by a backup protection rope; it has the advantages of simple structure, easy operation, safe and reliable use, saving personnel and time, can work with electricity, and has high operating efficiency.
附图说明Description of drawings
图1为电力架空输电线路检修用滑车结构主视示意图。Fig. 1 is a schematic front view of the structure of a pulley for maintenance of overhead power transmission lines.
图2为图1的左视示意图。FIG. 2 is a schematic left view of FIG. 1 .
图3为图1中A-A剖视图。Fig. 3 is a sectional view of A-A in Fig. 1 .
图中:1框架,2控制杆,3阻尼缓绳器,4支座,5螺母,6定夹块,7动夹块,8螺杆,9挂线滑轮,10梯头牵引滑轮,11后备保护绳滑轮,12导入口。In the figure: 1 frame, 2 control rod, 3 damping rope slowing device, 4 support, 5 nut, 6 fixed clamp block, 7 movable clamp block, 8 screw rod, 9 hanging wire pulley, 10 ladder head traction pulley, 11 backup protection Rope pulley, 12 inlets.
具体实施方式Detailed ways
下面利用附图和实施例对本发明作进一步说明。The present invention will be further described below using the accompanying drawings and examples.
本发明的电力架空输电线路检修用滑车包括框架1,在框架1上部置有定轴转动的挂线滑轮9,在框架1上位于挂线滑轮9侧下方设有导入口12,在框架1下部置有同轴定轴转动的梯头牵引滑轮10和后备保护绳滑轮11,在框架1顶部铰接有控制杆2。在所述的控制杆2下端设有阻尼缓绳器3,所述阻尼缓绳器3的结构是,包括与控制杆2下端固连的支座4,在支座4内设置定夹块6和对置的动夹块7,动夹块7固连的螺杆8与支座4的螺母5连接。The trolley for maintenance of overhead power transmission lines of the present invention comprises a frame 1, on which a hanging wire pulley 9 rotating with a fixed axis is arranged on the upper part of the frame 1, and an
使用本发明的电力架空输电线路检修用滑车时:作业人员将牵引绳绕接在电力架空输电线路检修用滑车挂线滑轮9上,梯头牵引绳及后备保护绳分别绕接在梯头牵引滑轮10、后备保护绳滑轮11上;牵引绳系固重物抛掷的方式抛过作业点上方架空输电线路上,牵引绳由人工牵引且通过挂线滑轮9侧下方设置的导入口12使挂线滑轮9挂在架空输电线路上;地面人员拉动梯头牵引绳经梯头牵引滑轮10导向牵引,将梯头挂在需要处理的架空输电线路上;出线作业人员穿戴好劳动保护用具,系好后备保护绳后,在地面作业人员配合下沿软梯进入作业点;作业完成,作业人员沿软梯回到地面;地面人员通过梯头牵引绳将梯头传至地面;利用控制杆2相对框架1夹角的改变,实现挂线滑轮9挂在架空输电线路上和从架空输电线路上脱下来。When using the tackle of the present invention for overhauling electric power transmission lines: the operator wraps the traction rope on the trolley hanging pulley 9 for overhauling electric power transmission lines, and the ladder head traction rope and the backup protection rope are respectively wound around the ladder
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010102391980A CN101908739B (en) | 2010-07-22 | 2010-07-22 | Trolley used for maintenance of electricity overhead power transmission line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010102391980A CN101908739B (en) | 2010-07-22 | 2010-07-22 | Trolley used for maintenance of electricity overhead power transmission line |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101908739A true CN101908739A (en) | 2010-12-08 |
| CN101908739B CN101908739B (en) | 2012-06-27 |
Family
ID=43264108
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010102391980A Active CN101908739B (en) | 2010-07-22 | 2010-07-22 | Trolley used for maintenance of electricity overhead power transmission line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101908739B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102162332A (en) * | 2011-03-18 | 2011-08-24 | 辽宁省电力有限公司沈阳供电公司 | Pulley insulating board ladder |
| CN103124054A (en) * | 2013-03-19 | 2013-05-29 | 国家电网公司 | One-way running routing pulley |
| CN103956685A (en) * | 2014-05-21 | 2014-07-30 | 国家电网公司 | Power transmission line grounding kite demounting device |
| CN112051282A (en) * | 2020-08-18 | 2020-12-08 | 国网山东省电力公司临沂供电公司 | A live X-ray flaw detection device and method for connecting pipes of overhead transmission lines |
| CN117134251A (en) * | 2023-09-07 | 2023-11-28 | 国网四川省电力公司德阳供电公司 | A drone hoisting bucket pulley used for power transmission line maintenance |
| CN118610941A (en) * | 2024-08-08 | 2024-09-06 | 国网山东省电力公司荣成市供电公司 | A transmission line insulator string maintenance transfer pulley |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10224931A (en) * | 1997-02-10 | 1998-08-21 | Kyoei Densetsu Kk | Hanging object transfer braking device |
| CN201213208Y (en) * | 2008-07-09 | 2009-03-25 | 成都电业局 | A sky pulley device |
| CN201260051Y (en) * | 2008-08-22 | 2009-06-17 | 华中电网有限公司 | Anti-dropping soft ladder for overhead line operation |
| CN201742028U (en) * | 2010-07-22 | 2011-02-09 | 吉林省电力有限公司吉林供电公司 | Pulley used for overhaul of overhead power transmission lines |
-
2010
- 2010-07-22 CN CN2010102391980A patent/CN101908739B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10224931A (en) * | 1997-02-10 | 1998-08-21 | Kyoei Densetsu Kk | Hanging object transfer braking device |
| CN201213208Y (en) * | 2008-07-09 | 2009-03-25 | 成都电业局 | A sky pulley device |
| CN201260051Y (en) * | 2008-08-22 | 2009-06-17 | 华中电网有限公司 | Anti-dropping soft ladder for overhead line operation |
| CN201742028U (en) * | 2010-07-22 | 2011-02-09 | 吉林省电力有限公司吉林供电公司 | Pulley used for overhaul of overhead power transmission lines |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102162332A (en) * | 2011-03-18 | 2011-08-24 | 辽宁省电力有限公司沈阳供电公司 | Pulley insulating board ladder |
| CN102162332B (en) * | 2011-03-18 | 2012-11-21 | 辽宁省电力有限公司沈阳供电公司 | Pulley insulating board ladder |
| CN103124054A (en) * | 2013-03-19 | 2013-05-29 | 国家电网公司 | One-way running routing pulley |
| CN103956685A (en) * | 2014-05-21 | 2014-07-30 | 国家电网公司 | Power transmission line grounding kite demounting device |
| CN112051282A (en) * | 2020-08-18 | 2020-12-08 | 国网山东省电力公司临沂供电公司 | A live X-ray flaw detection device and method for connecting pipes of overhead transmission lines |
| CN112051282B (en) * | 2020-08-18 | 2023-11-28 | 国网山东省电力公司临沂供电公司 | A device and method for charged X-ray flaw detection of overhead transmission line connecting pipes |
| CN117134251A (en) * | 2023-09-07 | 2023-11-28 | 国网四川省电力公司德阳供电公司 | A drone hoisting bucket pulley used for power transmission line maintenance |
| CN118610941A (en) * | 2024-08-08 | 2024-09-06 | 国网山东省电力公司荣成市供电公司 | A transmission line insulator string maintenance transfer pulley |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101908739B (en) | 2012-06-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101908739B (en) | Trolley used for maintenance of electricity overhead power transmission line | |
| CN105305317B (en) | Live wire hangs the instrument of insulated flexible ladder | |
| CN105186378A (en) | Power transmission line channel crossing protection mechanism | |
| CN201742028U (en) | Pulley used for overhaul of overhead power transmission lines | |
| CN105932601B (en) | Disconnected strand of overhead grounding wire method for repairing and mending | |
| CN204230769U (en) | Climb type steel cable ladder | |
| CN102185265B (en) | Construction method for replacing cross arm of 35kV line linear rod | |
| CN104638563A (en) | High-voltage transmission line conveying device | |
| CN104868397A (en) | Tumbling pulley used for crossing horizontally-arranged double-bundled conductor spacer | |
| CN201785175U (en) | Hoisting basket for high-voltage steel tower | |
| CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
| CN205595695U (en) | High altitude block system | |
| CN104836149A (en) | A tool and method for removing foreign matter from a split conductor of a high-voltage line | |
| CN204089033U (en) | A kind of based on the two-way remover under the wire foreign-matter electrical of rope ladder head | |
| CN203902839U (en) | Electrified foreign object clearing unmanned aerial vehicle | |
| CN202308917U (en) | Traction tool | |
| CN203660422U (en) | 500 kV overhead ground wire lifting tool | |
| CN205882550U (en) | Wire hangs special processing tool of foreign matter | |
| CN206774990U (en) | Power transmission line overhead ground wire damper resetting means | |
| CN205595702U (en) | High altitude block pulley | |
| CN104078890A (en) | Charged wire foreign body cleaner based on rope ladder head | |
| CN205141535U (en) | Live conductor hangs instrument of insulating rope ladder | |
| CN201285999Y (en) | Soft ladder for high voltage line maintenance | |
| CN201234089Y (en) | Protective interval for live operation on 1000kV AC very high voltage line | |
| CN205882560U (en) | Special circulation cord rack device of distribution live working earth potential |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121129 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20121129 Address after: 132001 No. 124, Jilin Avenue, Changyi District, Jilin, Jilin Patentee after: Jilin Power Supply Company, Jilin Electric Power Company Limited Patentee after: State Grid Corporation of China Address before: 132001 Jilin power supply company, No. 124 Jilin street, Changyi District, Jilin, Jilin Patentee before: Jilin Power Supply Company, Jilin Electric Power Company Limited |