CN101907456A - 直线塔架空输电线路覆冰厚度和重量的计算方法 - Google Patents

直线塔架空输电线路覆冰厚度和重量的计算方法 Download PDF

Info

Publication number
CN101907456A
CN101907456A CN 201010215641 CN201010215641A CN101907456A CN 101907456 A CN101907456 A CN 101907456A CN 201010215641 CN201010215641 CN 201010215641 CN 201010215641 A CN201010215641 A CN 201010215641A CN 101907456 A CN101907456 A CN 101907456A
Authority
CN
China
Prior art keywords
tower
lead
mobile jib
side lever
prime
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010215641
Other languages
English (en)
Other versions
CN101907456B (zh
Inventor
李立浧
阳林
罗兵
郝艳捧
黎小林
黎卫国
朱功辉
戴栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Original Assignee
South China University of Technology SCUT
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT, Power Grid Technology Research Center of China Southern Power Grid Co Ltd filed Critical South China University of Technology SCUT
Priority to CN2010102156410A priority Critical patent/CN101907456B/zh
Publication of CN101907456A publication Critical patent/CN101907456A/zh
Application granted granted Critical
Publication of CN101907456B publication Critical patent/CN101907456B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种直线塔架空输电线路覆冰厚度和重量的计算方法,包括如下步骤:S1、根据设计参数计算达到覆冰温度但无覆冰时垂直平面内导线基本力学参数;S2、根据传感器测量的绝缘子串风偏角,计算风偏平面内的高差角、导线水平应力、竖直方向上的导线自重比载以及大、小号侧杆塔导线最低点到主杆塔的水平档距,和大、小号侧杆塔导线最低点到主杆塔的导线长度;S3、建立风偏平面内的绝缘子串倾斜角与绝缘子串风偏角以及垂直平面内的绝缘子串倾斜角的关系式;在风偏平面内建立覆冰后竖直方向受力平衡方程,计算导线等效覆冰厚度和重量。本发明具有减少设备数量、提高计算精度、提高计算结果的准确性和可靠性等优点。

Description

直线塔架空输电线路覆冰厚度和重量的计算方法
技术领域
本发明涉及电力领域的输电线路覆冰在线监测领域,尤其涉及一种架空输电线路等效覆冰厚度和重量计算的力学方法。
背景技术
我国是世界上输电线路覆冰严重的国家之一。严重覆冰和积雪会导致输电线路机械和电气性能急剧下降,引起绝缘子闪络、线路跳闸、断线、倒塔、导线舞动和通信中断等事故。2008年初,我国南方部分省份遭受了80年以来最为严重的冰冻雨雪凝冻灾害,冰闪频发,线路跳闸、断线和倒塔等事故普遍,给南方地区电力系统的安全稳定运行和电力供应带来极大的影响和威胁。
目前,输电线路覆冰在线监测方法主要有力学方法和图像方法。运行经验表明,线路覆冰时摄像镜头表面往往覆盖冰层或因水雾无法拍到导线覆冰图像,或者即使拍到图像也因分辨率低和拍摄点位置不满足等原因,无法利用图像及其处理技术准确判断覆冰情况。现阶段架空输电线路覆冰量计算的力学方法是在多基杆塔排列成的垂直平面内建立力学模型,考虑悬垂绝缘子串倾斜角,计算竖直方向上增加的载荷,将它减去水平方向上的风载荷得到冰载荷,然后计算出导线覆冰量。目前的力学监测方法有以下不足:(1)未考虑绝缘子串风偏影响;(2)竖直方向上增加的载荷减去水平方向的风荷载得到冰载荷的方法没有力学上的联系;(3)风速传感器安装于杆塔顶,塔顶风速和实际线路处风速有差别且风速具有很大的随机性,直接用塔顶风速代替导线承受风速会带来计算误差;(4)导线的长度直接以垂直档距乘以一个估计的系数之积代替会带来较大误差。
发明内容
本发明的目的在于克服上述的缺点和不足,提供一种直线塔架空输电线路覆冰厚度和重量的计算方法,本发明综合考虑风偏角和倾斜角及导线长度变化,将可能因素考虑到覆冰计算中,具有减少监测设备数量、提高覆冰计算精度、提高计算结果的准确性和可靠性等优点,为监测系统的处置决策提供了有效的依据。
本发明的目的是通过下述技术方案实现的:一种直线塔架空输电线路覆冰厚度和重量的计算方法,包括如下步骤:
S1、在主杆塔和大、小号侧杆塔排列成的垂直平面内进行力学计算:根据设计参数计算达到覆冰温度但无覆冰时垂直平面内导线基本力学参数,所述垂直平面内的导线基本力学参数包括导线长度,导线水平应力,大、小号侧杆塔导线最低点到主杆塔的水平档距,大、小号侧杆塔导线最低点到主杆塔的导线长度;
S2、在导线风偏平面内进行力学计算:根据传感器测量的绝缘子串风偏角,计算风偏平面内的高差角、导线水平应力、竖直方向上的导线自重比载以及大、小号侧杆塔导线最低点到主杆塔的水平档距,和大、小号侧杆塔导线最低点到主杆塔的导线长度;
S3、在导线风偏平面内进行覆冰厚度和重量计算:由于覆冰导致主杆塔两侧导线水平张力不同形成绝缘子串倾斜角,建立风偏平面内的绝缘子串倾斜角与绝缘子串风偏角以及垂直平面内的绝缘子串倾斜角的关系式;在风偏平面内建立覆冰后竖直方向受力平衡方程,根据拉力传感器测量的绝缘子串轴向拉力,计算导线等效覆冰厚度和重量。
为更好的实现本发明,所述步骤S1在主杆塔和大、小号侧杆塔排列成的垂直平面内进行力学计算,具体为:
步骤S1.1,利用设计时小号侧杆塔和主杆塔之间的导线长度S1、设计时大号侧杆塔和主杆塔之间的导线长度S2,分别求解待计算时刻覆冰温度下的导线长度St1和St2,其中St1为覆冰温度时小号侧杆塔和主杆塔之间的导线长度,St2为覆冰温度时大号侧杆塔和主杆塔之间的导线长度:
St1=S1-S1αΔT
St2=S2-S2αΔT
其中,ΔT为设计温度与覆冰温度差,α为导线的温度膨胀系数;
步骤S1.2,由上述的St1和St2,利用存在高度差时的线路长度斜抛物线近似公式推出垂直平面内的小号侧杆塔导线水平应力σ10和大号侧杆塔导线水平应力σ20
σ 10 = γ 2 l 1 3 cos β 1 24 ( S t 1 - l 1 cos β 1 )
σ 20 = γ 2 l 2 3 cos β 2 24 ( S t 2 - l 2 cos β 2 )
其中γ为导线自重比载,β1为主杆塔与小号侧杆塔的高差角,β2为主杆塔与大号侧杆塔的高差角,l1为主杆塔和小号侧杆塔之间的水平档距,l2为主杆塔和大号侧杆塔之间的水平档距;
步骤S1.3,根据求得的导线水平应力σ10和σ20,代入公式分别求解小、大号侧杆塔导线最低点到主杆塔的水平档距,小、大号侧杆塔导线最低点到主杆塔的导线长度:
l b = l 1 2 ( 1 + 2 h 1 σ 10 l 1 2 γ cos β 1 )
l a = l 2 2 ( 1 - 2 h 2 σ 20 l 2 2 γ cos β 2 )
S b = l b + l b 3 γ 2 6 σ 10 2 cos 2 β 1
S a = l a + l a 3 γ 2 6 σ 20 2 cos 2 β 2
其中lb为小号侧杆塔导线最低点到主杆塔的水平档距,la为大号侧杆塔导线最低点到主杆塔的水平档距,Sb为小号侧杆塔导线最低点到主杆塔的导线线长,Sa为大号侧杆塔导线最低点到主杆塔的导线线长,h1为小号侧杆塔与主杆塔的导线悬挂点的高度差,h2为大号侧杆塔与主杆塔的导线悬挂点的高度差。
优选的,所述步骤S1.2中主杆塔与小号侧杆塔的高差角β1、主杆塔与大号侧杆塔的高差角β2,通过下式计算:
β1=arctan(h1/l1)
β2=arctan(h2/l2)
其中,h1为小号侧杆塔与主杆塔的导线悬挂点的高度差,h2为大号侧杆塔与主杆塔的导线悬挂点的高度差,l1为主杆塔和小号侧杆塔之间的水平档距,l2为主杆塔和大号侧杆塔之间的水平档距。
所述步骤S2在导线风偏平面内进行力学计算,具体为:
步骤S2.1,在步骤S1的基础上,未覆冰的线路受到风的影响,线路及其绝缘子串组成的几何平面将整体偏移垂直平面一定的角度,该角度即为角度传感器测得的绝缘子串风偏角η,偏移后的平面命为导线风偏平面:
导线风偏平面内的档距公式为:
l b ′ = l b 1 + ( tg β 1 sin η ) 2
l a ′ = l a 1 + ( tg β 2 sin η ) 2
其中lb′为风偏平面内小号侧杆塔导线最低点到主杆塔的水平档距,la′为风偏平面内大号侧杆塔导线最低点到主杆塔的水平档距;
导线风偏平面内高差角为:
cos β 1 ′ = cos β 1 1 + ( tg β 1 sin η ) 2
cos β 2 ′ = cos β 2 1 + ( tg β 2 sin η ) 2
其中β1′为风偏平面内主杆塔与小号侧杆塔的高差角,β2′为风偏平面内主杆塔与大号侧杆塔的高差角;
导线风偏平面内水平应力为:
σ ′ 10 = σ 10 1 + ( tg β 1 sin η ) 2
σ ′ 20 = σ 20 1 + ( tg β 2 sin η ) 2
其中σ′10为风偏平面内小号侧杆塔导线水平应力和σ′20为风偏平面内大号侧杆塔导线水平应力;
可推出导线风偏平面内,竖直方向导线自重比载γ′为:
γ ′ = γ cos η
步骤S2.2,导线风偏平面内,小号侧杆塔导线最低点到主杆塔的导线线长S′b,大号侧杆塔导线最低点到主杆塔的导线线长S′a为:
S ′ b = l ′ b + l ′ b 3 γ ′ 2 6 σ ′ 10 2 cos 2 β ′ 1
S ′ a = l ′ a + l ′ a 3 γ ′ 2 6 σ ′ 20 2 cos 2 β ′ 2
其中S′b为小号侧杆塔导线最低点到主杆塔的导线线长,S′a为大号侧杆塔导线最低点到主杆塔的导线线长。
所述步骤S3在导线风偏平面内进行覆冰厚度和重量计算,具体为:
步骤S3.1,在导线风偏平面内,由于覆冰导致主杆塔两侧导线水平张力不同形成绝缘子串倾斜角,由拉力传感器测得绝缘子串轴向拉力F,设该力的方向与风偏平面内竖直方向的夹角为θ′,即风偏平面内的绝缘子串倾斜角为θ′;
θ′与角度传感器测得的绝缘子串风偏角η和垂直平面内的绝缘子串倾斜角θ有如下关系:
cos θ ′ = 1 cos η 1 + tg 2 η + tg 2 θ
步骤S3.2,垂直平面内,设导线、绝缘子串和金具三者自重之和为G,导线风偏平面内,覆冰前竖直向下的力为导线、绝缘子串和金具三者自重之和G,它与风共同作用下形成风偏平面内的综合载荷:
G ′ = G cos η
步骤S3.3,导线风偏平面内,覆冰后则增加了覆冰载荷
F ′ ice = q ice ( S ′ a + S ′ b ) n cos η
其中qice为线路覆冰载荷集度;
覆冰后传感器测量的拉力为F,则竖向拉力Fv=Fcosθ′,根据导线风偏平面内覆冰后竖直方向受力平衡分析,有如下平衡方程:
FV=G′+F′ice
F cos θ ′ = G cos η + q ice ( S ′ a + S ′ b ) n cos η
q ice = F cos θ ′ cos η - G ( S ′ a + S ′ b ) n
步骤S3.4,根据电力设计规程,令等效的导线覆冰类型为雨凇,其密度ρ为0.9×10-3kg/(m·mm2),导线原始直径为D,令覆冰形状为均匀圆柱体,则等效成雨凇的单根导线覆冰厚度b为:
b = 1 2 ( 4 q ice 9.8 πρ + D 2 - D )
同理,主杆塔垂直档距内单根导线覆冰重量为:
Q ice = F cos θ ′ cos η - G 9.8 n
其中Qice为主杆塔垂直档距内单根导线覆冰重量。
优选的,所述步骤S3.2中导线、绝缘子串和金具三者自重之和G,通过下式计算:
G=Gi+γA(Sa+Sb)n
式中:Gi为绝缘子串和金具自重,A为导线截面积,γ为导线自重比载,n为导线分裂数。
优选的,所述架空输电线路的导线类型为钢芯铝绞线、钢芯铝合金绞线、钢芯铝包钢绞线中的一种或多种。
本发明相对现有技术的具有如下优点和有益结果:
第一,减少监测设备数量:与现有技术相比,本发明所用到的设备较少,结构简单、成本低廉。
第二,考虑因素充分,准确性高:将影响导线较大的风偏因素计入考虑,综合考虑风偏角和倾斜角及导线长度变化,将可能因素考虑到覆冰计算中,提高覆冰计算精度,解决了现有技术精度较低的问题。
第三,完善力学联系:完全从力学联系出发,力学联系可信,能有效提高输电线路在线监测覆冰计算结果的准确性和可靠性,为电网安全监测系统的处置决策提供有效依据。
第四,简化计算量:利用过程分解的办法分步进行覆冰相关计算,具有方法简单,思路巧妙的特点,减少计算量。
附图说明
图1是实施例中步骤S1对应的垂直平面内杆塔-导线示意图;
图2是实施例步骤S2和步骤S3对应的导线风偏平面内杆塔-导线示意图。
具体实施方式
下面结合实施例及附图,对本发明作进一步地详细说明,但本发明的实施方式不限于此。
实施例
本例对象为贵州电网某220kV线路96#直线杆塔,该杆塔设计能承受的覆冰厚度为10mm,该导线为钢芯铝绞线2×LGJ-500/45。以下将覆冰计算过程分解为未覆冰时力学参数计算和覆冰时受力平衡分析。
如图1所示,步骤S1,在主杆塔和大、小号侧杆塔排列成的垂直平面内进行力学计算:
利用设计时小号侧杆塔和主杆塔之间的导线长度S1、设计时大号侧杆塔和主杆塔之间的导线长度S2,分别求解待计算时刻覆冰温度下的导线长度St1和St2,其中St1为覆冰温度时小号侧杆塔和主杆塔之间的导线长度,St2为覆冰温度时大号侧杆塔和主杆塔之间的导线长度:
St1=S1-S1αΔT
St2=S2-S2αΔT
其中,S1和S2分别332m和569m,导线温度膨胀系数α为1.93×10-5/℃,ΔT为设计温度20℃与待计算时刻的覆冰温度差。
计算主杆塔与小号侧杆塔的高差角β1、主杆塔与大号侧杆塔的高差角β2
β1=arctan(h1/l1)
β2=arctan(h2/l2)
其中,小号侧杆塔与主杆塔的导线悬挂点的高度差h1为15m,大号侧杆塔与主杆塔的导线悬挂点的高度差h2为-55m,主杆塔和小号侧杆塔之间的水平档距l1为329m,主杆塔和大号侧杆塔之间的水平档距l2为564m。
利用存在高度差时的线路长度斜抛物线近似公式推出垂直平面内的小号侧杆塔导线水平应力σ10和大号侧杆塔导线水平应力σ20
σ 10 = γ 2 l 1 3 cos β 1 24 ( S t 1 - l 1 cos β 1 )
σ 20 = γ 2 l 2 3 cos β 2 24 ( S t 2 - l 2 cos β 2 )
其中,导线自重1.688kg/m,导线自重比载γ为2.34×10-2N/(m·mm2)。
根据求得的导线水平应力,利用公式分别求解小号侧杆塔导线最低点到主杆塔的水平档距lb,和大号侧杆塔导线最低点到主杆塔的水平档距la,及小号侧杆塔导线最低点到主杆塔的导线线长Sb,大号侧杆塔导线最低点到主杆塔的导线线长Sa
l b = l 1 2 ( 1 + 2 h 1 σ 10 l 1 2 γ cos β 1 )
l a = l 2 2 ( 1 - 2 h 2 σ 20 l 2 2 γ cos β 2 )
S b = l b + l b 3 γ 2 6 σ 10 2 cos 2 β 1
S a = l a + l a 3 γ 2 6 σ 20 2 cos 2 β 2
如图2所示,步骤S2,在导线风偏平面内进行力学计算:
在步骤S1的基础上,未覆冰的线路受到风的影响,线路及其绝缘子串组成的几何平面将整体偏移垂直平面一定的角度,该角度即为角度传感器测得的绝缘子串风偏角η,偏移后的平面命为导线风偏平面:
导线风偏平面内的档距公式为:
l b ′ = l b 1 + ( tg β 1 sin η ) 2
l a ′ = l a 1 + ( tg β 2 sin η ) 2
导线风偏平面内高差角为:
cos β 1 ′ = cos β 1 1 + ( tg β 1 sin η ) 2
cos β 2 ′ = cos β 2 1 + ( tg β 2 sin η ) 2
导线风偏平面内水平应力为:
σ ′ 10 = σ 10 1 + ( tg β 1 sin η ) 2
σ ′ 20 = σ 20 1 + ( tg β 2 sin η ) 2
可推出导线风偏平面内,竖直方向上导线自重比载为:
γ ′ = γ cos η
导线风偏平面内,小号侧杆塔导线最低点到主杆塔的导线线长S′b,大号侧杆塔导线最低点到主杆塔的导线线长S′a为:
S ′ b = l ′ b + l ′ b 3 γ ′ 2 6 σ ′ 10 2 cos 2 β ′ 1
S ′ a = l ′ a + l ′ a 3 γ ′ 2 6 σ ′ 20 2 cos 2 β ′ 2
其中,步骤S2中没有上标的各参量为垂直平面内的力学参数,有上标的各参量为导线风偏平面内的力学参数,符号的意义同步骤S1。
步骤S3,在导线风偏平面内进行覆冰厚度和重量计算:
在导线风偏平面内,由于覆冰导致主杆塔两侧导线水平张力不同形成绝缘子串倾斜角,绝缘子串轴向拉力F可由拉力传感器测得,设该力的方向与风偏平面内竖直方向的夹角为θ′,即风偏平面内的绝缘子串倾斜角为θ′;
θ′与角度传感器测得的绝缘子串风偏角η和垂直平面内的绝缘子串倾斜角θ有如下关系:
cos θ ′ = 1 cos η 1 + tg 2 η + tg 2 θ
求垂直平面内导线、绝缘子串及金具三者自重之和G:设绝缘子串和金具自重之和Gi为1441.874N,导线截面积A为7.065×102mm2,导线自重比载γ为2.34×10-2N/(m·mm2),导线分裂数n为2,则
G=Gi+γA(Sa+Sb)n
计算得到G为11303.4N。
导线风偏平面内,覆冰前竖直向下的力为导线、绝缘子串和金具三者自重之和,它与风共同作用下形成风偏平面内的综合载荷:
G ′ = G cos η
导线风偏平面内,覆冰后则增加了覆冰载荷
F ′ ice = q ice ( S ′ a + S ′ b ) n cos η
设覆冰后传感器测量的拉力为F,则竖向拉力Fv=Fcosθ′。
根据导线风偏平面内覆冰后竖直方向受力平衡分析,有如下平衡方程:
FV=G′+F′ice
F cos θ ′ = G cos η + q ice ( S ′ a + S ′ b ) n cos η
其中qice为线路覆冰载荷集度;
可得
q ice = F cos θ ′ cos η - G ( S ′ a + S ′ b ) n
根据电力设计规程,令等效的导线覆冰类型为雨凇,其密度ρ为0.9×10-3kg/(m·mm2),导线原始直径为D,D=30mm,令覆冰形状为均匀圆柱体,则等效成雨凇的单根导线覆冰厚度b为:
b = 1 2 ( 4 q ice 9.8 πρ + D 2 - D )
同理,主杆塔垂直档距内单根导线覆冰重量Qice为:
Q ice = F cos θ ′ cos η - G 9.8 n
根据上述覆冰厚度和重量计算公式,即可准确地算出每根架空导线上的覆冰状况。
显然,本领域的技术人员应该明白,上述的本发明的各个步骤或各模块可以用通用的计算装置来实现,它们可以集中在单个的计算装置或分布在多个计算装置所组成的网络上,从而,可以将它们存储在存储装置中由计算装置来执行,或将它们分别制作成各个集成电路模块,或将它们中的多个步骤或模块制成单个集成电路模块来实现。因此,本发明不限制于任何特定的硬件和软件结合。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受所述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。

Claims (7)

1.一种直线塔架空输电线路覆冰厚度和重量的计算方法,其特征在于,包括如下步骤:
S1、在主杆塔和大、小号侧杆塔排列成的垂直平面内进行力学计算:根据设计参数计算达到覆冰温度但无覆冰时垂直平面内导线基本力学参数,所述垂直平面内的导线基本力学参数包括导线长度,导线水平应力,大、小号侧杆塔导线最低点到主杆塔的水平档距,大、小号侧杆塔导线最低点到主杆塔的导线长度;
S2、在导线风偏平面内进行力学计算:根据传感器测量的绝缘子串风偏角,计算风偏平面内的高差角、导线水平应力、竖直方向上的导线自重比载以及大、小号侧杆塔导线最低点到主杆塔的水平档距,和大、小号侧杆塔导线最低点到主杆塔的导线长度;
S3、在导线风偏平面内进行覆冰厚度和重量计算:由于覆冰导致主杆塔两侧导线水平张力不同形成绝缘子串倾斜角,建立风偏平面内的绝缘子串倾斜角与绝缘子串风偏角以及垂直平面内的绝缘子串倾斜角的关系式;在风偏平面内建立覆冰后竖直方向受力平衡方程,根据拉力传感器测量的绝缘子串轴向拉力,计算导线等效覆冰厚度和重量。
2.根据权利要求1所述直线塔架空输电线路覆冰厚度和重量的计算方法,其特征在于,所述步骤S1在主杆塔和大、小号侧杆塔排列成的垂直平面内进行力学计算,具体为:
步骤S1.1,利用设计时小号侧杆塔和主杆塔之间的导线长度S1、设计时大号侧杆塔和主杆塔之间的导线长度S2,分别求解待计算时刻覆冰温度下的导线长度St1和St2,其中St1为覆冰温度时小号侧杆塔和主杆塔之间的导线长度,St2为覆冰温度时大号侧杆塔和主杆塔之间的导线长度:
St1=S1-S1αΔT
St2=S2-S2αΔT
其中,ΔT为设计温度与覆冰温度差,α为导线的温度膨胀系数;
步骤S1.2,由上述的St1和St2,利用存在高度差时的线路长度斜抛物线近似公式推出垂直平面内的小号侧杆塔导线水平应力σ10和大号侧杆塔导线水平应力σ20
σ 10 = γ 2 l 1 3 cos β 1 24 ( S t 1 - l 1 cos β 1 )
σ 20 = γ 2 l 2 3 cos β 2 24 ( S t 2 - l 2 cos β 2 )
其中γ为导线自重比载,β1为主杆塔与小号侧杆塔的高差角,β2为主杆塔与大号侧杆塔的高差角,l1为主杆塔和小号侧杆塔之间的水平档距,l2为主杆塔和大号侧杆塔之间的水平档距;
步骤S1.3,根据求得的导线水平应力σ10和σ20,代入公式分别求解小、大号侧杆塔导线最低点到主杆塔的水平档距,小、大号侧杆塔导线最低点到主杆塔的导线长度:
l b = l 1 2 ( 1 + 2 h 1 σ 10 l 1 2 γ cos β 1 )
l a = l 2 2 ( 1 - 2 h 2 σ 20 l 2 2 γ cos β 2 )
S b = l b + l b 3 γ 2 6 σ 10 2 cos 2 β 1
S a = l a + l a 3 γ 2 6 σ 20 2 cos 2 β 2
其中lb为小号侧杆塔导线最低点到主杆塔的水平档距,la为大号侧杆塔导线最低点到主杆塔的水平档距,Sb为小号侧杆塔导线最低点到主杆塔的导线线长,Sa为大号侧杆塔导线最低点到主杆塔的导线线长,h1为小号侧杆塔与主杆塔的导线悬挂点的高度差,h2为大号侧杆塔与主杆塔的导线悬挂点的高度差。
3.根据权利要求2所述直线塔架空输电线路覆冰厚度和重量的计算方法,其特征在于,所述步骤S1.2中主杆塔与小号侧杆塔的高差角β1、主杆塔与大号侧杆塔的高差角β2,通过下式计算:
β1=arctan(h1/l1)
β2=arctan(h2/l2)
其中,h1为小号侧杆塔与主杆塔的导线悬挂点的高度差,h2为大号侧杆塔与主杆塔的导线悬挂点的高度差,l1为主杆塔和小号侧杆塔之间的水平档距,l2为主杆塔和大号侧杆塔之间的水平档距。
4.根据权利要求2所述直线塔架空输电线路覆冰厚度和重量的计算方法,其特征在于,所述步骤S2在导线风偏平面内进行力学计算,具体为:
步骤S2.1,在步骤S1的基础上,未覆冰的线路受到风的影响,线路及其绝缘子串组成的几何平面将整体偏移垂直平面一定的角度,该角度即为角度传感器测得的绝缘子串风偏角η,偏移后的平面命为导线风偏平面:
导线风偏平面内的档距公式为:
l b ′ = l b 1 + ( tg β 1 sin η ) 2
l a ′ = l a 1 + ( tg β 2 sin η ) 2
其中lb′为风偏平面内小号侧杆塔导线最低点到主杆塔的水平档距,la′为风偏平面内大号侧杆塔导线最低点到主杆塔的水平档距;
导线风偏平面内高差角为:
cos β 1 ′ = cos β 1 1 + ( tg β 1 sin η ) 2
cos β 2 ′ = cos β 2 1 + ( tg β 2 sin η ) 2
其中β1′为风偏平面内主杆塔与小号侧杆塔的高差角,β2′为风偏平面内主杆塔与大号侧杆塔的高差角;
导线风偏平面内水平应力为:
σ ′ 10 = σ 10 1 + ( tg β 1 sin η ) 2
σ ′ 20 = σ 20 1 + ( tg β 2 sin η ) 2
其中σ′10为风偏平面内小号侧杆塔导线水平应力和σ′20为风偏平面内大号侧杆塔导线水平应力;
可推出导线风偏平面内,竖直方向上导线自重比载γ′为:
γ ′ = γ cos η
步骤S2.2,导线风偏平面内,小号侧杆塔导线最低点到主杆塔的导线线长S′b,大号侧杆塔导线最低点到主杆塔的导线线长S′a为:
S ′ b = l ′ b + l ′ b 3 γ ′ 2 6 σ ′ 10 2 cos 2 β ′ 1
S ′ a = l ′ a + l ′ a 3 γ ′ 2 6 σ ′ 20 2 cos 2 β ′ 2
其中S′b为小号侧杆塔导线最低点到主杆塔的导线线长,S′a为大号侧杆塔导线最低点到主杆塔的导线线长。
5.根据权利要求4所述直线塔架空输电线路覆冰厚度和重量的计算方法,其特征在于,所述步骤S3在导线风偏平面内进行覆冰厚度和重量计算,具体为:
步骤S3.1,在导线风偏平面内,由于覆冰导致主杆塔两侧导线水平张力不同形成绝缘子串倾斜角,由拉力传感器测得绝缘子串轴向拉力F,设该力的方向与风偏平面内竖直方向的夹角为θ′,即风偏平面内的绝缘子串倾斜角为θ′;
θ′与角度传感器测得的绝缘子串风偏角η和垂直平面内的绝缘子串倾斜角θ有如下关系:
cos θ ′ = 1 cos η 1 + tg 2 η + tg 2 θ
步骤S3.2,垂直平面内,设导线、绝缘子串和金具三者自重之和为G,导线风偏平面内,覆冰前竖直向下的力为导线、绝缘子串和金具三者自重之和G,它与风共同作用下形成风偏平面内的综合载荷:
G ′ = G cos η
步骤S3.3,导线风偏平面内,覆冰后则增加了覆冰载荷
F ′ ice = q ice ( S ′ a + S ′ b ) n cos η
其中qice为线路覆冰载荷集度;
覆冰后传感器测量的拉力为F,则竖向拉力Fv=Fcosθ′,根据导线风偏平面内覆冰后竖直方向受力平衡分析,有如下平衡方程:
FV=G′+F′ice
F cos θ ′ = G cos η + q ice ( S ′ a + S ′ b ) n cos η
q ice = F cos θ ′ cos η - G ( S ′ a + S ′ b ) n
步骤S3.4,根据电力设计规程,令等效的导线覆冰类型为雨凇,其密度ρ为0.9×10-3kg/(m·mm2),导线原始直径为D,令覆冰形状为均匀圆柱体,则等效成雨凇的单根导线覆冰厚度b为:
b = 1 2 ( 4 q ice 9.8 πρ + D 2 - D )
同理,主杆塔垂直档距内单根导线覆冰重量为:
Q ice = F cos θ ′ cos η - G 9.8 n
其中Qice为主杆塔垂直档距内单根导线覆冰重量。
6.根据权利要求5所述的直线塔架空输电线路覆冰厚度和重量的计算方法,其特征在于,所述步骤S3.2中导线、绝缘子串和金具三者自重之和G,通过下式计算:
G=Gi+γA(Sa+Sb)n
式中:Gi为绝缘子串和金具自重,A为导线截面积,γ为导线自重比载,n为导线分裂数。
7.根据权利要求1所述直线塔架空输电线路覆冰厚度和重量的计算方法,其特征在于,所述架空输电线路的导线类型为钢芯铝绞线、钢芯铝合金绞线、钢芯铝包钢绞线中的一种或多种。
CN2010102156410A 2010-06-30 2010-06-30 直线塔架空输电线路覆冰厚度和重量的计算方法 Expired - Fee Related CN101907456B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102156410A CN101907456B (zh) 2010-06-30 2010-06-30 直线塔架空输电线路覆冰厚度和重量的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102156410A CN101907456B (zh) 2010-06-30 2010-06-30 直线塔架空输电线路覆冰厚度和重量的计算方法

Publications (2)

Publication Number Publication Date
CN101907456A true CN101907456A (zh) 2010-12-08
CN101907456B CN101907456B (zh) 2012-07-18

Family

ID=43262981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102156410A Expired - Fee Related CN101907456B (zh) 2010-06-30 2010-06-30 直线塔架空输电线路覆冰厚度和重量的计算方法

Country Status (1)

Country Link
CN (1) CN101907456B (zh)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929886A (zh) * 2010-07-08 2010-12-29 电子科技大学 一种输电导线覆冰质量的测量方法
CN102663215A (zh) * 2012-05-14 2012-09-12 重庆大学 架空输电线路塔-线耦合体系抗冰能力的评估方法
CN102798367A (zh) * 2011-05-27 2012-11-28 上海涌能能源科技发展有限公司 输电线路导线覆冰厚度检测方法、装置
CN102927949A (zh) * 2012-09-07 2013-02-13 浙江工业大学 基于多元物理量数学模型的输电线路覆冰预测方法
CN103017732A (zh) * 2012-12-08 2013-04-03 安徽省电力公司淮北供电公司 输电杆塔倾斜角度在线监测方法
CN103335623A (zh) * 2013-06-13 2013-10-02 国家电网公司 输电线路覆冰厚度观测方法
CN103940397A (zh) * 2014-04-23 2014-07-23 华南理工大学 一种架空线路等值覆冰厚度的在线监测方法
CN104091046A (zh) * 2014-06-16 2014-10-08 中国南方电网有限责任公司超高压输电公司检修试验中心 一种基于称重法的耐张塔导线覆冰厚度计算方法和系统
CN104182611A (zh) * 2014-07-21 2014-12-03 中国南方电网有限责任公司超高压输电公司检修试验中心 一种基于称重法的直线塔导线覆冰厚度计算方法和系统
CN104236504A (zh) * 2014-08-28 2014-12-24 上海电力学院 一种输电线路等值覆冰厚度监测方法
CN104537270A (zh) * 2015-01-20 2015-04-22 中国南方电网有限责任公司超高压输电公司检修试验中心 用于覆冰监测的大重量绝缘子串挂点受力计算方法
CN104573192A (zh) * 2014-12-17 2015-04-29 华南理工大学 一种架空线路耐张塔等值覆冰厚度的在线监测方法
CN105258664A (zh) * 2015-11-11 2016-01-20 国网四川省电力公司电力科学研究院 输电线路等值覆冰厚度获得方法
CN106153097A (zh) * 2016-06-27 2016-11-23 中国电力科学研究院 覆冰绝缘子串覆冰程度表征方法
CN106777560A (zh) * 2016-11-29 2017-05-31 深圳供电局有限公司 一种测试输电线路全线风偏角分布状态的方法和系统
CN106767639A (zh) * 2017-03-06 2017-05-31 贵州电网有限责任公司电力科学研究院 一种覆冰工况下的垂直档距取值方法
CN107228646A (zh) * 2017-06-27 2017-10-03 贵州电网有限责任公司电力科学研究院 一种输电线路等值覆冰厚度计算方法
CN108108533A (zh) * 2017-12-06 2018-06-01 重庆大学 输电导线覆冰重量的计算方法
CN108363832A (zh) * 2018-01-10 2018-08-03 云南电网有限责任公司电力科学研究院 一种计算输电线路覆冰厚度的方法
CN108921396A (zh) * 2018-06-13 2018-11-30 中国南方电网有限责任公司超高压输电公司检修试验中心 一种基于微气象和覆冰历史数据的输电线路覆冰预警方法
CN110378066A (zh) * 2019-07-29 2019-10-25 贵州电网有限责任公司 一种耐张塔输电线路覆冰厚度计算方法
CN111442752A (zh) * 2020-03-26 2020-07-24 广州长川科技有限公司 一种输电线路等值覆冰厚度的监测方法
CN111967147A (zh) * 2020-07-30 2020-11-20 华南理工大学 一种计算架空输电线路覆冰增长模型关键参数的方法
CN112484779A (zh) * 2020-11-24 2021-03-12 中国南方电网有限责任公司超高压输电公司贵阳局 一种电力线路杆塔受力模式下的倾角覆冰监测方法
CN113360832A (zh) * 2021-06-04 2021-09-07 贵州电网有限责任公司 一种架空输电线路导线等值冰厚精准计算方法
CN113686287A (zh) * 2021-07-27 2021-11-23 南方电网科学研究院有限责任公司 基于悬垂杆塔绝缘子串偏斜角的覆冰厚度测量方法及系统
CN113686286A (zh) * 2021-07-23 2021-11-23 国电南瑞科技股份有限公司 输电线路耐张段连续档导线覆冰监测方法、装置及系统
CN113701690A (zh) * 2021-07-26 2021-11-26 南方电网科学研究院有限责任公司 等档距输配电线路直线塔等值覆冰厚度测量方法及系统
CN113937653A (zh) * 2021-09-18 2022-01-14 广东电网有限责任公司广州供电局 配电线路迁移方法
CN114689005A (zh) * 2022-05-06 2022-07-01 中国南方电网有限责任公司超高压输电公司贵阳局 一种不均匀覆冰工况下的覆冰监测方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107356218A (zh) * 2017-07-26 2017-11-17 国网山东省电力公司临朐县供电公司 输电线路覆冰监测系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201203463Y (zh) * 2008-04-30 2009-03-04 安徽省电力科学研究院 输电线路覆冰重量和厚度在线监测系统
CN101556195A (zh) * 2009-03-26 2009-10-14 杭州海康雷鸟信息技术有限公司 架空输电线路导线覆冰实时监测方法及系统
CN101666636A (zh) * 2008-09-04 2010-03-10 华东电力试验研究院有限公司 监测覆冰线路电线覆冰厚度及直线塔受力的方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201203463Y (zh) * 2008-04-30 2009-03-04 安徽省电力科学研究院 输电线路覆冰重量和厚度在线监测系统
CN101666636A (zh) * 2008-09-04 2010-03-10 华东电力试验研究院有限公司 监测覆冰线路电线覆冰厚度及直线塔受力的方法
CN101556195A (zh) * 2009-03-26 2009-10-14 杭州海康雷鸟信息技术有限公司 架空输电线路导线覆冰实时监测方法及系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《华东交通大学学报》 20060228 唐春林 覆冰过载情况下电线的允许比载和冰厚计算 102-105 1-7 第23卷, 第1期 2 *
《电力自动化设备》 20060125 刘庆丰 输电线路不平衡张力分析和计算 93-95 1-7 第26卷, 第1期 2 *

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929886A (zh) * 2010-07-08 2010-12-29 电子科技大学 一种输电导线覆冰质量的测量方法
CN102798367A (zh) * 2011-05-27 2012-11-28 上海涌能能源科技发展有限公司 输电线路导线覆冰厚度检测方法、装置
CN102798367B (zh) * 2011-05-27 2015-09-16 上海涌能能源科技发展有限公司 输电线路导线覆冰厚度检测方法、装置
CN102663215A (zh) * 2012-05-14 2012-09-12 重庆大学 架空输电线路塔-线耦合体系抗冰能力的评估方法
CN102927949B (zh) * 2012-09-07 2015-08-05 浙江工业大学 基于多元物理量数学模型的输电线路覆冰预测方法
CN102927949A (zh) * 2012-09-07 2013-02-13 浙江工业大学 基于多元物理量数学模型的输电线路覆冰预测方法
CN103017732A (zh) * 2012-12-08 2013-04-03 安徽省电力公司淮北供电公司 输电杆塔倾斜角度在线监测方法
CN103017732B (zh) * 2012-12-08 2016-01-20 国家电网公司 输电杆塔倾斜角度在线监测方法
CN103335623A (zh) * 2013-06-13 2013-10-02 国家电网公司 输电线路覆冰厚度观测方法
CN103940397A (zh) * 2014-04-23 2014-07-23 华南理工大学 一种架空线路等值覆冰厚度的在线监测方法
CN104091046B (zh) * 2014-06-16 2017-06-09 中国南方电网有限责任公司超高压输电公司检修试验中心 一种基于称重法的耐张塔导线覆冰厚度监测方法和系统
CN104091046A (zh) * 2014-06-16 2014-10-08 中国南方电网有限责任公司超高压输电公司检修试验中心 一种基于称重法的耐张塔导线覆冰厚度计算方法和系统
CN104182611A (zh) * 2014-07-21 2014-12-03 中国南方电网有限责任公司超高压输电公司检修试验中心 一种基于称重法的直线塔导线覆冰厚度计算方法和系统
CN104236504B (zh) * 2014-08-28 2016-10-05 上海电力学院 一种输电线路等值覆冰厚度监测方法
CN104236504A (zh) * 2014-08-28 2014-12-24 上海电力学院 一种输电线路等值覆冰厚度监测方法
CN104573192B (zh) * 2014-12-17 2018-01-05 华南理工大学 一种架空线路耐张塔等值覆冰厚度的在线监测方法
CN104573192A (zh) * 2014-12-17 2015-04-29 华南理工大学 一种架空线路耐张塔等值覆冰厚度的在线监测方法
CN104537270A (zh) * 2015-01-20 2015-04-22 中国南方电网有限责任公司超高压输电公司检修试验中心 用于覆冰监测的大重量绝缘子串挂点受力计算方法
CN104537270B (zh) * 2015-01-20 2017-06-27 中国南方电网有限责任公司超高压输电公司检修试验中心 用于覆冰监测的大重量绝缘子串挂点受力计算方法
CN105258664A (zh) * 2015-11-11 2016-01-20 国网四川省电力公司电力科学研究院 输电线路等值覆冰厚度获得方法
CN105258664B (zh) * 2015-11-11 2018-01-30 国网四川省电力公司电力科学研究院 输电线路等值覆冰厚度获得方法
CN106153097A (zh) * 2016-06-27 2016-11-23 中国电力科学研究院 覆冰绝缘子串覆冰程度表征方法
CN106153097B (zh) * 2016-06-27 2020-09-25 中国电力科学研究院 覆冰绝缘子串覆冰程度表征方法
CN106777560A (zh) * 2016-11-29 2017-05-31 深圳供电局有限公司 一种测试输电线路全线风偏角分布状态的方法和系统
CN106777560B (zh) * 2016-11-29 2020-03-27 深圳供电局有限公司 一种测试输电线路全线风偏角分布状态的方法和系统
CN106767639A (zh) * 2017-03-06 2017-05-31 贵州电网有限责任公司电力科学研究院 一种覆冰工况下的垂直档距取值方法
CN107228646A (zh) * 2017-06-27 2017-10-03 贵州电网有限责任公司电力科学研究院 一种输电线路等值覆冰厚度计算方法
CN108108533A (zh) * 2017-12-06 2018-06-01 重庆大学 输电导线覆冰重量的计算方法
CN108363832A (zh) * 2018-01-10 2018-08-03 云南电网有限责任公司电力科学研究院 一种计算输电线路覆冰厚度的方法
CN108921396A (zh) * 2018-06-13 2018-11-30 中国南方电网有限责任公司超高压输电公司检修试验中心 一种基于微气象和覆冰历史数据的输电线路覆冰预警方法
CN110378066A (zh) * 2019-07-29 2019-10-25 贵州电网有限责任公司 一种耐张塔输电线路覆冰厚度计算方法
CN110378066B (zh) * 2019-07-29 2023-06-09 贵州电网有限责任公司 一种耐张塔输电线路覆冰厚度计算方法
CN111442752A (zh) * 2020-03-26 2020-07-24 广州长川科技有限公司 一种输电线路等值覆冰厚度的监测方法
CN111442752B (zh) * 2020-03-26 2021-11-19 广州长川科技有限公司 一种输电线路等值覆冰厚度的监测方法
CN111967147A (zh) * 2020-07-30 2020-11-20 华南理工大学 一种计算架空输电线路覆冰增长模型关键参数的方法
CN111967147B (zh) * 2020-07-30 2024-04-16 华南理工大学 一种计算架空输电线路覆冰增长模型关键参数的方法
CN112484779B (zh) * 2020-11-24 2022-08-16 中国南方电网有限责任公司超高压输电公司贵阳局 一种电力线路杆塔受力模式下的倾角覆冰监测方法
CN112484779A (zh) * 2020-11-24 2021-03-12 中国南方电网有限责任公司超高压输电公司贵阳局 一种电力线路杆塔受力模式下的倾角覆冰监测方法
CN113360832A (zh) * 2021-06-04 2021-09-07 贵州电网有限责任公司 一种架空输电线路导线等值冰厚精准计算方法
CN113686286A (zh) * 2021-07-23 2021-11-23 国电南瑞科技股份有限公司 输电线路耐张段连续档导线覆冰监测方法、装置及系统
CN113701690A (zh) * 2021-07-26 2021-11-26 南方电网科学研究院有限责任公司 等档距输配电线路直线塔等值覆冰厚度测量方法及系统
CN113701690B (zh) * 2021-07-26 2024-03-22 南方电网科学研究院有限责任公司 等档距输配电线路直线塔等值覆冰厚度测量方法及系统
CN113686287B (zh) * 2021-07-27 2023-07-21 南方电网科学研究院有限责任公司 基于悬垂杆塔绝缘子串偏斜角的覆冰厚度测量方法及系统
CN113686287A (zh) * 2021-07-27 2021-11-23 南方电网科学研究院有限责任公司 基于悬垂杆塔绝缘子串偏斜角的覆冰厚度测量方法及系统
CN113937653A (zh) * 2021-09-18 2022-01-14 广东电网有限责任公司广州供电局 配电线路迁移方法
CN114689005A (zh) * 2022-05-06 2022-07-01 中国南方电网有限责任公司超高压输电公司贵阳局 一种不均匀覆冰工况下的覆冰监测方法
CN114689005B (zh) * 2022-05-06 2022-10-04 中国南方电网有限责任公司超高压输电公司贵阳局 一种不均匀覆冰工况下的覆冰监测方法

Also Published As

Publication number Publication date
CN101907456B (zh) 2012-07-18

Similar Documents

Publication Publication Date Title
CN101907456B (zh) 直线塔架空输电线路覆冰厚度和重量的计算方法
CN102095449B (zh) 一种架空输电线路舞动预警方法
CN101620000B (zh) 输电线路覆冰量的计算方法
CN102313853B (zh) 高压输电线路动态输送容量测算系统及方法
CN111442752B (zh) 一种输电线路等值覆冰厚度的监测方法
CN111460389B (zh) 一种覆冰导线舞动跳闸概率计算方法
CN103278306B (zh) 复合绝缘子抗风能力检测方法、装置及复合绝缘子制作方法
CN201653621U (zh) 一种输电架空地线覆冰在线监测装置
CN109632131B (zh) 一种锂电池组温度测量用的光纤光栅传感器及其测温方法
CN101666636A (zh) 监测覆冰线路电线覆冰厚度及直线塔受力的方法
CN104091046A (zh) 一种基于称重法的耐张塔导线覆冰厚度计算方法和系统
CN103234659A (zh) 一种架空线路在线测温方法
CN107356218A (zh) 输电线路覆冰监测系统
CN113983987A (zh) 一种输电线路覆冰动态监测方法、系统、装置及存储介质
CN105758787A (zh) 一种腐蚀速率测量装置及测量方法
CN108363832A (zh) 一种计算输电线路覆冰厚度的方法
CN108775929A (zh) 一种真空断路器在线监测系统
CN102033982B (zh) 基于模糊逻辑的覆冰输电线路状态评估方法
CN103940397A (zh) 一种架空线路等值覆冰厚度的在线监测方法
CN108108533A (zh) 输电导线覆冰重量的计算方法
CN102983533A (zh) 一种输电线路导/地线风荷载计算方法
CN101929886B (zh) 一种输电导线覆冰质量的测量方法
CN113836730A (zh) 一种覆冰监测用旋转多圆导体直径计算方法
CN202938845U (zh) 智能电网输电线路等值覆冰在线监测系统
CN104573192A (zh) 一种架空线路耐张塔等值覆冰厚度的在线监测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120718

Termination date: 20140630

EXPY Termination of patent right or utility model