CN101879353A - 用于使负荷物和/或人从高层建筑物下降的方法 - Google Patents
用于使负荷物和/或人从高层建筑物下降的方法 Download PDFInfo
- Publication number
- CN101879353A CN101879353A CN 201010173417 CN201010173417A CN101879353A CN 101879353 A CN101879353 A CN 101879353A CN 201010173417 CN201010173417 CN 201010173417 CN 201010173417 A CN201010173417 A CN 201010173417A CN 101879353 A CN101879353 A CN 101879353A
- Authority
- CN
- China
- Prior art keywords
- load bearing
- flexible load
- bearing component
- elastica
- free end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
- Types And Forms Of Lifts (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明涉及用于使人从建筑物下降的方法,而且本发明可用于在失火或自然灾害期间将负荷物和人从高层建筑物紧急撤退。这种使负荷物和/或人从高层建筑物下降的方法在于:通过连接用线将第一和第二挠性承载部件彼此连接在一起;同时在挠性承载部件之间沿所述挠性承载部件的整个长度形成恒定值间距;形成平行于每一个挠性承载部件的接缝,并且所有的连接用弹性线在同一平面内;将第二挠性承载部件的自由端安装在下降的起始点;将待下降的对象物悬挂在第一挠性承载部件的自由端;同时对一些连接用弹性线施加破断力直到它们断裂;并且第一挠性承载部件的自由端沿第二挠性承载部件的表面移动。
Description
技术领域
本发明涉及用于使人从建筑物下降的方法,而且本发明可用于在失火或自然灾害期间将负荷物和人从高层建筑物紧急撤退。
背景技术
从高层建筑物下降的方法是众所周知的,该方法包括:通过连接元件将两个挠性承载部件彼此连接在一起;将挠性承载部件的自由端安装在下降的起始点;将对象物悬挂在具有切削片的下降元件上;通过切削片切割连接元件以使对象物下降(JP 4-136244,IPC A62B 1/16,于1992年12月18日公布)。
该方法的缺点是切割连接元件的速率相当高,因此在从高层建筑物下降期间,人的生命是很危险的,此外,当实施该方法时,下降元件可能会脱离挠性承载部件,因此对人的生命是极其危险的。
作为最接近的现有技术,减震方法是众所周知的,该方法包括:通过连接用线将第一和第二挠性承载部件彼此连接在一起;将第二挠性承载部件的自由端与吊索的上部相连接,所述自由端可与吊索一起活动;将对象物悬挂在第一挠性承载部件的自由端;对多个连接用线同时施加破断力直到它们断裂,使得对象物通过第一挠性承载部件的自由端下降到完全停止位置且位于一距离处,这仅仅取决于对象物的重量和在承载部件开始拉紧时的对象物的下降速度(AU 1904001,IPC A62B35/04,2002年06月24日公布)。
该方法的缺点是:因为没有伸展性的连接用线的断裂,所以该方法不能为下降的可能性做好充分准备,只是在对象物对承载部件产生冲击效应时提供减震以及提供减速直到完成停止。此外,该方法并不具有下降速度调节功能。
发明内容
本发明可获得的技术效果是:提供一种适合于使负荷物和人从高层建筑物安全下降的方法。
该技术效果可通过一种使例如负荷物和/或人的对象物从高层建筑物下降的方法来实现,该方法包括:通过连接用弹性线将第一和第二挠性承载部件彼此连接在一起,同时在所述第一和第二挠性承载部件之间沿所述第一和第二挠性承载部件的整个长度形成恒定值间距,形成平行于每一个挠性承载部件的接缝,并且将所有的连接用弹性线设置在同一平面内;将所述第二挠性承载部件的自由端安装在下降的起始点;将待下降的对象物悬挂在所述第一挠性承载部件的自由端;对一些连接用线同时施加破断力直到它们断裂;通过沿所述第二挠性承载部件的表面移动所述第一挠性承载部件的所述自由端来实现所述对象物的下降。
将所述第二挠性承载部件的所述自由端通过铰接方式安装在下降起始点。
将每根弹性线拉伸0.0005-0.2秒直到其断裂。
每根连接用弹性线拉伸至断裂时的伸长率为5-500%。
所述第一和第二挠性承载部件通过间隔为0.1-10mm的连接用弹性线相连接。
所述第一和第二挠性承载部件之间的间距为0.5-200mm。
每秒对50-2500根线连续施加破断力直到断裂。
所述对象物的下降速度与所述对象物的重量和连接所述第一和第二挠性承载部件的所述连接用弹性线之间的间隔成正比,而与所述连接用弹性线的厚度、所述第一和第二挠性承载部件之间的间距值和所述弹性线断裂时的伸长率值成反比。
附图说明
下面将通过所示出的附图1-5对本发明加以解释。
图1和图2为图示了一种用于连接第一和第二承载部件的方法的视图,具体来说,图2为根据图1中的箭头A的视图;
图3为图示了一种用于将承载部件的自由端连接到支撑物和待下降的对象物的方法的视图;
图4为图示了由于对象物的重力而导致对象物下降的过程的视图;
图5为图示了在对象物下降期间连接用弹性线断裂的过程的视图。
具体实施方式
使负荷物和人从高层建筑物下降的方法可通过以下的方式实现。
在下降前,通过连接用弹性线3将第一挠性承载部件1和第二挠性承载部件2彼此连接在一起。在第一挠性承载部件1和第二挠性承载部件2之间形成恒定值间距4。也就是说,沿第一挠性承载部件1和第二挠性承载部件2的整个长度,第一和第二挠性承载部件之间的间距4为恒定值。第一挠性承载部件1和第二挠性承载部件2可以以织物带的形式制成,该织物带是通过编织、尤其通过交织经轴线和纬线来制造,而且经轴线和纬线的拉伸强度比连接用弹性线3的拉伸强度至少大20%。当使用连接用弹性线3将第一挠性承载部件1连接到第二挠性承载部件2上时,形成了平行于每一个挠性承载部件1和2的接缝5,并且将所有的连接用弹性线3设置在同一平面或几个互相平行的平面内。此处,“接缝5平行于每一个挠性承载部件1和2”是指接缝5平行于以织物带或带状物形式制成的挠性承载部件1和2的侧边。如果将粗绳或缆绳用作挠性承载部件1和2,那么接缝5将与粗绳或缆绳的轴线平行。
在下降前,将第二挠性承载部件2的自由端7安装在下降的起始点,如图3所示。然后,将对象物8悬挂在第一挠性承载部件1的自由端6上。优选地,将第二挠性承载部件2的自由端7通过铰接方式安装在下降的起始点,以补偿在对象物8下降过程中预料不到的第二挠性承载部件2可能出现的波动。对象物8可以是人或者任何其他的负荷物。
一旦将对象物8悬挂在第一挠性承载部件1的自由端6,离第二挠性承载部件2的自由端7最近的若干连接用弹性线3形成了有负载的一组连接用弹性线3,它们同时被等于对象物8的重力的张力拉伸,对象物8的重力如图4中的“P”所示,其方向也如图4中的箭头所示。有负载的该组连接用弹性线3中的连接用弹性线3上所进行的张力分配是不均匀的。所有经拉伸的连接用弹性线3均被设置在同一平面内。最大负载线是最接近于第二挠性承载部件2的自由端7的弹性线3。次最大负载(拉伸)线是沿对象物8下降方向紧跟在最接近于第二挠性承载部件2的自由端7的弹性线3后的弹性线3。此外,有负载的该组连接用弹性线3中的每一根连接用弹性线3的负载(拉伸)程度将沿对象物8下降方向减小。
因此,对连接用弹性线3施加张力直到它们断裂。从最接近于第二挠性承载部件2的自由端7的那根连接用弹性线3(图4或图5中最上端的连接用弹性线3)开始,有负载的该组连接用弹性线3中的连接用弹性线3沿对象物8下降方向依次断裂。在其它下降条件相同的情况下,有负载的该组连接用弹性线3中线的数量保持不变,尤其在无生命的对象物下降期间,这些无生命的对象物当它们在空间中的位置改变时不会产生波动。在最接近于第二挠性承载部件2的自由端7的连接用弹性线3断裂后,距有负载的该组连接用弹性线3最近的连接用弹性线3受张力作用。
因此,每一根连接用弹性线3依次断裂,第一挠性承载部件1的自由端6沿第二挠性承载部件2的表面移动,从而实现对象物8的下降。对象物8以一恒定速度执行下降,该恒定速度值的偏差可以不超过25%。
根据本发明方法,在对象物8下降期间,对象物8的下降速度与对象物8的重量和连接两个挠性承载部件1和2的连接用弹性线3之间的间隔9成正比,而与连接用弹性线3的厚度、挠性承载部件1和2之间的间距4的值和连接用弹性线3断裂前的伸长率成反比。
负荷物和人从高层建筑物下降的最佳速度为2米/秒,偏差不超过25%,较低的下降速度可能会导致增大有负载的连接用弹性线3组,从而对象物8可能停止;如果对象物8为人,较高的下降速度会不利地影响人的健康。
所进行的测试已经表明:通过应用连接用弹性线3可实现将质量为100kg的对象物8按2米/秒的速度下降,连接用弹性线3中的每一个在断裂前具有5-500%的伸长率。所使用的线由断裂前伸长率为4-5%的聚芳酰胺、断裂前伸长率为300-500%的聚氨酯线、断裂前伸长率为15-20%的聚丙烯线、断裂前伸长率为20-200%的聚丙烯线制成。柔性吊货带PTU(丙硫氧嘧啶)通过编织断裂负载为15,000千克力的聚酰胺纤维制成并且用作承载部件1和2。利用缝缀的方法采用这些连接用弹性线将柔性吊货带成对连接,连接用弹性线的间隔为0.1-10mm,同时在吊货带之间形成0.5-200mm的恒定值间距。当采用聚芳酰胺线时,各线之间的间隔为0.1mm,而吊货带之间的间距为200mm。当采用聚丙烯线时,各线之间的间隔为3-7mm,而吊货带之间的间距为50-120mm。当采用聚氨酯线时,各线之间的间隔为10mm,而吊货带之间的间距为0.5mm。
在至少0.0005s的时间段内将每一根弹性聚芳酰胺线拉伸至断裂,那么每秒需连续将力施加到1500-2500根线直到线断裂。在0.005-0.01s的时间段内将每一根弹性聚丙烯线拉伸至断裂,那么每秒需连续将力施加到100-300根线直到线断裂。在0.2s内将每一根弹性聚氨酯线拉伸至断裂,那么每秒需连续将力施加到50-100根线直到线断裂。因而以2m/s±25%的速度执行对象物的下降。
因此,由于这样的事实:通过连接用弹性线将两个挠性承载部件彼此连接在一起,而沿所述挠性承载部件的整个长度,在所述挠性承载部件之间形成恒定值间距,并且将所有的连接用弹性线设置在同一平面内,沿第二挠性承载部件的表面移动第一挠性承载部件的自由端;所以这种使负荷物和人从高层建筑物下降的方法适合于使负荷物和人从高层建筑物安全下降。
Claims (8)
1.一种使例如负荷物和/或人的对象物从高层建筑物下降的方法,该方法包括:
通过连接用弹性线将第一和第二挠性承载部件彼此连接在一起,同时在所述第一和第二挠性承载部件之间沿所述第一和第二挠性承载部件的整个长度形成恒定值间距,形成平行于每一个挠性承载部件的接缝,并且将所有的弹性线设置在同一平面内;
将所述第二挠性承载部件的自由端安装在下降的起始点;
将待下降的对象物悬挂在所述第一挠性承载部件的自由端;
对一些连接用线同时施加破断力直到它们断裂;
通过沿所述第二挠性承载部件的表面移动所述第一挠性承载部件的所述自由端来实现所述对象物的下降。
2.如权利要求1所述的方法,其中,将所述第二挠性承载部件的所述自由端通过铰接方式安装在所述下降的起始点。
3.如权利要求1所述的方法,其中,将每根弹性线拉伸0.0005-0.2秒直到其断裂。
4.如权利要求1所述的方法,其中,每根连接用弹性线拉伸至断裂时的伸长率为5-500%。
5.如权利要求1所述的方法,其中,所述第一和第二挠性承载部件通过间隔为0.1-10mm的连接用弹性线相连接。
6.如权利要求1所述的方法,其中,所述第一和第二挠性承载部件之间的间距为0.5-200mm。
7.如权利要求1所述的方法,其中,每秒对50-2500根线连续施加破断力直到断裂。
8.如权利要求1所述的方法,其中,所述对象物的下降速度与所述对象物的重量和连接所述第一和第二挠性承载部件的所述弹性线之间的间隔成正比,而与所述弹性线的厚度、所述第一和第二挠性承载部件之间的间距值和所述弹性线断裂时的伸长率值成反比。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2009116871/12A RU2400271C1 (ru) | 2009-05-06 | 2009-05-06 | Способ спуска грузов и людей с высотных объектов |
RU2009116871 | 2009-05-06 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101879353A true CN101879353A (zh) | 2010-11-10 |
CN101879353B CN101879353B (zh) | 2012-05-09 |
Family
ID=42940214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010173417XA Expired - Fee Related CN101879353B (zh) | 2009-05-06 | 2010-05-05 | 用于使负荷物和/或人从高层建筑物下降的方法 |
Country Status (4)
Country | Link |
---|---|
CN (1) | CN101879353B (zh) |
EA (1) | EA016597B1 (zh) |
RU (1) | RU2400271C1 (zh) |
UA (1) | UA95390C2 (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020160665A1 (en) * | 2019-02-05 | 2020-08-13 | Gravity Gear & Equipment Inc. | Breakfree safety lanyard |
WO2021035327A1 (en) * | 2019-08-26 | 2021-03-04 | British Columbia Ferry Services Inc. | System and method for lowering a user from an elevated position |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2509583C1 (ru) * | 2012-07-04 | 2014-03-20 | Алексей Викторович Фирсов | Устройство для спуска с высоты |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04136244A (ja) * | 1990-09-20 | 1992-05-11 | Kurobaa Kk | 編地の編成方法およびこの方法によって編成された編地 |
GB2292782A (en) * | 1994-09-02 | 1996-03-06 | Marling Leek Ltd | Shock absorber |
WO2002047764A1 (en) * | 2000-12-13 | 2002-06-20 | Grzegorz Laszkiewicz | Shock absorber |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1604702A (zh) * | 1968-04-17 | 1972-01-24 | ||
GB1464052A (en) * | 1975-05-05 | 1977-02-09 | Katsube A | Life saving chute |
US4246980A (en) * | 1979-08-17 | 1981-01-27 | The Garrett Corporation | Evacuation slide deceleration |
RU81079U1 (ru) * | 2008-09-30 | 2009-03-10 | Виктор Михайлович Фоминов | Устройство для аварийной эвакуации грузов и людей с высотных сооружений (варианты) |
-
2009
- 2009-05-06 RU RU2009116871/12A patent/RU2400271C1/ru not_active IP Right Cessation
-
2010
- 2010-04-19 EA EA201000492A patent/EA016597B1/ru not_active IP Right Cessation
- 2010-04-29 UA UAA201005271A patent/UA95390C2/ru unknown
- 2010-05-05 CN CN201010173417XA patent/CN101879353B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04136244A (ja) * | 1990-09-20 | 1992-05-11 | Kurobaa Kk | 編地の編成方法およびこの方法によって編成された編地 |
GB2292782A (en) * | 1994-09-02 | 1996-03-06 | Marling Leek Ltd | Shock absorber |
WO2002047764A1 (en) * | 2000-12-13 | 2002-06-20 | Grzegorz Laszkiewicz | Shock absorber |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020160665A1 (en) * | 2019-02-05 | 2020-08-13 | Gravity Gear & Equipment Inc. | Breakfree safety lanyard |
WO2021035327A1 (en) * | 2019-08-26 | 2021-03-04 | British Columbia Ferry Services Inc. | System and method for lowering a user from an elevated position |
Also Published As
Publication number | Publication date |
---|---|
CN101879353B (zh) | 2012-05-09 |
RU2400271C1 (ru) | 2010-09-27 |
EA201000492A1 (ru) | 2010-12-30 |
UA95390C2 (ru) | 2011-07-25 |
EA016597B1 (ru) | 2012-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105712178B (zh) | 用于提升救援设备的牵索组件 | |
US6006860A (en) | Safety harness or belt with fiber means to indicate shock loading | |
EP1915548B1 (en) | Energy absorbing webbings | |
CN101879353B (zh) | 用于使负荷物和/或人从高层建筑物下降的方法 | |
US20110042165A1 (en) | Energy absorber for personal fall arrestor | |
US7448577B2 (en) | Apparatus for providing velocity differential between parachute and payload to reduce shock load | |
CN101934962A (zh) | 吊索式电梯 | |
EP1399223B1 (en) | Method to reduce horizontal lifeline tension and extension during fall arrest | |
CN203408391U (zh) | 一种高处作业缓冲器 | |
CN204778140U (zh) | 电梯的限速器 | |
WO2013063196A2 (en) | Energy absorber | |
KR20150136555A (ko) | 안전대 죔줄 | |
US8146215B2 (en) | Flexible connection and release device and method | |
WO2019200048A1 (en) | Energy absorber | |
WO1995001815A2 (en) | Energy absorbing fall arrest device | |
CN112516481A (zh) | 一种电力作业安全带 | |
JP6223689B2 (ja) | 衝撃荷重緩和ロープ及びランヤード | |
CN209940262U (zh) | 一种直升机安全吊运器具 | |
CN202320799U (zh) | 航空器救援牵引挂具 | |
CN201484659U (zh) | 一种飞机救援拴紧索具 | |
CN214860705U (zh) | 一种高强度防护安全带 | |
CN106480759B (zh) | 一种建筑用缆绳保护器 | |
CN215876026U (zh) | 高空用安全带 | |
KR20140092738A (ko) | 충격흡수용 밴드 | |
CN203855337U (zh) | 塔机吊臂作业安全保护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120509 Termination date: 20130505 |