CN101858164A - Lifting communication base station iron tower - Google Patents
Lifting communication base station iron tower Download PDFInfo
- Publication number
- CN101858164A CN101858164A CN201010197223A CN201010197223A CN101858164A CN 101858164 A CN101858164 A CN 101858164A CN 201010197223 A CN201010197223 A CN 201010197223A CN 201010197223 A CN201010197223 A CN 201010197223A CN 101858164 A CN101858164 A CN 101858164A
- Authority
- CN
- China
- Prior art keywords
- base station
- communication base
- iron tower
- station iron
- pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The invention discloses a lifting communication base station iron tower which comprises a communication base station iron tower, an electromotor, a winch, a steel wire rope, pulleys and communication base station iron tower sections made from connected communication base station iron tower parts and components; the electromotor and the winch are arranged on the sections of a communication base station iron tower base; the pulleys are fixedly arranged on the upper ends of all sections of the communication base station iron tower; one end of the steel wire rope is fixed on the winch and the other end thereof sequentially passes through the pulleys and finally is fixed on the pulley arranged on the section of the iron tower of the communication base station iron tower to be locked, thus forming a full set of pulley system; all the sections of the communication base station iron tower can be foldable and sleeved together; when the communication base station iron tower is arranged, the electric machine drives the winch to rotate, the steel wire rope winds around the winch, and the steel wire rope is combined with the pulley group and drives the sections of the communication base station iron towers to lift section by section. The lifting communication base station iron tower has the advantages that the assembly of the sections of the communication base station iron tower can be finished before all the sections are transported into the construction site, the communication base station iron tower can be conveniently and rapidly arranged, has few upper air quantity of work, good safety and very small construction floor space, is easily coordinated and can be arranged and constructed at any time.
Description
Technical field
The invention belongs to communication and technical field of engineering machinery, relate to a kind of liftable communication base station iron tower, the iron tower that is specially adapted to communication base station is installed.
Background technology
Traditional communication base station iron tower belongs to the non-type product, manufactures and designs different towers according to different regions.The communication base station iron tower installation process is:
Prepare mounting material: make the various workpiece of communication base station iron tower earlier by factory process, then the communication base station iron tower workpiece is transported to the job site.
Install and implement: lay foundation earlier, place built-in fitting, treated concrete setting 15 days---after 30 days, utilize lifting appliance that each Duan Tacai of iron tower is sling again, personnel ascend a height and with the bolt segmentation tower material are carried out connection in the high-altitude.The iron tower group is proofreaied and correct straightening after standing and finishing again.
Such mounting means has a lot of defectives: the one, from the installation of laying foundation, need for a long time, and each communication base station iron tower construction and installation was finished about about 1 month; The 2nd, installation process is numerous and diverse, and installation personnel is wanted work high above the ground, reaches when the highest more than hundred meters, and is dangerous big; The 3rd, the construction area area is big, and it is big that difficulty is coordinated in occupation of land, should not install at any time.
Summary of the invention
The present invention discloses a kind of liftable communication base station iron tower, and problems such as length consuming time, danger is big, floor space is big, should not install are at any time installed in, high-altitude numerous and diverse with installation process in the solution prior art.
The present invention includes communication base station iron tower, communication base station iron tower comprises lightning rod, antenna holder, base station board house; It is characterized in that also comprising: motor, capstan winch, wire rope, pulley, connect the communication base station iron tower sections that is made into by the communication base station iron tower loose mail; The communication base station iron tower sections comprises communication base station iron tower epimerite section, communication base station iron tower coxopodite section at least; Motor and capstan winch are installed on the communication base station iron tower coxopodite section; Each sections upper end of communication base station iron tower is installed with pulley; Wire rope one end is fixed on the capstan winch, and the other end passes each pulley successively, is fixed on the pulley of communication base station iron tower epimerite section lockedly at last, has constituted a whole set of pulley system; Each sections of communication base station iron tower can be stacked together.
Little tripod of connection on the communication base station iron tower coxopodite section; Motor and capstan winch are installed on the little tripod on the communication base station iron tower coxopodite section.
The communication base station iron tower sections also comprises the communication base station iron tower interstitial segment; The communication base station iron tower interlude is installed with pulley; Wire rope one end is fixed on the capstan winch, the other end passes communication base station iron tower coxopodite section top sheave, communication base station iron tower interlude top sheave, communication base station iron tower epimerite section top sheave successively, be fixed on the pulley of communication base station iron tower epimerite section lockedly at last, constituted a whole set of pulley system; Each sections of communication base station iron tower can be stacked together; During installation, the rotation of driven by motor capstan winch, wire rope twines around capstan winch, and wire rope and assembly pulley combination drive the communication base station iron tower sections by joint and rise.
Have crossbeam on the communication base station iron tower sections, pulley is installed on the crossbeam by junction plate.
Communication base station iron tower installation process of the present invention is as follows:
Prepare before the first step is installed: at first the communication base station iron tower loose mail is connected the sections that is made into greater than 2 sections, wire rope one end is fixed on the capstan winch, and the other end passes each pulley successively, is fixed on the pulley of communication base station iron tower epimerite section locked at last; Then that each sections of communication base station iron tower is together nestable.
The installation of second step is implemented: the starter motor switch, and the driven by motor capstan winch rotates, and wire rope twines around capstan winch, and wire rope begins shortening, and wire rope and assembly pulley combination are pursued joint and are driven the rise of communication base station iron tower sections, realize the communication base station iron tower installation.
Advantage of the present invention is: the communication base station iron tower sections can be assembled before being transported to the job site and finish, and power supply, starter motor, lifting communication base station iron tower only need be connected in the job site, realizes installing; Quick and easy for installation, can finish construction in 1--3 days, shorten the construction and installation time; Significantly reduce the workload of work high above the ground, safety is good, and the construction area area is very little, coordinates easily installation at any time.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 for the present invention along the assembly pulley of B-B section connected mode cutaway view Amplified image in tower section lower end;
Fig. 3 is pulley tower section on the connected mode cutaway view Amplified image of the present invention along the A-A section.
Among the figure: 1 capstan winch; 2 pulleys; 3 pulleys; 4 pulleys; 5 pulleys; 6 pulleys; 7 pulleys; 8 pulleys; 9 little junction plates; 10 big junction plates; 11 crossbeams; 12 junction plates; 13 crossbeams; 101 communication base station iron tower epimerite sections; 201 communication base station iron tower interstitial segments; 301 communication base station iron tower coxopodite sections; 401 little tripods.
The specific embodiment
Below be one embodiment of the present of invention.
As shown in Figure 1: communication base station iron tower of the present invention comprises that lightning rod, antenna holder, base station board house, communication base station iron tower comprise communication base station iron tower epimerite section 101, communication base station iron tower interstitial segment 201, communication base station iron tower coxopodite section 301,
As Fig. 1, Fig. 2, shown in Figure 3: pulley jacking system of the present invention comprises motor, capstan winch 1, wire rope, pulley, junction plate, little tripod 401; Communication base station iron tower comprises communication base station iron tower epimerite section 101, communication base station iron tower interstitial segment 201, communication base station iron tower coxopodite section 301, have crossbeam 11 and crossbeam 13 on the communication base station iron tower sections, junction plate 9, junction plate 10, has bolt mounting holes in the middle of the junction plate 12, pulley 2, pulley 5 and pulley 8 for as shown in Figure 2 the upper end fixed structure, bolt passes two junction plate 12 installing holes and pulley axis hole, pulley is mounted between two junction plates 12, two junction plates 12 are welded on the last end floor beam 13 of crossbeam communication base station iron tower interstitial segment 201, and two junction plates 12 also are welded on the last end floor beam 13 of crossbeam communication base station iron tower coxopodite section 301; Pulley 3, pulley 4, pulley 6 and pulley 7 are lower end fixed structure as shown in Figure 3, bolt passes junction plate 9 and junction plate 10 installing holes and pulley axis hole, pulley is mounted between junction plate 9 and the junction plate 10, and junction plate 9 and junction plate 10 are welded on the crossbeam 11 of communication base station iron tower interstitial segment 201 lower ends; Junction plate 9 and junction plate 10 also are welded on the crossbeam 11 of communication base station iron tower epimerite section 101 lower ends; Little tripod 401 welded and installed are connected communication base station iron tower coxopodite section 301 lower ends; Motor and capstan winch 1 are installed on the little tripod 401 on the communication base station iron tower coxopodite section 301; Wire rope one end is fixed on the capstan winch 1, and the other end passes pulley 2, pulley 3, pulley 4, pulley 5, pulley 6 successively, and pulley 7 is fixed on the pulley 8 locked at last.
Before the installation, communication base station iron tower epimerite section 101, communication base station iron tower interstitial segment 201, communication base station iron tower coxopodite section 301 are together nestable;
During installation, the starter motor switch, wire rope twines around capstan winch, and wire rope begins to shorten, and assembly pulley drives communication base station iron tower epimerite section 101 and rises, and when pulley 6, when pulley 7 is highly identical with pulley 8 with pulley 5,101 raise-positions of communication base station iron tower epimerite section stop; Pulley 3, pulley 4 drive upwards rise of communication base station iron tower interstitial segment 201 continuation then, and when pulley 3, when pulley 4 is highly identical with pulley 2,201 raise-positions of communication base station iron tower interstitial segment stop.A plurality of communication base station iron tower interstitial segments can so be operated the iron tower that differing heights can be installed.
Claims (4)
1. a liftable communication base station iron tower comprises communication base station iron tower, and communication base station iron tower comprises lightning rod, antenna holder, base station board house; It is characterized in that also comprising: motor, capstan winch, wire rope, pulley, connect the communication base station iron tower sections that is made into by the communication base station iron tower loose mail; The communication base station iron tower sections comprises communication base station iron tower epimerite section, communication base station iron tower coxopodite section at least; Motor and capstan winch are installed on the communication base station iron tower coxopodite section; Each sections upper end of communication base station iron tower is installed with pulley; Wire rope one end is fixed on the capstan winch, and the other end passes each pulley successively, is fixed on the pulley of communication base station iron tower epimerite section lockedly at last, has constituted a whole set of pulley system; Each sections of communication base station iron tower can be stacked together, during installation, and the rotation of driven by motor capstan winch, wire rope twines around capstan winch, and wire rope and assembly pulley combination drive the communication base station iron tower sections by joint and rise.
2. communication base station iron tower according to claim 1 is characterized in that: little tripod of connection on the communication base station iron tower coxopodite section; Motor and capstan winch are installed on the little tripod on the communication base station iron tower coxopodite section.
3. according to claim 1,2 described communication base station iron towers, it is characterized in that: the communication base station iron tower sections also comprises the communication base station iron tower interstitial segment; The communication base station iron tower interlude is installed with pulley; Wire rope one end is fixed on the capstan winch, the other end passes communication base station iron tower coxopodite section top sheave, communication base station iron tower interlude top sheave, communication base station iron tower epimerite section top sheave successively, be fixed on the pulley of communication base station iron tower epimerite section lockedly at last, constituted a whole set of pulley system; Each sections of communication base station iron tower can be stacked together, during installation, and the rotation of driven by motor capstan winch, wire rope twines around capstan winch, and wire rope and assembly pulley combination drive the communication base station iron tower sections by joint and rise.
4. communication base station iron tower according to claim 1 is characterized in that: have crossbeam on the communication base station iron tower sections, pulley is installed on the crossbeam by junction plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010197223A CN101858164A (en) | 2010-06-11 | 2010-06-11 | Lifting communication base station iron tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010197223A CN101858164A (en) | 2010-06-11 | 2010-06-11 | Lifting communication base station iron tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101858164A true CN101858164A (en) | 2010-10-13 |
Family
ID=42944304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010197223A Pending CN101858164A (en) | 2010-06-11 | 2010-06-11 | Lifting communication base station iron tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101858164A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695753A (en) * | 2013-12-06 | 2015-06-10 | 贵州振华天通设备有限公司 | Lifting antenna tower and erection method thereof |
CN108104571A (en) * | 2017-12-27 | 2018-06-01 | 山东泰义金属科技有限公司 | A kind of aluminium alloy communications tower |
CN110540115A (en) * | 2019-09-18 | 2019-12-06 | 淮安信息职业技术学院 | Outdoor emergency mobile communication vehicle |
CN110685488A (en) * | 2019-09-23 | 2020-01-14 | 常州市飞黄钢杆有限公司 | Prefabricated communication base station iron tower and construction method thereof |
-
2010
- 2010-06-11 CN CN201010197223A patent/CN101858164A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695753A (en) * | 2013-12-06 | 2015-06-10 | 贵州振华天通设备有限公司 | Lifting antenna tower and erection method thereof |
CN108104571A (en) * | 2017-12-27 | 2018-06-01 | 山东泰义金属科技有限公司 | A kind of aluminium alloy communications tower |
CN110540115A (en) * | 2019-09-18 | 2019-12-06 | 淮安信息职业技术学院 | Outdoor emergency mobile communication vehicle |
CN110685488A (en) * | 2019-09-23 | 2020-01-14 | 常州市飞黄钢杆有限公司 | Prefabricated communication base station iron tower and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9016029B2 (en) | Method of setting up, maintaining and disassembling a wind turbine | |
US8584429B2 (en) | Tower erection system and method | |
US8297025B2 (en) | Method of building a hybrid tower for a wind generator | |
US10865078B1 (en) | Lifting assembly for elevating components to a wind turbine and a method for using the lifting assembly | |
US10012005B2 (en) | Crane system incorporated into a tower | |
CN201687254U (en) | Communication base-station iron tower capable of rising and falling | |
CN103669956B (en) | Centralized solar column assembly and method | |
CN106996214A (en) | A kind of communication tower provided with prefabricated pile basis | |
CN104150353A (en) | Liftable and detachable bridge crane | |
CN101858164A (en) | Lifting communication base station iron tower | |
CN110924738A (en) | Variable-diameter splicing platform and workpiece splicing method | |
CN207647152U (en) | Tower lifts constructing device certainly | |
KR20130073117A (en) | Tower structure construction process | |
CN211473325U (en) | Chimney heat preservation construction auxiliary device | |
CN205294694U (en) | Movable independent derrick mast hoist device | |
CN210561720U (en) | Pier stud maintenance repair operation platform | |
CN110593546A (en) | Chimney heat preservation construction auxiliary device | |
CN108978926B (en) | Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet | |
CN203922508U (en) | A kind of Portable crane device | |
CN210918153U (en) | Scaffold for building | |
CN211004222U (en) | Hoisting machine convenient to disassemble and assemble | |
CN219708955U (en) | Adjustable steel platform lower hanging cage device | |
CN220790542U (en) | Detachable construction work platform for steel pipe pole | |
CN103979426A (en) | Portable lifting device | |
CN105967085A (en) | Jacking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20101013 |