CN211473325U - Chimney heat preservation construction auxiliary device - Google Patents

Chimney heat preservation construction auxiliary device Download PDF

Info

Publication number
CN211473325U
CN211473325U CN201921447508.0U CN201921447508U CN211473325U CN 211473325 U CN211473325 U CN 211473325U CN 201921447508 U CN201921447508 U CN 201921447508U CN 211473325 U CN211473325 U CN 211473325U
Authority
CN
China
Prior art keywords
chimney
construction
heat preservation
construction platform
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921447508.0U
Other languages
Chinese (zh)
Inventor
杨春福
卢青
赵崑鹏
裴瑞国
王海洋
王志成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201921447508.0U priority Critical patent/CN211473325U/en
Application granted granted Critical
Publication of CN211473325U publication Critical patent/CN211473325U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a chimney keeps warm and is under construction auxiliary device, the device includes: a construction platform and lifting equipment; the construction platform is used for providing a construction platform for heat preservation outside the chimney on the periphery of the chimney; the lifting equipment is connected with the construction platform and used for lifting the construction platform so as to drive the construction platform to move up and down along the height direction of the chimney, and therefore the external heat preservation of the chimney is constructed. The utility model discloses a lifting means is to construction platform's promotion to make construction platform reciprocate along the axial of chimney, grind the electric chimney that gathers dust and carry out the construction that keeps warm outward to the regional raw materials of cement plant preheating tower. The device is adopted for heat preservation construction, the material cost for purchasing or renting the scaffold and the wood springboard and the labor cost for building the scaffold are saved, the labor efficiency is improved, and the potential safety hazard caused by heat preservation construction by utilizing the scaffold with the height of more than 40 meters is reduced.

Description

Chimney heat preservation construction auxiliary device
Technical Field
The utility model relates to a chimney keeps warm and is under construction technical field particularly, relates to a chimney keeps warm and is under construction auxiliary device.
Background
At present, in the project construction of 6000 tons of cement plants produced in Alchonia daily, a raw material grinding electric dust collection chimney in a preheating tower area is 125.6 meters in total height and 4.8 meters in diameter, a set of slidable supports connected with a preheating tower steel structure are designed only at the height of 71.315m except the bottom of the whole set of chimney is fixed with a foundation, and other positions are all in a suspended state.
In order to reduce the material cost and the labor loss of scaffold pipes, wood gangplank and the like generated by building the scaffold, improve the labor efficiency and shorten the construction period,
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a chimney keeps warm and is under construction auxiliary device aims at solving current problem.
The utility model provides a chimney keeps warm and is under construction auxiliary device, the device includes: a construction platform and lifting equipment; the construction platform is used for providing a construction platform for heat preservation outside the chimney on the periphery of the chimney; the lifting equipment is connected with the construction platform and used for lifting the construction platform so as to drive the construction platform to move up and down along the height direction of the chimney, and therefore the external heat preservation of the chimney is constructed.
Further, above-mentioned chimney keeps warm and constructs auxiliary device, construction platform includes: two arc-shaped hanging baskets; the two arc-shaped hanging baskets are detachably connected to form a circular structure in an assembled mode and are sleeved outside the chimney.
Further, each arc-shaped hanging basket is provided with a protection structure arranged along the circumferential direction of the arc-shaped hanging basket.
Further, in the auxiliary device for chimney heat preservation construction, each arc-shaped hanging basket is of a semicircular structure, and the two arc-shaped hanging baskets are symmetrically arranged.
Further, above-mentioned chimney keeps warm and constructs auxiliary device, lifting means includes: a winch and a plurality of pulleys; at least one pulley is arranged at the inner conical bottom of the chimney, the top of the chimney and the manhole of the chimney; the winding machine is arranged outside the chimney, a steel wire rope of the winding machine penetrates through a manhole of the chimney and sequentially bypasses a pulley at the manhole of the chimney, a pulley at the inner conical bottom of the chimney and a pulley at the top of the chimney, and then a rope tail of the steel wire rope is connected to the construction platform.
Furthermore, in the auxiliary device for chimney heat preservation construction, the pulleys arranged at the top of the chimney are in multiple groups and are uniformly arranged along the circumferential direction of the chimney; the steel wire rope is divided into an integral section and a plurality of strand sections; the head of the integral section is wound on the winch, the integral section penetrates through the manhole of the chimney and extends upwards after sequentially passing through the pulley at the manhole of the chimney and the pulley at the inner cone bottom of the chimney; the tail part of each strand of the strand-dividing section is connected to the construction platform, and the head part of each strand of the strand-dividing section is connected with the tail part of the whole section after the strand-dividing section bypasses a pulley arranged at the top of the chimney.
Further, in the auxiliary device for chimney heat preservation construction, the winch is arranged on a concrete platform of the preheating tower of the chimney, and a pulley is further arranged on the concrete platform and used for guiding the steel wire rope.
Further, in the auxiliary device for chimney heat preservation construction, the pulley arranged at the top of the chimney is fixed to the top of the chimney through the hanging bracket.
Further, above-mentioned chimney keeps warm and constructs auxiliary device, the gallows includes that two are criss-cross and the bracing piece of connecting, and, two be provided with the connecting rod between the bracing piece for improve the connection stability of two steel constructions.
Further, according to the auxiliary device for chimney heat preservation construction, a supporting structure is arranged on the outer wall of the chimney and used for installing the construction platform.
The utility model provides a chimney keeps warm and is under construction auxiliary device through the promotion of lifting means to construction platform to make construction platform reciprocate along the axial of chimney, provide the support construction platform that can reciprocate along the axial of chimney promptly through construction platform, and then grind the electric chimney that gathers dust to the regional raw materials of cement plant preheating tower and carry out the construction of keeping warm outward. The device is adopted for heat preservation construction, so that the material cost for purchasing or renting the scaffold and the wood springboard and the labor cost for building the scaffold are saved, the labor efficiency is improved, the potential safety hazard caused by heat preservation construction by using the scaffold with the height of more than 40 meters is reduced, the safety measure cost is reduced, the construction period is shortened to a great extent, the construction efficiency is improved, and the installation period of heat preservation work is ensured.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a schematic structural view of an auxiliary device for chimney heat preservation construction provided by an embodiment of the present invention;
fig. 2 is a schematic view of a partial structure of the auxiliary device for chimney heat preservation construction at a construction platform provided by the embodiment of the utility model;
fig. 3 is a schematic view of a partial structure of the auxiliary device for chimney heat preservation construction provided by the embodiment of the present invention at the inner conical bottom of the chimney;
fig. 4 is a schematic structural diagram of a hanger according to an embodiment of the present invention;
fig. 5 is a cross-sectional view of a construction platform provided by an embodiment of the present invention;
FIG. 6 is a cross-sectional view taken at D-D of FIG. 5;
fig. 7 is a cross-sectional view taken at E-E in fig. 5.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1 to 3, it shows the preferred structure of the chimney heat preservation construction auxiliary device provided by the embodiment of the utility model. As shown, the apparatus comprises: the construction method comprises the following steps of (1) constructing a platform, a supporting structure 2 and lifting equipment 3; wherein the content of the first and second substances,
the construction platform 1 is used for providing a construction platform for heat preservation outside the chimney on the periphery of the chimney 4. Specifically, the construction platform 1 may be a circular ring structure, and a frame structure manufactured according to the diameter of the chimney may be made using channel steel, steel plates, and steel pipes, which are left after being packed in a construction site, as main materials, so as to provide a construction platform for heat preservation outside the chimney 4 around the chimney 4, so that a constructor may perform heat preservation construction on the periphery of the chimney 4 on the construction platform 1. Preferably, a support structure 2 is provided on the outer wall of the chimney 4 for mounting the construction platform 1, so as to enable assembly and erection of the construction platform 1.
Lifting means 3 is connected with construction platform 1 for promote construction platform 1, reciprocate along the direction of height of chimney 4 the axial of chimney 4 promptly to drive construction platform 1, constructor can reciprocate along with construction platform 1, and the outside that keeps warm to the whole axial of chimney 4 is under construction. Specifically, lifting means 3 can be confirmed according to actual conditions to the realization is to bearing structure 2's promotion, and hoist and mount construction platform 1 and bearing structure 2 reciprocate along the axial of chimney 4 in step, so that realize the heat preservation construction of chimney 4 whole axial gradually. Wherein, lifting means 3 can set up on preheater 5 to provide the support construction platform that can reciprocate along the axial of chimney 4 through construction platform 1 and bearing structure 2, and then carry out outer heat preservation to the raw materials mill electric dust collection chimney in the preheater tower area of cement plant.
Obviously, it can be understood that, the auxiliary device for chimney heat preservation construction provided in this embodiment lifts the construction platform 1 through the lifting device 3, so that the construction platform 1 moves up and down along the axial direction of the chimney 4, that is, the construction platform 1 provides a supporting construction platform that can move up and down along the axial direction of the chimney 4, and then performs external heat preservation construction on the raw material mill electric dust collection chimney in the preheating tower area of the cement plant. The device is adopted for heat preservation construction, so that the material cost for purchasing or renting the scaffold and the wood springboard and the labor cost for building the scaffold are saved, the labor efficiency is improved, the potential safety hazard caused by heat preservation construction by using the scaffold with the height of more than 40 meters is reduced, the safety measure cost is reduced, the construction period is shortened to a great extent, the construction efficiency is improved, and the installation period of heat preservation work is ensured.
With continued reference to fig. 1 and to fig. 3, the lifting device 3 comprises: a winch 31 and a plurality of sheaves 32; wherein the content of the first and second substances,
at least one pulley 32 is arranged at the inner cone bottom a of the chimney 4, at the top B of the chimney (relative to the position shown in fig. 1) and at the manhole C of the chimney. Specifically, in order to realize the lifting of the construction platform 1, in this embodiment, the steel wire rope 33 of the winch 31 is guided by the pulley 32, so that the steel wire rope 33 is stretched according to a preset route, the construction platform 1 is ensured to move up and down only along the axial direction of the chimney 4, the inclination of the construction platform 1 is avoided, and the up-and-down movement stability and the construction safety of the construction platform 1 are further ensured. Preferably, a hanger 6 is provided at the top B of the chimney for fixing the pulley 32 at the top, i.e. the pulley 32 provided at the top B of the chimney 4 is fixed to the top of the chimney 4 by the hanger 6, so that the fixing of the pulley 32 is facilitated and the stability of the pulley 32 can be ensured.
The winch 31 is arranged outside the chimney 4, a steel wire rope 33 of the winch 31 penetrates through a manhole of the chimney 4, and sequentially bypasses a pulley 32 at the manhole C of the chimney 4, a pulley 32 at the inner conical bottom A of the chimney 4 and a pulley 32 at the top B of the chimney 4, and then the tail of the steel wire rope 33 is connected to the construction platform 1. Specifically, the winch 31 may be disposed on the concrete platform 5 of the preheating tower of the chimney 4, and the concrete platform 5 is further provided with a pulley 32 for guiding the steel cable 33, that is, the steel cable 33 on the winch 31 sequentially bypasses the pulley 32 on the concrete platform 5 and the pulley 32 at the manhole of the chimney 4, and after passing through the chimney 4 from the manhole to the inside of the chimney 4, sequentially bypasses the pulley 32 at the inner conical bottom a of the chimney 4, extends upward, and after bypassing the pulley 32 at the top B of the chimney 4, is connected downward to the construction platform 1. In order to ensure the stability of the up-and-down movement of the construction platform 1, it is preferable that the pulleys 32 on the hanger 6, i.e. the pulleys 32 arranged at the top B of the chimney 4, are provided in multiple groups and uniformly arranged along the circumferential direction of the chimney 4, wherein each group may be two and is arranged along the radial direction of the chimney 4. The steel wire rope 33 on the winch 31 is divided into two sections, namely an integral section 331 and a plurality of strand sections 332; the head of the whole body section 331 is wound on the winch 31, sequentially passes through the pulley 32 on the concrete platform 5 and the pulley 32 at the manhole of the chimney 4, passes through the chimney 4 from the manhole of the chimney 4, passes through the pulley 32 at the inner cone bottom A of the chimney 4, and extends upwards; the number of strands of the strand sections 332 is the same as the number of groups of the pulleys 32 on the hanger 6, and the strand sections are in one-to-one correspondence, that is, the tail of each strand section 332 is connected to the construction platform 1 and uniformly distributed along the circumference of the construction platform 1, each strand section 332 passes through two pulleys 32 on the corresponding hanger 6 and then extends downwards in the chimney 4, and the head of each strand section 332 is connected to the tail of the whole section 331. The hanger 6 may be formed by splicing H-shaped steel, steel plate or angle steel, and the winch 31 may be an electric winch. The stranding section 332 for lifting the movable construction platform 1 can be purchased and provided according to the height of the chimney 4, the length of the steel wire rope of the winch 31, namely the length of the integral section 331, the self weight of the construction platform 1 and the weight of the operating personnel and the heat insulation materials carried on the construction platform 1 during heat insulation.
The pulleys 32 can be 11 sets, wherein 8 sets are arranged on the hanging bracket 6 at the top of the chimney 4, and the other three sets are respectively arranged at the cone bottom inside the chimney, the concrete platform with the elevation of 14.71m of the preheating tower and the manhole. The pulley 32 may be secured by rolling bearings and mating pins to a bearing block support made of 15mm steel plate to make 11 sets of pulleys.
Refer to fig. 4, which is a schematic structural diagram of a hanger according to an embodiment of the present invention. As shown, the hanger 6 includes: two support rods 61; wherein the content of the first and second substances,
the two support rods 61 are crossed and connected with each other. Specifically, the support rod 61 may be H230 × 240 hot-rolled H-section steel made of Q235, and the two support rods 61 are fixed in a crisscross connection. In order to improve the connection strength and the connection stability between the two support rods 61, a connection rod 62 is disposed between the two support rods 61 to improve the connection stability of the two support rods 61, that is, one connection rod 62 may be disposed in each of four regions partitioned by the two support rods 61 or in one or more regions, and both ends of each connection rod are connected to the two support rods 61. The support rod 61 is provided with a pulley mounting hole 611 for mounting the pulley 32, and the pulley 32 can be mounted to the pulley mounting hole 611 through a bearing bracket. The support rod 61 may further be provided with a lifting lug mounting hole for mounting the lifting lug 63, so as to realize the lifting of the hanger 6.
With continued reference to fig. 1-7, the construction platform 1 includes: two arc-shaped hanging baskets 11; wherein the content of the first and second substances,
the two arc-shaped hanging baskets 11 are detachably connected to form a circular structure for being sleeved outside the chimney 4. Specifically, two arc hanging baskets 11 are arc structures to the ring structure that the internal diameter is greater than the external diameter of chimney 4 is assembled to end, in order to provide a round construction platform in the periphery of chimney 4. The two arc-shaped baskets 11 are detachably connected with each other to facilitate the assembly and disassembly of the two arc-shaped baskets 11. Arc hanging flower basket 11 can be through usable job site packing remaining channel-section steel, steel sheet and steel pipe as the main material to it is square skeleton texture to assemble the welded cross section, and, the roof of arc hanging flower basket 11 is steel sheet welded flat structure, carries out the platform of being under construction with the provision constructor. Preferably, the two arc-shaped baskets 11 are both of a semicircular structure and are symmetrically arranged between the two arc-shaped baskets 11, so that the two arc-shaped baskets 11 can be assembled by being hoisted onto the supporting structure 2. In order to ensure the safety of the constructors, preferably, each arc-shaped hanging basket 11 is provided with a protective structure 111 arranged along the circumferential direction of the arc-shaped hanging basket 11 so as to ensure the sealing performance of the arc-shaped hanging basket 11; the protective structure 111 can be arranged on the side wall of the arc-shaped hanging basket 11 far away from the chimney 4, so that the cross section of the arc-shaped hanging basket 11 is h-shaped, and the protective structure 111 can be formed by welding a steel pipe, a flat steel and a steel plate.
To sum up, the chimney heat preservation construction auxiliary device that this embodiment provided is through lifting means 3 to the promotion of construction platform 1 to make construction platform 1 reciprocate along the axial of chimney 4, provide the support construction platform that can reciprocate along the axial of chimney 4 promptly through construction platform 1, and then carry out outer heat preservation construction to the raw materials mill electricity chimney that preheats the tower region of cement plant. The device is adopted for heat preservation construction, so that the material cost for purchasing or renting the scaffold and the wood springboard and the labor cost for building the scaffold are saved, the labor efficiency is improved, the potential safety hazard caused by heat preservation construction by using the scaffold with the height of more than 40 meters is reduced, the safety measure cost is reduced, the construction period is shortened to a great extent, the construction efficiency is improved, and the installation period of heat preservation work is ensured.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. The utility model provides a chimney keeps warm and is under construction auxiliary device which characterized in that includes: a construction platform (1) and a lifting device (3); wherein the content of the first and second substances,
the construction platform (1) is of a circular structure and is used for providing the construction platform (1) for heat preservation outside the chimney (4) at the periphery of the chimney (4);
the lifting equipment (3) is connected with the construction platform (1) and used for lifting the construction platform (1) so as to drive the construction platform (1) to move up and down along the height direction of the chimney (4) and construct the external heat preservation of the chimney (4).
2. The chimney insulation construction aid according to claim 1, characterized in that the construction platform (1) comprises: two arc-shaped baskets (11); wherein the content of the first and second substances,
the two arc-shaped hanging baskets (11) are detachably connected to form a circular structure in an assembled mode and are sleeved outside the chimney (4).
3. The chimney heat preservation construction auxiliary device according to claim 2, characterized in that each arc-shaped hanging basket (11) is provided with a protective structure (111) arranged along the circumference of the arc-shaped hanging basket (11).
4. The chimney heat preservation construction auxiliary device according to claim 2, characterized in that each arc-shaped hanging basket (11) is of a semicircular structure, and the two arc-shaped hanging baskets (11) are symmetrically arranged.
5. The chimney insulation construction aid according to any one of claims 1 to 4, wherein the lifting device (3) comprises: a winch (31) and a plurality of pulleys (32); wherein the content of the first and second substances,
at least one pulley (32) is arranged at the position of an inner conical bottom (A) of the chimney (4), the top (B) of the chimney (4) and a manhole (C) of the chimney (4);
the winding machine (31) is arranged outside the chimney (4), a steel wire rope (33) of the winding machine (31) penetrates through a manhole of the chimney (4) and sequentially bypasses a pulley (32) at the manhole of the chimney (4), a pulley (32) at the inner conical bottom of the chimney (4) and a pulley (32) at the top of the chimney (4), and the tail of the steel wire rope (33) is connected to the construction platform (1).
6. The chimney heat preservation construction auxiliary device according to claim 5,
the pulleys (32) arranged at the top of the chimney (4) are in multiple groups and are uniformly arranged along the circumferential direction of the chimney (4);
the steel wire rope (33) is divided into an integral section (331) and a plurality of strand sections (332);
the head of the integral section (331) is wound on the winch (31), the integral section (331) penetrates through a manhole of the chimney (4), and sequentially winds a pulley (32) at the manhole of the chimney (4) and a pulley (32) at the inner cone bottom of the chimney (4) to extend upwards;
the tail part of each strand-dividing section (332) is connected to the construction platform (1), and the head part of each strand-dividing section is connected with the tail part of the whole section (331) after the tail part of each strand-dividing section bypasses a pulley (32) arranged at the top of the chimney (4).
7. The chimney heat preservation construction auxiliary device according to claim 6,
the winch (31) is arranged on a concrete platform (5) of a preheating tower of the chimney (4), and a pulley (32) is further arranged on the concrete platform (5) and used for guiding a steel wire rope (33).
8. The chimney heat preservation construction auxiliary device according to claim 6,
a pulley (32) arranged on the top of the chimney (4) is fixed on the top of the chimney (4) through a hanging bracket (6).
9. The chimney heat preservation construction auxiliary device according to claim 8,
the hanging bracket (6) comprises two supporting rods (61) which are crossed and connected in a cross mode, and a connecting rod (62) is arranged between the two supporting rods (61) and used for improving the connection stability of the two supporting rods (61).
10. The chimney insulation construction auxiliary device according to any one of claims 1 to 4, characterized in that a support structure (2) is arranged on the outer wall of the chimney (4) for mounting the construction platform (1).
CN201921447508.0U 2019-09-02 2019-09-02 Chimney heat preservation construction auxiliary device Active CN211473325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921447508.0U CN211473325U (en) 2019-09-02 2019-09-02 Chimney heat preservation construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921447508.0U CN211473325U (en) 2019-09-02 2019-09-02 Chimney heat preservation construction auxiliary device

Publications (1)

Publication Number Publication Date
CN211473325U true CN211473325U (en) 2020-09-11

Family

ID=72362702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921447508.0U Active CN211473325U (en) 2019-09-02 2019-09-02 Chimney heat preservation construction auxiliary device

Country Status (1)

Country Link
CN (1) CN211473325U (en)

Similar Documents

Publication Publication Date Title
DK2374966T3 (en) A method of building a hybrid tower for a wind turbine
CN104040096B (en) A kind of erection method of telescopic pylon
CN105888262B (en) A kind of construction method of large span piping lane pipeline
CN108086688B (en) Track type floor concrete distribution system and construction method thereof
US20170107736A1 (en) Crane system incorporated into a tower
CN105108395A (en) Blast furnace shell inner wall welding platform and erecting method thereof
CN107130770A (en) A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inversion construction method
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN115977456B (en) Floor type double-rocker arm holding pole
CN104481194A (en) Reversed assembling method of upright cylindrical equipment
CN206859698U (en) A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inverted construction facility
CN105888227B (en) Superelevation is tubaeform steel structure exterior finish operation platform and its building method
CN110593546A (en) Chimney heat preservation construction auxiliary device
CN201687254U (en) Communication base-station iron tower capable of rising and falling
CN211473325U (en) Chimney heat preservation construction auxiliary device
CN209503282U (en) It is a kind of for welding the rotary workbench of wind power foundation tower
CN101858164A (en) Lifting communication base station iron tower
CN210561720U (en) Pier stud maintenance repair operation platform
CN204954201U (en) Blast furnace stove outer covering outer wall welding platform
CN210237035U (en) Telescopic movable operation platform in heat absorption tower
CN204277366U (en) For the hydraulic lifting apparatus of vertical type tubular equipment upside-down mounting
CN207227959U (en) Overall peace is torn open connects high construction platform built in formula radial pattern colyliform steel pile casting
CN216072821U (en) Cable transportation protection device for tower crane
CN205857661U (en) Superelevation is tubaeform steel structure exterior finish operation platform and build and use equalizer bar
JPH08198586A (en) Movable working device for chimney

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant