CN101851922A - 用全套管钻机清除地下锚索/杆的方法 - Google Patents

用全套管钻机清除地下锚索/杆的方法 Download PDF

Info

Publication number
CN101851922A
CN101851922A CN 201010201928 CN201010201928A CN101851922A CN 101851922 A CN101851922 A CN 101851922A CN 201010201928 CN201010201928 CN 201010201928 CN 201010201928 A CN201010201928 A CN 201010201928A CN 101851922 A CN101851922 A CN 101851922A
Authority
CN
China
Prior art keywords
rod
anchor rope
casing drill
casing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010201928
Other languages
English (en)
Other versions
CN101851922B (zh
Inventor
刘富华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Jiecheng Foundation Engineering & Machine Co Ltd
Original Assignee
Kunming Jiecheng Foundation Engineering & Machine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Jiecheng Foundation Engineering & Machine Co Ltd filed Critical Kunming Jiecheng Foundation Engineering & Machine Co Ltd
Priority to CN2010102019288A priority Critical patent/CN101851922B/zh
Publication of CN101851922A publication Critical patent/CN101851922A/zh
Application granted granted Critical
Publication of CN101851922B publication Critical patent/CN101851922B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种城市建设的施工方法,特别是一种清除埋藏于地下的预应力锚索/杆的综合施工方法。本发明的施工步骤为:根据深基坑工程的施工图,定位斜拉锚索/杆的位置,用全套管钻机钻孔,冲抓或旋挖取土至锚索/杆,置入钢套管,用钻机自备吊车提升带刀刃的叉式重锤、冲击锚索/杆至切断,安装导管,灌注砼或其它填充物,再拔出套管。本发明的方法操作简单易行,对地面破损小,施工效率高,对周围建筑物无不利影响。

Description

用全套管钻机清除地下锚索/杆的方法
技术领域
本发明涉及一种城市建设的施工方法,特别是一种采用全套管钻机清除埋藏于地下的预应力锚索/杆的施工方法。
背景技术
随着我国城市建设的不断发展,深基坑工程不断增多,预应力锚索/杆在我国地下基坑支护中应用十分广泛,与其它支护技术相比较,锚索/杆具有价格低廉,施工简单成熟、速度快、安全可靠、不占用主体施工工作面等优点,是我国目前基坑支护的主要技术之一。但是作为一种临时性支护措施,锚索/杆在支护功能失效后无法回收,与所建的构筑物一起永久埋藏于地下无法取出,形成地下垃圾,造成地下环境污染,对相邻地块的桩基施工、基坑开挖,周围的市政施工、城市的长远规划及可持续发展等造成严重影响。
为了解决上述问题,我国的一些技术论文及专利文献中提出了可回收式预应力锚索/杆技术的方案,由于这类技术还处于探索中,还有许多问题尚待解决,因此没有被广泛应用于实际工程中,目前我国的深基坑工程种仍然大量使用斜拉锚索/杆。对于地下的锚索/杆目前还没有一种效率较高的清除方法。
技术方案
本发明所要解决的技术问题是提供一种用全套管钻机清除地下锚索/杆的方法,其操作简单易行,对地面破损小,施工效率高,对周围建筑物无不利影响。
实现本发明目的所采用的技术方案是:根据深基坑工程的施工图,定位斜拉锚索/杆的位置,用全套管钻机钻孔,冲抓或旋挖取土至锚索/杆,置入钢套管,用钻机自备吊车提升带刀刃的叉式重锤、冲击锚索/杆至切断,安装导管,灌注砼或其它填充物,再拔出套管。
在用全套管钻机钻孔前应在钻孔位置制作砼井圈并做地面局部硬化处理。
在用冲击锚索/杆时,在钢套管顶端设置一定位器对叉锤杆导向定位,同时限制叉式重锤以轴心线转动。所述的叉式重锤的刀刃采用整体堆焊的合金材料。
本发明的有益效果是:可以不对埋藏锚索/杆的地面作大面积开挖,因此对地面破损小,施工效率较高;采用叉式重锤将锚索/杆切断或挤开的方式,同时还对套管孔及时填充砼或其它填充物,因此操作简单且对土层结构损伤很小,不会引起周围地面或建筑物的沉降,所以本发明的方法较安全。
附图说明
图1为本发明的工艺流程示意图;
图2为本发明的叉式重锤与定位器主视示意图;
图3为本发明的叉式重锤与定位器侧视示意图;
图4为本发明的圆孔定位器剖视示意图;
图5为本发明的矩形孔定位器剖视示意图。
图中:导向套1、支架2、叉锤杆3、套管4、叉式重锤5、刀刃6、导向键7。
具体实施方式
参见各图,本发明的工艺步骤如下:
1.定位,制作砼井圈并做地面局部硬化处理。
2.安装全套管钻机并就位。
3.套管、冲抓或旋挖取土。
4.套管4取土至第一道锚索止。
5.套管4内安装叉式重锤5,在套管4顶端安装好定位器的支架2,使叉式重锤5的刀刃6与锚索(杆)大约成十字线。
6.使用钻机的自备吊车提升叉式重锤5,反复冲击锚索/杆,直至冲断锚索/杆为止。(如想减少振动和提高破除工效,也可以先用叉式重锤5冲击锚索/杆,再用液压钳等切割工具割掉破除锚索/杆。
7.压入套管4,使已切割掉的锚索/杆二段分别挤压到套管外侧),提出并卸下叉式重锤总成,继续用冲抓或旋挖取土至第二道锚索/杆。
8.重复本流程6的工序。
9.用本流程7工序,破除第三、四、五……道锚索/杆。
10.安装导管灌注砼或其它填充物。
11.逐次拔出外套管4,钻机移位,本孔位锚索/杆破除结束。
注:套管内无水状态也可以采用人工配合切割工具破除锚索/杆,则效率更高。

Claims (4)

1.一种用全套管钻机清除地下锚索/杆的方法,其特征是:根据深基坑工程的施工图,定位斜拉锚索/杆的位置,用全套管钻机钻孔,冲抓或旋挖取土至锚索/杆,置入钢套管,用钻机自备吊车提升带刀刃的叉式重锤、冲击锚索/杆至切断,安装导管,灌注砼或其它填充物,再拔出套管。
2.按权利要求1所述的用全套管钻机清除地下锚索/杆的方法,其特征是:在全套管钻机钻孔前应在钻孔位置制作砼井圈并做地面局部硬化处理。
3.按权利要求1所述的用全套管钻机清除地下锚索/杆的方法,其特征是:在冲击锚索/杆时,在钢套管顶端设置一定位器对叉锤杆导向定位,同时限制叉式重锤以轴心线转动。
4.按权利要求3所述的用全套管钻机清除地下锚索/杆的方法,其特征是:叉式重锤的刀刃采用整体堆焊的合金材料。
CN2010102019288A 2010-06-17 2010-06-17 用全套管钻机切断地下锚索/杆的处理方法 Active CN101851922B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102019288A CN101851922B (zh) 2010-06-17 2010-06-17 用全套管钻机切断地下锚索/杆的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102019288A CN101851922B (zh) 2010-06-17 2010-06-17 用全套管钻机切断地下锚索/杆的处理方法

Publications (2)

Publication Number Publication Date
CN101851922A true CN101851922A (zh) 2010-10-06
CN101851922B CN101851922B (zh) 2012-05-23

Family

ID=42803592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102019288A Active CN101851922B (zh) 2010-06-17 2010-06-17 用全套管钻机切断地下锚索/杆的处理方法

Country Status (1)

Country Link
CN (1) CN101851922B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797256A (zh) * 2012-09-11 2012-11-28 中建八局第三建设有限公司 一种穿越软土层的锚索施工方法
CN102974721A (zh) * 2012-10-24 2013-03-20 北京发研工程技术有限公司 地下锚索的切割施工方法及其切割装置
CN105840219A (zh) * 2016-04-08 2016-08-10 郑州市第建筑工程集团有限公司 双向激励共振型锚索拔除装置
CN106049495A (zh) * 2016-06-08 2016-10-26 山东大学 一种用于地下工程锚索切割的专用设备及其施工方法
CN108222012A (zh) * 2017-12-18 2018-06-29 中冶天工集团有限公司 一种基坑锚索切除和利用锚索切除系统进行支护成桩的施工方法
CN108612100A (zh) * 2018-04-12 2018-10-02 佛山轨道交通设计研究院有限公司 一种采用旋挖钻处理锚索的方法
CN110629756A (zh) * 2018-06-21 2019-12-31 北京东地岩土工程有限公司 锚索清除方法
CN111926821A (zh) * 2020-07-13 2020-11-13 北京城建勘测设计研究院有限责任公司 一种新型护坡桩的施工工法
CN112878334A (zh) * 2021-01-15 2021-06-01 郑州地铁集团有限公司 一种地铁车站深基坑内锚杆(锚索)切断机具及施工工艺

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4132498A (en) * 1977-02-17 1979-01-02 Shigeru Sugimura Earth anchor and method of setting and removing same
CN1163335A (zh) * 1996-12-06 1997-10-29 广东省水利水电第二工程局 强力锚杆回收的工艺方法
CN201169773Y (zh) * 2008-02-26 2008-12-24 上海古华实业有限公司 清除地下原有桩子的施工装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4132498A (en) * 1977-02-17 1979-01-02 Shigeru Sugimura Earth anchor and method of setting and removing same
CN1163335A (zh) * 1996-12-06 1997-10-29 广东省水利水电第二工程局 强力锚杆回收的工艺方法
CN201169773Y (zh) * 2008-02-26 2008-12-24 上海古华实业有限公司 清除地下原有桩子的施工装置

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797256A (zh) * 2012-09-11 2012-11-28 中建八局第三建设有限公司 一种穿越软土层的锚索施工方法
CN102797256B (zh) * 2012-09-11 2014-10-15 中建八局第三建设有限公司 一种穿越软土层的锚索施工方法
CN102974721A (zh) * 2012-10-24 2013-03-20 北京发研工程技术有限公司 地下锚索的切割施工方法及其切割装置
CN102974721B (zh) * 2012-10-24 2014-11-26 北京发研工程技术有限公司 地下锚索的切割施工方法及其切割装置
CN105840219B (zh) * 2016-04-08 2018-06-19 郑州市第一建筑工程集团有限公司 双向激励共振型锚索拔除装置
CN105840219A (zh) * 2016-04-08 2016-08-10 郑州市第建筑工程集团有限公司 双向激励共振型锚索拔除装置
CN106049495A (zh) * 2016-06-08 2016-10-26 山东大学 一种用于地下工程锚索切割的专用设备及其施工方法
CN106049495B (zh) * 2016-06-08 2019-05-31 山东大学 一种用于地下工程锚索切割的专用设备及其施工方法
CN108222012A (zh) * 2017-12-18 2018-06-29 中冶天工集团有限公司 一种基坑锚索切除和利用锚索切除系统进行支护成桩的施工方法
CN108612100A (zh) * 2018-04-12 2018-10-02 佛山轨道交通设计研究院有限公司 一种采用旋挖钻处理锚索的方法
CN110629756A (zh) * 2018-06-21 2019-12-31 北京东地岩土工程有限公司 锚索清除方法
CN111926821A (zh) * 2020-07-13 2020-11-13 北京城建勘测设计研究院有限责任公司 一种新型护坡桩的施工工法
CN112878334A (zh) * 2021-01-15 2021-06-01 郑州地铁集团有限公司 一种地铁车站深基坑内锚杆(锚索)切断机具及施工工艺

Also Published As

Publication number Publication date
CN101851922B (zh) 2012-05-23

Similar Documents

Publication Publication Date Title
CN101851922B (zh) 用全套管钻机切断地下锚索/杆的处理方法
CN101838988B (zh) 一种抽拔锚索的综合施工方法
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN105649083B (zh) 全套管一次性旋切式清桩装置及其清桩方法
CN102587380A (zh) 一种钻孔桩桩头整体破除施工方法
CN102776884B (zh) 中搅旋转预应力离心管桩沉桩装置及其沉桩方法
CN105178861A (zh) 钻进扩孔机构
CN101982614A (zh) 全套管钻机凿取岩石成桩的方法
CN102383431A (zh) 中掘预应力离心管桩(方桩)沉桩装置及其新型沉桩法
CN107338795A (zh) 一种全套管拔除柱排式钻孔灌注桩施工方法
CN104805831A (zh) 一种大直径硬岩基桩成孔方法
CN103485344A (zh) 一种拔除建筑工程桩基的方法
CN102383428B (zh) 中掘反拉法预应力离心管桩沉桩装置及其沉桩方法
CN104141455B (zh) 钻机设备和钻机钻进方法
CN104453705A (zh) 大孔径灌注桩旋挖钻机二次成孔方法
CN102373706B (zh) 中掘液压法预应力离心管桩沉桩装置及其沉桩方法
CN105113976A (zh) 钢丝刷钻头回旋钻机及解决埋钻、掉钻、卡钻的方法
CN104264662A (zh) 富含水土层中深嵌硬质岩咬合桩施工方法
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN102002943B (zh) 嵌岩咬合灌注桩的施工方法
CN102758434B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN103821137A (zh) 一种长螺旋钻孔嵌岩、扩底压灌桩的施工方法及装置
CN204782730U (zh) 钢丝刷钻头回旋钻机
CN103967000A (zh) 联合施工旋挖桩施工方法
CN203948024U (zh) 潜式横旋方孔钻机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant