CN101851920B - Treatment method of elevation-exceeding part of concrete pouring pile head - Google Patents
Treatment method of elevation-exceeding part of concrete pouring pile head Download PDFInfo
- Publication number
- CN101851920B CN101851920B CN2010101946629A CN201010194662A CN101851920B CN 101851920 B CN101851920 B CN 101851920B CN 2010101946629 A CN2010101946629 A CN 2010101946629A CN 201010194662 A CN201010194662 A CN 201010194662A CN 101851920 B CN101851920 B CN 101851920B
- Authority
- CN
- China
- Prior art keywords
- compressed gas
- pile head
- concrete
- pouring pile
- concrete pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101946629A CN101851920B (en) | 2010-06-01 | 2010-06-01 | Treatment method of elevation-exceeding part of concrete pouring pile head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101946629A CN101851920B (en) | 2010-06-01 | 2010-06-01 | Treatment method of elevation-exceeding part of concrete pouring pile head |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101851920A CN101851920A (en) | 2010-10-06 |
CN101851920B true CN101851920B (en) | 2011-07-27 |
Family
ID=42803590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101946629A Expired - Fee Related CN101851920B (en) | 2010-06-01 | 2010-06-01 | Treatment method of elevation-exceeding part of concrete pouring pile head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101851920B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485343B (en) * | 2013-09-03 | 2015-10-21 | 深圳市金世纪工程实业有限公司 | Filling pile head processing method |
CN112030960A (en) * | 2020-07-22 | 2020-12-04 | 中铁十局集团第一工程有限公司 | Construction method of separable fulcrum pile |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1316570A (en) * | 2000-04-05 | 2001-10-10 | 陈为群 | Prefabrication and casting combined technology for forming piles |
CN1196835C (en) * | 2003-04-01 | 2005-04-13 | 王国奋 | Piling method C |
CN1974939A (en) * | 2006-12-12 | 2007-06-06 | 王茂华 | Construction foundation working method |
CN101280563B (en) * | 2008-05-23 | 2010-07-14 | 中建五局第三建设有限公司 | Pretensioned prestressing pipe pile construction method under weak expansion soil condition |
CN100510290C (en) * | 2008-07-11 | 2009-07-08 | 大连三川建设集团股份有限公司 | Construction method of steel pipe concrete column |
CN101368389B (en) * | 2008-09-24 | 2010-06-02 | 中铁大桥局集团第五工程有限公司 | Single and double-wall combined steel cofferdam construction method and its single and double-wall combined steel cofferdam |
-
2010
- 2010-06-01 CN CN2010101946629A patent/CN101851920B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101851920A (en) | 2010-10-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110230309B (en) | Karst area bridge karst cave pile foundation construction method | |
CN106836214B (en) | Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect processing | |
KR100707492B1 (en) | A grout carrying out mehtod for Paste Backfill Grouting at the Cave | |
CN204807400U (en) | Rock fracture grouting effect testing arrangement | |
CN105201513A (en) | Shaft construction method for rail transit | |
CN110258538B (en) | Soil nail reinforced buffer type manual hole digging pile and construction method thereof | |
CN107503770A (en) | A kind of duct pieces of shield tunnel secondary grouting method | |
CN101851920B (en) | Treatment method of elevation-exceeding part of concrete pouring pile head | |
CN108442724B (en) | Earthen site crack repairing method | |
CN105388047A (en) | Preparation method of columnar joint fissure network model rock core samples | |
CN106988308A (en) | Grouting behind shaft or drift lining pile for prestressed pipe and its construction technology | |
CN106049464A (en) | Construction method for pile | |
Vimala et al. | Studies on the strength of stabilized mud block masonry using different mortar proportions | |
CN114472462A (en) | Underground-aboveground linkage coal gangue disposal system and disposal method | |
CN213115038U (en) | Wall structure for plugging outer wall screw hole and matching device | |
CHAUMENY et al. | Remarks on wet deep soil mixing quality control | |
CN101158162A (en) | Unmanned pneumatic caisson construction process | |
CN201738304U (en) | Processing unit for concrete cast-in-place pile head | |
Silva et al. | Shear behaviour of rammed earth walls repaired by means of grouting | |
CN104805864A (en) | Basement reverse building method outer wall groove and tongue and water-proofing gel combined waterproof construction technology | |
CN110005432B (en) | Synchronous grouting construction method for double-shield TBM (tunnel boring machine) tunneling through weak and broken zone | |
CN103711119B (en) | A kind of pneumatic anti-settling circulating system of drilled pile mud and using method | |
CN111807806B (en) | Earthen site crack repair slurry using original soil and preparation and use method thereof | |
CN109868813B (en) | Bottom sealing method of prestressed pipe pile | |
CN105464077A (en) | Intelligent charging and feeding pile formation operation method of cement soil mixing pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA FIRST METALLURGICAL GROUP CO., LTD. Free format text: FORMER OWNER: WUHAN YIYE TRAFFIC ENGINEERING CO., LTD. Effective date: 20101216 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430080 YIYE TECHNOLOGY BUILDING, NO. 3, GONGYE AVENUE, QINGSHAN DISTRICT, WUHAN CITY, HUBEI PROVINCE TO: 430081 NO. 3, GONGYE AVENUE, QINGSHAN DISTRICT, WUHAN CITY, HUBEI PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20101216 Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3 Applicant after: China First Metallurgical Group Co., Ltd. Address before: The rule of science and Technology Building No. 3 430080 Hubei Province, Wuhan City Qingshan District Industrial Avenue Applicant before: Wuhan First Metallurgical Communication Engineering Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110727 Termination date: 20200601 |
|
CF01 | Termination of patent right due to non-payment of annual fee |