CN101798848B - 使用机械运动模拟模型动态模拟张拉结构施工的方法 - Google Patents
使用机械运动模拟模型动态模拟张拉结构施工的方法 Download PDFInfo
- Publication number
- CN101798848B CN101798848B CN2010101207330A CN201010120733A CN101798848B CN 101798848 B CN101798848 B CN 101798848B CN 2010101207330 A CN2010101207330 A CN 2010101207330A CN 201010120733 A CN201010120733 A CN 201010120733A CN 101798848 B CN101798848 B CN 101798848B
- Authority
- CN
- China
- Prior art keywords
- cylindrical body
- rigid cylindrical
- rope
- straight line
- rigid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101207330A CN101798848B (zh) | 2010-03-05 | 2010-03-05 | 使用机械运动模拟模型动态模拟张拉结构施工的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101207330A CN101798848B (zh) | 2010-03-05 | 2010-03-05 | 使用机械运动模拟模型动态模拟张拉结构施工的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101798848A CN101798848A (zh) | 2010-08-11 |
CN101798848B true CN101798848B (zh) | 2011-08-31 |
Family
ID=42594675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101207330A Expired - Fee Related CN101798848B (zh) | 2010-03-05 | 2010-03-05 | 使用机械运动模拟模型动态模拟张拉结构施工的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101798848B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733525B (zh) * | 2012-06-18 | 2017-03-15 | 中国航空规划设计研究总院有限公司 | 一种基于承载全过程开口式整体张拉结构多阶段设计方法 |
CN103870648B (zh) * | 2014-03-17 | 2016-08-24 | 上海宇航系统工程研究所 | 一种柔性太阳能电池翼动态载荷非线性分析方法 |
CN104143215B (zh) * | 2014-08-07 | 2017-02-01 | 北京纽曼帝莱蒙膜建筑技术有限公司 | 索膜结构的信息化模型设计方法 |
CN104318609A (zh) * | 2014-10-24 | 2015-01-28 | 上海通用金属结构工程有限公司 | 一种不锈钢景观雕塑施工仿真模拟方法 |
CN105224746B (zh) * | 2015-10-01 | 2018-07-03 | 中国水利水电科学研究院 | 基于Adams软件的滑轮——绳索类物体的模拟方法 |
CN113486417B (zh) * | 2021-05-29 | 2024-01-19 | 中铁建工集团有限公司 | 一种控制主塔和钢梁施工仿真系统 |
CN113901593B (zh) * | 2021-12-09 | 2022-03-25 | 浙江大学 | 一种水下柔性回收机构形态与刚度调控方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6279288B1 (en) * | 1998-04-16 | 2001-08-28 | Kurt A. Keil | Structural tubing members with flared out end segments for conjoining |
CN101397851A (zh) * | 2008-10-24 | 2009-04-01 | 上海建科建设发展有限公司 | 一种预应力钢结构张拉端索力的施工调整方法 |
CN101582095A (zh) * | 2009-06-19 | 2009-11-18 | 东南大学 | 确定索杆系静力平衡状态的非线性动力有限元法 |
CN101630344A (zh) * | 2009-07-31 | 2010-01-20 | 东南大学 | 一种确定索穹顶初始平衡态的逐环递推方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3616382B2 (ja) * | 2002-06-04 | 2005-02-02 | 株式会社ア−キテック | 鉄筋加工仕様算出装置 |
-
2010
- 2010-03-05 CN CN2010101207330A patent/CN101798848B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6279288B1 (en) * | 1998-04-16 | 2001-08-28 | Kurt A. Keil | Structural tubing members with flared out end segments for conjoining |
CN101397851A (zh) * | 2008-10-24 | 2009-04-01 | 上海建科建设发展有限公司 | 一种预应力钢结构张拉端索力的施工调整方法 |
CN101582095A (zh) * | 2009-06-19 | 2009-11-18 | 东南大学 | 确定索杆系静力平衡状态的非线性动力有限元法 |
CN101630344A (zh) * | 2009-07-31 | 2010-01-20 | 东南大学 | 一种确定索穹顶初始平衡态的逐环递推方法 |
Non-Patent Citations (1)
Title |
---|
JP特开2004-13332A 2004.01.15 |
Also Published As
Publication number | Publication date |
---|---|
CN101798848A (zh) | 2010-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101798848B (zh) | 使用机械运动模拟模型动态模拟张拉结构施工的方法 | |
Fu | Advanced modelling techniques in structural design | |
Lourenço | Analysis of historical constructions: from thrust-lines to advanced simulations | |
Degertekin et al. | School-based optimization for performance-based optimum seismic design of steel frames | |
Lin et al. | Comparative design of structures | |
CN110837705B (zh) | 一种悬索桥拉索找力分析方法 | |
CN101261651A (zh) | 主梁断面气动自激力的全过程数值模拟方法 | |
Heping et al. | Analysis for a novel folding frame tensegrity tent | |
Pedretti | Smart tensegrity structures for the Swiss Expo 2001 | |
Vaulot | Form-finding of elastic gridshells | |
Game et al. | Full dynamic model of Golden Gate Bridge | |
Senatore | Designing and prototyping adaptive structures—an energy-based approach beyond lightweight design | |
Sehlström | Prestress in nature and technics | |
Khodadadi | Basic Concepts of Structural Design for Architecture Students | |
Portioli | DynABlock_2D: An optimization-based MATLAB application for rocking dynamics, nonlinear static and limit analysis of masonry block structures | |
González | Structural models in architectural education: Experimental explorations between the physical and the digital realms | |
Papadopoulos et al. | A simple method using a truss model for in-plane nonlinear static analysis of a cable-stayed bridge with a plate deck section | |
Huang et al. | Suspension footbridge form-finding with Laplacian smoothing algorithm | |
Del Savio et al. | A non-linear system for semi-rigid steel portal frame analysis | |
ANDRÉN JAKOBSSON et al. | A Generative Design of TimberStructures According to Eurocode: Development of a Parametric Model in Grasshopper | |
Hensel et al. | Tensegrity systems-Transferring tectonics from the extraordinary to the everyday | |
Yogesh et al. | Stability Analysis of Tied-Arch Bridges Under IRC Loading Condition Using Finite Element Method | |
Anwar | The Impact and Future Role of Computations and Software in Bridge Modeling, Analysis and Design | |
Goberis | The use of tensegrity systems in search for new forms of cable-stayed bridges | |
Lee et al. | Analysis of the stress-erection process of Strarch frames considering the joint connection properties |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Method for dynamically simulating construction of tension structure by using mechanical movement simulation model Effective date of registration: 20120928 Granted publication date: 20110831 Pledgee: Bank of Hangzhou, Limited by Share Ltd, Beijing, Zhongguancun branch Pledgor: Beijing N & L Fabric Technology Co., Ltd. Registration number: 2012110000002 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20131216 Granted publication date: 20110831 Pledgee: Bank of Hangzhou, Limited by Share Ltd, Beijing, Zhongguancun branch Pledgor: Beijing N & L Fabric Technology Co., Ltd. Registration number: 2012110000002 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110831 Termination date: 20150305 |
|
EXPY | Termination of patent right or utility model |