CN101630344A - 一种确定索穹顶初始平衡态的逐环递推方法 - Google Patents

一种确定索穹顶初始平衡态的逐环递推方法 Download PDF

Info

Publication number
CN101630344A
CN101630344A CN200910181887A CN200910181887A CN101630344A CN 101630344 A CN101630344 A CN 101630344A CN 200910181887 A CN200910181887 A CN 200910181887A CN 200910181887 A CN200910181887 A CN 200910181887A CN 101630344 A CN101630344 A CN 101630344A
Authority
CN
China
Prior art keywords
initial
ring
prestress
notochord
condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910181887A
Other languages
English (en)
Other versions
CN101630344B (zh
Inventor
罗斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2009101818878A priority Critical patent/CN101630344B/zh
Publication of CN101630344A publication Critical patent/CN101630344A/zh
Application granted granted Critical
Publication of CN101630344B publication Critical patent/CN101630344B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

一种确定索穹顶初始平衡态的逐环递推方法公开了一种根据已知参数条件、力平衡条件、脊索初始预应力条件和斜索初始预应力条件,从最内环向最外环逐环递推同步确定索穹顶结构的初始位形和初始预应力的逐环递推方法,属索穹顶建筑设计和结构设计领域,涉及程序编制和软件开发。本发明旨在根据若干基本条件,同步确定索穹顶初始平衡态的初始位形和初始预应力,不需先后确定,减少优化参数和次数。

Description

一种确定索穹顶初始平衡态的逐环递推方法
技术领域
本发明公开了一种根据已知参数条件、力平衡条件、脊索初始预应力条件和斜索初始预应力条件,从最内环向最外环逐环递推同步确定索穹顶结构的初始位形和初始预应力的逐环递推方法,属索穹顶建筑设计和结构设计领域,涉及程序编制和软件开发。
背景技术
索穹顶是一种由脊索、斜索和压杆构成的空间张力结构,其需要通过预应力张拉而使结构成形,具有结构刚度。索穹顶的初始平衡态是初始荷载(如结构自重、屋面系统自重等)和初始预应力在初始位形上平衡的状态,其包含了初始荷载、初始位形和初始预应力三大要素。
索穹顶结构设计时首先需要确定初始平衡态。确定初始平衡态时,一般情况下初始荷载条件是已知或者已假定的,需要确定的是初始位形和初始预应力。索穹顶的初始位形和初始预应力对于结构性能具有同样的重要性。根据力平衡条件,不同的初始位形对应不同的初始预应力,初始位形和初始预应力相互依存,因此一般情况下需要先已知其一,再通过分析确定其二。两条分析途径为:①已知初始位形,通过找力分析确定初始预应力;②已知初始预应力,通过找形分析确定初始位形。
现确定索穹顶的初始平衡态,一般步骤为:先根据建筑和结构特点确定初步的初始位形,通过找力分析确定该初始位形下平衡的初始预应力,然后通过参数分析以及多次的找力分析和找形分析,对初始平衡态进行优化调整,以满足建筑、结构和施工的综合要求。
发明内容
技术问题:本发明的目的是提供一种确定索穹顶初始平衡态的逐环递推方法,根据若干基本条件,同步确定索穹顶初始平衡态的初始位形和初始预应力,不需先后确定,减少优化参数和次数。
技术方案:初始位形是决定初始预应力和结构性能的关键因素之一,因此索穹顶的初始位形不能完全根据建筑确定,也需要由初始预应力和结构性能来确定。由于初始位形和初始预应力的相互依存性,现在确定索穹顶结构的初始平衡态一般需要先确定其一,再确定其二,然后多次循环优化调整,满足建筑、结构和施工的综合要求。本发明旨在根据若干基本条件,同步确定索穹顶初始平衡态的初始位形和初始预应力,不需先后确定,减少优化参数和次数。
确定索穹顶初始平衡态的逐环递推方法为:根据已知参数条件、力平衡条件、脊索初始预应力条件和斜索初始预应力条件,从最内环向最外环逐环递推同步确定索穹顶结构的初始预应力和初始位形;
确定索穹顶初始平衡态的逐环递推方法包含以下步骤:
1)设定基本结构尺寸,包括环数N、环索分段数M、环间距L(i)、最内环半径L(0)以及最内环脊索斜角α(1)
2)设定初始荷载值FV(i),i=1,…,N;
3)设定最内环脊索初始预应力PR(1)
4)确定第一环即最内环的初始位形和初始预应力;
①根据力平衡条件,确定第一环的环索和压杆的初始预应力,
②根据斜索初始预应力条件,确定第一环斜索的斜角和初始预应力,
③根据几何关系,确定第一环脊索、斜索、环索和压杆的几何长度;
5)第一环的初始位形和初始预应力确定后,向最外环逐环递推同步确定其它各环的初始位形和初始预应力,直至最外环;若第i环的初始位形和初始预应力已确定,则:
①根据脊索初始预应力条件,确定第i+1环脊索的初始预应力,
②根据力平衡条件,确定第i+1环脊索的斜角和压杆的初始预应力,
③根据斜索初始预应力条件,确定第i+1环斜索和环索的初始预应力以及斜索的斜角,
④根据几何关系,确定第i+1环脊索、斜索、环索和压杆的几何长度。
已知参数条件包括基本结构尺寸、初始荷载FV和最内环脊索初始预应力PR(1),其中基本结构尺寸包括环数N、环索分段数M、环间距L(i)、最内环半径L(0)以及最内环脊索斜角α(1)
力平衡条件为:除支座节点外,初始荷载和初始预应力在节点上满足力平衡方程。
脊索初始预应力条件为:脊索的初始预应力应等于相邻内环的脊索和斜索的初始预应力之和。
斜索初始预应力条件为:同环的斜索和脊索的初始预应力的径向水平分力应相。
有益效果:确定索穹顶初始平衡态的初始位形和初始预应力的逐环递推方法,根据已知参数条件(基本结构尺寸、初始荷载和最内环脊索初始预应力)、力平衡条件、脊索初始预应力条件和斜索初始预应力条件,在一次递推过程中,从最内环向最外环逐环递推同步确定初始位移和初始预应力,其有益效果有以下方面:①当设定初始荷载为零时,则可得到圆锥曲面的索穹顶,所有的脊索和斜索的斜角均一致,同环的脊索和斜索的初始预应力相等,从最内环向最外环脊索的初始预应力逐环递增一倍;②当设定初始荷载不为零时,同环的脊索和斜索的初始预应力相近;③仅需一次递推过程,无需过程迭代反复递推;④逐环递推过程中,同步确定初始平衡态的初始位形和初始预应力,无需先定其一再定其二;⑤脊索初始预应力条件保证了脊索和斜索的力流的连续性,这对于当脊索和斜索采用由多根预应力筋构成的组装拉索且脊索和斜索的预应力筋在压杆顶端合编而成相邻外环的脊索时是非常有利的;⑥递推过程的计算均采用解析公式,无需迭代求解,计算效率高;⑦若索穹顶结构在后续使用工况分析中需要优化调整,可以仅以最内环脊索初始预应力为自变量,无需多个自变量。
附图说明
图1为索穹顶结构的三维图,图中1为脊索,2为斜索,3为压杆,4为环索。
图2为索穹顶结构的竖向剖面图,图中1为脊索,2为斜索,3为压杆,4为环索,5为结构支座。
图3为索穹顶结构的初始位形尺寸和初始荷载图。
图4为索穹顶结构的初始预应力和初始荷载图。
图5为当设初始荷载为零时的索穹顶结构初始位形尺寸图,图中所有脊索和斜索的斜角均相同。
图6为逐环递推方法确定索穹顶初始平衡态的流程图。
具体实施方式
本发明确定索穹顶初始平衡态的逐环递推方法的基本条件为:①已知参数条件,包括基本结构尺寸、初始荷载(FV)和最内环脊索初始预应力(PR(1)),其中基本结构尺寸包括环数(N)、环索分段数(M)、环间距(第i环间距为L(i))、最内环半径(L(0))以及最内环脊索斜角(α(1));②力平衡条件:除支座节点外,初始荷载和初始预应力在节点上满足力平衡方程;③脊索初始预应力条件:脊索的初始预应力应等于相邻内环的脊索和斜索的初始预应力之和;④斜索初始预应力条件:同环的斜索和脊索的初始预应力的径向水平分力应相等。
各基本条件说明如下:
1)已知参数条件,包括基本结构尺寸、初始荷载(FV)和最内环脊索初始预应力(PR(1))。
基本结构尺寸包括环数(N)、环索分段数(M)、环间距(第i环间距为L(i))、最内环半径(L(0))以及最内环脊索斜角(α(1)),基本结构尺寸应满足基本的建筑要求。各环中最内环脊索的斜角最小,因此最内环脊索斜角(α(1))应满足屋面排水的建筑要求。
初始荷载简化为竖向向下作用在压杆顶节点上的集中力(第i环初始荷载为FV(i)),以使索穹顶初始平衡态不仅考虑初始预应力效应,还考虑初始荷载效应。初始荷载可为结构自重,或为结构自重和屋面自重之和,或者为零。
索穹顶结构使用工况分析时,最内环脊索容易松弛退出工作,因此先明确最内环脊索的初始预应力(PR(1)),待结构使用工况分析后再对最内环脊索的初始预应力(PR(1))进行调整。
2)力平衡条件:除支座节点外,初始荷载和初始预应力在节点上满足力平衡方程。设:压杆顶节点受到竖直向下初始荷载为FV(i),压杆初始预应力为PS(i),脊索初始预应力为PR(i),斜索初始预应力为PO(i),脊索和斜索的斜角分别为α(i)、β(i),则:
①压杆顶节点上关于径向水平方向的力平衡方程:
PR(i)cosα(i)=PR(i-1)cosα(i-1)+PO(i-1)cosβ(i-1)              (1)
②压杆顶节点上关于竖向的力平衡方程:
PS(i)=FV(i)+PR(i)sinα(i)+PO(i-1)sinβ(i-1)-PR(i-1)sinα(i-1)  (2)
③压杆底节点上关于径向水平方向的力平衡方程:
PO(i)cosβ(i)=2PC(i)sin(π/M)                                  (3)
④压杆底节点上关于竖向的力平衡方程:
PO(i)sinβ(i)=PS(i)                                            (4)
该基本条件是保证初始荷载和初始预应力在压杆的顶节点和底节点处关于竖向和径向水平方向平衡,即保证初始预应力和初始荷载在初始位形上是平衡的。
3)脊索初始预应力条件:脊索的初始预应力应等于相邻内环的脊索和斜索的初始预应力之和,即:
PR(i)=PR(i-1)+PO(i-1)                 (5)
该基本条件主要是保证脊索和斜索的力流的连续性,从而结合第2条基本条件确定脊索的初始预应力和斜角。
4)斜索初始预应力条件:同环的斜索和脊索的初始预应力的径向水平分力应相等,即:
PR(i)cosα(i)=PO(i)cosβ(i)           (6)
该基本条件主要是用以控制斜索和环索的初始预应力以及斜索的斜角。
确定索穹顶初始平衡态的逐环递推方法的具体步骤为:
1)输入已知参数,包括基本结构尺寸和最内环脊索初始预应力(PR(1))值以及初始荷载值,其中基本结构尺寸包括:环数(N)、环索分段数(M)、环间距(第i环间距为L(i))、最内环半径(L(0))以及最内环脊索斜角(α(1))。
2)确定第一环(最内环)的初始位形和初始预应力。
①根据力平衡条件,确定第一环的环索和压杆的初始预应力;
②根据斜索初始预应力条件,确定第一环斜索和下环索的初始预应力以及斜索的斜角;
③根据几何关系,确定第一环脊索、斜索、环索和压杆的几何长度。
3)第一环的初始位形和初始预应力确定后,向最外环逐环递推同步确定其它各环的初始位形和初始预应力,直至最外环。若第i(≥1)环的初始位形和初始预应力已确定,则:
①根据脊索初始预应力条件,确定第i+1环脊索的初始预应力;
②根据力平衡条件,确定第i+1环脊索的斜角和压杆的初始预应力;
③根据斜索初始预应力条件,确定第i+1环斜索和环索的初始预应力以及斜索的斜角;
④根据几何关系,确定第i+1环脊索、斜索、环索和压杆的几何长度。
4)根据拉索和压杆的初始预应力初步选择材料和规格,根据初始位形建立工况分析的结构模型,在拉索和压杆上施加初始预应力,进行工况分析。后期结构整体优化可通过调整最内环的脊索初始预应力来完成。
下面结合附图对本发明进一步详细说明:
1)设定基本结构尺寸,包括环数(N)、环索分段数(M)、环间距(第i环间距为L(i))、最内环半径(L(0))以及最内环脊索斜角(α(1))。
2)设定初始荷载值FV(i),i=1,…,N。
3)设定最内环脊索初始预应力PR(1)
4)确定第一环(最内环)的初始位形和初始预应力。
①根据力平衡条件,确定第一环的环索和压杆的初始预应力。
P C ( 1 ) = P R ( 1 ) cos α ( 1 ) 2 sin ( π / M ) - - - ( 7 )
PS(1)=FV(1)+PR(1)sinα(1)              (8)
②根据斜索初始预应力条件,确定第一环斜索的斜角和初始预应力。
β ( 1 ) = arctg ( P S ( 1 ) 2 P C ( 1 ) sin ( π / M ) ) - - - ( 9 )
P O ( 1 ) = P R ( 1 ) cos α ( 1 ) cos β ( 1 ) - - - ( 10 )
③根据几何关系,确定第一环脊索、斜索、环索和压杆的几何长度。
L R ( 1 ) = L ( 1 ) cos α ( 1 ) - - - ( 11 )
L O ( 1 ) = L ( 1 ) cos β ( 1 ) - - - ( 12 )
LS(1)=L(1)(tgα(1)+tgβ(1))        (13)
LC(1)=2L(0)sin(π/M)               (14)
5)第一环的初始位形和初始预应力确定后,向最外环逐环递推同步确定其它各环的初始位形和初始预应力,直至最外环。若第i(≥1)环的初始位形和初始预应力已确定,则:
①根据脊索初始预应力条件,确定第i+1环脊索的初始预应力。
PR(i+1)=PR(i)+PO(i)                (15)
②根据力平衡条件,确定第i+1环脊索的斜角和压杆的初始预应力。
α ( i + 1 ) = arccos ( P R ( i ) cos α ( i ) + P O ( i ) cos β ( i ) P R ( i + 1 ) ) - - - ( 16 )
P S ( i + 1 ) = Σ j = 1 i + 1 F V ( j ) + P R ( i + 1 ) sin α ( i + 1 ) - - - ( 17 )
③根据斜索初始预应力条件,确定第i+1环斜索和环索的初始预应力以及斜索的斜角。
P C ( i + 1 ) = P R ( i + 1 ) cos α ( i + 1 ) 2 sin ( π / M ) - - - ( 18 )
β ( i + 1 ) = arctg ( P S ( i + 1 ) 2 P C ( i + 1 ) sin ( π / M ) ) - - - ( 19 )
P O ( i + 1 ) = P R ( i + 1 ) cos α ( i + 1 ) cos β ( i + 1 ) - - - ( 20 )
④根据几何关系,确定第i+1环脊索、斜索、环索和压杆的几何长度。
L R ( i + 1 ) = L ( i + 1 ) cos α ( i + 1 ) - - - ( 21 )
L O ( i + 1 ) = L ( i + 1 ) cos β ( i + 1 ) - - - ( 22 )
LS(i+1)=L(i+1)(tgα(i+1)+tgβ(i+1))           (23)
L C ( i + 1 ) = 2 Σ j = 0 i L ( j ) sin ( π / M ) - - - ( 24 )

Claims (5)

1.一种确定索穹顶初始平衡态的逐环递推方法,其特征在于根据已知参数条件、力平衡条件、脊索初始预应力条件和斜索初始预应力条件,从最内环向最外环逐环递推同步确定索穹顶结构的初始预应力和初始位形;
确定索穹顶初始平衡态的逐环递推方法包含以下步骤:
1)设定基本结构尺寸,包括环数N、环索分段数M、环间距L(i)、最内环半径L(0)以及最内环脊索斜角α(1)
2)设定初始荷载值FV(i),i=1,…,N;
3)设定最内环脊索初始预应力PR(1)
4)确定第一环即最内环的初始位形和初始预应力;
①根据力平衡条件,确定第一环的环索和压杆的初始预应力,
②根据斜索初始预应力条件,确定第一环斜索的斜角和初始预应力,
③根据几何关系,确定第一环脊索、斜索、环索和压杆的几何长度;
5)第一环的初始位形和初始预应力确定后,向最外环逐环递推同步确定其它各环的初始位形和初始预应力,直至最外环;若第i环的初始位形和初始预应力已确定,则:
①根据脊索初始预应力条件,确定第i+1环脊索的初始预应力,
②根据力平衡条件,确定第i+1环脊索的斜角和压杆的初始预应力,
③根据斜索初始预应力条件,确定第i+1环斜索和环索的初始预应力以及斜索的斜角,
④根据几何关系,确定第i+1环脊索、斜索、环索和压杆的几何长度。
2.根据权利要求1所述的确定索穹顶初始平衡态的逐环递推方法,其特征在于已知参数条件包括基本结构尺寸、初始荷载FV和最内环脊索初始预应力PR(1),其中基本结构尺寸包括环数N、环索分段数M、环间距L(i)、最内环半径L(0)以及最内环脊索斜角α(1)
3.根据权利要求1所述的确定索穹顶初始平衡态的逐环递推方法,其特征在于力平衡条件为:除支座节点外,初始荷载和初始预应力在节点上满足力平衡方程。
4.根据权利要求1所述的确定索穹顶初始平衡态的逐环递推方法,其特征在于脊索初始预应力条件为:脊索的初始预应力应等于相邻内环的脊索和斜索的初始预应力之和。
5.根据权利要求1所述的确定索穹顶初始平衡态的逐环递推方法,其特征在于斜索初始预应力条件为:同环的斜索和脊索的初始预应力的径向水平分力应相等。
CN2009101818878A 2009-07-31 2009-07-31 一种确定索穹顶初始平衡态的逐环递推方法 Expired - Fee Related CN101630344B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101818878A CN101630344B (zh) 2009-07-31 2009-07-31 一种确定索穹顶初始平衡态的逐环递推方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101818878A CN101630344B (zh) 2009-07-31 2009-07-31 一种确定索穹顶初始平衡态的逐环递推方法

Publications (2)

Publication Number Publication Date
CN101630344A true CN101630344A (zh) 2010-01-20
CN101630344B CN101630344B (zh) 2011-01-05

Family

ID=41575449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101818878A Expired - Fee Related CN101630344B (zh) 2009-07-31 2009-07-31 一种确定索穹顶初始平衡态的逐环递推方法

Country Status (1)

Country Link
CN (1) CN101630344B (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798848A (zh) * 2010-03-05 2010-08-11 北京纽曼帝莱蒙膜建筑技术有限公司 使用机械运动模拟模型动态模拟张拉结构施工的方法
CN102707623A (zh) * 2012-05-10 2012-10-03 东南大学 一种预应力网格结构张拉全过程的反馈控制方法
CN102720294A (zh) * 2012-04-04 2012-10-10 中国航空规划建设发展有限公司 一种改善索穹顶性能的构造方法
CN102733478A (zh) * 2012-04-04 2012-10-17 中国航空规划建设发展有限公司 一种基于承载全过程研究的索穹顶结构设计指标确定方法
CN102733525A (zh) * 2012-06-18 2012-10-17 中国航空规划建设发展有限公司 一种基于承载全过程开口式整体张拉结构多阶段设计方法
CN102841968A (zh) * 2012-09-13 2012-12-26 东南大学 基于初始基准态的正高斯曲率索网形控结构设计方法
WO2013149592A1 (zh) * 2012-04-04 2013-10-10 中国航空规划建设发展有限公司 一种基于张拉和承载全过程分析的索穹顶预应力确定方法
CN104234200A (zh) * 2014-09-24 2014-12-24 东南大学 一种弦支穹顶索杆系逐环提升安装方法
CN109750780A (zh) * 2019-01-17 2019-05-14 上海海事大学 一种旋转双曲面肋环型索穹顶
CN109826355A (zh) * 2019-01-17 2019-05-31 上海海事大学 一种旋转仿s形曲面索穹顶
CN111350276A (zh) * 2020-03-25 2020-06-30 中信建筑设计研究总院有限公司 一种车辐式索承网格钢结构初始预应力状态的设计方法
CN111894135A (zh) * 2020-07-17 2020-11-06 中国建筑第八工程局有限公司 索结构压力环节点定位安装方法
CN110700474B (zh) * 2018-07-09 2021-05-14 上海海事大学 一种零高斯曲率索穹顶

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798848B (zh) * 2010-03-05 2011-08-31 北京纽曼帝莱蒙膜建筑技术有限公司 使用机械运动模拟模型动态模拟张拉结构施工的方法
CN101798848A (zh) * 2010-03-05 2010-08-11 北京纽曼帝莱蒙膜建筑技术有限公司 使用机械运动模拟模型动态模拟张拉结构施工的方法
CN102720294A (zh) * 2012-04-04 2012-10-10 中国航空规划建设发展有限公司 一种改善索穹顶性能的构造方法
CN102733478A (zh) * 2012-04-04 2012-10-17 中国航空规划建设发展有限公司 一种基于承载全过程研究的索穹顶结构设计指标确定方法
CN102720294B (zh) * 2012-04-04 2014-07-16 中国航空规划建设发展有限公司 一种改善索穹顶性能的构造方法
CN102733478B (zh) * 2012-04-04 2013-07-10 中国航空规划建设发展有限公司 一种基于承载全过程研究的索穹顶结构设计指标确定方法
WO2013149592A1 (zh) * 2012-04-04 2013-10-10 中国航空规划建设发展有限公司 一种基于张拉和承载全过程分析的索穹顶预应力确定方法
CN102707623B (zh) * 2012-05-10 2013-12-18 东南大学 一种预应力网格结构张拉全过程的反馈控制方法
CN102707623A (zh) * 2012-05-10 2012-10-03 东南大学 一种预应力网格结构张拉全过程的反馈控制方法
CN102733525A (zh) * 2012-06-18 2012-10-17 中国航空规划建设发展有限公司 一种基于承载全过程开口式整体张拉结构多阶段设计方法
CN102733525B (zh) * 2012-06-18 2017-03-15 中国航空规划设计研究总院有限公司 一种基于承载全过程开口式整体张拉结构多阶段设计方法
CN102841968A (zh) * 2012-09-13 2012-12-26 东南大学 基于初始基准态的正高斯曲率索网形控结构设计方法
CN104234200A (zh) * 2014-09-24 2014-12-24 东南大学 一种弦支穹顶索杆系逐环提升安装方法
CN110700474B (zh) * 2018-07-09 2021-05-14 上海海事大学 一种零高斯曲率索穹顶
CN109750780A (zh) * 2019-01-17 2019-05-14 上海海事大学 一种旋转双曲面肋环型索穹顶
CN109826355A (zh) * 2019-01-17 2019-05-31 上海海事大学 一种旋转仿s形曲面索穹顶
CN109750780B (zh) * 2019-01-17 2023-10-31 上海海事大学 一种旋转双曲面肋环型索穹顶
CN109826355B (zh) * 2019-01-17 2023-10-31 上海海事大学 一种旋转仿s形曲面索穹顶
CN111350276A (zh) * 2020-03-25 2020-06-30 中信建筑设计研究总院有限公司 一种车辐式索承网格钢结构初始预应力状态的设计方法
CN111350276B (zh) * 2020-03-25 2021-05-28 中信建筑设计研究总院有限公司 一种车辐式索承网格钢结构初始预应力状态的设计方法
CN111894135A (zh) * 2020-07-17 2020-11-06 中国建筑第八工程局有限公司 索结构压力环节点定位安装方法
CN111894135B (zh) * 2020-07-17 2021-09-21 中国建筑第八工程局有限公司 索结构压力环节点定位安装方法

Also Published As

Publication number Publication date
CN101630344B (zh) 2011-01-05

Similar Documents

Publication Publication Date Title
CN101630344B (zh) 一种确定索穹顶初始平衡态的逐环递推方法
CN106499193A (zh) 一种仿生态伞状单层网壳钢结构的安装方法
CN104847017B (zh) 一种预应力工业料场罩棚结构及施工方法
CN102733481A (zh) 一种非对称开口式整体张拉索膜结构的施工方法
CN104947942B (zh) 超高度拱形网架结构计算机控制外扩累积提升的安装方法
CN201972237U (zh) 一种节段预制矩形钢管混凝土桁架
CN102535648B (zh) 一种钢管柱环梁梁柱节点结构及其施工方法
CN101158195A (zh) 弦支穹顶多次预应力施工方法
CN105787183A (zh) 确定斜拉桥合理成桥索力的综合算法
CN112962850A (zh) 轮辐式双层索网结构上下双层整体提升的施工方法
CN202706332U (zh) 一种型钢混凝土组合结构柱脚
CN103334529A (zh) 一种全张力索杆屋盖结构体系及其构造方法
CN105672576A (zh) 年轮式配筋高强混凝土方柱
CN103741854A (zh) 一种预应力组合网架及其施工方法
CN106760559A (zh) 半球形球冠网壳的安装方法
CN202208986U (zh) 制麦塔双向预应力空心楼盖
CN205330202U (zh) 一种抽柱悬索加固结构
CN104060841A (zh) 大跨度钢梁安装施工方法
CN105672574A (zh) 年轮式配筋高强混凝土圆柱
CN113175090B (zh) 一种大跨度拉索拉杆桁架钢结构施工方法
CN201933397U (zh) 基于体外预应力的混凝土梁简支变连续构造
CN202577577U (zh) 一种斜拉索拱结构
CN113323154A (zh) 带悬挑结构的单层网壳结构罩棚的施工方法
Alexandrou et al. Hybrid bending-active structures with multiple cables
CN203394544U (zh) 具有撑脚的大跨度山岭隧道拱架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20130731