CN101797623A - Forging method of steam generator primary side connection pipe safety end and witness piece - Google Patents

Forging method of steam generator primary side connection pipe safety end and witness piece Download PDF

Info

Publication number
CN101797623A
CN101797623A CN200910247956A CN200910247956A CN101797623A CN 101797623 A CN101797623 A CN 101797623A CN 200910247956 A CN200910247956 A CN 200910247956A CN 200910247956 A CN200910247956 A CN 200910247956A CN 101797623 A CN101797623 A CN 101797623A
Authority
CN
China
Prior art keywords
primary side
forging
trace
steam generator
base substrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910247956A
Other languages
Chinese (zh)
Inventor
王兴中
王元华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd
Original Assignee
SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd filed Critical SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd
Priority to CN200910247956A priority Critical patent/CN101797623A/en
Publication of CN101797623A publication Critical patent/CN101797623A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The invention relates to the technical field of forging, in particular to forging method of a nuclear power plant steam generator nitrogen controlling stainless steel primary side pipe safety end and a witness piece thereof; the method comprises the following steps that: an appropriate steel ingot is selected, and the steel ingot is repeatedly upset and stretched at 1180 to 900DEG C, so that the forging ratio is no less than 4; afterwards, rough processing before heat treatment, performance heat treatment and machining after heat treatment are carried out sequentially, to prepare the primary side pipe safety end and the witness piece thereof; the forging method has the advantages that all properties of the primary side pipe safety end and the witness piece thereof which are manufactured by the method meet the standard requirements of RCC-M, thereby ensuring the use requirement on the use of the primary side pipe safety end and the witness piece thereof of a nuclear power plant steam generator, greatly improving the safety and the reliability, and meeting the technical requirements of this type of products.

Description

Primary side of steam generator is taken over the forging method of safe end and witness spare
Technical field
The present invention relates to technical field of forging, especially relate to a kind of forging method that nuclear power station steam generator control nitrogen stainless steel primary side is taken over safe end and witness spare thereof that is used for.
Background technology
In recent years, power shortages have become the bottleneck that the restriction China's economic grows continuously and fast, and as energy savings and the important behave of readjusting the energy structure, nuclear power has been included State Grid's development plan in.The history in year surplus the development of China's nuclear power cause existing 30 always based on research of nuclear power equipment and trial-production on a small scale, forms ripe manufacturing technology and produces equipment capability.Therefore, the nuclear power developing of China just develops towards high-power direction.
At present, the employed forge piece of million kilowatt nuclear power construction project, as be used for that nuclear power station steam generator control nitrogen stainless steel primary side is taken over safe end and primary side is taken over safe end witness spare, because its special Service Environment, performance requirement to forging is very high, and general heat treatment method is handled can not reach standard.And present above-mentioned nuclear power can't be realized production domesticization with taking over safe end and witness spare thereof, multidirectionally abroad orders.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, the forging method that provides a kind of primary side of steam generator to take over safe end and witness spare, this method satisfies the adapter safe end of nuclear power station user demand and the forging method of witness spare by accurate setting forging and heat treatment period, temperature manufacturing.
In order to solve the problems of the technologies described above, the object of the invention realizes being finished by following technical scheme:
A kind of primary side of steam generator is taken over the forging method of safe end and witness spare, it is characterized in that having following steps:
A) preparation and casting have the steel ingot of following percentage by weight: trace≤C≤0.035%, trace≤Si≤1.00%, trace≤Mn≤2.00%, trace≤P≤0.030%, trace≤S≤0.015%, 17.00%≤Cr≤18.20%, 2.25%≤Mn≤2.75%, trace≤Cu≤1.00%, trace≤B≤0.0018%, 11.50%≤Ni≤12.50%, trace≤N≤0.080%, trace≤Co≤0.10%, surplus are Fe and unavoidable impurities;
B) steel ingot described in the step a) is heated to 450 ℃, insulation 2.5h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, blanking behind the insulation 2.5h;
C) in 1200 ℃-900 ℃ temperature range, forge the base substrate that is used for described primary side adapter safe end and witness spare;
D) the described base substrate that generates in the step c) is carried out roughing;
E) the described base substrate that generates in the step d) is heated to 1050 ℃-1080 ℃ temperature range and be incubated 0.5-3h, water-cooled is to not being higher than 100 ℃ of water outlets afterwards;
F) base substrate that generates in the step e) is carried out machined to make described safe end and witness spare.
The concrete steps of step c) are: the workpiece that step b) generated is heated to 1180 ℃ as initial forging temperature, and pull out-jumping-up, round as a ball afterwards, alignment, correction size make forging ratio be not less than 4, be used for the base substrate that described primary side is taken over safe end and witness spare with forging, its final forging temperature is not less than 900 ℃.
The forging that said method generated at room temperature, its hot strength is 576-588Mpa, its yield strength of 0.2 is not less than 286Mpa, its percentage elongation δ is not less than 56%.
Base substrate described in the step e) is the pipe of internal diameter 743mm, external diameter 1021mm, length 550mm.
Base substrate described in the step e) is the pipe of internal diameter 710mm, external diameter 1045mm, length 560mm.
The specific requirement of water-cooled is in the step e): described billet surface temperature dropped to 427 ℃ in 3 minutes, and water-cooled is 60 minutes afterwards.
The invention has the beneficial effects as follows: adopt the primary side of steam generator adapter safe end of manufacturing of the present invention and the standard-required that the every performance indications of witness spare all satisfy RCC-M, guaranteed to be used for the instructions for use that primary side of steam generator of nuclear power plant is taken over safe end and witness spare thereof, its security, reliability are greatly promoted, satisfied the technical need of this series products.
Description of drawings
Fig. 1 is that the embodiment of the invention 1 is taken over safe end and witness spare cutaway view thereof.
The specific embodiment
The present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technical staff's of the same trade understanding:
As shown in Figure 1, label 1-2 represents respectively: take over safe end 1, witness spare 2.
As shown in Figure 1, the adapter safe end 1 of manufacturing of the present invention and witness spare 2 thereof are the identical hollow circular ring of size dimension, the internal diameter of the two be 753mm, external diameter be 1011mm, wall thickness be 129mm, highly for 180mm.
Its forging steel ingot selects 22 " square ingot, the chemical composition of its material should satisfy following requirement:
Trace≤C≤0.035%, trace≤Si≤1.00%, trace≤Mn≤2.00%, trace≤P≤0.030%, trace≤S≤0.015%, 17.00%≤Cr≤18.20%, 2.25%≤Mn≤2.75%, trace≤Cu≤1.00%, trace≤B≤0.0018%, 11.50%≤Ni≤12.50%, trace≤N≤0.080%, trace≤Co≤0.10%, surplus are Fe and unavoidable impurities.
During fabrication, it is measure-alike to take over safe end 1 and witness spare 2, so said two devices can be forged together.Owing to forge the back examination of materials, also need to forge the evaluation ring, so each forging length of forging is 550mm.
Because size, the weight of forging and the material of selecting for use thereof are determining the selection of each parameter of Forging Technology, so at above-mentioned adapter safe end 1, witness spare 2, following examples are described in detail for the manufacturing process of this Venturi tube.
Embodiment 1: the requirement of manufacturing process is in the present embodiment:
1. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
A) steel ingot described in the step a) is heated to 450 ℃, insulation 2.5h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, blanking behind the insulation 2.5h.
B) workpiece is heated to 1180 ℃ as initial forging temperature, and pull out-jumping-up, round as a ball afterwards, punching, reaming, saddle support reaming, rammer planar end surface, revise size and make forging ratio be not less than 4, be used for the base substrate that described primary side is taken over safe end and witness spare with forging, its final forging temperature is not less than 900 ℃.
2. roughing before the heat treatment: base substrate before heat treatment on request size carry out roughing.
3. property heat treatment: base substrate is heated to 1050 ℃ temperature range and is incubated 0.5h, and water-cooled is to not being higher than 100 ℃ of water outlets afterwards.
Key points for operation: described billet surface temperature dropped to 427 ℃ in 3 minutes, and water-cooled is 60 minutes afterwards.
4. machined after the heat treatment: base substrate carries out machined and takes over safe end 1 and witness spare 2 to make, and for the removal of defect area, allows or not to carry out any soldering with polishing method removal of defects under the requirement that does not influence the forging mechanical property.
Embodiment 2: the requirement of manufacturing process is in the present embodiment:
1. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
A) steel ingot described in the step a) is heated to 450 ℃, insulation 2.5h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, blanking behind the insulation 2.5h.
B) workpiece is heated to 1180 ℃ as initial forging temperature, and pull out-jumping-up, round as a ball afterwards, punching, reaming, saddle support reaming, rammer planar end surface, revise size and make forging ratio be not less than 4, be used for the base substrate that described primary side is taken over safe end and witness spare with forging, its final forging temperature is not less than 900 ℃.
2. roughing before the heat treatment: base substrate before heat treatment on request size carry out roughing.
3. property heat treatment: base substrate is heated to 1055 ℃ temperature range and is incubated 1h, and water-cooled is to not being higher than 100 ℃ of water outlets afterwards.
Key points for operation: described billet surface temperature dropped to 427 ℃ in 3 minutes, and water-cooled is 60 minutes afterwards.
Machined after the heat treatment: base substrate carries out machined and takes over safe end 1 and witness spare 2 to make, and for the removal of defect area, allows or not to carry out any soldering with polishing method removal of defects under the requirement that does not influence the forging mechanical property.
Embodiment 3: the requirement of manufacturing process is in the present embodiment:
1. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
A) steel ingot described in the step a) is heated to 450 ℃, insulation 2.5h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, blanking behind the insulation 2.5h.
B) workpiece is heated to 1180 ℃ as initial forging temperature, and pull out-jumping-up, round as a ball afterwards, punching, reaming, saddle support reaming, rammer planar end surface, revise size and make forging ratio be not less than 4, be used for the base substrate that described primary side is taken over safe end and witness spare with forging, its final forging temperature is not less than 900 ℃.
2. roughing before the heat treatment: base substrate before heat treatment on request size carry out roughing.
3. property heat treatment: base substrate is heated to 1060 ℃ temperature range and is incubated 1.5h, and water-cooled is to not being higher than 100 ℃ of water outlets afterwards.
Key points for operation: described billet surface temperature dropped to 427 ℃ in 3 minutes, and water-cooled is 60 minutes afterwards.
Machined after the heat treatment: base substrate carries out machined and takes over safe end 1 and witness spare 2 to make, and for the removal of defect area, allows or not to carry out any soldering with polishing method removal of defects under the requirement that does not influence the forging mechanical property.
Embodiment 4: the requirement of manufacturing process is in the present embodiment:
1. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
A) steel ingot described in the step a) is heated to 450 ℃, insulation 2.5h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, blanking behind the insulation 2.5h.
B) workpiece is heated to 1180 ℃ as initial forging temperature, and pull out-jumping-up, round as a ball afterwards, punching, reaming, saddle support reaming, rammer planar end surface, revise size and make forging ratio be not less than 4, be used for the base substrate that described primary side is taken over safe end and witness spare with forging, its final forging temperature is not less than 900 ℃.
2. roughing before the heat treatment: base substrate before heat treatment on request size carry out roughing.
3. property heat treatment: base substrate is heated to 1070 ℃ temperature range and is incubated 2h, and water-cooled is to not being higher than 100 ℃ of water outlets afterwards.
Key points for operation: described billet surface temperature dropped to 427 ℃ in 3 minutes, and water-cooled is 60 minutes afterwards.
Machined after the heat treatment: base substrate carries out machined and takes over safe end 1 and witness spare 2 to make, and for the removal of defect area, allows or not to carry out any soldering with polishing method removal of defects under the requirement that does not influence the forging mechanical property.
Embodiment 5: the requirement of manufacturing process is in the present embodiment:
1. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
A) steel ingot described in the step a) is heated to 450 ℃, insulation 2.5h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, blanking behind the insulation 2.5h.
B) workpiece is heated to 1180 ℃ as initial forging temperature, and pull out-jumping-up, round as a ball afterwards, punching, reaming, saddle support reaming, rammer planar end surface, revise size and make forging ratio be not less than 4, be used for the base substrate that described primary side is taken over safe end and witness spare with forging, its final forging temperature is not less than 900 ℃.
2. roughing before the heat treatment: base substrate before heat treatment on request size carry out roughing.
3. property heat treatment: base substrate is heated to 1080 ℃ temperature range and is incubated 3h, and water-cooled is to not being higher than 100 ℃ of water outlets afterwards.
Key points for operation: described billet surface temperature dropped to 427 ℃ in 3 minutes, and water-cooled is 60 minutes afterwards.
Machined after the heat treatment: base substrate carries out machined and takes over safe end 1 and witness spare 2 to make, and for the removal of defect area, allows or not to carry out any soldering with polishing method removal of defects under the requirement that does not influence the forging mechanical property.
After adopting technical scheme among above-mentioned 5 embodiment to complete, test to obtain data shown in the following table for forging:
Mechanical performance
Figure G2009102479560D00091
Adopt the primary side of steam generator adapter safe end of manufacturing of the present invention and the standard-required that the every performance indications of witness spare all satisfy RCC-M, guaranteed to be used for the instructions for use that primary side of steam generator of nuclear power plant is taken over safe end and witness spare thereof, its security, reliability are greatly promoted, satisfied the technical need of this series products.

Claims (6)

1. a primary side of steam generator is taken over the forging method of safe end and witness spare, it is characterized in that having following steps:
A) preparation and casting have the steel ingot of following percentage by weight: trace≤C≤0.035%, trace≤Si≤1.00%, trace≤Mn≤2.00%, trace≤P≤0.030%, trace≤S≤0.015%, 17.00%≤Cr≤18.20%, 2.25%≤Mn≤2.75%, trace≤Cu≤1.00%, trace≤B≤0.0018%, 11.50%≤Ni≤12.50%, trace≤N≤0.080%, trace≤Co≤0.10%, surplus are Fe and unavoidable impurities;
B) steel ingot described in the step a) is heated to 450 ℃, insulation 2.5h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, blanking behind the insulation 2.5h;
C) in 1180 ℃-900 ℃ temperature range, forge the base substrate that is used for described primary side adapter safe end and witness spare;
D) the described base substrate that generates in the step c) is carried out roughing;
E) the described base substrate that generates in the step d) is heated to 1050 ℃-1080 ℃ temperature range and be incubated 0.5-3h, water-cooled is to not being higher than 100 ℃ of water outlets afterwards;
F) base substrate that generates in the step e) is carried out machined to make described safe end and witness spare.
2. a kind of primary side of steam generator according to claim 1 is taken over the forging method of safe end and witness spare, the concrete steps that it is characterized in that step c) are: the workpiece that step b) generated is heated to 1180 ℃ as initial forging temperature, and pull out-jumping-up, round as a ball afterwards, punching, reaming, saddle support reaming, rammer planar end surface, revise size and make forging ratio be not less than 4, be used for the base substrate that described primary side is taken over safe end and witness spare with forging, its final forging temperature is not less than 900 ℃.
3. a kind of primary side of steam generator according to claim 1 is taken over the forging method of safe end and witness spare, and it is characterized in that: base substrate described in the step e) is the pipe of internal diameter 743mm, external diameter 1021mm, length 550mm.
4. a kind of primary side of steam generator according to claim 1 is taken over the forging method of safe end and witness spare, and it is characterized in that: base substrate described in the step e) is the pipe of internal diameter 710mm, external diameter 1045mm, length 560mm.
5. a kind of primary side of steam generator according to claim 1 is taken over the forging method of safe end and witness spare, and it is characterized in that the specific requirement of water-cooled is in the step e): described billet surface temperature dropped to 427 ℃ in 3 minutes, and water-cooled is 60 minutes afterwards.
6. a kind of primary side of steam generator according to claim 1 is taken over the forging method of safe end and witness spare, it is characterized in that described forging at room temperature, its hot strength is 576-588Mpa, and its yield strength of 0.2 is not less than 286Mpa, and its percentage elongation δ is not less than 56%.
CN200910247956A 2009-12-31 2009-12-31 Forging method of steam generator primary side connection pipe safety end and witness piece Pending CN101797623A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910247956A CN101797623A (en) 2009-12-31 2009-12-31 Forging method of steam generator primary side connection pipe safety end and witness piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910247956A CN101797623A (en) 2009-12-31 2009-12-31 Forging method of steam generator primary side connection pipe safety end and witness piece

Publications (1)

Publication Number Publication Date
CN101797623A true CN101797623A (en) 2010-08-11

Family

ID=42593549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910247956A Pending CN101797623A (en) 2009-12-31 2009-12-31 Forging method of steam generator primary side connection pipe safety end and witness piece

Country Status (1)

Country Link
CN (1) CN101797623A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102319848A (en) * 2011-09-02 2012-01-18 上海新闵重型锻造有限公司 Primary side of steam generator is taken over the Forging Technology of witness spare and safe end
CN102825207A (en) * 2011-06-13 2012-12-19 鞍钢重型机械有限责任公司 Forging process of main stainless-steel pipeline for nuclear power
CN105057560A (en) * 2015-07-20 2015-11-18 安徽蓝博旺机械集团振邺机械有限公司 Forging method for drive axle lifting oil cylinder
CN109961859A (en) * 2017-12-14 2019-07-02 中国核动力研究设计院 A kind of nuclear power main equipment safe end and its manufacturing process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102825207A (en) * 2011-06-13 2012-12-19 鞍钢重型机械有限责任公司 Forging process of main stainless-steel pipeline for nuclear power
CN102825207B (en) * 2011-06-13 2015-12-02 鞍钢重型机械有限责任公司 A kind of stainless steel main nuclear power pipeline Forging Technology
CN102319848A (en) * 2011-09-02 2012-01-18 上海新闵重型锻造有限公司 Primary side of steam generator is taken over the Forging Technology of witness spare and safe end
CN105057560A (en) * 2015-07-20 2015-11-18 安徽蓝博旺机械集团振邺机械有限公司 Forging method for drive axle lifting oil cylinder
CN109961859A (en) * 2017-12-14 2019-07-02 中国核动力研究设计院 A kind of nuclear power main equipment safe end and its manufacturing process

Similar Documents

Publication Publication Date Title
CN101722406B (en) Method for manufacturing pin shaft through forging
CN102205482B (en) Method for producing round-link chain
CN103111808B (en) A kind of nickel base superalloy GH4169 hexagon socket head cap screw processing technologys
CN109822024A (en) A kind of forging and heat treatment process of 750 DEG C of grades high temperature alloy forging
CN102371471B (en) Method for manufacturing pipe tower type pylon for wind power generation
CN101767179B (en) Method for forging screw and nut
CN106051721A (en) Pressure vessel integrated end socket for nuclear power, end socket plate blank of pressure vessel integrated end socket and forging method of pressure vessel integrated end socket
CN104174798B (en) Main nuclear power pipeline pipe short route forging method
CN110453109B (en) NS3306 high-temperature alloy small-caliber precise seamless pipe and manufacturing method thereof
CN101774107B (en) Method for forging Venturi tubes
CN102717237A (en) Method for forming wind power flange
CN104923603A (en) Technology for preparing pressure resisting titanium alloy half ball for bathyscaph manned ball
CN101767177B (en) Method for forging bearing support forge piece
CN103071743A (en) Preparation method for TC11 titanium alloy small-bore thick-walled cylindrical part
CN101797623A (en) Forging method of steam generator primary side connection pipe safety end and witness piece
CN105252230A (en) Machining process for inclined tee
CN105363823A (en) Method for rolling aluminum alloy sheet forge pieces
CN105798539A (en) Method for manufacturing high-temperature alloy bolt
CN103509960B (en) A kind of smelting process prepares the method for NiW alloy composite baseband billet used for coating conductor
CN105525228A (en) Nuclear safety grade 316L stainless steel gauge pipe
CN101780519B (en) Forging method of forge piece for safe end of reactor pressure vessel
CN101745785B (en) Method for manufacturing neutron flux-measured sleeve crossed stiffened plate by forging
CN103436806A (en) Production method of forged flange capable of meeting A694F70 high yield value core sampling requirements
CN108018507A (en) A kind of flexible ring preparation method for rolling electric rotation transmission device
CN112126867A (en) Main shaft forging for large tidal current energy generator set and manufacturing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100811