CN102825207A - Forging process of main stainless-steel pipeline for nuclear power - Google Patents

Forging process of main stainless-steel pipeline for nuclear power Download PDF

Info

Publication number
CN102825207A
CN102825207A CN2011101583583A CN201110158358A CN102825207A CN 102825207 A CN102825207 A CN 102825207A CN 2011101583583 A CN2011101583583 A CN 2011101583583A CN 201110158358 A CN201110158358 A CN 201110158358A CN 102825207 A CN102825207 A CN 102825207A
Authority
CN
China
Prior art keywords
hour
forging
incubated
pulling
blank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101583583A
Other languages
Chinese (zh)
Other versions
CN102825207B (en
Inventor
朴振胜
宋嘉欣
冷永炎
孙凤先
宋恩余
高扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Heavy Machinery Co Ltd
Original Assignee
Angang Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Heavy Machinery Co Ltd filed Critical Angang Heavy Machinery Co Ltd
Priority to CN201110158358.3A priority Critical patent/CN102825207B/en
Publication of CN102825207A publication Critical patent/CN102825207A/en
Application granted granted Critical
Publication of CN102825207B publication Critical patent/CN102825207B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a forging process of a main stainless-steel pipeline for nuclear power. The forging process is characterized in that a 316LN electroslag ingot blank is adopted; heat cleaning is carried out on surface cracks in time in the forging process, and a forging ratio is guaranteed to be more than 4; construction members needed by the forging process comprise a hot leg L001A, a hot leg L001B, a cold leg A, a cold leg B, a cold leg C, a cold leg D, a wave pipe I, a wave pipe II, a wave pipe III, a wave pipe IV and a wave pipe VII; and the forging process of the construction members is grouped into the hot leg L001A, the hot leg L001B, a cold leg group, a wave pipe group including the wave pipes I, II and V, and a wave pipe group including the wave pipes III and IV. Compared with the prior art, the process disclosed by the invention has the beneficial effects of reducing the production heating number of a forge piece to a great extent, improving the production efficiency, guaranteeing the design size requirements on the forge piece, overcoming the heat crack tendency of the surface of the blank and improving the surface quality of the main pipeline through the timely heat cleaning in the forging process, and realizing the 100% localization of key equipment of the nuclear power.

Description

A kind of stainless steel main nuclear power pipeline Forging Technology
Technical field
The present invention relates to technical field of forging, relate in particular to a kind of stainless steel main nuclear power pipeline Forging Technology.
Background technology
The core of " the non-active compressed water reactor nuclear power technology " that is widely used at present is fission to take place in the equipment of " reactor " and produce great amount of heat energy with the nuclear fuel that uranium is processed; Take heat energy out of with the water that is under the high pressure again; In steam generator, produce steam; Steam pushing turbine band generator and is rotated together, and electricity just generates continuously, and delivers to from all directions through electrical network.The nuclear power station trunk line is the big heavy wall bearing pipe of coupled reaction core pressure vessel and steam generator, is " main artery " of nuclear steam supply system output reactor core heat energy, is one of nuclear one-level key equipment of pressurized-water reactor nuclear power plant.
The nuclear power station trunk line adopts Ultra-low carbon control nitrogen stainless steel 316LN material, and the processing and manufacturing difficulty is big, and it forges difficult point and mainly contains:
1) surperficial hot cracking tendency appears in blank surface during forge hot.
2) 316LN is an austenitic stainless steel, can not adopt the heat treatment mode crystal grain thinning after the forging, can only come crystal grain thinning through forging deformation.
3) forging is complex-shaped, hot arc L001A especially, and two ozzle space 45s, it is big to forge difficulty, is not easy to satisfy the design size requirement.
Summary of the invention
The purpose of this invention is to provide a kind of stainless steel main nuclear power pipeline Forging Technology, solve the deficiency of prior art, reduce face crack, refinement ozzle position grain size satisfies the design size requirement.
For realizing above-mentioned purpose, the present invention realizes through following technical scheme:
A kind of stainless steel main nuclear power pipeline Forging Technology; It is characterized in that; Adopt 316LN ESR ingot blank, control its harmful components S≤0.005% during smelting, P≤0.025%; Forge in the process and in time face crack is carried out the heat cleaning; Guarantee forging ratio greater than 4, its member comprises 11 sections of hot arc L001A, hot arc L001B, cold section A, cold section B, cold section C, cold section D, fluctuation pipe I, fluctuation pipe II, fluctuation pipe III, fluctuation pipe IV, fluctuation pipe V altogether, by structure difference and mechanical performance requirement difference; The Forging Technology of above-mentioned member is grouped into hot arc L001A, hot arc L001B, cold section group, fluctuation pipe IIIV group, fluctuation pipe IIIIV group, and wherein the operating procedure of hot arc L001A is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-6 hour;
4) secondary jumping-up pulling repeatedly when jumping-up is not in place, is returned stove insulation 16-24 hour; Pull out when not in place; Return stove insulation 2-6 hour, each drafts 50-150mm is because trunk line two ozzles become 45 ° of angles in the space; For ease of two ozzles are carried out calibration, at last blank is pulled out into the prism of cross section octagon;
5) seal is drawn in corresponding ozzle position, the segmentation pulling, as pull out not in placely, and return stove insulation 2-6 hour, forge when crackle appears in blank surface in the process, in time carry out heat cleaning, assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour, and the part forges the ozzle crystal grain thinning;
7) behind the forging finished product, be positioned over the ventilation, accelerate to be cooled to room temperature.
The operating procedure of said hot arc L001B is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-6 hour;
4) three jumping-ups pulling repeatedly when jumping-up is not in place, is returned stove insulation 16-24 hour, pulls out when not in place, returns stove insulation 2-6 hour, and each drafts 50-150mm can not pull out like last pulling and to require size, then increases jumping-up one time;
5) seal is drawn in corresponding ozzle position, the segmentation pulling, as pull out not in placely, and return stove insulation 2-6 hour, forge when crackle appears in blank surface in the process, in time carry out heat cleaning, assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour, and the part forges the ozzle crystal grain thinning;
7) behind the forging finished product, be positioned over the ventilation, accelerate to be cooled to room temperature.
The operating procedure of said cold section group is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
4) secondary jumping-up pulling repeatedly when jumping-up is not in place, is returned stove insulation 10-15 hour, pulls out when not in place, returns stove insulation 2-4 hour, and each drafts 50-150mm pulls out into earlier cylindrically, pulls out into the prism of cross section octagon then;
5) draw the seal segmentation, segmentation pulling, as pull out not in placely, and return stove insulation 2-6 hour, forge when crackle appears in blank surface in the process, in time carry out heat cleaning, assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour;
7) be positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
The operating procedure of said fluctuation pipe IIIV group is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) pulling blanking, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
4) segmentation pulling pull out not in placely, returns stove insulation 1-2 hour, forges when crackle appears in blank surface in the process, in time carries out heat cleaning, and assurance width and depth ratio were greater than 6: 1 when crackle was cleared up;
5) finishing is positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
The operating procedure of said fluctuation pipe IIIIV group is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
4) jumping-up pulling when jumping-up is not in place, is returned stove insulation 16-20 hour, pulls out when not in place, returns stove insulation 2-4 hour, each drafts 50-150mm;
5) pulling blanking, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
6) segmentation pulling pull out not in placely, returns stove insulation 1-2 hour, forges when crackle appears in blank surface in the process, in time carries out heat cleaning, and assurance width and depth ratio were greater than 6: 1 when crackle was cleared up;
7) finishing is positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
Compared with prior art, the invention has the beneficial effects as follows:
1) reduces the production fire of forging greatly, promptly practiced thrift the energy, improved production efficiency, guaranteed the design size requirement of forging again.
2) through heat cleaning in time in the forging process, overcome the hot cracking tendency of blank surface, improved the surface quality of trunk line.
3) played great function to realizing that nuclear power key equipment 100% domesticizes, its social benefit and economic benefit are inestimable.
Description of drawings
Fig. 1 is main nuclear power pipeline hot arc L001A forging ' s block dimension figure;
Fig. 2 is that hot arc L001A is drawn into eight arris post state diagrams;
Fig. 3 is that hot arc L001A presses shoulder to tell the state diagram of C section;
Fig. 4 is hot arc L001A segmentation pulling finishing state diagram;
Fig. 5 is main nuclear power pipeline hot arc L001B forging ' s block dimension figure;
Fig. 6 is that the seal state diagram is drawn in hot arc L001B segmentation;
Fig. 7 is cold section A of main nuclear power pipeline, cold section B forging ' s block dimension figure;
Fig. 8 is that the seal state diagram is drawn in cold section A, cold section B segmentation;
Fig. 9 is cold section C of main nuclear power pipeline, cold section D forging ' s block dimension figure;
Figure 10 is that the seal state diagram is drawn in cold section C, cold section D segmentation;
Figure 11 is main nuclear power pipeline fluctuation pipe I, fluctuation pipe II, fluctuation pipe V forging ' s block dimension figure;
Figure 12 is main nuclear power pipeline fluctuation pipe III, fluctuation pipe IV forging ' s block dimension figure.
The specific embodiment
Below in conjunction with embodiment the present invention is described further:
The present invention is a kind of stainless steel main nuclear power pipeline Forging Technology; It adopts 316LN ESR ingot blank; Control its harmful components S≤0.005% during smelting, P≤0.025% in time carries out the heat cleaning to face crack in the process of forging; Improve forging surface quality; Its member comprises its 11 sections of hot arc L001A, hot arc L001B, cold section A, cold section B, cold section C, cold section D, fluctuation pipe I, fluctuation pipe II, fluctuation pipe III, fluctuation pipe IV, fluctuation pipe V altogether, and is different by structure difference and mechanical performance requirements, and the Forging Technology of above-mentioned member is grouped into hot arc L001A, hot arc L001B, cold section group, fluctuation pipe IIIV group, fluctuates and manage IIIIV and organize.
See Fig. 1, Fig. 2, Fig. 3, Fig. 4, show that wherein the operating procedure of hot arc L001A is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 6 hours with blank heating; Be heated to 630-670 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14 hours, and then be heated to 1190-1210 ℃, be incubated 30 hours with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size φ 930mm * 1300mm and hydraulic press upset die coupling;
3) pull out 1600mm * 3960mm to φ in advance, each drafts 50mm pulls out when not in place, returns stove insulation 3 hours;
4) secondary jumping-up pulling repeatedly, jumping-up when jumping-up is not in place, are returned stove insulation 16 hours to φ 2050mm * 2500mm; Pull out 1600mm * 3960mm, pull out when not in place, return stove insulation 4 hours, each drafts 50-150mm to φ; Because trunk line two ozzles become 45 ° of angles in the space, for ease of two ozzles are carried out calibration, at last blank is pulled out into the prism of cross section octagon; Prism size opposite side distance 1430mm, long 4690mm, pull out earlier the circle after the side of pulling out;
5) seal is drawn in corresponding ozzle position, presses shoulder to tell C section, A+B section, D+E+ rear, and the C section is pressed the dark 160mm of shoulder, wide 1200mm; The wide 780mm of B section, the wide 780mm of D section, A section, C section, the segmentation of E section pull out the 1060mm to φ, as pull out not in place then; Return stove insulation 5 hours, forge when crackle appears in blank surface in the process, in time carry out the heat cleaning; Guarantee during the crackle cleaning that width and depth ratio greater than 6: 1, can not form not only narrow but also dark pit;
6) pulling finishing B section, D section guarantee total forging ratio greater than 4, pull outs not in placely, return stove and are incubated 5 hours, and the part forges B section, D section ozzle position with crystal grain thinning;
7) behind the forging finished product, be positioned over the ventilation, accelerate to be cooled to room temperature, reduce the possibility of grain growth under the high temperature.
See Fig. 5, Fig. 6, wherein the operating procedure of hot arc L001B is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 6 hours with blank heating; Be heated to 630-670 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14 hours, and then be heated to 1190-1210 ℃, be incubated 30 hours with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size φ 930mm * 1250mm and hydraulic press upset die coupling;
3) pull out 1600mm * 3960mm to φ in advance, each drafts 50mm pulls out when not in place, returns stove insulation 3 hours;
4) three jumping-up pullings repeatedly, jumping-up is to φ 2000mm * 2550mm, when jumping-up is not in place; Returned stove insulation 16 hours, and pulled out 1600mm, pull out when not in place to φ; Return stove insulation 4 hours; Each drafts 50-150mm can not pull out 1900mm * 1060mm * 4015mm like last pulling, then increases jumping-up one time;
5) draw the seal segmentation and go out the wide 1645mm of I section, the wide 960mm of II section, the wide 1300mm of III section, II section respective tube mouth position pulls out I section and III section respectively to φ 1100mm; Guarantee that I section and III section are coaxial, as pull out not in placely, return stove and be incubated 2-6 hour; Forge when crackle appears in blank surface in the process; In time carry out the heat cleaning, guarantee during the crackle cleaning that width and depth ratio greater than 6: 1, can not form not only narrow but also dark pit;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour, and the part forges the ozzle crystal grain thinning;
7) behind the forging finished product, be positioned over the ventilation, accelerate to be cooled to room temperature, reduce the possibility of grain growth under the high temperature.
Comprise cold section A, cold section B, cold section C, cold section D in the said cold section group, structural similarity is seen Fig. 7, Fig. 8 each other, and wherein cold section A is identical with cold section B physical dimension, sees Fig. 9, Figure 10, and cold section C is identical with cold section D physical dimension, and the concrete operations step is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size φ 930mm * 1100mm and hydraulic press upset die coupling;
3) pull out 1400mm * 2900mm to φ in advance, each drafts 50mm pulls out when not in place, returns stove insulation 2-4 hour;
4) secondary jumping-up pulling repeatedly, jumping-up is to φ 1750mm, when jumping-up is not in place; Returned stove insulation 10-15 hour, and pulled out 1400mm * 2850mm, pull out when not in place to φ; Return stove insulation 2-4 hour; Each drafts 50-150mm pulls out into earlier cylindrically, pulls out into the prism of cross section octagon opposite side distance 1100mm then;
5) draw seal blank is divided into I section, II section, III section+tail, segmentation pulling, as pull out not in placely, and return stove insulation 2-6 hour, forge when crackle appears in blank surface in the process, in time carry out heat cleaning, assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour;
7) be positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
In the said fluctuation pipe IIIV group, fluctuation pipe I, fluctuation pipe II, fluctuation pipe V are formed by same blank disjunction, see Figure 11, and its concrete operations step is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size φ 930mm * 1100mm and hydraulic press upset die coupling;
3) pull out 650mm * 13800mm to φ, the marking knife blanking is divided into fluctuation pipe I+ fluctuation pipe V+ arc end and receives two sections at arc end with fluctuation pipe II+, and each drafts 50mm pulls out when not in place, returns stove insulation 2-4 hour;
4) segmentation pulls out 515 ± 10mm to φ, pulls out not in placely, returns stove insulation 1-2 hour, forges when crackle appears in blank surface in the process, in time carries out heat cleaning, and assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
5) finishing is positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
In the said fluctuation pipe IIIIV group, fluctuation pipe III, fluctuation pipe IV are formed by same blank disjunction, see Figure 12, and its concrete operations step is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size φ 930mm * 1100mm and hydraulic press upset die coupling;
3) pull out 1400mm * 2900mm to φ in advance, each drafts 50mm pulls out when not in place, returns stove insulation 2-4 hour;
4) jumping-up pulling, jumping-up when jumping-up is not in place, are returned stove insulation 16-20 hour to φ 1800mm, pull out 750mm * 10070mm to φ, pull out when not in place, return stove insulation 2-4 hour, each drafts 50-150mm;
5) marking knife segmentation blanking becomes fluctuation pipe III+ arc end and fluctuation pipe IV+ to receive two sections at arc end; The segmentation pulling is forging ' s block dimension extremely separately; Pull out not in placely, returned stove insulation 1-2 hour, forge when crackle appears in blank surface in the process; In time carry out the heat cleaning, guarantee during the crackle cleaning that width and depth ratio were greater than 6: 1;
7) finishing is positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.

Claims (5)

1. stainless steel main nuclear power pipeline Forging Technology; It is characterized in that; Adopt 316LN ESR ingot blank, control its harmful components S≤0.005% during smelting, P≤0.025%; Forge in the process and in time face crack is carried out the heat cleaning; Guarantee forging ratio greater than 4, its member comprises 11 sections of hot arc L001A, hot arc L001B, cold section A, cold section B, cold section C, cold section D, fluctuation pipe I, fluctuation pipe II, fluctuation pipe III, fluctuation pipe IV, fluctuation pipe V altogether, by structure difference and mechanical performance requirement difference; The Forging Technology of above-mentioned member is grouped into hot arc L001A, hot arc L001B, cold section group, fluctuation pipe IIIV group, fluctuation pipe IIIIV group, and wherein the operating procedure of hot arc L001A is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-6 hour;
4) secondary jumping-up pulling repeatedly when jumping-up is not in place, is returned stove insulation 16-24 hour; Pull out when not in place; Return stove insulation 2-6 hour, each drafts 50-150mm is because trunk line two ozzles become 45 ° of angles in the space; For ease of two ozzles are carried out calibration, at last blank is pulled out into the prism of cross section octagon;
5) seal is drawn in corresponding ozzle position, the segmentation pulling, as pull out not in placely, and return stove insulation 2-6 hour, forge when crackle appears in blank surface in the process, in time carry out heat cleaning, assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour, and the part forges the ozzle crystal grain thinning;
7) behind the forging finished product, be positioned over the ventilation, accelerate to be cooled to room temperature.
2. a kind of stainless steel main nuclear power pipeline Forging Technology according to claim 1 is characterized in that the operating procedure of said hot arc L001B is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-6 hour;
4) three jumping-ups pulling repeatedly when jumping-up is not in place, is returned stove insulation 16-24 hour, pulls out when not in place, returns stove insulation 2-6 hour, and each drafts 50-150mm can not pull out like last pulling and to require size, then increases jumping-up one time;
5) seal is drawn in corresponding ozzle position, the segmentation pulling, as pull out not in placely, and return stove insulation 2-6 hour, forge when crackle appears in blank surface in the process, in time carry out heat cleaning, assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour, and the part forges the ozzle crystal grain thinning;
7) behind the forging finished product, be positioned over the ventilation, accelerate to be cooled to room temperature.
3. a kind of stainless steel main nuclear power pipeline Forging Technology according to claim 1 is characterized in that the operating procedure of said cold section group is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
4) secondary jumping-up pulling repeatedly when jumping-up is not in place, is returned stove insulation 10-15 hour, pulls out when not in place, returns stove insulation 2-4 hour, and each drafts 50-150mm pulls out into earlier cylindrically, pulls out into the prism of cross section octagon then;
5) draw the seal segmentation, segmentation pulling, as pull out not in placely, and return stove insulation 2-6 hour, forge when crackle appears in blank surface in the process, in time carry out heat cleaning, assurance width and depth ratio were greater than 6: 1 during the crackle cleaning;
6) pulling finishing guarantees total forging ratio greater than 4, pull out not in placely, returns stove and is incubated 2-6 hour;
7) be positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
4. a kind of stainless steel main nuclear power pipeline Forging Technology according to claim 1 is characterized in that, the operating procedure of said fluctuation pipe IIIIV group is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) pulling blanking, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
4) segmentation pulling pull out not in placely, returns stove insulation 1-2 hour, forges when crackle appears in blank surface in the process, in time carries out heat cleaning, and assurance width and depth ratio were greater than 6: 1 when crackle was cleared up;
5) finishing is positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
5. a kind of stainless steel main nuclear power pipeline Forging Technology according to claim 1 is characterized in that, the operating procedure of said fluctuation pipe IIIIV group is following:
1) heat blank with heating furnace, elder generation to 330-370 ℃, is incubated 5-6 hour with blank heating; Be heated to 620-660 ℃ with the heating rate that is not more than 30 ℃/h then; Be incubated 14-15 hour, and then be heated to 1180-1250 ℃, be incubated 20-30 hour with the heating rate that is not more than 40 ℃/h; The forging of can coming out of the stove, final forging temperature is not less than 950 ℃;
2) bar hold, jaw size and hydraulic press upset die coupling;
3) in advance pulling, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
4) jumping-up pulling when jumping-up is not in place, is returned stove insulation 16-20 hour, pulls out when not in place, returns stove insulation 2-4 hour, each drafts 50-150mm;
5) pulling blanking, each drafts 40-60mm pulls out when not in place, returns stove insulation 2-4 hour;
6) segmentation pulling pull out not in placely, returns stove insulation 1-2 hour, forges when crackle appears in blank surface in the process, in time carries out heat cleaning, and assurance width and depth ratio were greater than 6: 1 when crackle was cleared up;
7) finishing is positioned over the ventilation behind the finished product, accelerate to be cooled to room temperature.
CN201110158358.3A 2011-06-13 2011-06-13 A kind of stainless steel main nuclear power pipeline Forging Technology Active CN102825207B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110158358.3A CN102825207B (en) 2011-06-13 2011-06-13 A kind of stainless steel main nuclear power pipeline Forging Technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110158358.3A CN102825207B (en) 2011-06-13 2011-06-13 A kind of stainless steel main nuclear power pipeline Forging Technology

Publications (2)

Publication Number Publication Date
CN102825207A true CN102825207A (en) 2012-12-19
CN102825207B CN102825207B (en) 2015-12-02

Family

ID=47328637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110158358.3A Active CN102825207B (en) 2011-06-13 2011-06-13 A kind of stainless steel main nuclear power pipeline Forging Technology

Country Status (1)

Country Link
CN (1) CN102825207B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106041427A (en) * 2016-06-29 2016-10-26 宝钢特钢有限公司 Production method of cylindrical forging
CN108994230A (en) * 2018-07-16 2018-12-14 成都先进金属材料产业技术研究院有限公司 Method for manufacturing and its forging for 16Mn alloy structure steel forgings
CN109187864A (en) * 2018-09-06 2019-01-11 苏州热工研究院有限公司 Used in nuclear power station forges main pipeline manufacturing process assessment method
CN110125315A (en) * 2019-05-23 2019-08-16 二重(德阳)重型装备有限公司 The forging forming method of main pipeline pipe with asymmetric ozzle
CN110465616A (en) * 2019-08-15 2019-11-19 上海电气上重铸锻有限公司 A kind of forging method of super-section axis class austenite pipe control grain size
CN111644552A (en) * 2020-06-16 2020-09-11 建龙北满特殊钢有限责任公司 Forging method of multistage step roller with cone frustum
CN111889602A (en) * 2020-07-31 2020-11-06 河南中原特钢装备制造有限公司 Upsetting plate for improving electroslag ingot forging roll yield and forging method
CN115740314A (en) * 2022-11-24 2023-03-07 南京工程学院 Anti-cracking and energy-saving forging process for high-strength large-scale forging

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020136347A1 (en) * 2001-01-19 2002-09-26 Jeong Yong Hwan Method for manufacturing a tube and a sheet of niobium-containing zirconium alloy for a high burn-up nuclear fuel
JP2009299120A (en) * 2008-06-12 2009-12-24 Daido Steel Co Ltd MANUFACTURING METHOD OF Ni-Cr-Fe TERNARY SYSTEM ALLOY MATERIAL
CN101670416A (en) * 2008-09-09 2010-03-17 上海重型机器锻件厂 Forging molding method for million kilowatt nuclear power main pipe
CN101797623A (en) * 2009-12-31 2010-08-11 上海新闵重型锻造有限公司 Forging method of steam generator primary side connection pipe safety end and witness piece
CN101954439A (en) * 2010-08-17 2011-01-26 吉林省昊宇石化电力设备制造有限公司 Forging method of AP1000 nuclear-power main pipeline forging piece
CN101987342A (en) * 2009-08-07 2011-03-23 上海重型机器厂有限公司 Forging method of tube sheet of nuclear power equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020136347A1 (en) * 2001-01-19 2002-09-26 Jeong Yong Hwan Method for manufacturing a tube and a sheet of niobium-containing zirconium alloy for a high burn-up nuclear fuel
JP2009299120A (en) * 2008-06-12 2009-12-24 Daido Steel Co Ltd MANUFACTURING METHOD OF Ni-Cr-Fe TERNARY SYSTEM ALLOY MATERIAL
CN101670416A (en) * 2008-09-09 2010-03-17 上海重型机器锻件厂 Forging molding method for million kilowatt nuclear power main pipe
CN101987342A (en) * 2009-08-07 2011-03-23 上海重型机器厂有限公司 Forging method of tube sheet of nuclear power equipment
CN101797623A (en) * 2009-12-31 2010-08-11 上海新闵重型锻造有限公司 Forging method of steam generator primary side connection pipe safety end and witness piece
CN101954439A (en) * 2010-08-17 2011-01-26 吉林省昊宇石化电力设备制造有限公司 Forging method of AP1000 nuclear-power main pipeline forging piece

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106041427A (en) * 2016-06-29 2016-10-26 宝钢特钢有限公司 Production method of cylindrical forging
CN108994230A (en) * 2018-07-16 2018-12-14 成都先进金属材料产业技术研究院有限公司 Method for manufacturing and its forging for 16Mn alloy structure steel forgings
CN109187864A (en) * 2018-09-06 2019-01-11 苏州热工研究院有限公司 Used in nuclear power station forges main pipeline manufacturing process assessment method
CN109187864B (en) * 2018-09-06 2021-02-26 苏州热工研究院有限公司 Method for evaluating manufacturing process of forged main pipeline for nuclear power station
CN110125315A (en) * 2019-05-23 2019-08-16 二重(德阳)重型装备有限公司 The forging forming method of main pipeline pipe with asymmetric ozzle
CN110465616A (en) * 2019-08-15 2019-11-19 上海电气上重铸锻有限公司 A kind of forging method of super-section axis class austenite pipe control grain size
CN111644552A (en) * 2020-06-16 2020-09-11 建龙北满特殊钢有限责任公司 Forging method of multistage step roller with cone frustum
CN111644552B (en) * 2020-06-16 2021-09-14 建龙北满特殊钢有限责任公司 Forging method of multistage step roller with cone frustum
CN111889602A (en) * 2020-07-31 2020-11-06 河南中原特钢装备制造有限公司 Upsetting plate for improving electroslag ingot forging roll yield and forging method
CN111889602B (en) * 2020-07-31 2022-01-07 河南中原特钢装备制造有限公司 Upsetting plate for improving electroslag ingot forging roll yield and forging method
CN115740314A (en) * 2022-11-24 2023-03-07 南京工程学院 Anti-cracking and energy-saving forging process for high-strength large-scale forging
CN115740314B (en) * 2022-11-24 2023-05-16 南京工程学院 High-strength large forging anti-cracking energy-saving forging process

Also Published As

Publication number Publication date
CN102825207B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN102825207B (en) A kind of stainless steel main nuclear power pipeline Forging Technology
CN104722702B (en) Supercritical unit high temperature steam pipeline forging molding process
CN101954439A (en) Forging method of AP1000 nuclear-power main pipeline forging piece
CN102019334B (en) Forging method of main pipe blank with branch pipe nozzles used in nuclear power station
CN104439933B (en) Technological method for improving performance of large-diameter carbon steel cast and rolled flange part
CN103143659B (en) Hollow forging method of nuclear power main pipeline
CN101623719A (en) Method for manufacturing stainless steel heat transfer pipe of nuclear heat exchanger
CN102554084A (en) Forging method for water chamber head of steam generator of third-generation nuclear power station
CN102632182A (en) Forging molding process for integral hollow nuclear power main pipe
CN103817180A (en) Roller-type continuous cold roll forming method for light steel sheet piles CSPL2
CN101637780A (en) Method for producing titanium strip coil by adopting single-frame twelve-roller reversible cold-rolling mill set
CN104014594A (en) Method for overcoming post-cold-shearing lateral bending of gear steel bar
CN101934309A (en) Metal plate heating type roll bending forming method and device thereof
CN104624892B (en) A kind of method refining AP1000 Nuclear power plant main pipeline forging ozzle position crystal grain
CN105328110B (en) A kind of AP1000 one loop of nuclear power station main pipeline solid forging method
CN104001742A (en) Method for achieving controlled cooling on rolled pieces between and after bar finishing mill units
CN103599928A (en) Production method for rolling special pipeline steel through steckle mill
CN105525228A (en) Nuclear safety grade 316L stainless steel gauge pipe
CN102059272A (en) Method for horizontal continuous casting, Pilger rolling and continuous drawing of copper alloy condenser tube
CN103436677B (en) Production method of stainless steel tube specially used for double-tube plate heat exchanger
CN104525814A (en) Mold tooling for straight pipe forging stock for nuclear main pipe and forging method
CN107058684A (en) A kind of Technology for Heating Processing after the rolling for 12Cr1MoVG Steel Tube Specials
CN107377838A (en) A kind of nuclear power eliminates the forging method of mixed crystal with SA508Gr.4N steel heavy forging thickness section
CN104971960A (en) Method of producing super-thick steel plate through three-dimensional deformation of continuous casting billet
CN204934324U (en) A kind of main nuclear power pipeline blank ozzle boss punching die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant