CN101780519B CN2009102479556A CN200910247955A CN101780519B CN 101780519 B CN101780519 B CN 101780519B CN 2009102479556 A CN2009102479556 A CN 2009102479556A CN 200910247955 A CN200910247955 A CN 200910247955A CN 101780519 B CN101780519 B CN 101780519B
Authority
CN
China
Prior art keywords
forging
safe end
insulation
heated
trace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009102479556A
Other languages
Chinese (zh)
Other versions
CN101780519A (en
Inventor
王兴中
王元华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd
Original Assignee
SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd filed Critical SHANGHAI XIN MIN HEAVY DUTY FORGING CO Ltd
Priority to CN2009102479556A priority Critical patent/CN101780519B/en
Publication of CN101780519A publication Critical patent/CN101780519A/en
Application granted granted Critical
Publication of CN101780519B publication Critical patent/CN101780519B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relate to a forging method of a forge piece for the safe end of a reactor pressure vessel, belonging to the technical field of forging. The forging method comprises the following steps of: selecting a proper steel ingot; repeatedly upsetting-drawing the steel ingot at the temperature ranging from 1180 DEG C to 900 DEG C so that a forging ratio is not less than 4; and then sequentially carrying out property heat treatment and machining after the heat treatment to obtain a supporting seat forge piece. The forge piece for the safe end of the reactor pressure vessel, which is manufactured by using the forging method, has actual grain size finer than that a third grade and various property indexes reaching the standard requirements of a Radio Chemical Centre (RCC-M) and an American Society for Testing Material (ASTM), ensures the utilization requirements of the forge piece for the safe end of the reactor pressure vessel in a nuclear power station, greatly enhances the safety and the reliability of the forge piece and meets the technical requirements of such products.

Description

The forging method of forge piece for safe end of reactor pressure vessel
Technical field
The present invention relates to technical field of forging, especially relate to a kind of forging method that is used for nuclear power plant reactor pressure vessel safety end with forging
Background technology
In recent years, power shortages have become the bottleneck that the restriction China's economic grows continuously and fast, and as energy savings and the important behave of readjusting the energy structure, nuclear power has been included State Grid's development plan in.The history in year surplus the development of China's nuclear power cause existing 30 always based on research of nuclear power equipment and trial-production on a small scale, forms ripe manufacturing technology and produces equipment capability.Therefore, the nuclear power developing of China just develops towards high-power direction.
At present, the employed heavy casting and forging of million kilowatt nuclear power construction project, as be used for forge piece for safe end of reactor pressure vessel, because its special Service Environment is very high to the performance requirement of forging, general heat treatment method is handled can not reach standard.And present above-mentioned nuclear power can't be realized production domesticization with bearing support forge piece, multidirectionally abroad orders.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of forging method of forge piece for safe end of reactor pressure vessel is provided, and this method satisfies the forge piece for safe end of reactor pressure vessel of nuclear power station user demand by accurate setting forging and heat treatment period, temperature manufacturing.
In order to solve the problems of the technologies described above, the object of the invention realizes being finished by following technical scheme:
A kind of forging method of forge piece for safe end of reactor pressure vessel, described forging include discharge connection safe end, discharge connection safe end welding witness spare and entrance sleeve safe end, it is characterized in that having following steps:
A) selection has the steel ingot of following percentage by weight: trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities;
B) in 1180 ℃-900 ℃ temperature range, with in the step b) the workpiece that generates jumping-up-pulling repeatedly, round as a ball afterwards, punching, reaming, saddle support reaming, revise size and make forging ratio be not less than 4, be used for the base substrate of described forging with forging;
When the described billet surface temperature that c) generates in step b) is not higher than 500 ℃, described base substrate is heated to 1050 ℃-1060 ℃ temperature range and is incubated 3-6h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards;
D) base substrate that generates in the step c) is carried out machined to make described forging.
When described discharge connection safe end forged separately, the concrete steps of step b) were in its manufacture process:
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 4h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, pull out-jumping-up, the forging ratio of described upsetting process is 1.5, the forging ratio of described pulling process is 2.2;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also carries out jumping-up, round as a ball, and the forging ratio of described upsetting process is 1.7;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and punching, reaming;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
When described discharge connection safe end, discharge connection safe end welding witness spare forged as one, the concrete steps of step b) were in its manufacture process:
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.5;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.5;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
When described entrance sleeve safe end forged, the concrete steps of step b) were in its manufacture process:
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3.5h afterwards and make its temperature reach 1180 ℃, insulation 2.5h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.3;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.4;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.3.
When described discharge connection safe end forged separately, the temperature retention time of step c) was 3h in its manufacture process.
In the step c): after described base substrate is come out of the stove, be transported to the cooling medium time to be no more than 55s; The concrete grammar of described water-cooled is that described base substrate is immersed in the tank, and immersion depth is no less than 1.5M and moves up and down, described tank ON cycle water, and water temperature is not higher than 50 ℃ in it.
The obtained forging of described method at room temperature, its hot strength is 588-601Mpa, its yield strength of 0.2 is not less than 288Mpa, its contraction percentage of area Ψ is not less than 56%.
A kind of discharge connection safe end, it is characterized in that described discharge connection safe end is that above any described method is made, it is used for reactor pressure vessel, and described discharge connection safe end is a hollow circular ring, and its internal diameter is that 697mm, external diameter are that 950mm, width are 142mm.
A kind of discharge connection safe end welding witness spare, it is characterized in that described discharge connection safe end welding witness spare is to be made according to above any described method, it is used for reactor pressure vessel, described discharge connection safe end welding witness spare is a hollow circular ring, and its internal diameter is that 697mm, external diameter are that 950mm, width are 250mm.
A kind of entrance sleeve safe end, it is characterized in that described entrance sleeve safe end is to be made according to above any described method, it is used for reactor pressure vessel, and described entrance sleeve safe end is a hollow circular ring, and its internal diameter is that 659mm, external diameter are that 910mm, width are 142mm.
The invention has the beneficial effects as follows: adopt the prior austenite grain size of the forge piece for safe end of reactor pressure vessel of manufacturing of the present invention to be narrower than 3 grades, every performance indications all satisfy the standard-required of RCC-M and ASTM, guaranteed of the instructions for use of nuclear power plant reactor pressure vessel safety end with forging, its security, reliability are greatly promoted, satisfied the technical need of this series products.
Description of drawings
Fig. 1 is an embodiment of the invention discharge connection safe end cutaway view;
Cutaway view when Fig. 2 is embodiment of the invention discharge connection safe end and the forging of discharge connection safe end welding witness spare one;
Fig. 3 is an embodiment of the invention entrance sleeve safe end cutaway view.
The specific embodiment
The present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technical staff's of the same trade understanding:
As Figure 1-3, the forge piece for safe end of reactor pressure vessel of manufacturing of the present invention includes discharge connection safe end, discharge connection safe end welding witness spare and entrance sleeve safe end, the three is hollow circular ring, and wherein: the discharge connection internal diameter is that 697mm, external diameter are that 950mm, width are 142mm; Discharge connection safe end welding witness spare internal diameter is that 697mm, external diameter are that 950mm, width are 250mm; Entrance sleeve safe end internal diameter is that 659mm, external diameter are that 910mm, width are 142mm.
Because size, the weight of forging and the material of selecting for use thereof are determining the selection of each parameter of Forging Technology, so at above-mentioned forging, following examples are described in detail for the manufacturing process of this forging.
Embodiment 1: present embodiment is discharge connection safe end manufacturing process when forging separately:
1. material is selected:
Select 19 " square ingot, 2200Kg/ props up, these are 19 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 4h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, pull out-jumping-up, the forging ratio of described upsetting process is 1.5, the forging ratio of described pulling process is 2.2;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also carries out jumping-up, round as a ball, and the forging ratio of described upsetting process is 1.7;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and punching, reaming;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1050 ℃ temperature range and is incubated 3h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 2: present embodiment is discharge connection safe end manufacturing process when forging separately:
1. material is selected:
Select 19 " square ingot, 2200Kg/ props up, these are 19 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 4h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, pull out-jumping-up, the forging ratio of described upsetting process is 1.5, the forging ratio of described pulling process is 2.2;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also carries out jumping-up, round as a ball, and the forging ratio of described upsetting process is 1.7;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and punching, reaming;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1060 ℃ temperature range and is incubated 3h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 3: present embodiment is discharge connection safe end manufacturing process when forging separately:
1. material is selected:
Select 19 " square ingot, 2200Kg/ props up, these are 19 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 4h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, pull out-jumping-up, the forging ratio of described upsetting process is 1.5, the forging ratio of described pulling process is 2.2;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also carries out jumping-up, round as a ball, and the forging ratio of described upsetting process is 1.7;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and punching, reaming;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1055 ℃ temperature range and is incubated 3h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 4: present embodiment is the discharge connection safe end, manufacturing process when discharge connection safe end welding witness spare forges as one:
1. material is selected:
Select 20 " square ingot, 2700Kg/ props up, these are 20 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.5;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.5;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1050 ℃ temperature range and is incubated 3h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 5: present embodiment is the discharge connection safe end, manufacturing process when discharge connection safe end welding witness spare forges as one:
1. material is selected:
Select 20 " square ingot, 2700Kg/ props up, these are 20 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.5;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.5;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1060 ℃ temperature range and is incubated 6h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 6: present embodiment is the discharge connection safe end, manufacturing process when discharge connection safe end welding witness spare forges as one:
1. material is selected:
Select 20 " square ingot, 2700Kg/ props up, these are 20 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.5;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.5;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1055 ℃ temperature range and is incubated 4.5h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 7: present embodiment is entrance sleeve safe end manufacturing process when forging separately:
1. material is selected:
Select 22 " square ingot, 2930Kg/ props up, these are 22 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3.5h afterwards and make its temperature reach 1180 ℃, insulation 2.5h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.3;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.4;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.3.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1050 ℃ temperature range and is incubated 3h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 8: present embodiment is entrance sleeve safe end manufacturing process when forging separately:
1. material is selected:
Select 22 " square ingot, 2930Kg/ props up, these are 22 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3.5h afterwards and make its temperature reach 1180 ℃, insulation 2.5h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.3;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.4;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.3.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1060 ℃ temperature range and is incubated 6h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
Embodiment 9: present embodiment is entrance sleeve safe end manufacturing process when forging separately:
1. material is selected:
Select 22 " square ingot, 2930Kg/ props up, these are 22 years old " chemical composition of square ingot should meet following regulation:
Trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities.
2. forge:
The head of ingot, ingot tail excision percentage: butt ingot 17%, back-end crop 8%.
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3.5h afterwards and make its temperature reach 1180 ℃, insulation 2.5h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.3;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.4;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.3.
3. property heat treatment:
When the billet surface temperature is not higher than 500 ℃ after forging, base substrate is heated to 1055 ℃ temperature range and is incubated 4.5h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards.
Key points for operation:
1. after workpiece is come out of the stove, workpiece handling to the cooling medium time is no more than 55 seconds.
2. when workpiece is gone into water cooling, ON cycle water, the water yield is opened greatly as far as possible; Water temperature≤50 ℃.
3. workpiece is immersed tank, immersion depth 〉=1.5M also moves up and down.
4. machined after the heat treatment: base substrate carries out machined to make described discharge connection safe end.
For the removal of defect area, under the requirement that does not influence the forging mechanical property, allow to forbid on forging, to carry out any repair welding with polishing method removal of defects.
After adopting technical scheme among above-mentioned 9 embodiment to complete, test to obtain data shown in the following table for forging:
Figure G2009102479556D00201
Metal lographic examination
Grain size
The evaluation of forging material grains degree is carried out according to the regulation of ASTM E112, and the prior austenite grain size of forging is narrower than 5 grades.
Non-metallic inclusion
Press the non-metallic inclusion rank of ASTM E45 standard test forging, evaluation result satisfies following regulation:
Category-A (sulfide-based)≤1.5 grade;
Category-B (alumina type)≤1.5 grade;
C class (silicates)≤1.5 grade;
D class (spherical oxide class)≤1.5 grades.

Claims (10)

1. the forging method of a forge piece for safe end of reactor pressure vessel, described forging include discharge connection safe end, discharge connection safe end welding witness spare and entrance sleeve safe end, it is characterized in that having following steps:
A) selection has the steel ingot of following percentage by weight: trace≤C≤0.35%, trace≤Si≤0.80%, trace≤Mn≤2.00%, trace≤P≤0.020%, trace≤S≤0.015%, 11.50%≤Ni≤12.50%, 17.00≤Gr≤18.20%, 2.25%≤Mo≤2.75%, trace≤N≤0.080%, trace≤B≤0.0010%, trace≤Cu≤0.50%, trace≤Co≤0.10%, trace≤Nb+Ta≤0.15%, surplus is Fe and unavoidable impurities;
B) in 900 ℃-1180 ℃ temperature range, with the jumping-up-pulling repeatedly of selected steel ingot in the step a), round as a ball afterwards, punching, reaming, saddle support reaming, revise size and make forging ratio be not less than 4, be used for the base substrate of described forging with forging;
When the described billet surface temperature that c) generates in step b) is not higher than 500 ℃, described base substrate is heated to 1050 ℃-1060 ℃ temperature range and is incubated 3-6h, water-cooled is not come out of the stove to not being higher than 100 ℃ afterwards;
D) base substrate that generates in the step c) is carried out machined to make described forging.
2. the forging method of a kind of forge piece for safe end of reactor pressure vessel according to claim 1, it is characterized in that: when described discharge connection safe end forged separately, the concrete steps of step b) were in its manufacture process:
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 4h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, pull out-jumping-up, the forging ratio of described upsetting process is 1.5, the forging ratio of described pulling process is 2.2;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also carries out jumping-up, round as a ball, and the forging ratio of described upsetting process is 1.7;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and punching, reaming;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
3. the forging method of a kind of forge piece for safe end of reactor pressure vessel according to claim 1, it is characterized in that: when described discharge connection safe end, discharge connection safe end welding witness spare forged as one, the concrete steps of step b) were in its manufacture process:
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3h afterwards and make its temperature reach 1180 ℃, insulation 2h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.5;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.5;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.4.
4. the forging method of a kind of forge piece for safe end of reactor pressure vessel according to claim 1 is characterized in that: when described entrance sleeve safe end forged, the concrete steps of step b) were in its manufacture process:
1) described steel ingot is heated to 450 ℃, insulation 2h; Heat 3h afterwards and make its temperature reach 800 ℃, insulation 5h; Heat 3.5h afterwards and make its temperature reach 1180 ℃, insulation 2.5h, and in this process, carry out jumping-up, the forging ratio of described upsetting process is 1.3;
2) workpiece that generates in the step 1) is heated to 1180 ℃, insulation 2h also pulls out, and the forging ratio of described pulling process is 2.1;
3) with step 2) in the workpiece that generates be heated to 1180 ℃, be incubated 2h and also carry out jumping-up, the forging ratio of described upsetting process is 1.4;
4) workpiece that generates in the step 3) is heated to 1180 ℃, insulation 2h and punching, reaming;
5) workpiece that generates in the step 4) is heated to 1180 ℃, insulation 1.5h and saddle support reaming, correction size, the forging ratio of described saddle support reaming, correction dimension process is 1.3.
5. the forging method of a kind of forge piece for safe end of reactor pressure vessel according to claim 1, it is characterized in that: when described discharge connection safe end forged separately, the temperature retention time of step c) was 3h in its manufacture process.
6. a kind of forging method of forge piece for safe end of reactor pressure vessel according to claim 1 or 5 is characterized in that in the step c): after described base substrate is come out of the stove, be transported to the cooling medium time to be no more than 55s; The concrete grammar of described water-cooled is that described base substrate is immersed in the tank, and immersion depth is no less than 1.5m and moves up and down, described tank ON cycle water, and water temperature is not higher than 50 ℃ in it.
7. the forging method of a kind of forge piece for safe end of reactor pressure vessel according to claim 1, it is characterized in that the obtained forging of described method at room temperature, its hot strength is 588-601Mpa, and its yield strength of 0.2 is not less than 288Mpa, and its contraction percentage of area Ψ is not less than 56%.
8. discharge connection safe end, it is characterized in that described discharge connection safe end is to be made according to any one described method in the claim 1,2,3 or 6, it is used for reactor pressure vessel, described discharge connection safe end is a hollow circular ring, and its internal diameter is that 697mm, external diameter are that 950mm, width are 142mm.
9. a discharge connection safe end welds witness spare, it is characterized in that described discharge connection safe end welding witness spare is to be made according to any one described method in the claim 1,3 or 6, it is used for reactor pressure vessel, described discharge connection safe end welding witness spare is a hollow circular ring, and its internal diameter is that 697mm, external diameter are that 950mm, width are 250mm.
10. entrance sleeve safe end, it is characterized in that described entrance sleeve safe end is to be made according to any one described method in the claim 1,4 or 6, it is used for reactor pressure vessel, described entrance sleeve safe end is a hollow circular ring, and its internal diameter is that 659mm, external diameter are that 910mm, width are 142mm.
CN2009102479556A 2009-12-31 2009-12-31 Forging method of forge piece for safe end of reactor pressure vessel Active CN101780519B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102479556A CN101780519B (en) 2009-12-31 2009-12-31 Forging method of forge piece for safe end of reactor pressure vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102479556A CN101780519B (en) 2009-12-31 2009-12-31 Forging method of forge piece for safe end of reactor pressure vessel

Publications (2)

Publication Number Publication Date
CN101780519A CN101780519A (en) 2010-07-21
CN101780519B true CN101780519B (en) 2011-09-21

Family

ID=42520730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102479556A Active CN101780519B (en) 2009-12-31 2009-12-31 Forging method of forge piece for safe end of reactor pressure vessel

Country Status (1)

Country Link
CN (1) CN101780519B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102319855A (en) * 2011-08-27 2012-01-18 江阴振宏重型锻造有限公司 Method for forging thick-walled ring-shaped parts
CN109961859A (en) * 2017-12-14 2019-07-02 中国核动力研究设计院 A kind of nuclear power main equipment safe end and its manufacturing process

Also Published As

Publication number Publication date
CN101780519A (en) 2010-07-21

Similar Documents

Publication Publication Date Title
CN101722406B (en) Method for manufacturing pin shaft through forging
CN102371471B (en) Method for manufacturing pipe tower type pylon for wind power generation
CN101767177B (en) Method for forging bearing support forge piece
CN101623719B (en) Method for manufacturing stainless steel heat transfer pipe of nuclear heat exchanger
CN103290192B (en) Thermal treatment process of spliced-welding type large tube plate forging of pressure container
CN104532097B (en) High-strength high corrosion-resistant nickel-base high temperature alloy and solid-solution and aging heat treatment method thereof
CN102392195A (en) High-strength high-toughness nuclear power pressure vessel forging steel and its manufacturing method
CN101774107B (en) Method for forging Venturi tubes
CN109822024A (en) A kind of forging and heat treatment process of 750 DEG C of grades high temperature alloy forging
CN104498843A (en) Ferritic stainless steel and manufacturing method for valve disc forge piece by using same
CN103361570B (en) Heat treatment technology aartensite stainless steel annular forging
CN105252230A (en) Machining process for inclined tee
CN101767179B (en) Method for forging screw and nut
CN103789684A (en) Driving rod of driving mechanism of nuclear power station control rod and preparation method thereof
CN101701315B (en) Manufacturing method of submerged pipeline steel pipe
CN103695809A (en) Travel sleeve of control rod drive mechanism for nuclear power plant and preparation method thereof
CN110404972B (en) Production method of seamless steel tube with diameter of 1422mm
CN101780519B (en) Forging method of forge piece for safe end of reactor pressure vessel
CN115502610A (en) Welding wire steel wire containing vanadium and titanium for high-strength steel, welding wire for high-strength steel and production method of welding wire
CN115502609A (en) Niobium-titanium-containing welding wire steel for high-strength steel welding wire for water and high-strength steel and production method thereof
CN112251666A (en) Austenitic stainless steel forging for spent fuel post-treatment and manufacturing method thereof
CN103695810A (en) Sleeve shaft of control rod drive mechanism (CRDM) in nuclear power plant and preparation method thereof
CN101797623A (en) Forging method of steam generator primary side connection pipe safety end and witness piece
CN101745786B (en) Forging method of water supply connecting tube and secondary side manhole
CN112126867A (en) Main shaft forging for large tidal current energy generator set and manufacturing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant