CN101793008A - Construction method of multiple sections of adjacent bridges - Google Patents

Construction method of multiple sections of adjacent bridges Download PDF

Info

Publication number
CN101793008A
CN101793008A CN 201010121169 CN201010121169A CN101793008A CN 101793008 A CN101793008 A CN 101793008A CN 201010121169 CN201010121169 CN 201010121169 CN 201010121169 A CN201010121169 A CN 201010121169A CN 101793008 A CN101793008 A CN 101793008A
Authority
CN
China
Prior art keywords
bridge
support
column
dolly
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010121169
Other languages
Chinese (zh)
Inventor
张海奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANTONG BUILDING Co Ltd
Original Assignee
ANTONG BUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANTONG BUILDING Co Ltd filed Critical ANTONG BUILDING Co Ltd
Priority to CN 201010121169 priority Critical patent/CN101793008A/en
Publication of CN101793008A publication Critical patent/CN101793008A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a construction method of multiple sections of adjacent bridges. In the method, various rows of stand columns are transversely and longitudinally fixedly connected to ensure that the stand columns, beams and stringers form a stable bracket integration, thus only templates at the other side need to be disassembled so as to ensure that the disassembly and assembly workload of a mould bridge is halved, thereby greatly reducing the disassembly and assembly workload of the bridge templates, further shortening the work period and improving the working efficiency.

Description

Construction method of multiple sections of adjacent bridges
Technical field
The present invention relates to a kind of bridge pouring construction method, specifically is a kind of construction method of multiple sections of adjacent bridges.
Background technology
Need use stent support bridge mould when bridge is built, the post and beam support is the comparatively frequent a kind of form of using during bridge is built.Existing post and beam support is mainly reassembling type, it is made up of foundation, the rack device that falls, column, crossbeam and longeron, its operating principle is: column is supported on the foundation by the rack device that falls of sand bucket form, crossbeam is installed on the column, many row's longerons are installed on the crossbeam again, by crisscross supporting bridge beam mould, realize the support that bridge is built.But support can't move, whenever after building one section bridge, need support is dismantled fully, be transported to the position that other need be built, can build other one section bridge after re-assemblying, and because its piece volumes and weight are all very big, dismounting and carrying, assembling bother very all, need employ a large amount of equipment, manpower and time, have a strong impact on the cycle and the efficient of construction.
Summary of the invention
The purpose of this invention is to provide a kind of construction method of multiple sections of adjacent bridges, this job practices can effectively shorten the construction period.
In order to achieve the above object, technical scheme of the present invention is: a kind of construction method of multiple sections of adjacent bridges is characterized in that may further comprise the steps:
A at first assembles the support of post and beam, installs and fix the mould of bridge then thereon, builds one section bridge;
B, treat bridge solidification forming that step a builds after, then regulate rack device, support is descended makes bridge mould and bridge throw off and dismounting bridge mould;
C, with hydraulic cylinder or fill in the column of back-up block supporting bracket, the rack device that will fall takes out, ground way on foundation, the slideway horizontal expansion connects the casting position of laterally contiguous advertisement advertisement jingle bridge section, in slideway, put into dolly, remove back-up block or hydraulic cylinder, column is seated on the dolly;
D, the pulling dolly makes dolly carry support integral body along the traversing casting position to next bridge of transverse slipway;
E reuses the column of hydraulic cylinder supporting bracket behind the back-up block, and dolly and slideway are shifted out, and fills in rack device below column, and regulator solution cylinder pressure or back-up block removed makes column be supported by the rack device that falls and gets final product;
F installs the bridge mould once more and builds bridge above support;
G repeats above-mentioned steps B, C, D, E, F successively, finishes all bridge sections of same row and builds;
H, horizontal adjacent bridge section with row all build finish after, place column on the travelling car once more as stated above again, support integral body is pulled to the adjacent bridge of multistage one side and lays on the sidewalk of the consistent longitudinal extension of direction with bridge, is that dolly moves longitudinally to the corresponding position of next section of bridge casting position along sidewalk with support integral body;
I, horizontal traversing carriage to bridge casting position is put stent support in the perforation of the horizontal expansion of this section bridge bottom laterally on the casting position foundation of each contiguous bridge section by the chord position that falls, and the bridge mould is installed on support subsequently and is built;
J repeats above-mentioned steps b---i successively, finishes building of multiple sections of adjacent bridges.
The present invention adopts with each row's column laterally, vertically connect firmly mutually, makes column, crossbeam and longeron be a firm support integral body.Therefore the present invention's template that only need dismantle opposite side gets final product, and makes the disassemble and assemble work amount of mould bridge reduce by half, and has reduced the disassemble and assemble work amount of bridge template significantly, has further shortened the work period, has improved working efficiency.
The specific embodiment
At first assemble the support of post and beam, install and fix the mould of bridge then thereon, build one section bridge; After treating above-mentioned bridge solidification forming of building, then regulate rack device, support is descended make bridge mould and bridge throw off and dismounting bridge mould; With hydraulic cylinder or fill in the column of back-up block supporting bracket, the rack device that will fall takes out, ground way on foundation, the slideway horizontal expansion connects the casting position of laterally contiguous advertisement advertisement jingle bridge section, in slideway, put into dolly, remove back-up block or hydraulic cylinder, column is seated on the dolly; The pulling dolly makes dolly carry support integral body along the traversing casting position to next bridge of transverse slipway; Reuse the column of hydraulic cylinder supporting bracket behind the back-up block, dolly and slideway are shifted out, fill in rack device below column, regulator solution cylinder pressure or back-up block removed makes column be supported by the rack device that falls and gets final product; The bridge mould is installed above support once more and is built bridge;
Repeat above-mentioned steps successively, finish all bridge sections of same row and build.Horizontal adjacent bridge section with row all build finish after, place column on the travelling car once more as stated above again, support integral body is pulled to the adjacent bridge of multistage one side and lays on the sidewalk of the consistent longitudinal extension of direction with bridge, is that dolly moves longitudinally to the corresponding position of next section of bridge casting position along sidewalk with support integral body; Horizontal traversing carriage to bridge casting position is put stent support in the perforation of the horizontal expansion of this section bridge bottom laterally on the casting position foundation of each contiguous bridge section by the chord position that falls, and the bridge mould is installed on support subsequently and is built; Repeat the process of above-mentioned horizontal foundation traversing carriage successively, just can finish building of multiple sections of adjacent bridges.

Claims (1)

1. construction method of multiple sections of adjacent bridges is characterized in that may further comprise the steps:
A at first assembles the support of post and beam, installs and fix the mould of bridge then thereon, builds one section bridge;
B, treat bridge solidification forming that step a builds after, then regulate rack device, support is descended makes bridge mould and bridge throw off and dismounting bridge mould;
C, with hydraulic cylinder or fill in the column of back-up block supporting bracket, the rack device that will fall takes out, ground way on foundation, the slideway horizontal expansion connects the casting position of laterally contiguous advertisement advertisement jingle bridge section, in slideway, put into dolly, remove back-up block or hydraulic cylinder, column is seated on the dolly;
D, the pulling dolly makes dolly carry support integral body along the traversing casting position to next bridge of transverse slipway;
E reuses the column of hydraulic cylinder supporting bracket behind the back-up block, and dolly and slideway are shifted out, and fills in rack device below column, and regulator solution cylinder pressure or back-up block removed makes column be supported by the rack device that falls and gets final product;
F installs the bridge mould once more and builds bridge above support;
G repeats above-mentioned steps B, C, D, E, F successively, finishes all bridge sections of same row and builds;
H, horizontal adjacent bridge section with row all build finish after, place column on the travelling car once more as stated above again, support integral body is pulled to the adjacent bridge of multistage one side and lays on the sidewalk of the consistent longitudinal extension of direction with bridge, is that dolly moves longitudinally to the corresponding position of next section of bridge casting position along sidewalk with support integral body;
I, horizontal traversing carriage to bridge casting position is put stent support in the perforation of the horizontal expansion of this section bridge bottom laterally on the casting position foundation of each contiguous bridge section by the chord position that falls, and the bridge mould is installed on support subsequently and is built;
J repeats above-mentioned steps b---i successively, finishes building of multiple sections of adjacent bridges.
CN 201010121169 2010-03-10 2010-03-10 Construction method of multiple sections of adjacent bridges Pending CN101793008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010121169 CN101793008A (en) 2010-03-10 2010-03-10 Construction method of multiple sections of adjacent bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010121169 CN101793008A (en) 2010-03-10 2010-03-10 Construction method of multiple sections of adjacent bridges

Publications (1)

Publication Number Publication Date
CN101793008A true CN101793008A (en) 2010-08-04

Family

ID=42585905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010121169 Pending CN101793008A (en) 2010-03-10 2010-03-10 Construction method of multiple sections of adjacent bridges

Country Status (1)

Country Link
CN (1) CN101793008A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735143A (en) * 2016-04-29 2016-07-06 夏玉娟 Bridge deck construction device and bridge deck construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5740575A (en) * 1995-09-29 1998-04-21 Gordon; Julian D. Ramp systems
CN101280549A (en) * 2008-05-28 2008-10-08 中铁十二局集团有限公司 Construction method of mobile type bracket subsection cast-in-situ continuous beam
CN101532336A (en) * 2009-04-15 2009-09-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Beam-column type support and method for constructing multi-section adjacent bridges using same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5740575A (en) * 1995-09-29 1998-04-21 Gordon; Julian D. Ramp systems
CN101280549A (en) * 2008-05-28 2008-10-08 中铁十二局集团有限公司 Construction method of mobile type bracket subsection cast-in-situ continuous beam
CN101532336A (en) * 2009-04-15 2009-09-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Beam-column type support and method for constructing multi-section adjacent bridges using same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735143A (en) * 2016-04-29 2016-07-06 夏玉娟 Bridge deck construction device and bridge deck construction method
CN107151981A (en) * 2016-04-29 2017-09-12 夏玉娟 Bridge floor constructing device and its construction method
CN107151981B (en) * 2016-04-29 2019-05-31 东阳市天齐知识产权运营有限公司 The construction method of bridge floor constructing device

Similar Documents

Publication Publication Date Title
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN104097253B (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN202544854U (en) Lining trolley for subway station
CN202830776U (en) Bridge variable cross-section rectangular high pier cantilever creeping formwork construction device
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN107630709B (en) A kind of construction method of the mobile trolley of bored tunnel construction
CN108643938B (en) Smooth surface shotcrete supporting structure of deep coal mine tunnel and construction method thereof
CN104763446A (en) Multi-functional trolley for subway station construction
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN105350454A (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN108103945A (en) A kind of whole landing mould bases of cast-in-situ box girder
CN201627587U (en) Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN205400756U (en) Variable section platform truck
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN106150525A (en) A kind of rock anchorage beam construction trolley and construction method thereof
CN203878979U (en) Bolt opposite-pulling type track sliding formwork
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN101793008A (en) Construction method of multiple sections of adjacent bridges
CN103866699A (en) Rail-free type walking hanging basket
CN206111212U (en) Rock -anchored beam construction trolley car
CN206329347U (en) A kind of lining trolley for metro station construction
CN109944164A (en) Jack up hollow thin-walled high pier roller die system and its construction method
CN110883920B (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN201358794Y (en) Combined type concrete construction arch pattern

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100804