CN101770445A - 变电站无功补偿容量的多元线性回归计算方法 - Google Patents

变电站无功补偿容量的多元线性回归计算方法 Download PDF

Info

Publication number
CN101770445A
CN101770445A CN200810205270A CN200810205270A CN101770445A CN 101770445 A CN101770445 A CN 101770445A CN 200810205270 A CN200810205270 A CN 200810205270A CN 200810205270 A CN200810205270 A CN 200810205270A CN 101770445 A CN101770445 A CN 101770445A
Authority
CN
China
Prior art keywords
substation
reactive compensation
multiple linear
reactive
regression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810205270A
Other languages
English (en)
Other versions
CN101770445B (zh
Inventor
李昌
陈毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Great Energy Technology Co.,Ltd.
Original Assignee
SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRISE POWER AUTOMATION CO Ltd filed Critical SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority to CN 200810205270 priority Critical patent/CN101770445B/zh
Publication of CN101770445A publication Critical patent/CN101770445A/zh
Application granted granted Critical
Publication of CN101770445B publication Critical patent/CN101770445B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Abstract

一种变电站无功补偿容量的多元线性回归计算方法,涉及数据处理技术领域;所要解决的是运行或者改造变电站无功补偿装置容量如何计算的技术问题;该回归计算方法的步骤包括:1)观测变电站所在区域的自变量值;2)获取变电站的无功实时值Yrealreactive,生成多元线性观测值Y;3)建立多元线性方程式;4)对变电站获取M(M>>4)组数据,采用最小二乘方法估计回归系数b0,b1,...,b6;5)对变电站自变量输入一组典型方式下的运行数据,根据本发明计算的回归系数求得因变量无功补偿容量y;6)对一系列时段求取多组回归系数,得到无功补偿向量,求取无功补偿容量的数学期望。本发明具有能对变电站的无功补偿装置运行、改造提供容量参考数值依据的特点。

Description

变电站无功补偿容量的多元线性回归计算方法
技术领域
本发明涉及数据处理技术,特别是涉及一种用于电力系统的变电站无功补偿优化处理技术。
背景技术
多元线性回归分析是指:根据因变量与多个自变量的实际观测值建立因变量对多个自变量的多元线性回归方程。
存在如下多元线性回归的方程:
Y=a+bX
式中,X(x1、x2、...、xm)为可以观测的一组变量(或为可以观测的随机变量);Y为可以观测的随机变量,随x1、x2、...、xm而变,受试验误差影响;为相互独立且都服从的随机变量。我们可以根据实际观测值对以及方差作出估计。
描述变量Y一般采用经典的最小二乘(least squares)原则:每个观察点距离回归线的纵向距离的平方和最小:
y=b0+b1x1+b2x2+…+bmxm
上式(2)称为回归方程,其中b0,b1,…,bm为多元回归系数、x1、x2、...、xm为可以观测的一组变量,y为变量。
采用最小二乘原则来估计多元回归系数b0,b1,…,bm,就得到回归方程,进而求解变量y。
多元线性回归用于处理因变量与多个自变量之间的关系,可以估计出我们关心的因变量。
变电站无功补偿容量的计算一直是一个工程难题,在国内外一般采用经验数据,经验数据忽视了季节、负荷等变化,在实际变电站自动电压控制中,补偿的容量没有数值方法求解,即使根据经验还会导致电容器组容量频繁的调整,在工程上难以实现。在国内,对变电站进行无功补偿,成熟、实用数值的求解方法还未见报道。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是提供一种能对无功补偿容量进行估计,从而给变电站改造提供一个参考的数值依据的变电站无功补偿容量的多元线性回归计算方法。
为了解决上述技术问题,本发明所提供的一种变电站无功补偿容量的多元线性回归计算方法,其特征在于,回归计算方法的步骤:
1)观测变电站所在区域的自变量值:区域负荷Xarea、变电站负荷Xst、变电站母线电压Xvol、电容器组产生无功Xcap、低端线路无功补偿Xline、发电机组无功补偿Xgen
2)获取变电站的无功实时值Yrealreactive,生成多元线性观测值Y;
3)令y=b0+b1Xarea+b2Xst+b3Xvol+b4Xca+b5Xline+b6Xgen,建立多元线性方程式;
4)对变电站获取M(M>>4)组数据,采用最小二乘方法估计回归系数b0,b1,…,b6
5)在典型运行方式下,对变电站自变量输入一组的运行数据,根据回归系数求得因变量无功补偿容量y;
6)对一系列时段求取多组回归系数,得到无功补偿向量,求取无功补偿容量的数学期望。
利用本发明提供的变电站无功补偿容量的多元线性回归计算方法,由于采用最小二乘估计中得到的回归系数b0,b1,…,b6,可以快速的求解出一组设定值的无功补偿容量值,以便用于变电站电容器组的容量改造。
附图说明
图1为本发明实施例变电站无功补偿容量的多元线性回归计算流程图。
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述,但本实施例并不用于限制本发明,凡是采用本发明的相似方法及其相似变化,均应列入本发明的保护范围。
本发明实施例的变电站无功补偿容量的多元线性回归计算方法,对影响变电站无功补偿容量的相关变量,建立线性回归方程进行估计,从而得出一个可行的数值解。根据电力系统的变电站负荷影响情况,相关变量有区域负荷、变电站负荷、变电站母线电压、电容器组产生无功、低端线路无功补偿、发电机组无功补偿等。
由图1所示,本发明实施例所提供的一种,其特点是,方法具体步骤如下:
1)观测变电站所在区域的自变量值:区域负荷Xarea、变电站负荷Xst、变电站母线电压Xvol、电容器组产生无功Xcap、低端线路无功补偿Xline、发电机组无功补偿Xgen
2)获取变电站的无功实时值Yrealreactive,生成多元线性观测值Y;
3)令y=b0+b1Xarea+b2Xst+b3Xvol+b4Xca+b5Xline+b6Xgen,建立多元线性方程式;
4)对变电站获取M(M>>4)组数据,采用最小二乘方法估计回归系数b0,b1,…,b6
5)在没有特殊事件、没有极端气候、正常工作时间的典型方式下,对变电站自变量输入一组的运行数据,根据回归系数b0,b1,…,b6求得因变量无功补偿容量y;
6)对一系列时段求取多组回归系数,得到无功补偿向量,求取无功补偿容量的数学期望。

Claims (1)

1.一种变电站无功补偿容量的多元线性回归计算方法,其特征在于,回归计算方法的步骤:
1)观测变电站所在区域的自变量值:区域负荷Xarea、变电站负荷Xst、变电站母线电压Xvol、电容器组产生无功Xcap、低端线路无功补偿Xline、发电机组无功补偿Xgen
2)获取变电站的无功实时值Yrealreactive,生成多元线性观测值Y;
3)令y=b0+b1Xarea+b2Xst+b3Xvol+b4Xcap+b5Xline+b6Xgen,建立多元线性方程式;
4)对变电站获取M(M>>4)组数据,采用最小二乘方法估计回归系数b0,b1,…,b6
5)对变电站自变量输入一组典型方式下的运行数据,根据本发明计算的回归系数求得因变量无功补偿容量y;
6)对一系列时段求取多组回归系数,得到无功补偿向量,求取无功补偿容量的数学期望。
CN 200810205270 2008-12-31 2008-12-31 变电站无功补偿容量的多元线性回归计算方法 Active CN101770445B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810205270 CN101770445B (zh) 2008-12-31 2008-12-31 变电站无功补偿容量的多元线性回归计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810205270 CN101770445B (zh) 2008-12-31 2008-12-31 变电站无功补偿容量的多元线性回归计算方法

Publications (2)

Publication Number Publication Date
CN101770445A true CN101770445A (zh) 2010-07-07
CN101770445B CN101770445B (zh) 2012-10-17

Family

ID=42503312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810205270 Active CN101770445B (zh) 2008-12-31 2008-12-31 变电站无功补偿容量的多元线性回归计算方法

Country Status (1)

Country Link
CN (1) CN101770445B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103197692A (zh) * 2013-04-12 2013-07-10 莱芜钢铁集团有限公司 一种流量控制方法、装置及系统
CN103323672A (zh) * 2013-05-27 2013-09-25 云南电力试验研究院(集团)有限公司电力研究院 一种并联电力电容器的在线谐振预警装置与方法
CN108334680A (zh) * 2018-01-22 2018-07-27 陈波 两等高避雷针间保护范围最小宽度的获取方法
CN111585276A (zh) * 2020-05-18 2020-08-25 国网重庆市电力公司电力科学研究院 一种pss参数在线整定方法、装置及可读存储介质

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103197692A (zh) * 2013-04-12 2013-07-10 莱芜钢铁集团有限公司 一种流量控制方法、装置及系统
CN103197692B (zh) * 2013-04-12 2016-04-06 莱芜钢铁集团有限公司 一种流量控制方法、装置及系统
CN103323672A (zh) * 2013-05-27 2013-09-25 云南电力试验研究院(集团)有限公司电力研究院 一种并联电力电容器的在线谐振预警装置与方法
CN103323672B (zh) * 2013-05-27 2016-03-16 云南电力试验研究院(集团)有限公司电力研究院 一种并联电力电容器的在线谐振预警装置与方法
CN108334680A (zh) * 2018-01-22 2018-07-27 陈波 两等高避雷针间保护范围最小宽度的获取方法
CN111585276A (zh) * 2020-05-18 2020-08-25 国网重庆市电力公司电力科学研究院 一种pss参数在线整定方法、装置及可读存储介质
CN111585276B (zh) * 2020-05-18 2021-08-17 国网重庆市电力公司电力科学研究院 一种pss参数在线整定方法、装置及可读存储介质

Also Published As

Publication number Publication date
CN101770445B (zh) 2012-10-17

Similar Documents

Publication Publication Date Title
CN101770445B (zh) 变电站无功补偿容量的多元线性回归计算方法
US20120283967A1 (en) State-matrix-independent dynamic process estimation method in real-time for weakly observable measurement nodes without pmu
Jain et al. Power system tracking and dynamic state estimation
AT512003A2 (de) Verfahren zur Ermittlung eines regelungstechnischen Beobachters für den SoC
CN108370157A (zh) 控制电力分配的方法
WO2012139658A2 (de) Niederspannungsverteilnetz und verfahren zu dessen betrieb
EP2549280A1 (de) System und Verfahren zur Bestimmung elektrischer Kenngrössen
Gao et al. On-line dynamic state estimation of power systems
CN105488572A (zh) 一种配电设备健康状态评价方法
CN101593976A (zh) 一种同杆并架双回输电线路物理模型的构建方法
CN104767207A (zh) 基于发电机无功储备灵敏度的电压稳定预防控制方法
Echternacht et al. Optimized positioning of measurements in distribution grids
CN111553080B (zh) 一种配电台区负荷动态等值非机理模型参数闭环辨识方法
CN107179758B (zh) 一种动态信号参数辨识方法及系统
CN105470951A (zh) 一种基于大数据挖掘技术的配电网可靠供电能力评估方法
Chitsazan et al. State estimation of IEEE 14 bus with unified interphase power controller (UIPC) using WLS method
CN103618309B (zh) 电网中误差参数的调节方法和系统
Hussaini et al. Artificial neural network aided cable resistance estimation in droop-controlled islanded DC microgrids
CN107025500A (zh) 主动配电网量测设备关键部署位置的识别方法
Yusuf et al. Predicting Voltage Changes in Low-Voltage Secondary Networks using Deep Neural Networks
CN114329691A (zh) 一种基础施工占地面积计算方法、计算机设备和存储介质
EP3047291B1 (de) Verfahren und anordnung zum ermitteln der elektrischen eigenschaften einer windenergieanlage
CN104901315A (zh) 电网减载方法和系统
CN103679553B (zh) 电网状态估计系统的评估方法和系统
CN103346565B (zh) 基于向量有向图的电网薄弱节点辨识方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI SUNRISE PROTECTIVE RELAY ELECTRIC CO.,LTD

Free format text: FORMER OWNER: SHANGHAI SUNRISE POWER AUTOMATION CO., LTD.

Effective date: 20130226

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130226

Address after: Shanghai, Xuhui District, China No. 470 Guiping Road, building 12, building 5

Patentee after: Shanghai Sunrise Power Technology Co., Ltd.

Address before: 200233 Shanghai City, Xuhui District Road No. 159 15 Tianzhou room unit 1301

Patentee before: Shanghai Sunrise Power Automation Co., Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170110

Address after: 518000 Guangdong, Shenzhen Province, science and technology, South Road, No. twelve Changhong science and technology building, building 9, unit 01-02, unit 18

Patentee after: Shenzhen Great Energy Technology Co.,Ltd.

Address before: Shanghai, Xuhui District, China No. 470 Guiping Road, building 12, building 5

Patentee before: Shanghai Sunrise Power Technology Co., Ltd.