CN101769074B - Automatic clogging method and automatic clogging device for oblique concrete column - Google Patents
Automatic clogging method and automatic clogging device for oblique concrete column Download PDFInfo
- Publication number
- CN101769074B CN101769074B CN 200910256110 CN200910256110A CN101769074B CN 101769074 B CN101769074 B CN 101769074B CN 200910256110 CN200910256110 CN 200910256110 CN 200910256110 A CN200910256110 A CN 200910256110A CN 101769074 B CN101769074 B CN 101769074B
- Authority
- CN
- China
- Prior art keywords
- vibrating
- bag
- concrete column
- slurry bag
- slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses an automatic clogging method and an automatic clogging device thereof. The automatic clogging device comprises an elastic rubber washer; the upper end of the elastic rubber washer is provided with a fixed ring outside a slurry bag, while the lower end is provided with a fixed ring inside the slurry bag, and a plurality of slurry bags are arranged between the two fixed rings; and the upper bag mouth of the slurry bag is connected with the fixed ring outside the slurry bag, and the lower bag mouth is connected with the fixed ring inside the slurry bag. The automatic clogging device is mounted in a vibrating hole 1; and after mounting, concrete is fed from the top end of an oblique concrete column template, and a vibrating bar is inserted from an insertion route of the vibrating bar of the nearby vibrating hole along with the feeding position of the concrete in an oblique concrete column to perform vibration vertical to an oblique column surface. The method and the device can solve the problems of exposed rib, honeycomb, pitted surface and the like on the oblique column.
Description
Technical field
The present invention relates to a kind of job practices and special-purpose stifled sizing device thereof of concrete column, specifically a kind of automatic blocking paste-making method that is applied to Y, V-shape oblique concrete column, and special-purpose automatic blocking sizing device belongs to building field.
Background technology
For the batter post member of Y, V-shape in the building structure, conventional method is: the reinforcing bar binding of batter post member is complete, then with the formwork erection of batter post and reinforce complete, at last from the upper end concreting of batter post.The main problem that exists: after taper pile shuttering is removed, reveal the quality problems such as muscle, honeycomb, pitted skin in the upper surface existence of batter post.Main cause: because column inclination, when concrete injected template and vibrates with vibrating spear, vibrating spear had been pressed close to the batter post soffit under the effect of self gravitation, the upper surface of batter post has been existed leak the district that shakes.
Summary of the invention
For the deficiency that prior art exists, technical problem to be solved by this invention is that a kind of automatic blocking paste-making method and Special Automatic stifled sizing device thereof that there are quality problems such as revealing muscle, honeycomb, pitted skin in the batter post surface that solve is provided.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of automatic blocking sizing device of oblique concrete column, comprise and be arranged on vibrate elastic caoutchouc packing ring on the hole of template, this elastic caoutchouc packing ring upper end arranges slurry bag external stability circle, the lower end arranges the inner retainer plate of slurry bag, several slurry bags are set between the two, and described slurry bag upper bag mouth is connected with slurry bag external stability circle, and lower bag mouth is connected with the inner retainer plate of slurry bag.
The automatic blocking sizing device of above-mentioned oblique concrete column, described elastic caoutchouc packing ring is a column structure, bayonet socket is set on the shaft cooperates with the hole of vibrating, and column structure inside arranges a hollow bulb, and the hollow bulb bottom surface arranges bell-mouth structure of air; Described slurry bag external stability circle is a column structure, draw-in groove on the outer setting, and inside arranges a T-shape hollow structure, connects with elastic caoutchouc packing ring resilient inserting; The inner retainer plate of described slurry bag is a pair of circular ring structure, end face is provided with the cone inclined-plane that matches with the bell-mouth structure of air of elastic caoutchouc packing ring, outer rotating part arranges lower bayonet slot, several is set between two annulus connects brace rod, and two annulus arrange several spaces with being connected between the brace rod.
The automatic blocking sizing device of above-mentioned oblique concrete column, the upper draw-in groove of described slurry bag upper bag mouth and external stability circle is fixed, and slurry bag lower bag mouth passes slurry bag inner retainer plate space and lower bayonet slot is fixed.
A kind of method of utilizing the described automatic blocking sizing device of one of above-mentioned claim to carry out the oblique concrete column construction, its step comprises:
(1) install the oblique concrete column template, reserve the hole of vibrating at oblique concrete column template upper surface, the order that the layout of reserving the hole of vibrating is vibrated according to vibrating spear and spacing are stayed and are established;
(2) described automatic blocking sizing device is installed in the hole of vibrating;
(3) after the installation, concrete feeds intake from the top of oblique concrete column template, and vibrating spear carries out vibrating perpendicular to the batter post face along with the placement position of the oblique concrete column inner concrete insertion route near the vibrating spear in the hole of vibrating inserts.
(4) vibrate and vibrating spear is extracted from bottom to top successively repetitive operation on oblique concrete column along former route after complete.
The advantage of the automatic blocking paste-making method of oblique concrete column of the present invention and stifled sizing device is: be arranged on the automatic blocking sizing device on the oblique concrete column template, can in the process of vibrating, will flow into the slurry bag from space between two annulus between the connection ribs of the inner retainer plate of slurry bag by cement paste, to starch bag under the effect of pressure heaves, when vibrating spear was extracted along former route, the insertion route of vibrating spear was blocked.Solve oblique concrete column and had quality problems such as revealing muscle, honeycomb, pitted skin.
Description of drawings
Fig. 1 is the structural representation of the oblique concrete column of an embodiment of the present invention;
Fig. 2 is the structural representation of automatic blocking sizing device;
Fig. 3 is the structural representation of elastic caoutchouc packing ring;
Fig. 4 is slurry bag external stability coil structures schematic diagram;
Fig. 5 is the inner fixed ring schematic diagram of slurry bag;
Fig. 6 is the complete section top view of Fig. 5;
Fig. 7 is for adding the automatic blocking sizing device structural representation of slurry bag.
The specific embodiment
Below in conjunction with accompanying drawing and tool figure embodiment the present invention is described in further details;
As shown in Figure 1, be the structure chart of Y or V font oblique concrete column, wherein be provided with number in its template that installs 1 and arrange the hole 2 of vibrating, more this hole 2 of vibrating can establish or establish less according to oblique concrete slope length and concrete quality requirement.
As shown in Figure 2, be the structural representation of automatic blocking sizing device 18, comprising the elastic caoutchouc packing ring 3 that is arranged on the hole 2 of vibrating, these elastic caoutchouc packing ring 3 upper ends arrange slurry bag external stability circle 4, and the lower end arranges the inner retainer plate 5. of slurry bag
As shown in Figure 3, be the structural representation of elastic caoutchouc packing ring 3, these elastic caoutchouc packing ring 3 outsides are a column structure, bayonet socket 6 is set on the shaft is fixed with the hole 2 of vibrating, and column structure inside arranges a hollow bulb 7, and hollow bulb 7 bottom surfaces arrange bell-mouth structure of air 8;
As shown in Figure 4, described slurry bag external stability circle 4 is a column structure, and draw-in groove 9 on the outer setting, and inside arranges a T-shape hollow structure 10.
Shown in Fig. 5,6, the inner retainer plate 5 of slurry bag is a pair of circular ring structure, end face is provided with the cone inclined-plane 16 that matches with the bell-mouth structure of air 8 of elastic caoutchouc packing ring 3, outer rotating part arranges lower bayonet slot 11, three connection brace rod 13, two annulus 12 are set between two annulus 12 are partitioned into four spaces 14 by three connection brace rods 13.
As shown in Figure 7, for adding automatic blocking sizing device 18 structural representations of slurry bag 15, slurry bag 15 upper bag mouths 16 are fixing with the upper draw-in groove 9 of slurry bag external stability circle 4, and it is fixing with lower bayonet slot 11 that slurry bag 15 lower bag mouths 17 pass the space 14 of the inner retainer plate 5 of slurry bag.
The bell-mouth structure of air 8 of elastic caoutchouc packing ring 3 is pegged graft with cone inclined-plane 16 elasticity of the inner retainer plate 5 of slurry bag; The T-shape hollow structure 10 of slurry bag external stability circle 4 is fastened on elastic caoutchouc packing ring 3 tops.
During construction: when oblique concreting section was installed template 1, in the oblique concrete column upper surface processing hole 2 of vibrating, vibrate order that the layout in hole 2 vibrates according to vibrating spear and spacing of processing stayed and established.Before the template 1 of laying upper surface at the hole 2 interior installation automatic blocking sizing devices 18 that vibrate.That is: the end that will starch bag internal layer 19 is enclosed within on the lower bayonet slot 11 and is fixing, an end of slurry bag outer 20 is enclosed within on the upper draw-in groove 9 and fixing, then will starch the other end of bag internal layer 19 and slurry bag outer 20 nestable on upper draw-in groove 9 and fix.Slurry bag external stability circle 4 just links into an integrated entity with the inner retainer plate 5 of slurry bag by the two-layer slurry bag 15 of ring set like this.To starch the inner retainer plate 5 of bag and pass elastic caoutchouc packing ring 3, at this moment slurry bag 15 is threaded in the elastic caoutchouc packing ring 3, then this elastic caoutchouc packing ring 3 is positioned on the hole 2 of vibrating, bayonet socket 6 cooperates with the hole 2 of vibrating, the size in hole 2 and the size of elastic caoutchouc packing ring 3 of vibrating designs through strict, makes elastic caoutchouc packing ring 3 be close to the side elevation of batter post upper surface template 1.Two ends snapping with elastic caoutchouc packing ring 3 is firm respectively with the inner retainer plate 11 of slurry bag with slurry bag external stability circle 4.After the installation, concrete feeds intake from the top of batter post, and vibrating spear requires to carry out vibrating perpendicular to the standard of batter post face along with the placement position of the batter post inner concrete insertion route 21 near the vibrating spear in the hole 2 of vibrating inserts.Vibrate and vibrating spear is extracted along former route after complete.At this moment the cement paste that vibrates will flow into slurry bag 15 from space between two annulus between the connection ribs 13 of the inner retainer plate 5 of slurry bag, will starch bag 15 and heave under the effect of pressure, and at this moment the insertion route 21 of vibrating spear is blocked.During construction, carry out successively from down to up along the incline direction of batter post.
Certainly, above-mentioned explanation is not to be limitation of the present invention, and the present invention also is not limited to above-mentioned giving an example; those skilled in the art; in essential scope of the present invention, the variation of making, remodeling, interpolation or replacement all should belong to protection scope of the present invention.
Claims (4)
1. the automatic blocking sizing device of an oblique concrete column, it is characterized in that: comprise being arranged on vibrate elastic caoutchouc packing ring on the hole of template, this elastic caoutchouc packing ring upper end arranges slurry bag external stability circle, the lower end arranges the inner retainer plate of slurry bag, several slurry bags are set between the two, described slurry bag upper bag mouth is connected with slurry bag external stability circle, and lower bag mouth is connected with the inner retainer plate of slurry bag.
2. the automatic blocking sizing device of oblique concrete column according to claim 1, it is characterized in that: described elastic caoutchouc packing ring is a column structure, bayonet socket is set on the shaft cooperates with the hole of vibrating, column structure inside arranges a hollow bulb, and the hollow bulb bottom surface arranges bell-mouth structure of air; Described slurry bag external stability circle is a column structure, draw-in groove on the outer setting, and inside arranges a T-shape hollow structure, connects with elastic caoutchouc packing ring resilient inserting; The inner retainer plate of described slurry bag is a pair of circular ring structure, end face is provided with the cone inclined-plane that matches with the bell-mouth structure of air of elastic caoutchouc packing ring, outer rotating part arranges lower bayonet slot, several is set between two annulus connects brace rod, and two annulus arrange several spaces with being connected between the brace rod.
3. the automatic blocking sizing device of oblique concrete column according to claim 2 is characterized in that: described slurry bag upper bag mouth is fixed with the upper draw-in groove of external stability circle, and a slurry bag lower bag mouth passes slurry bag inner retainer plate space and lower bayonet slot is fixed.
4. one kind is utilized the described automatic blocking sizing device of one of claim 1-3 to carry out the method that oblique concrete column is constructed, and its step comprises:
(1) install the oblique concrete column template, reserve the hole of vibrating at oblique concrete column template upper surface, the order that the layout of reserving the hole of vibrating is vibrated according to vibrating spear and spacing are stayed and are established;
(2) described automatic blocking sizing device is installed in the hole of vibrating;
(3) after the installation, concrete feeds intake from the top of oblique concrete column template, and vibrating spear carries out vibrating perpendicular to the batter post face along with the placement position of the oblique concrete column inner concrete insertion route near the vibrating spear in the hole of vibrating inserts;
(4) vibrate and vibrating spear is extracted from bottom to top successively repetitive operation on oblique concrete column along former route after complete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910256110 CN101769074B (en) | 2009-12-29 | 2009-12-29 | Automatic clogging method and automatic clogging device for oblique concrete column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910256110 CN101769074B (en) | 2009-12-29 | 2009-12-29 | Automatic clogging method and automatic clogging device for oblique concrete column |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101769074A CN101769074A (en) | 2010-07-07 |
CN101769074B true CN101769074B (en) | 2013-01-09 |
Family
ID=42502157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200910256110 Expired - Fee Related CN101769074B (en) | 2009-12-29 | 2009-12-29 | Automatic clogging method and automatic clogging device for oblique concrete column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101769074B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669837A (en) * | 2013-12-31 | 2014-03-26 | 青建集团股份公司 | Construction method for rapidly removing formwork on slope concrete structure |
CN112609986A (en) * | 2020-12-11 | 2021-04-06 | 上海宝冶集团有限公司 | Method for controlling pouring forming quality of concrete batter post |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL9401021A (en) * | 1994-06-21 | 1996-02-01 | Hollandsche Betongroep Nv | Method for applying concrete mortar to produce a reinforced concrete construction |
CN2707819Y (en) * | 2004-05-25 | 2005-07-06 | 辽宁工程技术大学 | Grouting air-discharging bore-sealing device |
CN1657710A (en) * | 2005-01-11 | 2005-08-24 | 北京市机械施工公司 | Method of vibration and extrusion for cast-in-place concrete in pile hole and its vibration rod device |
CN201221203Y (en) * | 2008-07-02 | 2009-04-15 | 易朝全 | Circular ring-shaped narrow gap vibrator for concrete of floor drain of drainage pipe sleeve |
-
2009
- 2009-12-29 CN CN 200910256110 patent/CN101769074B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL9401021A (en) * | 1994-06-21 | 1996-02-01 | Hollandsche Betongroep Nv | Method for applying concrete mortar to produce a reinforced concrete construction |
CN2707819Y (en) * | 2004-05-25 | 2005-07-06 | 辽宁工程技术大学 | Grouting air-discharging bore-sealing device |
CN1657710A (en) * | 2005-01-11 | 2005-08-24 | 北京市机械施工公司 | Method of vibration and extrusion for cast-in-place concrete in pile hole and its vibration rod device |
CN201221203Y (en) * | 2008-07-02 | 2009-04-15 | 易朝全 | Circular ring-shaped narrow gap vibrator for concrete of floor drain of drainage pipe sleeve |
Also Published As
Publication number | Publication date |
---|---|
CN101769074A (en) | 2010-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111206698B (en) | Construction method of assembled wallboard | |
CN107443566B (en) | The production method of prefabricated constructional column formwork | |
CN105239725A (en) | Construction method and construction template for ultrahigh oblique concrete column | |
CN101769074B (en) | Automatic clogging method and automatic clogging device for oblique concrete column | |
CN109898429B (en) | Structure for reinforcing bridge cracks and construction process thereof | |
CN102704507A (en) | Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures | |
KR101150597B1 (en) | Apparatus for file construction corresponding height restriction to and the method thereof | |
CN109296138B (en) | Positioning device for post-planting steel bars of constructional column and construction method | |
CN105332511A (en) | Huge concrete filled steel tubular column core grouting pouring and tamping device and method | |
CN206360377U (en) | The mounting structure of precast concrete wall column | |
CN110700872B (en) | Construction method of rail top air duct | |
CN102363960A (en) | Large-volume concrete pouring method for nuclear island raft foundation | |
CN103628684B (en) | A kind of construction method of simultaneously watering build floor and shear wall | |
CN205839812U (en) | A kind of post-cast strip pretreatment unit | |
CN212688717U (en) | Concrete vibrating working channel for bridge V-shaped structure | |
CN109555314A (en) | Reusable expansion joint construction template and mounting and dismounting methods thereof | |
CN204899949U (en) | Bow -shaped steel pipe back up support | |
CN214329404U (en) | Construction structure for joint of beam bottom filler wall | |
SU1027402A1 (en) | Pneumatic forms for underground work | |
CN205711756U (en) | A kind of distance vertical prestressing pipeline pneumatic mortar device | |
CN211285287U (en) | Auxiliary device for grouting large support | |
CN107905530A (en) | A kind of adjustable support for shuttering of movement for groove construction column | |
CN210105061U (en) | Curtain wall embedded part | |
CN220052223U (en) | Reusable fabricated building prefabricated wallboard opposite-pulling hole embedded part | |
CN215406868U (en) | I-shaped brick wall component for threading |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130109 Termination date: 20181229 |