CN214329404U - Construction structure for joint of beam bottom filler wall - Google Patents

Construction structure for joint of beam bottom filler wall Download PDF

Info

Publication number
CN214329404U
CN214329404U CN202023211436.5U CN202023211436U CN214329404U CN 214329404 U CN214329404 U CN 214329404U CN 202023211436 U CN202023211436 U CN 202023211436U CN 214329404 U CN214329404 U CN 214329404U
Authority
CN
China
Prior art keywords
wall
base
main body
construction
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023211436.5U
Other languages
Chinese (zh)
Inventor
朱彦霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202023211436.5U priority Critical patent/CN214329404U/en
Application granted granted Critical
Publication of CN214329404U publication Critical patent/CN214329404U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction structures of handing-over department of beam-bottom infilled wall, it includes: the device comprises a main body, a plug-in end, a bearing end, a top plate and a base; the first side part of the main body is a plugging end, the second side part of the main body is a bearing end, and the plugging end and the bearing end are adaptive structures which can be connected with each other; the top plate is fixedly connected to the upper part of the main body directly or through a support rod; the upper part of the base is provided with a connecting pipe, the interior of the base is hollow, and a filter screen is arranged at the position of an upper feed inlet of the connecting pipe; the outer wall of one side of the base is provided with a discharge outlet, and the outer wall of the other side of the base is provided with a gap; the connecting pipe is connected to the bottom of the main body; the wall top of the building is provided with a cavity for placing the base, the base is arranged in the cavity, and the cavity is filled with concrete. The utility model discloses reduced the way that whole gaps all need the stopper seam construction to carry out the filling, can improve the efficiency of construction and accelerate the construction progress. Meanwhile, the construction quality problem possibly generated by plastering construction of workers is avoided.

Description

Construction structure for joint of beam bottom filler wall
Technical Field
The utility model belongs to the technical field of the construction structure, especially, relate to a construction structure of handing-over department of beam-bottom infilled wall.
Background
In the design of a house, a filler wall is usually arranged below a beam bottom for separating the room layout, the filler wall is usually built by building blocks, and a gap between the beam bottom and the top of the filler wall is generally filled with cement mortar. Although cement mortar has certain load-carrying capacity after being solidified, the cement mortar also has certain defects, and as the use time goes on, the cracks of the cement mortar can be caused due to the changes of indoor humidity and temperature, the cracks not only can influence the attractiveness of a wall body, but also can influence the one-time quality acceptance qualification rate, and are easy to rework. Meanwhile, when workers perform operation construction between the filling wall and the beam bottom, the trowel is often used for plugging the seam because of inconvenient operation, the problem that local concrete cannot be filled actually is easily caused, and the construction quality is poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a breast infilled wall handing-over department construction structures to adopt cement mortar packing to fill the crack between the breast and the infilled wall crest among the solution prior art, produce the crack easily and influence the whole impression of seeing of wall body, reduce disposable quality acceptance percent of pass, cause rework and repair, extravagant construction period and construction cost's problem.
The utility model provides an above-mentioned technical problem's technical scheme as follows: a sill filler wall joint construction structure for connecting a wall top and a sill of a building, comprising: the device comprises a main body, a plug-in end, a bearing end, a top plate and a base; the first side part of the main body is a plugging end, the second side part of the main body is a bearing end, and the plugging end and the bearing end are adaptive structures which can be connected with each other; the top plate is fixedly connected to the upper part of the main body directly or through a support rod; the upper part of the base is provided with a connecting pipe, the base is hollow, and a filter screen is arranged at the position of an upper feed inlet of the connecting pipe; the outer wall of one side of the base is provided with a discharge outlet, and the outer wall of the other side of the base is provided with a gap; the connecting pipe is connected to the bottom of the main body; the wall top of the building is provided with a cavity for placing the base, the base is installed in the cavity, and concrete is filled in the cavity.
The utility model discloses as above beam-bottom infilled wall handing-over department construction structures, it is further, the main part includes fixed connection's steel sheet, plank and foam brick in proper order.
The utility model discloses a construction structure of the beam bottom filler wall junction as above, further, the insertion end includes a lug, the lug is connected to the first side of the main body; the bearing end is provided with a groove, and the convex block can be inserted into the groove.
The utility model discloses a construction structure of the beam bottom infilled wall handing-over department as above, further, the lateral wall of lug still sets up spring and flexible post, and the spring makes flexible post reset; a limiting hole is formed in the side wall of the groove of the bearing end; when the lug inserts the recess, the flexible post that corresponds can insert and fix a position corresponding spacing hole.
The utility model discloses as above beam-bottom infilled wall handing-over department construction structures, it is further, the minimum of bin outlet is greater than 5 centimetres with the bottom plate upper surface distance of base, and the lower edge in gap is greater than 5 centimetres with the bottom plate upper surface distance of base.
The utility model discloses as above the construction structures of handing-over department of beam-bottom infilled wall, further, the distance between highly less than or equal to wall crown and the beam-bottom of main part.
Utilize the utility model discloses the beam-bottom filler wall handing-over department construction structures of above-mentioned embodiment carries out the gap construction between beam-bottom and the filler wall top, has reduced the way that all need the caulking construction to fill in whole gaps, can improve the efficiency of construction and accelerate the construction progress. Meanwhile, the construction quality problem possibly generated by plastering construction of workers is avoided.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
fig. 1 is a schematic view of a construction structure at a joint of a beam-bottom filler wall according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of a main body of an embodiment of the present invention;
fig. 3 is a schematic view of a base according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
100. construction structure of beam-bottom infilled wall handing-over department, 101, grafting end, 102, accept the end, 1, main part, 2, spacing hole, 3, roof, 4, recess, 5, flexible post, 6, lug, 7, base, 8, feed inlet, 9, filter screen, 10, bin outlet, 11, gap, 12, steel sheet, 13, plank, 14, foam brick.
Detailed Description
Hereinafter, embodiments of the present invention of a construction structure of a joint of a bottom filler wall will be described with reference to the accompanying drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1, fig. 2 and fig. 3 show that the utility model relates to a beam-bottom infilled wall handing-over department construction structures 100 of embodiment, beam-bottom infilled wall handing-over department construction structures 100 are used for connecting the wall top and the beam-bottom of building, and it includes:
the connector comprises a main body 1, wherein a first side part of the main body 1 is a plug end 101, a second side part of the main body 1 is a socket end 102, and the plug end 101 and the socket end 102 are adaptive structures which can be connected with each other; in the construction structure of the joint of the beam bottom filler wall of one embodiment, the height of the main body 1 is less than or equal to the distance between the top of the wall and the beam bottom.
In a specific construction structure embodiment of the joint of the beam-bottom infilled wall, the main body 1 comprises a steel plate 12, a wood plate 13 and a foam brick 14 which are fixedly connected in sequence. On the one hand, the foam brick alleviates the gravity of main part 1 in the engineering quality requirement scope that does not influence the main part, makes things convenient for the staff to carry and install, and in addition, the foam brick is convenient for whitewash, and whitewash and can hide main part internal framework and increase the aesthetic feeling.
The top plate 3 is fixedly connected to the upper part of the main body 1 directly or through a support rod;
the device comprises a base 7, wherein a connecting pipe is arranged at the upper part of the base 7, the base 7 is hollow, and a filter screen 9 is arranged at the position of an upper feeding hole 8 of the connecting pipe; the outer wall of one side of the base 7 is provided with a discharge opening 10, and the outer wall of the other side of the base 7 is provided with a gap 11; the connecting pipe is connected to the bottom of the main body 1, and the mounting position needs to ensure that the position of the feed inlet cannot be shielded by the main body, for example, the top of the connecting pipe cannot be directly fixedly connected with the bottom of the main body; preferably, the outer wall of the connecting pipe made of metal is welded on the side wall of the main steel plate (when the main body 1 comprises the steel plate 12, the wood plate 13 and the foam brick 14 which are fixedly connected in sequence); the wall top of the building is provided with a cavity for placing the base 7, the base 7 is installed in the cavity, and the cavity is filled with concrete. The setting of filter screen can avoid great stone to plug up bin outlet or gap in the concrete. After the concrete flowed into the inside of base, the inside liquid level of base rose, and cement can be through the bin outlet toward arranging outward when the liquid level reached the position of bin outlet, and cement toward arranging outward effect lets outer cement fill around the base, and the base is as an organic whole with the wall when solidifying to reach the effect that improves stability. In a further preferred embodiment, the lowest point of the discharge opening 10 is at a distance of more than 5 cm from the upper surface of the base plate of the base 7, and the lower edge of the gap 11 is at a distance of more than 5 cm from the upper surface of the base plate of the base 7. Can make great stone sink to the base bottom in the concrete, avoid it to block up the gap that the bin outlet or arrange the material usefulness.
Utilize the utility model discloses beam-bottom filler wall handing-over department construction structure carries out the gap construction method between beam-bottom and the filler wall top as follows, sets up the cavity that is used for placing the base at the wall top of building in advance, carries out major structure's concatenation according to gap length during concrete construction, makes the major length after the concatenation unanimous with gap length. Then put into the cavity with the base, when carrying out concrete placement, the concrete gets into the base and arranges outward to the cavity, realizes the packing to the cavity, realizes the fixed connection of wall body and base after the concrete solidifies. The construction mode reduces the method that all gaps need to be filled by seam plugging construction, and can improve the construction efficiency and accelerate the construction progress. Meanwhile, the construction quality problem possibly generated by plastering construction of workers is avoided.
In the construction structure of the joint of the beam bottom filler wall of one embodiment, the insertion end 101 comprises a projection 6, and the projection 6 is connected to the first side part of the main body 1; the receiving end 102 is provided with a recess 4, into which recess 4 a projection 6 can be inserted. The side wall of the lug 6 is also provided with a spring and a telescopic column 5, and the spring enables the telescopic column 5 to reset; a limiting hole 2 is arranged on the side wall of the groove 4 of the bearing end 102; when the lug 6 is inserted into the groove 4, the corresponding telescopic column 5 can be inserted into the corresponding limiting hole 2 for positioning. Through the setting of the end of pegging graft of above-mentioned structure and accepting the end, can realize swift adjustment between the different main parts and connect the dismantlement, the convenient roof beam and the wall gap to length are under construction, improve the flexibility of using. Meanwhile, after the beams and the walls are manufactured, generally, the distances between each section of wall are different, and the adjustable structure can enable the main body to be better adapted to the conditions between the walls and the beams. The intermediate position that at first need align the spacing hole with the bottom of lug when installing then slowly down pushes down, can be crowded flexible post toward the interior at the in-process that pushes down, can pop out again when the position that reachs spacing hole and contact the effect that reaches stability, and the terminal surface of flexible post is preferred to be set up to the inclined plane structure, conveniently carries out better flexible when crowded.
The technical features disclosed above are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the invention to achieve the aim of the invention.

Claims (6)

1. The utility model provides a filler wall handing-over department construction structures at bottom of a beam, construction structures is used for connecting the wall top and the bottom of a beam of building, its characterized in that includes: the device comprises a main body (1), an inserting end (101), a bearing end (102), a top plate (3) and a base (7); the first side part of the main body (1) is an inserting end (101), the second side part of the main body (1) is a bearing end (102), and the inserting end (101) and the bearing end (102) are adaptive structures which can be connected with each other; the top plate (3) is fixedly connected to the upper part of the main body (1) directly or through a support rod; the upper part of the base (7) is provided with a connecting pipe, the base (7) is hollow, and a filter screen (9) is arranged at the position of an upper feed inlet (8) of the connecting pipe; a discharge outlet (10) is arranged on the outer wall of one side of the base (7), and a gap (11) is arranged on the outer wall of the other side of the base (7); the connecting pipe is connected to the bottom of the main body (1); the wall top of the building is provided with a cavity for placing the base (7), the base (7) is installed in the cavity, and the cavity is filled with concrete.
2. The sill infill wall interface construction structure as claimed in claim 1, wherein the main body (1) comprises a steel plate (12), a wooden plate (13) and a foam brick (14) fixedly connected in sequence.
3. The sill infill wall interface construction structure of claim 1, wherein the spigot end (101) comprises a projection (6), the projection (6) being attached to a first side of the body (1); the bearing end (102) is provided with a groove (4), and the convex block (6) can be inserted into the groove (4).
4. The construction structure of the joint of the beam-bottom filling wall as claimed in claim 3, wherein the side wall of the projection (6) is further provided with a spring and a telescopic column (5), and the spring resets the telescopic column (5); a limiting hole (2) is arranged on the side wall of the groove (4) of the bearing end (102); when the convex block (6) is inserted into the groove (4), the corresponding telescopic column (5) can be inserted into the corresponding limiting hole (2) for positioning.
5. The construction structure of the joint of the beam-bottom infilled wall as claimed in claim 1, characterized in that the distance between the lowest point of the discharge opening (10) and the upper surface of the bottom plate of the base (7) is greater than 5 cm, and the distance between the lower edge of the gap (11) and the upper surface of the bottom plate of the base (7) is greater than 5 cm.
6. The sill filler wall joint construction structure as claimed in claim 1, wherein the height of the body (1) is not more than the distance between the top of the wall and the sill.
CN202023211436.5U 2020-12-28 2020-12-28 Construction structure for joint of beam bottom filler wall Expired - Fee Related CN214329404U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023211436.5U CN214329404U (en) 2020-12-28 2020-12-28 Construction structure for joint of beam bottom filler wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023211436.5U CN214329404U (en) 2020-12-28 2020-12-28 Construction structure for joint of beam bottom filler wall

Publications (1)

Publication Number Publication Date
CN214329404U true CN214329404U (en) 2021-10-01

Family

ID=77902392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023211436.5U Expired - Fee Related CN214329404U (en) 2020-12-28 2020-12-28 Construction structure for joint of beam bottom filler wall

Country Status (1)

Country Link
CN (1) CN214329404U (en)

Similar Documents

Publication Publication Date Title
CN201649633U (en) Steel formwork for forming building stair treads
CN107190847A (en) Prefabricated assembled light steel wallboard, building construction and its method of construction
CN214329404U (en) Construction structure for joint of beam bottom filler wall
CN108130950A (en) A kind of component component of assembled arthitecutral structure and include its building
CN205677249U (en) A kind of casting concrete constructional column hopper
CN113047612A (en) Fabricated building constructional column and construction method thereof
CN210263490U (en) Assembled wall that possesses adjustable extending structure
CN109025173A (en) A kind of air channel structure and its construction method
CN105804291A (en) Bare concrete sloping core interlayer through connection system and construction method thereof
CN107227829B (en) A kind of quick levelling hanging structure of metope
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN205713113U (en) A kind of PCF board supporting structure
CN209556285U (en) A kind of air channel structure
CN208380073U (en) Template tie
CN113463801A (en) Gabion curtain wall structure and construction method thereof
CN109267482B (en) Construction method for broken stone bridge floor of gallery bridge
CN207812926U (en) A kind of decoration of exterior wall board mounting assembly
CN108442698B (en) Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve
CN207499170U (en) Walling system
CN203008232U (en) Steel truss strut
CN114000666B (en) Construction technology for fixing joints of waterproof coiled materials of roof structures
CN220704737U (en) Windowsill coping prefabricated component
CN215483897U (en) Stone cage curtain wall structure
CN108822876A (en) Coke oven divides flue bent pipe construction method of installation and dedicated wooden box
CN213653858U (en) Assembled wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211001