CN103669837A - Construction method for rapidly removing formwork on slope concrete structure - Google Patents

Construction method for rapidly removing formwork on slope concrete structure Download PDF

Info

Publication number
CN103669837A
CN103669837A CN201310748530.XA CN201310748530A CN103669837A CN 103669837 A CN103669837 A CN 103669837A CN 201310748530 A CN201310748530 A CN 201310748530A CN 103669837 A CN103669837 A CN 103669837A
Authority
CN
China
Prior art keywords
concrete
formwork
slope
construction method
quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310748530.XA
Other languages
Chinese (zh)
Inventor
张明禄
刘树洪
董毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGJIAN INTERNATIONAL DEVELOPMENT Co Ltd
Qingjian Group Co Ltd
Original Assignee
QINGJIAN INTERNATIONAL DEVELOPMENT Co Ltd
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGJIAN INTERNATIONAL DEVELOPMENT Co Ltd, Qingjian Group Co Ltd filed Critical QINGJIAN INTERNATIONAL DEVELOPMENT Co Ltd
Priority to CN201310748530.XA priority Critical patent/CN103669837A/en
Publication of CN103669837A publication Critical patent/CN103669837A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a construction method for rapidly removing a formwork on a slope concrete structure. The construction method includes the following steps that a, when the formwork is erected on the upper surface of slope concrete, concrete pouring and compacting openings distributed in a plum-blossom shape are reserved with the distances of about one meter; b, the layered pouring sequence from bottom to top is adopted for the concrete, before the poured concrete at the bottom layer is set initially, the formwork removal and surface plastering are performed rapidly according to the layered sequence from bottom to top, and emerging portions defective in impression are repaired; c, bolt holes left after formwork removal are compacted and troweled to ensure that the poured concrete has zero defect in quality impression, and then covering, water sprinkling and maintaining are performed by using non-woven fabric. Due to the improvement and innovation of butt-joint bolts, the positioning mode of the top formwork is simplified, the erecting efficiency of the top formwork is improved, meanwhile, cost for manufacturing and installing cushion blocks is saved, quality defects of the concrete are avoided, and quality maintaining cost is saved.

Description

A kind of slope concrete structure quick removable mould board construction method
Technical field
The present invention relates to a kind of construction techniques, especially a kind of slope concrete structure quick removable mould board construction method.
Technical background
During slope concrete structure construction, conventionally there are two kinds of formwork ways: single side formwork and bilateral formwork.
Single side formwork is conventional simple and easy way in slope concrete construction, is about to harsh concrete (concrete that the slump is less) and photographs in template, and manual sorting moulding, vibrates during initial set also floating a little.There is following defect in this kind of method: (1), owing to being difficult to effectively to vibrate before concrete initial set (effectively vibrate should start bleeding with mixture till), the concrete density of moulding is lower, easily produces Seepage; (2) because concrete vibrating is insufficient, receipts face difficulty, concrete surface poor flatness, needs the levelling of mortar cover.(3) need the artificial slope moulding of clapping during concreting, efficiency of construction is lower.
During bilateral formwork concreting, with respect to single surface formwork, can guarantee concrete compactness, large face can reach the effect of " the outer light of interior reality " substantially.But still can there are some defects in part: (1), because vibrating spear is difficult to insert completely, easily causes partial portion concrete vibrating leakiness, occurs honeycombing; (2) bilateral formwork generally adopts connecting bolt, if the docking bolt position after form removal is positioned at roofing, easily occurs along bolt Seepage.
The slope concrete template system of the two-sided and single surface formwork of tradition is because of the defect of self technique, be difficult to the disposable quality requirement that reaches high standard concrete " the outer light of interior reality ", often need once to have a shave, occur the hidden danger of quality such as seepage, thereby increased construction cost.
Summary of the invention
The object of this invention is to provide a kind of easy quality problems that occur of traditional slope concrete formwork that solve, reduce the slope concrete structure quick removable mould board construction method of construction cost.
For addressing the above problem, slope concrete structure quick removable mould board construction method of the present invention, comprises the following steps,
When a. slope concrete upper surface template is established, that keeps somewhere 1 meter of left and right of spacing is plum blossom-shaped distribution casting and compacting of concrete mouth;
B. concrete adopts placement layer by layer order from bottom to top, and the concrete that bottom has been built is wiped one's face according to the quick form removal of hierarchical sequence from bottom to top before initial set, and the perception rejected region occurring is repaired;
C. the concrete quality perception zero-fault floating to the bolt hole compacting staying after form removal, assurance has been built, then covers watering maintenance with nonwoven.
No matter rolling over template construction technique soon, slope of the present invention template from efficiency of construction or construction quality, is all better than traditional one side and two-sided formwork construction technique.Contrast traditional two-sided formwork upper former and need to add cushion block, this kind of method simplified the locate mode of backform by the transformation innovation to connecting bolt, improved the efficiency that installs of backform, while has also saved making, the cost of cushion block has been installed, avoid quality defect of concrete, saved quality maintenance cost; Contrast single surface formwork, the method to concrete binding effect, has been avoided the trickling phenomenon that occurs in concreting process by backform, has also saved the time of waiting for concrete formation simultaneously, greatly accelerate concrete speed of application, saved the cost of mortar cover.
The specific embodiment
1, make split bolt: traditional split bolt is improved, when the pulling force producing requires, play the effect of Template Location when meeting concrete construction
2. installation form: when slope concrete upper surface template is established, that keeps somewhere 1 meter of left and right of spacing is plum blossom-shaped distribution casting and compacting of concrete mouth, fully vibrates and accelerates flowing water construction while guaranteeing concrete construction, waters the plugging plate smash mouthful through particular design, convenient mounting or dismounting.
Levels template is relatively independent, and upper former can meet quick-detachment, and while receiving face before concrete initial set, just collapsible die carries out concrete pavement processing, accelerates the turnover of turnover material tool and uses; Top bolt, nut and backing plate, can, with form removable recycling, reduce cost.
3, stripping and concrete are received face maintenance: before concrete initial set, form removable can be carried out to surface layer processing, non-textile mulch maintenance is used on surface, and concrete formation quality is better.

Claims (1)

1. a slope concrete structure quick removable mould board construction method, is characterized in that: comprises the following steps,
When a. slope concrete upper surface template is established, that keeps somewhere 1 meter of left and right of spacing is plum blossom-shaped distribution casting and compacting of concrete mouth;
B. concrete adopts placement layer by layer order from bottom to top, and the concrete that bottom has been built is wiped one's face according to the quick form removal of hierarchical sequence from bottom to top before initial set, and the perception rejected region occurring is repaired;
C. the concrete quality perception zero-fault floating to the bolt hole compacting staying after form removal, assurance has been built, then covers watering maintenance with nonwoven.
CN201310748530.XA 2013-12-31 2013-12-31 Construction method for rapidly removing formwork on slope concrete structure Pending CN103669837A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310748530.XA CN103669837A (en) 2013-12-31 2013-12-31 Construction method for rapidly removing formwork on slope concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310748530.XA CN103669837A (en) 2013-12-31 2013-12-31 Construction method for rapidly removing formwork on slope concrete structure

Publications (1)

Publication Number Publication Date
CN103669837A true CN103669837A (en) 2014-03-26

Family

ID=50308546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310748530.XA Pending CN103669837A (en) 2013-12-31 2013-12-31 Construction method for rapidly removing formwork on slope concrete structure

Country Status (1)

Country Link
CN (1) CN103669837A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927090A (en) * 2020-08-10 2020-11-13 湖南省第六工程有限公司 Steel pipe support construction structure of beam type conversion layer of high-rise building and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4834923A (en) * 1986-07-30 1989-05-30 Sprecace Pantoli Enio Method of concrete construction utilizing a concrete formwork of modular plank elements
JPH06294211A (en) * 1993-04-07 1994-10-21 Nippon Steel Corp Repairing method of existing concrete structure
CN101575913A (en) * 2009-06-09 2009-11-11 中天建设集团有限公司天津分公司 Construction method for preventing reserved holes of pipes from water leakage
CN101769074A (en) * 2009-12-29 2010-07-07 青岛建设集团零零一工程有限公司 Automatic clogging method and automatic clogging device for oblique concrete column
CN102758436A (en) * 2011-04-27 2012-10-31 五冶集团上海有限公司 Benzene hydrogenation engineering concrete pouring method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4834923A (en) * 1986-07-30 1989-05-30 Sprecace Pantoli Enio Method of concrete construction utilizing a concrete formwork of modular plank elements
JPH06294211A (en) * 1993-04-07 1994-10-21 Nippon Steel Corp Repairing method of existing concrete structure
CN101575913A (en) * 2009-06-09 2009-11-11 中天建设集团有限公司天津分公司 Construction method for preventing reserved holes of pipes from water leakage
CN101769074A (en) * 2009-12-29 2010-07-07 青岛建设集团零零一工程有限公司 Automatic clogging method and automatic clogging device for oblique concrete column
CN102758436A (en) * 2011-04-27 2012-10-31 五冶集团上海有限公司 Benzene hydrogenation engineering concrete pouring method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张平川: "大面积水磨石地坪施工", 《山西建筑》 *
邓杰: "浅谈如何控制1.6m厚砼的施工质量", 《工程科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927090A (en) * 2020-08-10 2020-11-13 湖南省第六工程有限公司 Steel pipe support construction structure of beam type conversion layer of high-rise building and construction method thereof
CN111927090B (en) * 2020-08-10 2021-10-22 湖南省第六工程有限公司 Steel pipe support construction structure of beam type conversion layer of high-rise building and construction method thereof

Similar Documents

Publication Publication Date Title
CN103899088B (en) Large span ultra-thin overlength cast-in-situ clear-water concrete Slate hanging construction method
CN102003069A (en) Construction method and pouring device for framework masonry infill wall structure
CN113668928B (en) Method for controlling construction cracks of ultra-large-volume concrete water pool
CN109537893A (en) Pouring construction method without facing layer concrete
CN109930455A (en) A kind of town road kerbstone mounting structure and constructing device and construction method
CN106284789B (en) Construction technology for controlling cast-in-situ floor Forming Quality
CN106564114A (en) Factorial construction technology for small prefabricated components
CN109252662A (en) Vertical shaft gantry wears cast-in-place concrete floor one-pass molding construction method
CN201850773U (en) Pouring device for constructional column of frame masonry infilled wall
CN103669837A (en) Construction method for rapidly removing formwork on slope concrete structure
CN108544655A (en) The curved beam prefabricated construction method of curved bridge
CN109278155A (en) A kind of translucent concrete ship quick molding method
CN111516096A (en) Precast column concrete pouring method in fabricated building
CN104074354A (en) Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template
CN109750831A (en) The template system and mold method that kitchen toilet water-stopping platform and floor drop plate pour simultaneously
CN106368362A (en) Hollow floor for GBF high-infusion alloy thin-walled square boxes and manufacturing method
CN106088583A (en) Construction ceiling Concrete Double mode structure
CN207277644U (en) The box internal model hollow floor of air-entrained concrete building block
CN106192699B (en) A kind of same phase out-phase road surface cutting method and device
CN206158756U (en) Tunnel concrete floor and low wall pour template device
CN115538316A (en) Pier column construction method
CN104453235B (en) Current conversion station fire wall construction technology
CN108331343A (en) The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint
CN107587637A (en) The box internal model hollow floor of air-entrained concrete building block and its construction method
CN207812999U (en) Digital alloy steel framework plastic formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326