CN101768981A - Underwater tunnel-bridge - Google Patents
Underwater tunnel-bridge Download PDFInfo
- Publication number
- CN101768981A CN101768981A CN200910028723A CN200910028723A CN101768981A CN 101768981 A CN101768981 A CN 101768981A CN 200910028723 A CN200910028723 A CN 200910028723A CN 200910028723 A CN200910028723 A CN 200910028723A CN 101768981 A CN101768981 A CN 101768981A
- Authority
- CN
- China
- Prior art keywords
- bridge
- tunnel
- water
- bridge pier
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses an underwater tunnel-bridge and relates to an underwater passage. The underwater tunnel-bridge consists of a bridge pier, a reinforced concrete deck beam, tunnels, a helmet shield, a secondary channel and a water service road. The tunnels are arranged in parallel on the reinforced concrete deck beam, the shell of each tunnel is covered with the reinforced concrete helmet shield; and the tunnels are provided with the secondary channel which is stretched out of the water face and connected with the water service road, and the water service road is supported by the bridge pier. The invention concisely provides a basic method for building a stable and firm railway close to the water face in a water area with a deep rock layer and high requirement on a navigation pure height so as to well solve a plurality of problems; the tunnel is built by using buoyancy of water, and sand stone is fully used for protecting the tunnel-bridge and absorbing the vibration when a vehicle passes; and the basic method can be used for building stable and firm passages of railways and highways at the downstream of the Yangtze River and similar water areas, and building tunnels close to the water face in a deep water areas.
Description
Technical field
The present invention relates to passage in a kind of water, belong to the bridge construction technical field.
Background technology
In THE LOWER YANGTZE VALLEY with similar rock stratum is dark, the water surface is wide, especially big suspension bridge, cable stayed bridge and even composite bridge are built in navigation clear height big waters, the technology that is used to solve highway communication all possesses.But lead to railway, build the steel structure bridge in similar Wuhu, then certainly will stand in great numbers by bridge pier, be bound to access bridge length, bridge pier Gao Ershen certainly will make the navigation channel seriously limited.If build golden waterway in, its influence to water transport is well imagined.If go deep into the rock stratum built tunnel, then dark nearly hundred meters, even surpass hundred meters, too dark again.If it is built tunnel passes through the alluvium, then difficult again steady.
Summary of the invention
The present invention is directed to the problems referred to above and demand, propose a kind of both more shallow alluvium of in water, passing through, can base oneself upon the organic assembling body in tunnel and bridge in the water of the anti-depression in rock stratum again as the bridge pier that stands in great numbers.
Technical scheme of the present invention is: the present invention is made up of bridge pier, reinforced concrete bridge deck beam, tunnel, helmet cover, subaisle and sidewalk waterborne, tunnel arranged side by side is arranged on the reinforced concrete bridge deck beam, cover steel concrete helmet cover above the shell in tunnel, the tunnel is provided with emersed subaisle, subaisle is connected with sidewalk waterborne, and sidewalk waterborne is supported by bridge pier.
The tunnel lowest part is located under water apart from the above depths of water surface 20m.
Described reinforced concrete bridge deck beam is provided with the circular groove suitable with tunnel bottom, and cross section is pen carriage shape.
The reinforced concrete bridge deck soffit is level and smooth, circular arc is established in itself and confluce, two sides, the bridge floor beam inner hollow, closed at both ends, load when sinking to fall greatly, the length that bridge floor beam is every section is 2 times of bridge pier spacing, and the middle part, two ends of every section bridge floor beam all rests on the corresponding bridge pier, and the both sides of every section bridge floor beam are provided with lifts bail.
Bridge pier of the present invention is by bearing platform and spacing bridge pier two parts are formed under water, be positioned at the following bridge pier in bridge floor beam bottom and be bearing platform under water, every platform be a cross section be fusiformis monolithic construction, also can be character, be positioned at the bridge floor beam both sides on the platform and have emersed spacing bridge pier, the cross-sectional area of spacing bridge pier is less than 1/2 of bearing platform.
Described spacing bridge pier restriction tunnel, helmet cover and and the position of subaisle, and the supporting basis of double as sidewalk waterborne.
The spacing bridge pier middle part that is positioned on the navigation channel is provided with articulated elements, can have a down dip by saving it on by control device waterborne, and it saves up and down also to can be and removably connects, save the junction up and down and be located under water, with the distance of the water surface greater than the specified navigation degree of depth.
The proposition that the present invention is simple and clear dark in the rock stratum; the basic skills that dried up nearer steady real railway passage built in the big waters of navigation clear height demand; more satisfactory solution relevant many difficult problems; the present invention not only uses buoyancy of water to set up the tunnel; and sandstone have been made full use of to the protective effect of tunnel bridge with the cushioning effect when being open to traffic; basic skills of the present invention can apply to THE LOWER YANGTZE VALLEY and railway, the steady real channel of highway are built in similar waters, also can apply in dried up nearer tunnel of construction, profundal zone.
Description of drawings
Fig. 1 is a structural representation of the present invention
1 is that subaisle, 2 is bearing platform under water for bridge floor beam, 9 for submersible pump, 8 for tunnel, 7 for floating drum, 6 for cover in the steel, 5 for steel concrete helmet cover, 4 for spacing bridge pier, 3 among the figure.
Fig. 2 is the structural representation of another embodiment
Fig. 3 is Fig. 1,2 left view
10 is sidewalks waterborne among the figure.
Fig. 4 is the structural representation of junction, tunnel in the water of the present invention
11 is that protection steel bushing, 12 is that rubber sealing boot, 13 is that elastic steel sheet, 14 is that rubber cushion, 15 is spring steel member, 16 cuffs among the figure.
The specific embodiment
The present invention is made up of bridge pier, reinforced concrete bridge deck beam 8, tunnel 6, helmet cover 3, subaisle 1 and sidewalk waterborne 10, tunnel 6 arranged side by side is arranged on the reinforced concrete bridge deck beam 8, cover steel concrete helmet cover 3 above the shell in tunnel 6, tunnel 6 is provided with emersed subaisle 1, subaisle 1 is connected with sidewalk 10 waterborne, and sidewalk 10 waterborne is supported by bridge pier.
Described reinforced concrete bridge deck beam 8 is provided with and the suitable circular groove in 6 bottoms, tunnel, and cross section is pen carriage shape.
Circular arc is established in reinforced concrete bridge deck beam 8 level and smooth bottom surfaces and confluce, two sides, inside is position hollow on the upper side, closed at both ends, load when sinking to fall greatly, bridge floor beam 8 every section length are 2 times of bridge pier spacing, the two ends of every section bridge floor beam 8 and middle part all rest on the corresponding bridge pier, and the both sides of every section bridge floor beam 8 are provided with lifts bail.
Bridge pier of the present invention is by bearing platform 9 and spacing bridge pier 2 two parts are formed under water, be positioned at the following bridge pier in bridge floor beam 8 bottoms and be bearing platform 9 under water, every platform 9 be a cross section be fusiformis monolithic construction, also can be character, be positioned at bridge floor beam 8 both sides on the platform 9 and have emersed spacing bridge pier 2, the cross-sectional area of spacing bridge pier 2 is less than 1/2 of bearing platform 9.
Described spacing bridge pier 2 restriction tunnels 6, helmet cover 3 and and the position of subaisle 1, and the supporting basis of double as sidewalk 10 waterborne.
The below is provided with floor in the tunnel 6, and the below, floor is provided with reservoir, water pump and suction water pipe, and tunnel 6 inner lowest segment are established two high-power automation submersible pumps 7 and ancillary facility thereof at least, and controlled by the ground monitoring chamber, and described floor has check valve.
Super long tunnel is established subaisle 1 in a side of contiguous adjacent tunnel, the double as service aisle, and through sidewalk 10 waterborne is wherein established elevator in the part passage.
When tunnel 6 was installed in the water of the present invention, the top positioning systems had controlled floating drum 5 in the tunnel.
Respectively save the end in the water in tunnel 6 of the present invention and internode is established the flexible sealing connecting portion, comprise and be provided with adaptive stopping means and sealing device, mainly the exceed spring steel member 15 of internode distance and retardance bending of described stopping means, spring steel member 15 is along the tunnel ends setting that circumferentially distributes, described sealing device mainly is made up of stacked elastic steel sheet 13, rubber sealing boot 12 and the cuff 16 that adds interspersed setting of number the 2-3 cover, and wherein big spacing place adds fills out several thicker rubber cushion 14.
The junction overcoat protection steel bushing 11 in tunnel 6 in the water of the present invention, protection steel bushing 11 is formed by the Elastic Steel coiling.
After tunnel 6 in place the fixing, install the reinforced seal layer more within it additional in the water.
Claims (6)
1. tunnel bridge in the water, form by bridge pier, reinforced concrete bridge deck beam, tunnel, helmet cover, subaisle and sidewalk waterborne, it is characterized in that, tunnel arranged side by side is arranged on the reinforced concrete bridge deck beam, cover steel concrete helmet cover above the shell in tunnel, the tunnel is provided with emersed subaisle, and subaisle is connected with sidewalk waterborne, and sidewalk waterborne is supported by bridge pier.
2. tunnel bridge in the water according to claim 1 is characterized in that, the tunnel lowest part is located under water apart from the above depths of water surface 20m.
3. tunnel bridge in the water according to claim 1 is characterized in that, described reinforced concrete bridge deck beam is provided with the circular groove suitable with tunnel bottom, and cross section is pen carriage shape.
4. tunnel bridge in the water according to claim 1, it is characterized in that, the reinforced concrete bridge deck soffit is level and smooth, circular arc is established in itself and confluce, two sides, bridge floor beam inner hollow, closed at both ends, the length that bridge floor beam is every section are 2 times of bridge pier spacing, the middle part, two ends of every section bridge floor beam all rests on the corresponding bridge pier, and the both sides of every section bridge floor beam are provided with lifts bail.
5. tunnel bridge in the water according to claim 1, it is characterized in that, bridge pier of the present invention is by bearing platform and spacing bridge pier two parts are formed under water, be positioned at the following bridge pier in bridge floor beam bottom and be bearing platform under water, every platform be a cross section be fusiformis monolithic construction, also can be character, be positioned at the bridge floor beam both sides on the platform and have emersed spacing bridge pier, the cross-sectional area of spacing bridge pier is less than 1/2 of bearing platform.
6. tunnel bridge in the water according to claim 1, it is characterized in that, the spacing bridge pier middle part that is positioned on the navigation channel is provided with articulated elements, can have a down dip by joint on it by control device waterborne, it saves up and down also to can be and removably connects, save the junction up and down and be located under water, with the distance of the water surface greater than the specified navigation degree of depth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910028723A CN101768981A (en) | 2009-01-01 | 2009-01-01 | Underwater tunnel-bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910028723A CN101768981A (en) | 2009-01-01 | 2009-01-01 | Underwater tunnel-bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101768981A true CN101768981A (en) | 2010-07-07 |
Family
ID=42502067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910028723A Pending CN101768981A (en) | 2009-01-01 | 2009-01-01 | Underwater tunnel-bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101768981A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587417A (en) * | 2012-03-31 | 2012-07-18 | 招商局重庆交通科研设计院有限公司 | Urban underwater overpass tunnel system |
CN107190776A (en) * | 2017-06-13 | 2017-09-22 | 中交二航局第三工程有限公司 | Water discharge tunnel standpipe plants pipe construction device and method |
CN114960757A (en) * | 2021-02-26 | 2022-08-30 | 宝山钢铁股份有限公司 | Net-hanging masking type tunnel under still water surface and construction method thereof |
CN114960755A (en) * | 2021-02-26 | 2022-08-30 | 宝山钢铁股份有限公司 | Shielding type tunnel on underwater rock foundation and construction method thereof |
-
2009
- 2009-01-01 CN CN200910028723A patent/CN101768981A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587417A (en) * | 2012-03-31 | 2012-07-18 | 招商局重庆交通科研设计院有限公司 | Urban underwater overpass tunnel system |
CN107190776A (en) * | 2017-06-13 | 2017-09-22 | 中交二航局第三工程有限公司 | Water discharge tunnel standpipe plants pipe construction device and method |
CN107190776B (en) * | 2017-06-13 | 2019-04-19 | 中交二航局第三工程有限公司 | Water discharge tunnel standpipe plants pipe construction device and method |
CN114960757A (en) * | 2021-02-26 | 2022-08-30 | 宝山钢铁股份有限公司 | Net-hanging masking type tunnel under still water surface and construction method thereof |
CN114960755A (en) * | 2021-02-26 | 2022-08-30 | 宝山钢铁股份有限公司 | Shielding type tunnel on underwater rock foundation and construction method thereof |
CN114960757B (en) * | 2021-02-26 | 2024-03-08 | 宝山钢铁股份有限公司 | Calm subsurface net hanging masking type tunnel and construction method thereof |
CN114960755B (en) * | 2021-02-26 | 2024-06-04 | 宝山钢铁股份有限公司 | Masking tunnel on underwater rock foundation and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101634126A (en) | Ground-road combined comprehensive tunnel for underground pipeline and trolley bus | |
CN101215819A (en) | Separated double-layer bridge-floor cable stayed bridge | |
CN104532876B (en) | Deep see immersed type tunnel based on rigidity carrier | |
CN101768981A (en) | Underwater tunnel-bridge | |
CN111734584B (en) | Floating type fan foundation and fan | |
CN201317908Y (en) | Double deck cable stayed bridge of separation type | |
CN111254979B (en) | Cable anchor system of underwater cable-stayed suspension tunnel | |
CN206034268U (en) | Float plank road module of wooden plank road | |
CN105133493A (en) | Embedded track structure suitable for middle-span and small-span bridge and construction method | |
CN113833025A (en) | Water suspension type steel-concrete structure road and railway traffic engineering | |
CN111254983B (en) | Draw formula suspension tunnel to one side under water to connect bank structure | |
CN211849255U (en) | Floating type wave wall structure | |
CN111254980B (en) | Floating weight ratio adjusting system of underwater suspension tunnel | |
WO2014119877A1 (en) | Fit-together, height-adjustable screening structure having breakwater wall | |
CN217706214U (en) | Foam plastic raft type drilling platform suitable for water drilling in low-water area | |
RU2536726C1 (en) | Self-lifting drilling rig | |
CN113202140B (en) | Fixed floated underwater sightseeing tunnel and water sightseeing platform | |
CN105129039A (en) | Floating hydrological measurement station device | |
CN207143998U (en) | A kind of underwater bridge structure | |
KR20150053056A (en) | Submerged floating tunnel and construction method thereof | |
CN1616768A (en) | Easy navigation type over-sea floating bridge | |
CN111827083A (en) | Light long-distance sea-crossing intelligent permanent railway and highway floating bridge with low manufacturing cost and short construction period | |
CN101985837A (en) | Process and construction method for manufacturing integral submarine tunnel on land | |
KR20100117701A (en) | An underwater bridge | |
CN218229332U (en) | Suspension type sightseeing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20100707 |
|
WD01 | Invention patent application deemed withdrawn after publication |