CN101749021A - 一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法 - Google Patents

一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法 Download PDF

Info

Publication number
CN101749021A
CN101749021A CN200810207310A CN200810207310A CN101749021A CN 101749021 A CN101749021 A CN 101749021A CN 200810207310 A CN200810207310 A CN 200810207310A CN 200810207310 A CN200810207310 A CN 200810207310A CN 101749021 A CN101749021 A CN 101749021A
Authority
CN
China
Prior art keywords
push
bench
received well
well
narrow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810207310A
Other languages
English (en)
Other versions
CN101749021B (zh
Inventor
张朝彪
周杜鑫
王国弼
金中林
徐进勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN 200810207310 priority Critical patent/CN101749021B/zh
Publication of CN101749021A publication Critical patent/CN101749021A/zh
Application granted granted Critical
Publication of CN101749021B publication Critical patent/CN101749021B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明涉及一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法。其特征在于:顶管机接近接收井后,在接收井上开凿洞门,顶管机的前端依靠后端的动力装置部分进入狭小的接收井内,对顶管机的前端外层钢壳做适当加固后,拆除与顶管机钢壳连接的顶管机部件并运离接收井,将接收井内的顶管机的外层钢壳割除,并吊离接收井,随后依上述方法,直到顶管机剩余部分全部进入接收井,由此完成在狭小接收井内顶管机的进洞接收工作。本发明的优点是解决列施工场地狭小的问题,同时由于分段割除的仅是顶管机钢壳,但顶管机内部的核心部件仍完整地予以保留,待以后再制作钢壳后重新组装部件以形成完整的顶管机,因而经济节约。

Description

一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法
技术领域
本发明涉及一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法。
背景技术
目前在城市的建设中为了尽可能地利用地下空间,有大量的地下隧道的顶管施工,现在一般采用地下顶管的施工工艺,它是利用顶管机从一个工作井顶管到另一接收井来完成地下管道的施工,它避免了对于地面的开挖,最大限度地保持地面交通的正常进行。通常当完成地下顶管施工后,顶管机应进入接收井,从而在此空间内完成顶管机的解体工作,并将其取出。通常情况下,接收井的空间应大于顶管机的外形尺寸,从而使得施工人员有足够的操作位置完成拆除顶管机的工作。但是,在特殊情况下,尤其是在城市闹市区既有地下建筑物内,且甚至顶管机只能斜向进入接收井时,由于受到周边建筑物的影响,无法提供足够容纳顶管机的空间时,进洞工作的困难就变得异常突出。此处的狭小接收井是指其长度小于顶管顶管机的长度。因而,顶管机无法完全进入接收井,由此也不能按常规方法完成顶管机的解体。
发明内容
本发明的目的是解决在狭小的接收井内不能按常规方法完成顶管机的解体所存在的问题,提供一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法。本发明设计一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法,其特征在于:当顶管机接近接收井后,在接收井相对于顶管机顶管线上开凿洞门,然后顶管机的前端依靠后端的动力装置部分进入狭小的接收井内,对顶管机的前端外层钢壳做适当加固后,首先拆除与顶管机钢壳连接的顶管机部件并运离接收井,当确认接收井的投影范围内无顶管机部件后,将接收井内的顶管机的外层钢壳割除,并吊离接收井,此后顶管机再次依靠后端的动力装置顶进拼装管节后,又有一部分顶管机进入狭小接收井,依上述方法,对钢壳适当加固后拆除接收井投影范围内的部件,然后再次割除钢壳,并吊离接收井,直到顶管机剩余部分全部进入接收井,由此完成在狭小接收井内顶管机的进洞接收工作。本发明的优点是解决列施工场地狭小的问题,同时由于分段割除的仅是顶管机钢壳,但顶管机内部的核心部件仍完整地予以保留,待以后再制作钢壳后重新组装部件以形成完整的顶管机,因而经济节约。
附图说明
附图1为本发明中顶管机接近接收井的示意图,
附图2为本发明中顶管机进接收井洞口的示意图,
附图3为本发明中顶管机在接收井中部分被拆卸后吊起空壳的示意图,
附图4为本发明中顶管机全部进接收井的示意图,
具体实施方式
当顶管机1接近接收井2后,在接收井2上相对于顶管机1顶管线上开凿洞门3,并在接收井2中搭建接收胎架4,然后顶管机1的前端依靠后端的动力装置部分进入狭小的接收井2内的接收胎架4上,对顶管机1的前端外层钢壳做适当加固后,首先拆除与顶管机1钢壳连接的顶管机部件并运离接收井2,当确认接收井2的投影范围内无顶管机1部件后,将接收井2内的顶管机1的外层钢壳割除,并吊离接收井2,此后顶管机1再次依靠后端的动力装置顶进拼装管节后,又有一部分顶管机1进入狭小接收井2,依上述方法,对钢壳适当加固后拆除接收井投影范围内的部件,然后再次割除钢壳,并吊离接收井2,直到顶管机1剩余部分可以全部进入接收井2,可以利用大型吊车一次性完成吊离接收井2的工作,完成在狭小接收井2内顶管机1的进洞接收工作。
利用本发明可以解决由于接收井的长度小而顶管机的长度大,无法在接收井内一次性完成顶管机的解体工作。将顶管机逐次顶入接收井,分段割除,解决了施工场地狭小的问题。而由于分段割除的仅是顶管机钢壳,但顶管机内部的核心部件仍完整地予以保留。待以后再制作钢壳后重新组装部件以形成完整的顶管机,因而经济节约。

Claims (1)

1.一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法,其特征在于:当顶管机接近接收井后,在接收井相对于顶管机顶管线上开凿洞门,然后顶管机的前端依靠后端的动力装置部分进入狭小的接收井内,对顶管机的前端外层钢壳做适当加固后,首先拆除与顶管机钢壳连接的顶管机部件并运离接收井,当确认接收井的投影范围内无顶管机部件后,将接收井内的顶管机的外层钢壳割除,并吊离接收井,此后顶管机再次依靠后端的动力装置顶进拼装管节后,又有一部分顶管机进入狭小接收井,依上述方法,对钢壳适当加固后拆除接收井投影范围内的部件,然后再次割除钢壳,并吊离接收井,直到顶管机剩余部分全部进入接收井,由此完成在狭小接收井内顶管机的进洞接收工作。
CN 200810207310 2008-12-18 2008-12-18 一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法 Expired - Fee Related CN101749021B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810207310 CN101749021B (zh) 2008-12-18 2008-12-18 一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810207310 CN101749021B (zh) 2008-12-18 2008-12-18 一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法

Publications (2)

Publication Number Publication Date
CN101749021A true CN101749021A (zh) 2010-06-23
CN101749021B CN101749021B (zh) 2013-09-18

Family

ID=42476580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810207310 Expired - Fee Related CN101749021B (zh) 2008-12-18 2008-12-18 一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法

Country Status (1)

Country Link
CN (1) CN101749021B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102486091A (zh) * 2010-12-06 2012-06-06 上海市机械施工有限公司 一种在封闭空间内矩形顶管机斜出洞的施工方法
CN102486092A (zh) * 2010-12-06 2012-06-06 上海市机械施工有限公司 一种在深覆土地层中的矩形通道施工的顶管机进洞施工方法
CN102505945A (zh) * 2011-12-29 2012-06-20 上海市机械施工有限公司 一种在已建建筑物内矩形顶管机进洞的施工方法
CN102518443A (zh) * 2011-12-26 2012-06-27 上海市机械施工有限公司 超浅覆土异型通道特种组合施工的新方法
CN104763436A (zh) * 2015-03-09 2015-07-08 中国地质大学(武汉) 一种用于高水压复杂地质条件下的顶管机接收方法及装置
CN105041322A (zh) * 2015-06-08 2015-11-11 上海隧道工程有限公司 顶管机进出洞的加固方法及加固系统
CN107035381A (zh) * 2017-05-26 2017-08-11 安徽理工大学 一种地下矿井tbm拆卸施工方法
CN109667985A (zh) * 2018-12-26 2019-04-23 上海市政建设有限公司 顶管施工中顶管机与接收井钢套管对接的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030022243A (ko) * 2003-02-21 2003-03-15 건양씨앤이 주식회사 중소구경 강관압입 추진 공법 및 그 장치
CN1865650A (zh) * 2006-06-22 2006-11-22 刘明明 水平螺旋钻机与水平定向钻机协同工作顶管施工方法
CN100425801C (zh) * 2005-06-17 2008-10-15 上海市隧道工程轨道交通设计研究院 用于地下管涵直线暗挖的对拉装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030022243A (ko) * 2003-02-21 2003-03-15 건양씨앤이 주식회사 중소구경 강관압입 추진 공법 및 그 장치
CN100425801C (zh) * 2005-06-17 2008-10-15 上海市隧道工程轨道交通设计研究院 用于地下管涵直线暗挖的对拉装置
CN1865650A (zh) * 2006-06-22 2006-11-22 刘明明 水平螺旋钻机与水平定向钻机协同工作顶管施工方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102486091A (zh) * 2010-12-06 2012-06-06 上海市机械施工有限公司 一种在封闭空间内矩形顶管机斜出洞的施工方法
CN102486092A (zh) * 2010-12-06 2012-06-06 上海市机械施工有限公司 一种在深覆土地层中的矩形通道施工的顶管机进洞施工方法
CN102486091B (zh) * 2010-12-06 2014-03-12 上海市机械施工集团有限公司 一种在封闭空间内矩形顶管机斜出洞的施工方法
CN102518443A (zh) * 2011-12-26 2012-06-27 上海市机械施工有限公司 超浅覆土异型通道特种组合施工的新方法
CN102505945A (zh) * 2011-12-29 2012-06-20 上海市机械施工有限公司 一种在已建建筑物内矩形顶管机进洞的施工方法
CN102505945B (zh) * 2011-12-29 2014-07-30 上海市机械施工集团有限公司 一种在已建建筑物内矩形顶管机进洞的施工方法
CN104763436A (zh) * 2015-03-09 2015-07-08 中国地质大学(武汉) 一种用于高水压复杂地质条件下的顶管机接收方法及装置
CN105041322A (zh) * 2015-06-08 2015-11-11 上海隧道工程有限公司 顶管机进出洞的加固方法及加固系统
CN107035381A (zh) * 2017-05-26 2017-08-11 安徽理工大学 一种地下矿井tbm拆卸施工方法
CN107035381B (zh) * 2017-05-26 2018-06-22 安徽理工大学 一种地下矿井tbm拆卸施工方法
CN109667985A (zh) * 2018-12-26 2019-04-23 上海市政建设有限公司 顶管施工中顶管机与接收井钢套管对接的方法
CN109667985B (zh) * 2018-12-26 2024-04-16 上海市政建设有限公司 顶管施工中顶管机与接收井钢套管对接的方法

Also Published As

Publication number Publication date
CN101749021B (zh) 2013-09-18

Similar Documents

Publication Publication Date Title
CN101749021A (zh) 一种地下顶管施工时顶管机斜向进入狭小接收井内的接收方法
CN102011596B (zh) 盾构始发或接收端头洞门维护工艺
CN103362515B (zh) 盾构土仓高压水冲刷系统
CN100491694C (zh) 机内可拆换式盾构刀盘驱动装置及其拆换方法
CN202852194U (zh) 一种非开挖气动裂管修复地下管道的装置及系统
CN103628884A (zh) 小净距隧道中夹岩加固方法
CN103244127B (zh) 一种加快连拱隧道施工速度的方法
CN109339809A (zh) 一种适应于大埋深的经济型隧道掘进机及其施工方法
CN109779653A (zh) 软岩大断面隧道交岔口施工方法
CN104612722A (zh) 一种环形盾构或环形顶管始发及到达的洞门加固方法
CN202181907U (zh) 一种无榫管幕结构
CN103352701A (zh) 一种盾构机的推盾施工工法
CN203113344U (zh) 注浆管
CN105863673B (zh) 顶推机机身可返回式顶管施工方法及施工结构
CN205225272U (zh) 防盾构管片上浮施工结构
CN105863666B (zh) 一种隧道掘进机排渣装置及具有该装置的非开挖隧道掘进机
CN104018864B (zh) 超前支护径向锚杆结构及其施工方法
CN205100997U (zh) 一种隧道超前支护用高强度管棚管
CN114483067A (zh) 一种双护盾tbm护盾卡机自主脱困方法
CN204326061U (zh) 一种易拔出的管桩
CN203514325U (zh) 一种重力式水泥土墙结合单排桩的基坑梯级支护体系
CN206035494U (zh) 一种管棚施工推进器
CN203129140U (zh) 一种注水成孔、注浆拉锚、抽排降水土钉管
CN103061344B (zh) 注浆管
CN204898692U (zh) 一种边坡加固结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHANGHAI CITY MACHINERY CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 201802 Shanghai City, Jiading District Nanxiang Town, Shanghai Yi Road No. 1255

Patentee after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 201802 Shanghai City, Jiading District Nanxiang Town, Shanghai Yi Road No. 1255

Patentee before: Shanghai Mechanized Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130918

Termination date: 20191218

CF01 Termination of patent right due to non-payment of annual fee