CN101748883B - Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points - Google Patents

Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points Download PDF

Info

Publication number
CN101748883B
CN101748883B CN200810204684.1A CN200810204684A CN101748883B CN 101748883 B CN101748883 B CN 101748883B CN 200810204684 A CN200810204684 A CN 200810204684A CN 101748883 B CN101748883 B CN 101748883B
Authority
CN
China
Prior art keywords
scaffold
strength aluminum
aluminum alloy
continuous fixed
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200810204684.1A
Other languages
Chinese (zh)
Other versions
CN101748883A (en
Inventor
李福全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200810204684.1A priority Critical patent/CN101748883B/en
Publication of CN101748883A publication Critical patent/CN101748883A/en
Application granted granted Critical
Publication of CN101748883B publication Critical patent/CN101748883B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points, which belongs to the field of construction facility. The main material of the scaffold is made of 6082-T6 high strength aluminum alloy, the scaffold adopts frame type cross connection, and the frame adopts prefabricated die blocks. During the installation process, by the installation method of rotating the pin, the worker needs to push the pin forward, position the T-head component in the vertical state, insert the T-head component into the groove of the upright column, rotate the Z-shaped groove of the pin for 90 degree, and perform fastening through a hammer. Then the entire installation is completed, and the disassembly process is in reverse. Compared with the traditional construction method, the scaffold has the advantages of safety, reliability, convenient installation and disassembly, simple structure and strong adaptability.

Description

Continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold
Technical field:
The invention discloses a kind of new type scaffold, refer more particularly to a kind of high-strength aluminum alloy of fixed point continuously fast-assembling new type scaffold, belong to construction equipment field.
Background technology:
China is as the developing country of a high speed development, builing industry is just experiencing the vigorous growth stage, no matter that vast esidential building building or public mega project are all at experience unprecedented upsurge in construction, scaffold as one of most important equipment of builing industry, in state-owned huge demand.
At present, at home in construction market, main industrial product scaffold is steel tube fastener formula scaffold, this scaffold originates from European and American developed countries in 20 beginnings of the century, China introduces this scaffold in the nineties later stage in last century from America and Europe, and the main building project of current China all adopts steel tube fastener formula scaffold.
The main material of steel tube fastener formula scaffold adopts Q235 steel, steel tube surface is sprayed paint or zinc-plated, critical piece is 48.3X3.5mm steel pipe, fastener and bolt, main mounting means employing spanner tights a bolt and fixes fastener and steel pipe, main product processing technique is round as a ball welding and forging and stamping, because steel tube fastener formula scaffold is at material, processing technology, surfacing, mounting methods etc. all also exist very large not scientific, so, steel tube fastener formula scaffold also exists the time-consuming effort of installing/dismounting in actual applications, consume a large amount of artificial and time, and the corrosion that gets rusty easily, reduce the holding capacity of scaffold, and the shortcoming such as poor safety performance.
Summary of the invention:
The object of this invention is to provide a kind of high-strength aluminum alloy of fixed point continuously fast-assembling new type scaffold, the advantages such as it has excellent Anti-inclining performance, safe and reliable, to facilitate installing/dismounting, component with low cost, reusable.
The present invention is achieved by the following technical solutions:
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, the material adopted is 6082T6 high-strength aluminum alloy, the performance of 6082T6 high-strength aluminum alloy is tensile strength is 310Mpa, yield strength is 280Mpa, elongation per unit length is 8%, because aluminium alloys can not get rusty under field conditions (factors), therefore ensure that this product can not cause the decline of scaffold holding power because getting rusty, and the critical piece of product adopts the technique of extruding, aluminium alloys adopts the technique of extruding in process of production, can design elements section adopt spiral, bending colored part circular tube structure, greatly can improve the bearing capacity of unit part, in addition, metal is under the technique of extruding, because crystal inside is tightr, therefore the mechanical property of part can be improved.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, adopt frame type lateral connection, all frameworks adopt Prefabricated block, with the mounting method of rotary insertion pin, whole scaffold need not a bolt in installation process, only need a hammer just can complete, reduce the installation of workman, thus improve efficiency of construction.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, in installation process, workman needs by latch toward sinciput, and T head dummy parts are in plumbness, then stretches in the trough of column by T head dummy parts, by T head dummy parts 90-degree rotation,strike tightly with hammer, now just complete whole installation, on the contrary unloading process.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, the parts all after assembling process due to this scaffold are fixed together, so in use, can move integrally as required, that can reduce part like this repeats installation, reduces work hours.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, be all furnished with a threaded rod under every root pillar, this threaded rod can adjust according to the concavo-convex of ground, and realizes at short notice regulating.
The framework of described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold adopts the mutual embedding structure of aluminium wood, and module is placed directly on framework, and nails.
Owing to have employed above technical scheme, the present invention has following beneficial effect:
1. excellent Anti-inclining performance, security performance are high;
2. facilitate installing/dismounting, prevent from getting rusty;
3. component is with low cost, reusable;
4. large, the strong adaptability of bearing capacity, economize on resources.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of the framework in the present invention;
Fig. 3 is the structural representation of adjustable support leg in the present invention.
Wherein: 1 adjustable support leg, 2 columns, 3 frameworks, 4 are rotatably connected latch, 5 draw-in grooves, 6 screw threads, 7 nuts.
detailed description of the invention:
Below in conjunction with accompanying drawing, structure of the present invention is further illustrated: with reference to accompanying drawing 1, 2, 3, continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, adjustable support leg (1) can directly insert in the pipe of column (2), and the height of adjusting post (2) is carried out by the nut (6) on adjustable support leg (1), connect with framework (3) between two root posts (2), framework is divided into 1.2 meters, 1.5 rice, 1.8 rice, 2.4 rice, 3.0 meters are waited different length, the two ends of framework (3) are provided with draw-in groove (5), framework (3) is direct and column (2) clamping by draw-in groove (5), each framework (3) is provided with 4 latches that are rotatably connected (4), be rotatably connected to have in latch (4) one can 90 degree rotate and the T head dummy parts of fore-aft travel, when T head dummy parts are in plumbness, can by any one of the head of T head dummy parts insertion column (2) upper 8 grooves, then T head dummy parts 90-degree rotation will be rotated, the head of T head dummy parts is made to be buckled in the both sides of the groove of column (2), again the whippletree on T head dummy parts pin is inserted, fix T head dummy parts, an adjustable support leg (1) is all furnished with under vertical (2) post of every root, adjustable support leg (1) can adjust according to the concavo-convex of ground, tune nut (7) can turn screw thread (6) change adjustable support leg (1) length.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, the parts all after assembling process due to this scaffold are fixed together, so in use, can move integrally as required, that can reduce part like this repeats installation, reduces work hours.
The crossbeam of described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold adopts the mutual embedding structure of aluminium wood, and module is placed directly on framework, and adopts and nail.

Claims (2)

1. continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, it is characterized in that: the material of main material is 6082 T6 high-strength aluminum alloys, adopt frame type lateral connection, framework adopts Prefabricated block, each framework is provided with the latch that is rotatably connected, be rotatably connected in latch and be provided with T head dummy parts, in installation process, with the mounting method of rotary insertion pin, workman needs latch toward sinciput, T head dummy parts are in plumbness, then T head dummy parts are stretched in the trough of column, by T connector parts 90-degree rotation, strike tightly with hammer, now just complete whole installation.
2. continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold according to claim 1, is characterized in that: be all furnished with a threaded rod under every root pillar, this threaded rod can adjust according to the concavo-convex of ground.
CN200810204684.1A 2008-12-16 2008-12-16 Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points Expired - Fee Related CN101748883B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810204684.1A CN101748883B (en) 2008-12-16 2008-12-16 Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810204684.1A CN101748883B (en) 2008-12-16 2008-12-16 Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points

Publications (2)

Publication Number Publication Date
CN101748883A CN101748883A (en) 2010-06-23
CN101748883B true CN101748883B (en) 2015-02-04

Family

ID=42476449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810204684.1A Expired - Fee Related CN101748883B (en) 2008-12-16 2008-12-16 Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points

Country Status (1)

Country Link
CN (1) CN101748883B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635227B (en) * 2012-04-28 2015-11-18 深圳市特辰科技股份有限公司 Aluminium alloys lifting false work
CN109346294A (en) * 2018-12-05 2019-02-15 江苏宏源电气有限责任公司 A kind of novel transformer high voltage porcelain bushing pipe and its mounting structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2153597Y (en) * 1992-12-08 1994-01-19 朱可夫 Stiff clamp for connecting scaffold member
CN2617857Y (en) * 2003-02-20 2004-05-26 李富安 Quick rotating connector for scaffold
EP1589162A1 (en) * 2002-12-02 2005-10-26 Ingenieria de Encofrados y Servicios, S.L. FA4çADE SCAFFOLD
CN2871715Y (en) * 2006-01-27 2007-02-21 刘维俊 Spiral connector scaffold

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200985643Y (en) * 2006-03-09 2007-12-05 赵中南 Large moulding plate error flat proof rapid assembling connecting structure
CN201071593Y (en) * 2007-07-24 2008-06-11 魏志光 Adjustable supporting column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2153597Y (en) * 1992-12-08 1994-01-19 朱可夫 Stiff clamp for connecting scaffold member
EP1589162A1 (en) * 2002-12-02 2005-10-26 Ingenieria de Encofrados y Servicios, S.L. FA4çADE SCAFFOLD
CN2617857Y (en) * 2003-02-20 2004-05-26 李富安 Quick rotating connector for scaffold
CN2871715Y (en) * 2006-01-27 2007-02-21 刘维俊 Spiral connector scaffold

Also Published As

Publication number Publication date
CN101748883A (en) 2010-06-23

Similar Documents

Publication Publication Date Title
CN101748883B (en) Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points
CN204477005U (en) Built-in sliding chute is fixing uses T-shaped bolt
CN103243901A (en) External scaffolding bridging connector
CN106869520B (en) Reinforced concrete beam reinforcing device and installation method thereof
CN214615043U (en) Prefabricated component reserved steel bar positioning and correcting device
CN212656599U (en) Steel structure component for reinforcement of assembly type building
CN211775944U (en) Support arrangement for quicken installation of taking one's place of PC wall body
CN204492327U (en) A kind of Assembled safety enclosing railings
CN202622700U (en) Hanger rod installation tool
CN218970608U (en) Scaffold connecting piece for construction engineering construction
CN201358576Y (en) Novel fast-assembled aluminium alloy scaffolding structure
CN206987410U (en) A kind of adjustable guard rail fixed mount
CN201771199U (en) Fixture for mounting safety ropes
CN205153127U (en) Stabilize steel construction
CN212336703U (en) Socket key groove type steel pipe bearing support structure
CN219375918U (en) Safety belt fixing clamp for building edge operation
CN220848621U (en) Mounting structure of overhanging scaffold
CN219261370U (en) Connection structure for steel structure installation
CN216731580U (en) Stable form end plate
CN214246612U (en) Template system for post-cast plate construction of pipe shaft
CN219863317U (en) Building steel structure convenient to equipment
CN203175031U (en) Connecting piece for external frame diagonal bridging
CN204386168U (en) A kind of shaped steel assembly type type pillar shuttering clamp
CN210530388U (en) Simple detachable safety flat net structure
CN218428036U (en) Be used for vertical bottom plate to go up screw rod pretightning force and screw up auxiliary device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

Termination date: 20151216

EXPY Termination of patent right or utility model