CN101748883A - Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points - Google Patents
Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points Download PDFInfo
- Publication number
- CN101748883A CN101748883A CN200810204684A CN200810204684A CN101748883A CN 101748883 A CN101748883 A CN 101748883A CN 200810204684 A CN200810204684 A CN 200810204684A CN 200810204684 A CN200810204684 A CN 200810204684A CN 101748883 A CN101748883 A CN 101748883A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- strength aluminum
- scaffold
- continuous fixed
- new type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points, which belongs to the field of construction facility. The main material of the scaffold is made of 6082-T6 high strength aluminum alloy, the scaffold adopts frame type cross connection, and the frame adopts prefabricated die blocks. During the installation process, by the installation method of rotating the pin, the worker needs to push the pin forward, position the T-head component in the vertical state, insert the T-head component into the groove of the upright column, rotate the Z-shaped groove of the pin for 90 degree, and perform fastening through a hammer. Then the entire installation is completed, and the disassembly process is in reverse. Compared with the traditional construction method, the scaffold has the advantages of safety, reliability, convenient installation and disassembly, simple structure and strong adaptability.
Description
Technical field:
The invention discloses a kind of new type scaffold, refer more particularly to a kind of continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, belong to the construction equipment field.
Background technology:
China is as the developing country of a high speed development, builing industry is just experiencing the vigorous growth stage, no matter be that vast esidential building building or public mega project are all at unprecedented upsurge in construction of experience, scaffold is as one of builing industry most important equipment, in state-owned huge demand.
At present, at home on the construction market, main industrial product scaffold is a steel tube fastener formula scaffold, this scaffold is to originate from American-European developed country in 20 beginnings of the century, China introduces this scaffold in the nineties later stage in last century from the America and Europe, and the main building project of China all adopts steel tube fastener formula scaffold at present.
The main material of steel tube fastener formula scaffold adopts the Q235 steel, steel tube surface is sprayed paint or is zinc-plated, critical piece is 48.3 * 3.5mm steel pipe, fastener and bolt, main mounting means employing spanner tights a bolt and fixes fastener and steel pipe, main product processing technique is round as a ball welding and forging and pressing, because steel tube fastener formula scaffold is at material, processing technology, surfacing, mounting methods etc. all exist very big not scientific, so, steel tube fastener formula scaffold exists the time-consuming effort of installing/dismounting in actual applications, consume a large amount of artificial and time, and the corrosion that gets rusty easily reduces the holding capacity of scaffold, and shortcoming such as poor safety performance.
Summary of the invention:
The purpose of this invention is to provide a kind of continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, it has good anti-inclination performance, and is safe and reliable, make things convenient for advantages such as installing/dismounting, member be with low cost, reusable.
The present invention is achieved by the following technical solutions:
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, the material that adopts is the 6082T6 high-strength aluminum alloy, the performance of 6082T6 high-strength aluminum alloy is that tensile strength is 310Mpa, yield strength is 280Mpa, elongation per unit length is 8%, because aluminium alloys can not get rusty under field conditions (factors), therefore guaranteed that this product can not cause the decline of scaffold holding power because of getting rusty, and the critical piece of product adopts the technology of extruding, aluminium alloys adopts the technology of extruding in process of production, section that can design elements adopts spiral, crooked colored part circular tube structure, can improve the bearing capacity of unit part greatly, in addition, metal is under the technology of extruding, because crystal inside is tightr, therefore can improve the mechanical property of part.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, adopt frame type laterally to connect, all frameworks adopt Prefabricated block, mounting method with the rotation bolt-type, whole scaffold need not a bolt in installation process, only need a hammer just can finish, reduce workman's installation, thereby improved efficiency of construction.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, in installation process, the workman need be with latch toward sinciput, T head dummy parts are in plumbness, then T head dummy parts are stretched in the trough of column, latch Z type groove is revolved turn 90 degrees, strike tightly with hammer, just finished whole erection this moment, on the contrary unloading process.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, because this scaffold all parts after assembling process are fixed together, so in use, can carry out integral body as required and move, can reduce the installation that repeats of part like this, reduce work hours.
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold all is furnished with a threaded rod under the every pillar, this threaded rod can be adjusted according to the concavo-convex of ground, and realizes at short notice regulating.
The framework of described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold adopts aluminium wood embedding structure mutually, and module is placed directly on the framework, and nails.
Owing to adopted above technical scheme, the present invention has following beneficial effect:
1. good anti-inclination performance, security performance height;
2. make things convenient for installing/dismounting, prevent to get rusty;
3. member is with low cost, reusable;
4. bearing capacity is big, compliance strong, economize on resources etc.
Description of drawings:
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of the framework among the present invention;
Fig. 3 is the structural representation of adjustable support leg among the present invention.
Wherein: 1 adjustable support leg, 2 columns, 3 frameworks, 4 be rotatably connected latch, 5 draw-in grooves, 6 screw threads, 7 nuts.
The specific embodiment:
Below in conjunction with accompanying drawing structure of the present invention is further specified: with reference to accompanying drawing 1,2,3, continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, adjustable support leg (1) can directly insert in the pipe of column (2), and regulate the height of column (2) by the nut (6) on the adjustable support leg (1), connect with framework (3) between two root posts (2), framework is divided into 1.2 meters, 1.5 rice, 1.8 rice, 2.4 rice, 3.0 different lengths such as rice, the two ends of framework (3) are provided with draw-in groove (5), framework (3) can pass through direct and column (2) clamping of draw-in groove (5), each framework (3) all is equipped with 4 latches that are rotatably connected (4), be rotatably connected have in the latch (4) one can 90 degree rotations and before and after movable T head dummy parts, when T head dummy parts are in plumbness, the head of T head dummy parts can be inserted any one of last 8 grooves of column (2), to rotate T head dummy parts then revolves and turn 90 degrees, make the head of T head dummy parts be buckled in the both sides of the groove of column (2), again the whippletree on the T head dummy parts pin is inserted, fix T head dummy parts, all is furnished with an adjustable support leg (1) under every upright (2) post, adjustable support leg (1) can be adjusted according to the concavo-convex of ground, tunes nut (7) but the length of turn screw thread (6) change adjustable support leg (1).
Described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, because this scaffold all parts after assembling process are fixed together, so in use, can carry out integral body as required and move, can reduce the installation that repeats of part like this, reduce work hours.
The crossbeam of described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold adopts aluminium wood embedding structure mutually, and module is placed directly on the framework, and adopts nail to fix.
Claims (5)
1. the high-strength aluminum alloy fast-assembling new type scaffold of fixing a point continuously, it is characterized in that: the material of main material is 6082 T6 high-strength aluminum alloys, adopts frame type laterally to connect, and framework adopts Prefabricated block, in installation process, with the mounting method of rotation bolt-type, the workman need be in plumbness with T head dummy parts with latch toward sinciput, then T head dummy parts are stretched in the trough of column, latch Z type groove revolved turn 90 degrees, strike tightly, just finished whole erection this moment with hammer.
2. according to claims 1 described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, it is characterized in that: adopt frame type laterally to connect, all frameworks adopt Prefabricated block.
3. according to claims 1 described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, it is characterized in that: in installation process, with the mounting method of rotation bolt-type.
4. according to claims 1 described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, it is characterized in that: the workman need be in plumbness with T head dummy parts with latch toward sinciput, then T head dummy parts is stretched in the trough of column, latch Z type groove revolved turn 90 degrees, strike tightly with hammer.
5. according to claims 1 described continuous fixed point high-strength aluminum alloy fast-assembling new type scaffold, it is characterized in that: all be furnished with a threaded rod under the every pillar, this threaded rod can be adjusted according to the concavo-convex of ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810204684.1A CN101748883B (en) | 2008-12-16 | 2008-12-16 | Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810204684.1A CN101748883B (en) | 2008-12-16 | 2008-12-16 | Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101748883A true CN101748883A (en) | 2010-06-23 |
CN101748883B CN101748883B (en) | 2015-02-04 |
Family
ID=42476449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810204684.1A Expired - Fee Related CN101748883B (en) | 2008-12-16 | 2008-12-16 | Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101748883B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102635227A (en) * | 2012-04-28 | 2012-08-15 | 深圳市特辰科技股份有限公司 | Aluminum alloy lifting scaffold |
CN109346294A (en) * | 2018-12-05 | 2019-02-15 | 江苏宏源电气有限责任公司 | A kind of novel transformer high voltage porcelain bushing pipe and its mounting structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2153597Y (en) * | 1992-12-08 | 1994-01-19 | 朱可夫 | Stiff clamp for connecting scaffold member |
CN2617857Y (en) * | 2003-02-20 | 2004-05-26 | 李富安 | Quick rotating connector for scaffold |
EP1589162A1 (en) * | 2002-12-02 | 2005-10-26 | Ingenieria de Encofrados y Servicios, S.L. | FA4çADE SCAFFOLD |
CN2871715Y (en) * | 2006-01-27 | 2007-02-21 | 刘维俊 | Spiral connector scaffold |
CN200985643Y (en) * | 2006-03-09 | 2007-12-05 | 赵中南 | Large moulding plate error flat proof rapid assembling connecting structure |
CN201071593Y (en) * | 2007-07-24 | 2008-06-11 | 魏志光 | Adjustable supporting column |
-
2008
- 2008-12-16 CN CN200810204684.1A patent/CN101748883B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2153597Y (en) * | 1992-12-08 | 1994-01-19 | 朱可夫 | Stiff clamp for connecting scaffold member |
EP1589162A1 (en) * | 2002-12-02 | 2005-10-26 | Ingenieria de Encofrados y Servicios, S.L. | FA4çADE SCAFFOLD |
CN2617857Y (en) * | 2003-02-20 | 2004-05-26 | 李富安 | Quick rotating connector for scaffold |
CN2871715Y (en) * | 2006-01-27 | 2007-02-21 | 刘维俊 | Spiral connector scaffold |
CN200985643Y (en) * | 2006-03-09 | 2007-12-05 | 赵中南 | Large moulding plate error flat proof rapid assembling connecting structure |
CN201071593Y (en) * | 2007-07-24 | 2008-06-11 | 魏志光 | Adjustable supporting column |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102635227A (en) * | 2012-04-28 | 2012-08-15 | 深圳市特辰科技股份有限公司 | Aluminum alloy lifting scaffold |
CN102635227B (en) * | 2012-04-28 | 2015-11-18 | 深圳市特辰科技股份有限公司 | Aluminium alloys lifting false work |
CN109346294A (en) * | 2018-12-05 | 2019-02-15 | 江苏宏源电气有限责任公司 | A kind of novel transformer high voltage porcelain bushing pipe and its mounting structure |
Also Published As
Publication number | Publication date |
---|---|
CN101748883B (en) | 2015-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100424301C (en) | Pulley type truss-string arc-scaffolding combined structural system | |
CN202787968U (en) | Changeable-angle adjusting type template inclined support | |
CN111441582B (en) | Template for building convenient to swift installation | |
CN108060718B (en) | Detachable assembly type column and foundation ductility node connection mode | |
CN101748883B (en) | Novel high strength aluminum alloy scaffold which can be quickly mounted at continuous fixed points | |
CN204477005U (en) | Built-in sliding chute is fixing uses T-shaped bolt | |
CN204876349U (en) | Steel bar anchoring device | |
CN201358576Y (en) | Novel fast-assembled aluminium alloy scaffolding structure | |
CN210529935U (en) | Primary and secondary beam of steel structure platform | |
CN208867066U (en) | Wind-powered electricity generation studs fastening sleeve component | |
CN209025275U (en) | A kind of assembled architecture steel structure frame Universal connecting piece | |
CN212336703U (en) | Socket key groove type steel pipe bearing support structure | |
CN202622700U (en) | Hanger rod installation tool | |
CN214246612U (en) | Template system for post-cast plate construction of pipe shaft | |
CN220828027U (en) | Wall-penetrating wall connecting piece | |
CN201771199U (en) | Fixture for mounting safety ropes | |
CN220451099U (en) | Supporting steel structure building assembly | |
CN215441633U (en) | Guardrail steel pipe installation is carried and is carried device of taking one's place for municipal construction | |
CN217177941U (en) | Foundation bolt interval adjusting device | |
CN220150526U (en) | Reinforced steel structure | |
CN210530388U (en) | Simple detachable safety flat net structure | |
CN203213023U (en) | Combination tool for controlling down-warping of components | |
CN202964862U (en) | Novel fastening clamp for concrete template | |
CN219375918U (en) | Safety belt fixing clamp for building edge operation | |
CN204386168U (en) | A kind of shaped steel assembly type type pillar shuttering clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150204 Termination date: 20151216 |
|
EXPY | Termination of patent right or utility model |