CN202622700U - Hanger rod installation tool - Google Patents
Hanger rod installation tool Download PDFInfo
- Publication number
- CN202622700U CN202622700U CN 201220085668 CN201220085668U CN202622700U CN 202622700 U CN202622700 U CN 202622700U CN 201220085668 CN201220085668 CN 201220085668 CN 201220085668 U CN201220085668 U CN 201220085668U CN 202622700 U CN202622700 U CN 202622700U
- Authority
- CN
- China
- Prior art keywords
- rod
- hanger rod
- screw cap
- aluminium alloy
- suspension rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a hanger rod installation tool. A rod with certain length is machined according to the height of a structural floor by adopting an aluminum alloy round pipe, a screw cap sleeve (2) is connected to one end of the aluminum alloy rod (1), and a cross rod handle (3) is arranged at a position of 1.5 meters away from the end face at the other end of the rod so that a hanger rod expansion bolt is tightened through the operating rod. When a hanger rod is installed, the hanger rod (4) is inserted into the screw cap sleeve, and one end of the hanger rod (4), which is provided with the expansion bolt, is forcibly tightened into a mounting hole through the handle (3). The tool is suitable for installing the hanger rod for fixing strong and weak bridges, heating and ventilation, fire-fighting horizontal pipes and the like.
Description
Technical field
The utility model relates to the erecting tools in the suspension rod installations such as horizontal tube of a kind of strong and weak electricity crane span structure, HVAC and fire-fighting.
Background technology
The fixing of current strong and weak electricity crane span structure, HVAC and fire-fighting horizontal tube etc. installed with suspension rod; Generally all be to adopt the gate-type mobile platform; Installation personnel stands on the mobile platform and is inserted in the installing hole nut of the expansion bolt that screws up with a wrench with the end of hand with suspension rod band expansion bolt.The gate-type mobile platform was along with constantly move the suspension rod position when on the one hand this method was constructed, and personnel will descend flooring in the moving process for the sake of security, the high and low, and construction is inconvenience very, and the suspension rod installation effectiveness is lower; Operating personnel stand in for a long time on the gate-type mobile platform and construct on the other hand, have potential safety hazard, are prone to take place security incident.
The utility model content
Improve the suspension rod installation efficiency for solving, strengthen working security, the utility model provides a kind of suspension rod erecting tools.Its concrete technical scheme is following:
A kind of suspension rod erecting tools comprises adjustable aluminium alloy rod, handle, is fixed with the screw cap sleeve of the fastening usefulness of suspension rod expansion bolt at adjustable aluminium alloy rod one end, is provided with a hole at the other end of adjustable aluminium alloy rod from the position of end face 1.5m, inserts handle in this hole.
According to the structure story height; Adopt the bar of a certain-length of tube and pipe of aluminium alloy processing and fabricating; Connect a screw cap sleeve on the aluminium alloy rod top, install a cross bar additional from the position of end face 1.5m at the other end of aluminium alloy rod and be convenient to action bars as handle and tighten the suspension rod bolt.When suspension rod is installed, suspension rod is inserted in the sleeve, an end of suspension rod expansion bolt is stuck in the screw cap sleeve, firmly an end of suspension rod band expansion bolt is tightened in the installing hole through cross bar.
The utility model beneficial effect: improved the suspension rod installation efficiency, strengthened working security.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 is the elevation of the utility model;
1. aluminium alloy rods, 2. screw cap sleeves among the figure
3. handle 4. suspension rods.
The specific embodiment
1, according to story height, with the aluminium alloy rod (1) of a certain-length of tube and pipe of aluminium alloy processing and fabricating.
2, at the fixing screw cap sleeve (2) of an end of aluminium alloy rod, screw cap sleeve inserts in the aluminium alloy rod (1), fixes with the aluminium alloy pin.
3, wear a hole at the other end of aluminium alloy rod from the position of end face 1.5m, in the hole, insert a steel handle (3) that long 300mm is long then, this so simple and easy suspension rod erecting tools has been made.
When 4, suspension rod (4) being installed; Installation personnel inserts the suspension rod of an end band expansion bolt in the screw cap sleeve (2); The nut of expansion bolt just is stuck in the screw cap sleeve of aluminium alloy rod end; One end of band screw cap sleeve is aimed at installing hole and is inserted, and both hands are held handle (3) tight in one's hands and tightened suspension rod end expansion bolt, and such suspension rod (4) just installs and fixes and finishes.
Claims (1)
1. suspension rod erecting tools; Comprise adjustable aluminium alloy rod (1), handle (3); It is characterized in that: the screw cap sleeve (2) that is fixed with the fastening usefulness of suspension rod expansion bolt at adjustable aluminium alloy rod (1) one end; The other end at adjustable aluminium alloy rod (1) is provided with a hole from the position of end face 1.5m, inserts handle (3) in this hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220085668 CN202622700U (en) | 2012-03-07 | 2012-03-07 | Hanger rod installation tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220085668 CN202622700U (en) | 2012-03-07 | 2012-03-07 | Hanger rod installation tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202622700U true CN202622700U (en) | 2012-12-26 |
Family
ID=47375940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220085668 Expired - Fee Related CN202622700U (en) | 2012-03-07 | 2012-03-07 | Hanger rod installation tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202622700U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121120A (en) * | 2016-08-17 | 2016-11-16 | 中铁建设集团有限公司 | A kind of hanger rod mounting device |
CN110249905A (en) * | 2019-07-29 | 2019-09-20 | 山东省果树研究所 | A kind of tight silk device of Kiwi berry rack and its application |
-
2012
- 2012-03-07 CN CN 201220085668 patent/CN202622700U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121120A (en) * | 2016-08-17 | 2016-11-16 | 中铁建设集团有限公司 | A kind of hanger rod mounting device |
CN110249905A (en) * | 2019-07-29 | 2019-09-20 | 山东省果树研究所 | A kind of tight silk device of Kiwi berry rack and its application |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201496669U (en) | Pipeline supporting and hanging frame | |
CN204238570U (en) | The spiral adjuster of absolute altitude of frame ball node is installed | |
CN204282853U (en) | Adjustable inner bearing type protective door for elevator shaft | |
CN202622700U (en) | Hanger rod installation tool | |
CN203390893U (en) | Sliding weight for pulling pin | |
CN203541033U (en) | Pipe cleaner trolley | |
CN201851791U (en) | Pipeline clamp | |
CN202117299U (en) | Tool type support system of cantilever scaffold | |
CN202913761U (en) | Tower cross arm with handrail | |
CN201695661U (en) | Component for arranging external suspending bracket of window | |
CN201863181U (en) | Special tool for disassembling and assembling feet screws of air conditioner | |
CN204252496U (en) | Convenient installation device for constructional engineering suspender | |
CN202706511U (en) | Fixing device for hanging scaffold used in dismantling high structures | |
CN201714058U (en) | Detachable overhanging and supporting structure for steel pipe scaffold | |
CN204492327U (en) | A kind of Assembled safety enclosing railings | |
CN204983712U (en) | But socket joint round pin stationary height -adjusting protection canopy | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN204621973U (en) | Surface pipe screw thread helmet extracting tool | |
CN203603490U (en) | Supporting structure used for erecting formwork truss on prefabricated beam | |
CN203514921U (en) | Electricity approaching stay wire replacing tool | |
CN202055146U (en) | Connecting structure for screed board accessories | |
CN204571334U (en) | A kind of security protection platform built for piping lane | |
CN205033132U (en) | A T type long arm sleeve for fastening lead screw | |
CN203956804U (en) | A kind of suspension rod quick-mounting instrument | |
CN204036334U (en) | Top board expansion bolt fastener |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121226 Termination date: 20210307 |
|
CF01 | Termination of patent right due to non-payment of annual fee |