CN101736118B - Installation method of track beam of oxygen lance for steel-making converter - Google Patents

Installation method of track beam of oxygen lance for steel-making converter Download PDF

Info

Publication number
CN101736118B
CN101736118B CN2008101531360A CN200810153136A CN101736118B CN 101736118 B CN101736118 B CN 101736118B CN 2008101531360 A CN2008101531360 A CN 2008101531360A CN 200810153136 A CN200810153136 A CN 200810153136A CN 101736118 B CN101736118 B CN 101736118B
Authority
CN
China
Prior art keywords
track girder
track beam
steel
track
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008101531360A
Other languages
Chinese (zh)
Other versions
CN101736118A (en
Inventor
索建红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Construction Co Ltd
Original Assignee
MCC Tiangong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Construction Co Ltd filed Critical MCC Tiangong Construction Co Ltd
Priority to CN2008101531360A priority Critical patent/CN101736118B/en
Publication of CN101736118A publication Critical patent/CN101736118A/en
Application granted granted Critical
Publication of CN101736118B publication Critical patent/CN101736118B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention relates to an installation method of a track beam of an oxygen lance for a steel-making converter, comprising the following steps of: (1) processing before installing a track beam: the bottom flange plate of the track beam is brazed to the top of a load bearing crossbeam after the load bearing crossbeam is installed in place, but the brazing is carried out after positioning, the standard height of the track beam is measured by a precise leveling instrument, the measuring space is 100mm, measuring data are recorded, the ripple quantity of the measuring data is depictured, a chartis listed, and the ripple figure of the measuring data are drawn; (2) making the track beam into H-shaped steel; (3) cutting the H-shaped steel into T-shaped steel in one step; (4) installing the track beam; (5) measuring the levelness of the top face and the standard height of the track beam until the levelness and the standard height are qualified after the track beam is welded and cooled, and then installing the track beam again. The installation method has the advantage of enhancing the installation precision of the track beam so as to enhance the installation quality of oxygen lance equipment.

Description

Installation method of track beam of oxygen lance for steel-making converter
Technical field:
The invention belongs to a kind of installation method of track girder, particularly a kind of oxygen lance for steel-making converter pwoer track installing method.
Background technology:
In steel-making converter framework installation process, frame beam column progressive error can occur after the multilayer welded and installed, comprise factors such as parts manufacturing deviation, weld seam contraction and settlement of foundation, therefore the repetition measurement of the carrier bar top absolute altitude of the displacement that must carry out framework before the track beam of oxygen lance and track beam of oxygen lance is installed, to control and to revise these deviations, reach the regulation that meets design paper, construction inspection rules, guarantee the complete installation quality of oxygen rifle equipment; And the installation quality of oxygen rifle equipment will directly influence the operation of converter installation, so must control its quality well; And want to reach its setting accuracy, must do from the setting accuracy of track girder earlier.
Summary of the invention:
Purpose of the present invention just is to provide a kind of installation method of track beam of oxygen lance for steel-making converter, and this method can make the setting accuracy of track beam of oxygen lance for steel-making converter be improved, and then improves the installation quality of oxygen rifle equipment.
Technical scheme of the present invention is: a kind of installation method of track beam of oxygen lance for steel-making converter, it is characterized in that: carry out: the processing before 1. track girder is installed: after the load-bearing crossbeam is in place according to the following step, earlier with the disconnected top that is welded to the load-bearing crossbeam of the bottom wing listrium of track girder, but must locate earlier the weldering of afterwards breaking, with precision level its absolute altitude is measured then, measure spacing 100mm, write down its take off data and retouch out take off data ripple quantity, list chart, mark its moire pattern; 2. track girder is made as into H shaped steel; 3. the chart production of 1. making according to step once cuts into T-steel with H shaped steel, and also with regard to the top flange plate and the web of track girder, the web plate section height is extended by the data among the peak value figure or shortens; 4. the installation of track girder: track girder is behind hoisted in position, at first reinforce, consider the allowance for shrinkage 1~1.5mm of track girder when welding simultaneously, thereby track girder after finishing, needs also its levelness of repetition measurement and absolute altitude to guarantee its upper water Pingdu and absolute altitude in reinforcing, welds again; 5. track girder is finished cooling back in welding and is measured its end face levelness and absolute altitude, need not carry out milled processed till qualified when its part reaches requirement, carries out the installation of track again.
Reserve the surplus of 20mm during above-mentioned H section steel manufacture.
Above-mentioned track girder must the intermittent welding of two people symmetry only takes over control in when welding that stress is out of shape greatly, preferably adopts CO 2Shielded welding.
1. advantage of the present invention is: 1, carried out track girder installation, welding and measurement process control and leave record, thereby guaranteed the setting accuracy of track girder.Therefore weld seam allowance for shrinkage when 2, track girder has been considered the track girder bottom wing listrium top discrepancy in elevation and welding when mounted makes installation process more accurate.3, track girder must the intermittent welding of two people symmetry only takes over control in when welding that stress is out of shape greatly, therefore, has guaranteed the quality of welding process.
Description of drawings:
Fig. 1 is a track girder lower flange horizontal degree measurement synoptic diagram.
Fig. 2 is bearing beam and track girder lower flange plate level degree observed value chart.
Fig. 3 is a bearing beam at (the horizontal degree measurement peak value figure of 0m~1m~2m).
Fig. 4 is a bearing beam at (the horizontal degree measurement peak value figure of 2m~3m~4m).
Fig. 5 is that the track girder T-steel is made synoptic diagram.
Fig. 6 is the reinforcing synoptic diagram of track girder before welding.
Embodiment:
Because track girder upper track installation specification is higher, therefore add and must take the particular processing method man-hour at track girder, concrete grammar is as described below.
As shown in Figure 1: in the cross section is after the bearing beam 1 of 1700mm is in place, it with the cross section earlier the disconnected top that is welded to the load-bearing crossbeam of bottom wing listrium of the track girder 2 of 20x20x20x234mm, but must locate earlier the weldering of afterwards breaking (guaranteeing its linearity), with precision level its absolute altitude is measured then, measure Jian Ju @100mm, write down its take off data and retouch out take off data ripple quantity, list chart, mark its moire pattern, (shown in Fig. 2,3,4).
According to above-mentioned chart production T-steel, also with regard to the top flange plate and the web of track girder, the web plate section height is extended by the data among the peak value figure or shortens, and that is to say that the lower end of web is a wave-like, and specific practice is illustrated in fig. 5 shown below:
Earlier it is made as into H shaped steel because track girder is long when T-steel is made, needs to be interrupted for fear of the distortion of H shaped steel and cut, its cut lengths are reserved the surplus of 20mm simultaneously and are guaranteed cutting forming of T-steel according to data decision in the table when the H section steel manufacture.
Indeformable when transporting in order to guarantee T-steel with lifting, must will enter next procedure after the T-steel consolidation process again.
Track girder is behind hoisted in position, gusset plate 3 must be installed earlier, consider simultaneously track girder the allowance for shrinkage in when welding (1~1.5mm), thus track girder also needs its levelness of repetition measurement and absolute altitude to guarantee its upper water Pingdu and absolute altitude after reinforcing finishes, and welds again; Must two people during welding symmetry intermittent welding only to take over control stress big and be out of shape, preferably adopt CO 2Shielded welding.
Track girder is finished cooling back in welding and is measured its end face levelness and absolute altitude, as finds that its part does not reach requirement and need carry out milled processed till qualified, carries out the installation of track again.

Claims (3)

1. installation method of track beam of oxygen lance for steel-making converter, it is characterized in that: carry out: the processing before 1. track girder is installed: after the load-bearing crossbeam is in place according to the following step, earlier with the disconnected top that is welded to the load-bearing crossbeam of the bottom wing listrium of track girder, but must locate earlier the weldering of afterwards breaking, with precision level its absolute altitude is measured then, measure spacing 100mm, write down its take off data and retouch out take off data ripple quantity, list chart, mark its moire pattern; 2. track girder is made as into H shaped steel; 3. the chart production of 1. making according to step once cuts into T-steel with H shaped steel, and also with regard to the top flange plate and the web of track girder, the web plate section height is extended by the data among the peak value figure or shortens; 4. the installation of track girder: track girder is behind hoisted in position, at first reinforce, consider the allowance for shrinkage 1~1.5mm of track girder when welding simultaneously, thereby track girder after finishing, needs also its levelness of repetition measurement and absolute altitude to guarantee its upper water Pingdu and absolute altitude in reinforcing, welds again; 5. track girder is finished cooling back in welding and is measured its end face levelness and absolute altitude, need not carry out milled processed till qualified when its part reaches requirement, carries out the installation of track again.
2. installation method of track beam of oxygen lance for steel-making converter according to claim 1 is characterized in that: the surplus of reserving 20mm during above-mentioned H section steel manufacture.
3. installation method of track beam of oxygen lance for steel-making converter according to claim 1 is characterized in that: above-mentioned track girder must the intermittent welding of two people symmetry only takes over control in when welding that stress is out of shape greatly, preferably adopts CO 2Shielded welding.
CN2008101531360A 2008-11-18 2008-11-18 Installation method of track beam of oxygen lance for steel-making converter Active CN101736118B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101531360A CN101736118B (en) 2008-11-18 2008-11-18 Installation method of track beam of oxygen lance for steel-making converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101531360A CN101736118B (en) 2008-11-18 2008-11-18 Installation method of track beam of oxygen lance for steel-making converter

Publications (2)

Publication Number Publication Date
CN101736118A CN101736118A (en) 2010-06-16
CN101736118B true CN101736118B (en) 2011-09-07

Family

ID=42460148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101531360A Active CN101736118B (en) 2008-11-18 2008-11-18 Installation method of track beam of oxygen lance for steel-making converter

Country Status (1)

Country Link
CN (1) CN101736118B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106929628B (en) * 2017-04-18 2018-10-02 中国十七冶集团有限公司 The installation method of converter oxygen gun horizontal rail
CN107245543A (en) * 2017-06-27 2017-10-13 攀钢集团攀枝花钢钒有限公司 Costume changing method for top-blown converter oxygen rifle vehicle guide

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3531097A (en) * 1967-03-24 1970-09-29 Pittsburgh Steel Co Oxygen lance
CN2289798Y (en) * 1995-11-09 1998-09-02 冶金工业部鞍山热能研究院 Oxygen-enriched coal powder injection device for ironmaking furnace
CN2366420Y (en) * 1998-12-30 2000-03-01 宝山钢铁(集团)公司 Nozzle of oxygen lance for large scale converter
CN1282379A (en) * 1997-12-19 2001-01-31 Sms德马格股份公司 Converter installation
EP1204769B1 (en) * 1999-05-15 2003-08-06 Messer Griesheim GmbH Device and method for spraying natural gas and/or oxygen

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3531097A (en) * 1967-03-24 1970-09-29 Pittsburgh Steel Co Oxygen lance
CN2289798Y (en) * 1995-11-09 1998-09-02 冶金工业部鞍山热能研究院 Oxygen-enriched coal powder injection device for ironmaking furnace
CN1282379A (en) * 1997-12-19 2001-01-31 Sms德马格股份公司 Converter installation
CN2366420Y (en) * 1998-12-30 2000-03-01 宝山钢铁(集团)公司 Nozzle of oxygen lance for large scale converter
EP1204769B1 (en) * 1999-05-15 2003-08-06 Messer Griesheim GmbH Device and method for spraying natural gas and/or oxygen

Also Published As

Publication number Publication date
CN101736118A (en) 2010-06-16

Similar Documents

Publication Publication Date Title
CN108049302B (en) A kind of manufacturing method of full welding steel case and full bolt truss combined bridge lower edge steel box-girder
CN105040567B (en) Interchange steel bridge and manufacture method thereof
CN101011781B (en) Welding deformation controlling method in bridge steel pylon manufacturing process
CN101347703B (en) Installation technique of metallurgical gas desulfuration absorbing tower
CN110846958B (en) Method for controlling construction line shape precision of ballastless track on cable-stayed bridge
CN108457262B (en) A kind of self-elevating drilling platform rig floor building technology
CN103485539B (en) The construction control method of large-scale direct burial steel anchor fluke built-in fitting
CN101736118B (en) Installation method of track beam of oxygen lance for steel-making converter
CN111254835A (en) Continuous matching construction method for steel box girder segments in factory
CN103669314B (en) High-efficiency rack mounting method and auxiliary adjustment device of gear rack climbing type vertical ship lift
CN110295620A (en) The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest
CN103696369A (en) Four-point locating and installing method of steel box beam sections
CN103696410B (en) Rack-and-pinion climbing type vertical ship lift Nut column Efficient installation method and servicing unit
CN115075398A (en) Reverse-order socket construction method for installing Y-shaped steel column
CN103292696B (en) Installation center of blast furnace shell measuring method
CN205152802U (en) Improve structure of arched bridge strength nature skeleton building -site preparation precision
CN109610289A (en) A kind of production method of hyperboloid steel box-girder moulding bed
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns
CN110030019B (en) Rapid positioning lofting method for tunnel primary support steel arch frame
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN108442712A (en) A kind of vertical assembling method of nuclear power plant structure module
CN209556123U (en) A kind of dedicated auxiliary fixing device in cast-in-place concrete node
CN111139808A (en) Method for carrying cantilever beam of self-elevating drilling platform
CN107447994A (en) A kind of concrete column top force-bearing steel plate flatness control methods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant