CN101725359A - Turn round method of shield machine in work shaft - Google Patents

Turn round method of shield machine in work shaft Download PDF

Info

Publication number
CN101725359A
CN101725359A CN200810201656A CN200810201656A CN101725359A CN 101725359 A CN101725359 A CN 101725359A CN 200810201656 A CN200810201656 A CN 200810201656A CN 200810201656 A CN200810201656 A CN 200810201656A CN 101725359 A CN101725359 A CN 101725359A
Authority
CN
China
Prior art keywords
shield machine
jack
pedestal shelf
translation
active well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810201656A
Other languages
Chinese (zh)
Inventor
林其荃
蓝戊已
赵殿峰
蒋岩峰
王海
徐福俊
杨吾松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Original Assignee
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd filed Critical SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority to CN200810201656A priority Critical patent/CN101725359A/en
Publication of CN101725359A publication Critical patent/CN101725359A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a turn round method of a shield machine in a work shaft. In the method, steel plates are laid at the bottom of the work shaft, a base rack supported by translational suspended gliding feet is placed, and the shield machine is placed on the base rack and is pushed or rotated to finish turn round. The method not only has strong controllability, but also is safe and reliable, and can better realize turn round of the large shield machine.

Description

The turn round method of shield machine in active well
Technical field
The present invention relates to tunnelling works, relate in particular to the turn round method of shield machine in active well in the tunnelling works.
Background technology
Shield structure tune promptly in carrying out the uplink and downlink tunnelling works, after finishing the uplink tunnel tunneling construction, is reversed end for end shield machine and is moved in the active well of downlink, so that carry out the headwork of downlink tunnel in active well.
The Engineering Projects of shield machine tune both at home and abroad is less at present, and general just less at diameter, lightweight shield structure is reversed end for end.The turning method that this type of shield machine is traditional can be according to decisions such as vertical shaft size, equipment, shield structure diameter, weight and displacements.The shield structure moves horizontally distance when big in vertical shaft, can adopt traverse table.Minor diameter and lightweight shield structure, available crane directly lifts by crane tune.
The turn round method basic step of existing shield machine in active well is as follows:
1, prepares in the well
Before the shield structure enters received well, in well, expire the coarse sand of shop earlier, and jolt ramming is smooth, then at sand cushion upper berth steel plate.The shield structure turns to pedestal to be placed on the steel plate of shaft bottom.The shield structure enters received well, be located in turn on the pedestal after, with the shield structure with turn to the pedestal firm welding, and will clean out in the tunnel and prepare tune.At borehole wall weldering system towing point.Arrange electric winch in the received well shaft bottom.
2, shield structure tune
The shield structure turns to, the shift operation step:
1) manual monitoring is adopted in shield structure jacking, after several centimetres of every jackings, suspends jacking, and whether measure jacking synchronous, and the jacking process adopts interim cushion block to support;
2) after jacking is finished, place rolling bar or disc type bearing, take out interim lip block, the shield structure falls sinking to rolling bar or disc type bearing;
3) utilize the hoist engine traction that 90 ° of levels of shield structure Caudad Starting Well are turned to.
4) shield structure horizontal movement is passed the down-hole crossbeam and is arrived the uplink position of appearing.
5) shield structure head turns to (finishing the shield structure turns to for 180 °) to the 90 ° of levels in the side of appearing.
6) the shield structure is aimed at the orientation axis orientation.
7) shield structure jacking, remove rolling bar or.
8) to press axis in place for the shield structure, and operation is finished.
There is the deficiency of following several respects in the turn round method of above-mentioned existing shield machine in active well;
The deficiency of 1, jacking control method
The Artificial Control jacking is adopted in jacking, the jacking stroke is by manual monitoring, Synchronization Control is poor, particularly for Heavy Weight, bulky shield machine, if it is asynchronous in the dropping process, the stressed increase of the slow jack of certain falling speed is sharply increased, may produce the domino phenomenon, cause the collapse of whole jacking system;
2, the deficiency of friction mode
Traditional shield structure turning method adopts rolling bar or disc type bearing as rubbing poor mode.So-called rolling bar can be divided into two kinds on solid steel rolling bar and concrete filled steel tube rolling bar.The disc type bearing is in advance evenly digs a hole on steel plate, and the solid steel pearl is set under steel plate then.Though the advantage that mobile power is little, cost is low that coefficient of friction is little, need provide is provided these two kinds of friction modes, still has some shortcomings, as:
1), rolling produces vertical vibrations, unfavorable in structural safety;
2), the rolling bar direction should not control, have only during rotation and adopt the method for hammering to adjust direction;
3), the bottom lays the steel plate force way for linear or put stressed, big to weight shield structure tune engineering, this kind force way needs to consume great deal of steel to active well top board steel plate and upper tray structural requirement height, economic effect is poor; If active well bottom steel plate is laid out-of-flatness, easily cause coming to nothing of part ball, cause the structure stress inequality, poor to the top architecture security;
3, the deficiency of rotation mode
1), the deficiency of rotary power:
Rotary power is provided by hoist engine, and during each rotation beginning, the hoist engine wire rope will be finished and can draw shield machine after the elastic deformation and be shifted.So the shield structure at every turn by quiet be moment to moving process, it is big to start acceleration, and uncontrollable.
2), the deficiency of rotation route:
During rotation, shield machine is finished tune gradually by broken line, rather than reverses end for end to be shifted around some rotary middle points.This just needs the steel plate seam in the whole place all to want full weld and need grinding process, has increased construction costs.And direction of rotation should not be controlled, and the tune precision is not high, long in time limit.
It is less that above-mentioned turn round method of the prior art can only adapt to diameter, and the tune of lightweight shield structure is to realizing the very difficulty that turns around of large-scale shield machine.
Summary of the invention
Technical problem to be solved by this invention provides a kind of controllability chamber, safety and stability, can realize the turn round method of shield machine in active well that large-scale shield machine turns around.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme:
The turn round method of a kind of shield machine in active well the steps include:
A, will be paved with steel plate on the active well base plate, as the sliding friction surface of slippage;
B, mounting base shelf are installed the floated shoes of translation in pedestal shelf bottom, and jacking plays the pedestal shelf and places the cushion block gradient that pedestal shelf furnishing is consistent with the tunnel up direction in its bottom, and pedestal shelf and active well wall are carried out support fixation;
C, shield machine is slowly moved on on the pedestal shelf, and with the shield machine solid welding on the pedestal shelf;
D, jacking pedestal shelf are also removed cushion block, and whole pedestal shelf and shield machine are set level, and are supported by the floated shoes of translation;
E, the pedestal shelf is imposed thrust or revolving force drive shield machine translation or rotation, shield machine is finished in the precalculated position turned around;
F, jacking plays the pedestal shelf and places the gradient of cushion block with pedestal shelf furnishing tunnel down direction unanimity in its bottom more once more.
The butt joint, integrally welded again after cutting into two parts difference completing steps e after the steps d of described shield machine.
Oiling on the described steel plate.
The floated shoes of described translation both sides are provided with stopping means to guarantee the direction of translation.
Described pedestal shelf bottom shield machine position of centre of gravity has axis of rotation, carries out around this axis of rotation during the rotation of pedestal shelf.
Described jacking pedestal shelf is to carry out with jack by the supertronic that is installed in both sides in the pedestal shelf; Described is by being fixed on the active well sidewall or/and the pushing tow of solid welding steel plate at the bottom of active well carries out with jack to the pedestal shelf being imposed thrust; It is described that the pedestal shelf is imposed revolving force is to carry out with jack by the rotation of solid welding on steel plate at the bottom of the active well; The floated shoes of described translation comprises that translation suspends with jack and is fixed on suspend macromolecular material slide block bottom jack of translation.
Described supertronic with jack, pushing tow with jack carry out, rotate with jack carry out, translation suspends and controls by the PLC hydraulic synchronous control system with jack.
Described supertronic need keep clean with the hydraulic oil that jack carries out, rotates with jack carries out, translation suspends with the employing of jack shoes with jack, pushing tow.
Adopt technique scheme, because the pedestal shelf that the shop is supported by the floated shoes of translation with steel plate and placement at the bottom of active well, shield machine is placed on it and imposes thrust or revolving force and finish turning around of shield machine, not only controllability is strong but also safety and stability for this method, can realize turning around of large-scale shield machine well.
Description of drawings
The present invention is described in detail below in conjunction with the drawings and specific embodiments:
Fig. 1 is the flow chart of steps that turns around of the present invention.
Fig. 2 is placed in schematic diagram on the pedestal shelf for shield machine of the present invention;
Fig. 3 is the gradient schematic diagram that pedestal shelf furnishing is consistent with the tunnel up direction;
Fig. 4 is the gradient schematic diagram that pedestal shelf furnishing is consistent with the tunnel down direction;
Fig. 5 is a pedestal rack structure schematic diagram;
Fig. 6 is decline supertronic construction process figure;
Fig. 7 is rotation construction schematic diagram.
The specific embodiment
As shown in Figure 1, the turn round method of shield machine of the present invention in active well the steps include:
A, active well base plate upper base is completely spread steel plate, as the sliding friction surface of slippage;
B, as shown in Figure 2, mounting base shelf 1, the floated shoes 2 of translation is installed in pedestal shelf 1 bottom, and jacking plays pedestal shelf 1 and places the cushion block gradient that pedestal shelf furnishing is consistent with the tunnel up direction in its bottom, and pedestal shelf and active well wall are carried out support fixation;
C, shield machine 100 is slowly moved on on the pedestal shelf 1, and with shield machine 100 solid weldings on the pedestal shelf, as shown in Figures 2 and 3 shown in;
D, jacking are lived the pedestal shelf and are removed cushion block, and whole pedestal shelf and shield machine are set level, and are supported by the floated shoes of translation;
E, the pedestal shelf is imposed thrust or revolving force drive shield machine translation or rotation, shield machine is finished in the precalculated position turned around;
F, jacking plays the pedestal shelf and places the gradient (as shown in Figure 4) of cushion block with pedestal shelf furnishing tunnel down direction unanimity in its bottom more once more.
Described shield machine is cutting into respectively butt joint behind the completing steps e of two parts, integrally welded (satisfy the needs of shield structure tune size as the active well size, just can not carry out cutting work) again after the steps d.
Oiling on the described steel plate can further reduce friction factor like this.
The floated shoes of described translation both sides are provided with stopping means to guarantee the direction of translation.
Described pedestal shelf bottom shield machine position of centre of gravity has the axis of rotation of revolving, and revolves axis of rotation around this during the rotation of pedestal shelf and carries out.
Described jacking pedestal shelf is to carry out with jack by the supertronic that is installed in both sides in the pedestal shelf; Described is by being fixed on the active well sidewall or/and the pushing tow of solid welding steel plate at the bottom of active well carries out with jack to the pedestal shelf being imposed thrust; It is described that the pedestal shelf is imposed revolving force is to carry out with jack by the rotation of solid welding on steel plate at the bottom of the active well; The floated shoes of described translation comprises that translation suspends with jack and is fixed on suspend macromolecular material slide block bottom jack of translation.
Described supertronic with jack, pushing tow with jack carry out, rotate with jack carry out, translation suspends and controls by the PLC hydraulic synchronous control system with jack.
Described supertronic need keep clean with the hydraulic oil that jack carries out, rotates with jack carries out, translation suspends with the employing of jack shoes with jack, pushing tow.
For those skilled in the art being understood and implementing the present invention, with shield machine (whole long 12.72m to φ 14.87m, gross weight 1900t) engineering that turns around is an example, and the employing equipment and the critical process of the turn round method of large-scale shield machine in active well is described in further detail:
One, equipment
1, the pedestal shelf is formed
With reference to figure 5,
1), pedestal shelf 1 is made up of guide rail 11, crossbeam 12, vertical connection steel pipe 13, cushion block 14, the floated shoes 2 of translation, supertronic jack 3 and arc-shaped base etc.;
2), guide rail 11 adopts square steel, is provided with 4 altogether, is distributed in the 60 ° of circular arcs in shield shell machine bottom, 2 guide rails in the outside are close to the shield shell, directly place crossbeam 12 tops; Middle 2 guide rails are from shield shell 7mm, and place crossbeam 12 tops by razor-edge liner.
3), the crossbeam 12 of pedestal shelf 1 and connect steel pipe 13 by vertical connection and be integral.Crossbeam 12 is established opening box column 15 for degree of uprising steel plate welding I beam, crossbeam 12 two ends, and built-in supertronic is used jacking jack 3 so that adjust the shield structure gradient.Jack arc footstock is established on box column 15 tops, and establish annular connecting plate and can be connected with supertronic cushion block bolt at 15 ends of box column.Upper and lower part, box column 15 outside can connect the stull seat board, so as shield machine to arrive and when starting pedestal shelf and borehole wall stull fix.
4), the vertical steel pipe of pedestal shelf 1 13 is welded into one with crossbeam 12, forms the plane framework system, and the level top power when bearing shield machine and arriving seat and go into pedestal shelf 1.For satisfying displacement and assembling segmentation needs, the vertical steel pipe 13 between segmentation place two crossbeams is divided into trifle.And link to each other with bolt with flange.Shield machine arrives and when starting, pedestal shelf 1 is fixed with the vertical support of the borehole wall by the vertical flange at two ends.
5), during substrate shelf 1 displacement rotation, divide into horizontalization at every Pin crossbeam 12 and move floated shoes 2, the floated shoes 2 of translation comprises that translation suspends and combines with jack and macromolecular material slide block.The floated shoes 2 of monolithic translation is of a size of 250 * 250mm, and nominal load-bearing capacity is 100T, can connect by bolt according to the floated shoes 2 of the demand translation of load to be used in combination, thereby bigger bearing capacity is provided.
6), pedestal shelf when rotation, shield machine position of centre of gravity shelf place establishes axis of rotation 16, both has been convenient to the rotary body location, the horizontal force in the time of can bearing rotation again.Axis of rotation 16 is made up of urceolus and center axis body two parts.Axis of rotation 16 urceolus are welded on pedestal shelf bottom, and the urceolus slightly larger in diameter is in center axis body diameter.Axis of rotation is installed after shelf installs, and with reinforcing bar to the central axis body hang temporarily draw fixing.Box column 15 bottoms four jiaos of pedestal shelf displacement segmentations are welded with for the seat board that the used jack of rotation is installed.
7), supertronic divides into arc-shaped base with jack 3, and cooperates with box column 15 top arc footstocks, it is stressed to keep in the supertronic process very heavy center.
8), 14 fens upper and lower two joints of cushion block.Be installed in crossbeam 12 box columns 15 belows, bear via guide rail 11, crossbeam 12, box column 15 and transmit the shield machine load of coming.Every cushion block 14 is linked to be box section by two channel sections with bolt, so that after supertronic finishes with jack 3 supertronics, carry out cushion block from the jack both sides and install.
2, displacement construction
1) hydraulic test is selected for use
It is floated with jack and 4 four kinds on jack of rotation with jack, translation with jack 3, pushing tow that this jack of selecting for use is divided into supertronic.
2), the weldering of pedestal shelf 1 crossbeam 12 bottom flanges is connected with the footstock box.The footstock box divides four types on leading portion osculant (A type), leading portion two ends types (Type B) rear osculant (C type) and rear two ends type (D type).Two ends type footstock box also can be used as the vertical shift jack pad assembly except that the horizontal force that can bear slide device.The floated shoes 2 of translation is installed in the footstock box, and 2 floated shoes 2 of translation are installed in each footstock box of leading portion shield machine, and the floated shoes 2 of translation is installed in each footstock box of back segment shield machine.This engineering needs 68 floated shoes of translation altogether.
4, PLC hydraulic synchronous control system
This engineering to shield machine translation, rotation and in place after the butt joint of drawing close require all higherly, wherein merging precision requires in the 1mm scope.This has just proposed higher requirement to the control accuracy of each step, therefore intends adopting ripe PLC hydraulic synchronous control system, guarantees that the construction precision of each construction sequence satisfies related request.
Two, jacking supertronic rotation construction
1, preliminary preparation
1) jack-up system certificate authenticity
The certificate authenticity of element (referring to various jack): the quality of element is the basis of mass of system, and is reliable for guaranteeing element, selects the jack of high-quality.Formal implement jacking before, will reaffirm the reliability of sealing with the pressurize 5 hours at the scene of the top lift of 70%-90%.
The cleannes of hydraulic oil: the cleannes of hydraulic oil are that system guarantees reliably, the design of native system and assembly technology, except that carrying out in strict accordance with the design criterion of polluting control and technological requirement, connect flexible pipe and carry out the strictness flushing in factory, move to the scene after sealing, the scene installs carries out 10 no-load running, to get rid of in the site assembly process dirt that possible accident is sneaked into.
The stability of power closed loop: so-called power closed loop is exactly after the well certain power of default, and the error of power is in 5%, and after power surpassed this scope, system adjusted to the scope of setting value automatically; The power closed loop is the basis of native system, and the debugging of power closed loop utilizes the dead point pressurization, is undertaken by platform in factory.
The stability of position closed loop: so-called position closed loop is exactly after system sets top lifting height for the grating chi, when surpassing this height system, top lifting height reduces to this height automatically, automatically rise to this height when top lifting height is lower than this height system, guarantee the safety and the synchronism of system's jacking.
2) the supertronic construction is simulated at the scene in advance
In order to ensure the duration, the disposable success of guarantee jacking, working in the slope that falls.Hydraulic test and pedestal shelf are marched into the arena in advance, carry out pre-assembly unit outside foundation ditch, arrange and the grouping situation according to the jack of actual jacking then, to whole pedestal shelf carry out pre-jacking, the simulation jacking on the slope that falls.So that can discover problems and solve them ahead of time, guarantee that equipment can disposable jacking success after entering foundation ditch.
Commissioning content is as follows:
A, hydraulic checking system
● oil cylinder is installed firmly correct;
● pumping plant is connected with oil pipe between the oil cylinder must be correct, reliable;
● fuel tank liquid level should reach specified altitude;
● redundant hydraulic oil, refueling must be through oil filter;
● whether the hydraulic system operation is normal, and oil circuit has or not obstruction or leaks;
● whether hydraulic oil needs by the no-load running filter cleaning;
B, control system inspection
● system's installation in position has also been debugged and has been finished;
● each road power supply, its wiring, capacity and safety all should be up to specification:
● control device wiring, installation must be correct;
● should guarantee that the data communication circuit is correct;
● whether the operation of PLC control system is normal, and whether hydraulic system is sensitive to the control instruction reaction;
● each sensing system guarantees that signal correctly transmits;
● system can lifting freely;
● the working condition of grating chi;
● whether whether the working condition of various valves is normal, need to change;
3) set up jacking engineering site leader group
The floor manager group is established 1 of commander in chief, be responsible for the floor manager operation, commander's group is divided into 4 functional groups comprehensively: be respectively monitoring group, control group, hydraulic pressure group and operation group, be responsible for relevant work, each functional group establishes one of group leader, commands common composition floor manager group with commander in chief, vice president.
The function of each functional group is respectively:
A, monitoring group: the displacement situation when utilizing transit, level gauge etc. to supertronic is monitored, and is the auxiliary monitoring of computer automation monitoring, when abnormal conditions or monitoring result occurring and exceed alarming value, then should in time report to the commander in chief, and advise.
B, control group: hydraulic system is sent startup, jacking or operational order such as stop according to commander in chief's order.For startup, jacking or halt instruction, only accept commander in chief's instruction, when abnormal conditions occurring and need promptly stop, should send halt instruction to system in the very first time that obtains information, and no matter this information whether send from the commander in chief.
C, hydraulic pressure group: be responsible for the installation and the formation of whole hydraulic system, maintenance, inspection and maintenance etc.Adjust the setting of Hydraulic Elements according to commander in chief's requirement.
D, operation group: the labour's configuration during the responsible jacking, utility service operation in the whole process of supertronic.Land clearing when its action comprises preparation of construction, the peace of lip block, tear open etc.
Each functional group is assumed unified command of by the commander in chief, reports the work to the commander in chief, and the commander in chief gathers and makes a policy after the leader organizes other member's suggestion, and sends instruction by the commander in chief to each functional group, enters next process work;
4) staff training
The personnel of the construction of all participation jackings carry out the strictness division of labor of work, train fully before entering the scene;
2, supertronic divides into groups with jack
According to the performance of hydraulic control system,, need supertronic is divided into groups with jack for ease of the control of jacking precision.
3, weigh
A, for guaranteeing carrying out synchronously of jacking process, before jacking, should measure the actual loading at each Jacking point place
B, when weighing according to calculating the jacking load, adopt the mode that loads step by step to carry out, and in certain top lifting height (1~10mm), by adjusting the oil pressure of each group repeatedly, can set one group of jacking oil pressure value, make the jacking pressure on each summit and its upper load in a basic balance.
C, whether break away from, need measure its stroke with dial gage for observing jacking place.
D, with every measured value and calculated value relatively calculates its measures of dispersion, analyzes reason jointly by hydraulic engineer and structural engineer, finally organizes a reference value when determining that can this measured value as jacking by the leader.As differ greatly, will be adjusted accordingly.
4. formal jacking
The jacking of this engineering is divided into decline supertronic and whole upwards jacking.After the examination jacking, observe if no problem just carries out formal jacking, the jack range is 1200mm.This can finish in a jacking (decline supertronic).Make progress earlier during the decline supertronic about jacking 1cm, remove lip block then, can descend.
Shield machine is taked the method for " being rotated into level earlier, whole then whereabouts " when the southern side active well descends supertronic.Take the method for " first integral jacking to the Pin height rotates to design elevation then " behind the active well of arrival north side.Formal jacking, must be undertaken by follow procedure, and perform record:
1. operation: load and jacking by default load;
2. observe: each point of observation is the reflected measurement situation in time.
3. measure: each survey mark should conscientiously be carried out surveying work, in time the reflected measurement data;
4. check: the on-the-spot leader's group of data junction, the relatively difference of measured data and gross data;
5. analyze: if having data deviation, each side concerned to answer serious analysis also in time to adjust.
6. decision-making: approval work at present state, and next step operation of making a strategic decision.
Above decline supertronic construction process is as shown in Figure 6:
5, rotation construction
As shown in Figure 7, treat that shield machine moves to the precalculated position after, remove and to hang drawing device temporarily, rotating shaft center's axis body is fixed in the full shop steel plate of active well bottom, be rotated then.
Those of ordinary skill in the art will be appreciated that, above embodiment is used for illustrating the present invention, and be not to be used as limitation of the invention, as long as in connotation scope of the present invention, all will drop on claim scope of the present invention to variation, the modification of the above embodiment.

Claims (8)

1. the turn round method of a shield machine in active well is characterized in that step is as follows:
A, will be paved with steel plate on the active well base plate, as the sliding friction surface of slippage;
B, mounting base shelf are installed the floated shoes of translation in pedestal shelf bottom, and jacking plays the pedestal shelf and places the cushion block gradient that pedestal shelf furnishing is consistent with the tunnel up direction in its bottom, and pedestal shelf and active well wall are carried out support fixation;
C, shield machine is slowly moved on on the pedestal shelf, and with the shield machine solid welding on the pedestal shelf;
D, jacking pedestal shelf are also removed cushion block, and whole pedestal shelf and shield machine are set level, and are supported by the floated shoes of translation;
E, the pedestal shelf is imposed thrust or revolving force drive shield machine translation or rotation, shield machine is finished in the precalculated position turned around;
F, jacking plays the pedestal shelf and places the gradient of cushion block with pedestal shelf furnishing tunnel down direction unanimity in its bottom more once more.
2. the turn round method of shield machine according to claim 1 in active well is characterized in that: the butt joint, integrally welded again after cutting into two parts difference completing steps e after the steps d of described shield machine.
3. the turn round method of shield machine according to claim 1 and 2 in active well is characterized in that: oiling on the described steel plate.
4. the turn round method of shield machine according to claim 1 and 2 in active well is characterized in that: the floated shoes of described translation both sides are provided with stopping means to guarantee the direction of translation.
5. the turn round method of shield machine according to claim 1 and 2 in active well is characterized in that: described pedestal shelf bottom shield machine position of centre of gravity has axis of rotation, carries out around this axis of rotation during the rotation of pedestal shelf.
6. the turn round method of shield machine according to claim 1 and 2 in active well is characterized in that: described jacking pedestal shelf is to carry out with jack by the supertronic that is installed in both sides in the pedestal shelf; Described is by being fixed on the active well sidewall or/and the pushing tow of solid welding steel plate at the bottom of active well carries out with jack to the pedestal shelf being imposed thrust; It is described that the pedestal shelf is imposed revolving force is to carry out with jack by the rotation of solid welding on steel plate at the bottom of the active well; The floated shoes of described translation comprises that translation suspends with jack and is fixed on suspend macromolecular material slide block bottom jack of translation.
7. the turn round method of shield machine according to claim 6 in active well is characterized in that: described supertronic with jack, pushing tow with jack carry out, rotate with jack carry out, translation suspends and controls by the PLC hydraulic synchronous control system with jack.
8. the turn round method of shield machine according to claim 6 in active well is characterized in that: described supertronic need keep clean with the hydraulic oil that jack carries out, rotates with jack carries out, translation suspends with the employing of jack shoes with jack, pushing tow.
CN200810201656A 2008-10-23 2008-10-23 Turn round method of shield machine in work shaft Pending CN101725359A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810201656A CN101725359A (en) 2008-10-23 2008-10-23 Turn round method of shield machine in work shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810201656A CN101725359A (en) 2008-10-23 2008-10-23 Turn round method of shield machine in work shaft

Publications (1)

Publication Number Publication Date
CN101725359A true CN101725359A (en) 2010-06-09

Family

ID=42446841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810201656A Pending CN101725359A (en) 2008-10-23 2008-10-23 Turn round method of shield machine in work shaft

Country Status (1)

Country Link
CN (1) CN101725359A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400690A (en) * 2011-12-26 2012-04-04 中铁四局集团有限公司 Shield machine jacking and turning method in shield method construction subway tunnel
CN102425424A (en) * 2011-12-26 2012-04-25 中铁四局集团有限公司 Pushing system for pushing and turning construction of shield tunneling machine in subway tunnel
CN104695965A (en) * 2014-12-30 2015-06-10 中铁隧道集团有限公司 Multifunctional originating station and originating method for departure and reception of shield
CN105569663A (en) * 2014-10-09 2016-05-11 中国铁建大桥工程局集团有限公司 Inclined shaft open cutting lining section TBM main engine dropping method
CN107975377A (en) * 2017-11-26 2018-05-01 上海宝冶集团有限公司 Horizontal displacement methods of the shield machine in active well

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400690A (en) * 2011-12-26 2012-04-04 中铁四局集团有限公司 Shield machine jacking and turning method in shield method construction subway tunnel
CN102425424A (en) * 2011-12-26 2012-04-25 中铁四局集团有限公司 Pushing system for pushing and turning construction of shield tunneling machine in subway tunnel
CN102400690B (en) * 2011-12-26 2013-08-28 中铁四局集团有限公司 Shield machine jacking and turning method in shield method construction subway tunnel
CN105569663A (en) * 2014-10-09 2016-05-11 中国铁建大桥工程局集团有限公司 Inclined shaft open cutting lining section TBM main engine dropping method
CN105569663B (en) * 2014-10-09 2019-12-10 中国铁建大桥工程局集团有限公司 Inclined shaft open cut lining section TBM host falling method
CN104695965A (en) * 2014-12-30 2015-06-10 中铁隧道集团有限公司 Multifunctional originating station and originating method for departure and reception of shield
CN107975377A (en) * 2017-11-26 2018-05-01 上海宝冶集团有限公司 Horizontal displacement methods of the shield machine in active well

Similar Documents

Publication Publication Date Title
CN107012949B (en) Lifting method of large-span steel corridor
CN106284079A (en) A kind of bridge break post replace classification synchronize integral jacking construction method
CN105442459B (en) Large-Span Continuous girder span building up station rotator construction rotor system and construction method
CN103806658B (en) High-cleanness, high electronic workshop steel work integral slipping and discharging method
CN110126876B (en) Ground penetrating radar auxiliary device for train track detection
CN101725359A (en) Turn round method of shield machine in work shaft
CN106869037A (en) The reusable ball pivot construction of pier top erection by swing constructing continuous beam
CN103816983B (en) A kind of construction method of installation of large-scale coal pulverizer
CN110629675A (en) Cast-in-place pier top rotating and cantilever pouring combined construction method for continuous beam support
CN106092629B (en) The ship lift ship compartment compartment Shui Man performance test method
CN110295765B (en) Construction method for emigration protection of building site
KR101906326B1 (en) Computer hydraulic synchronization system having leveler-mounted hydraulic jack and 3-axis clinometer for restoring and lifting structure, and method for the same
CN112177630B (en) Device and method for vertically jacking shield tunnel
CN109235903A (en) Steel structure modularization construction method
CN105569385A (en) Building industrialization PC component production line mounting and debugging process
CN205591131U (en) Whole superelevation of multispan case roof beam is jacking construction system in turn
CN110509424B (en) Construction method for transversely moving beams by double-track trolley
CN101486090A (en) Method for dismounting and replacing ladle turret revolving bearing
CN113718627B (en) Construction method for adjusting weight center of open bridge
CN101367116A (en) Mounting technique of vertical conticaster for smelting copper
CN110359373A (en) Beam body method for correcting error for transom pier bridge
CN105773138A (en) O-type four-car dumper installation technology
CN107524093A (en) A kind of bridge jacking method
CN117211826A (en) Box culvert jacking construction method based on under-crossing airport runway pipe curtain method
CN101852066A (en) Device and method for arranging track of drilling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20100609