CN101722573B - Steam box for box girder erection support grouting in severe cold region and curing method thereof - Google Patents

Steam box for box girder erection support grouting in severe cold region and curing method thereof Download PDF

Info

Publication number
CN101722573B
CN101722573B CN2009102287185A CN200910228718A CN101722573B CN 101722573 B CN101722573 B CN 101722573B CN 2009102287185 A CN2009102287185 A CN 2009102287185A CN 200910228718 A CN200910228718 A CN 200910228718A CN 101722573 B CN101722573 B CN 101722573B
Authority
CN
China
Prior art keywords
box
steam
grouting
steam box
severe cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009102287185A
Other languages
Chinese (zh)
Other versions
CN101722573A (en
Inventor
杨振平
周云
黄黔川
傅力
蔡伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil Aviation Airport Construction Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN2009102287185A priority Critical patent/CN101722573B/en
Publication of CN101722573A publication Critical patent/CN101722573A/en
Application granted granted Critical
Publication of CN101722573B publication Critical patent/CN101722573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a steam box for box girder erection support grouting in a severe cold region. The steam box comprises a square box body, wherein the bottom of the box body is provided with caster wheels; a heating pipe is arranged in the box body; and both side walls of the box body are provided with a switch connected with a gas pipe respectively. The invention also provides a method for curing the box girder erection support grouting using the steam box in the severe cold region. The steam box and the method have the effects of applying steam curing to bridging construction and improving work efficiency, ensure quality of support grouting, avoid quality defects after grouting, save time for the bridging construction and accelerate construction progress. One girder is erected for about 6 hours if not using the steam curing; and one girder is erected for 4 hours if using the steam curing, and one more girder is erected on average per day so as to ensure high quality and high efficiency of erecting box girders. The required grouting strength of through holes of a bridge girder erection machine is over 20MPa in the process of erecting the box girders of 900 tons in the severe cold region. The steam box is immediately subjected to steam curing after grouting, ensures that about 45 min is needed when the strength reaches 20MPa.

Description

Box girder erection support grouting in severe cold region steam box and maintenance process thereof
Technical field
The invention belongs to box girder erection support grouting in severe cold region steam box and maintenance process thereof, this method is mainly used in 900 tons of box beam erection engineerings.
Technical background
When 900 tons of box beam erection winter construction of severe cold area, the maintenance process of adopting is that the grouting slurry is gone up cotton-wadded quilt all around usually, and this method filling intensity reached the 20MPa stand-by period about 3 hours, about 6 hours consuming time of frame one Pin beam.And because powerful feature morning of grouting material, if maintenance in early stage environment can not be guaranteed, common quality defects such as the face blind crack that directly causes being in the milk occur.Therefore being badly in need of a kind of device carries out maintenance, shortens the grouting back intensity stand-by period, guarantees construction quality, improves efficiency of construction.
Summary of the invention
For solving the problem that exists in the above-mentioned technology, the purpose of this invention is to provide a kind of box girder erection support grouting in severe cold region steam box and maintenance process thereof, effectively guaranteed construction quality, improved efficiency of construction.
For achieving the above object, the technical solution used in the present invention provides a kind of box girder erection support grouting in severe cold region maintenance process of adopting steam box, in the box beam erection process, when beam is finished, fallen to the contraposition of case beam after on the jack, four the bearing crab-bolt bars in case beam bottom have been arranged in the anchor hole of pier stud top pinner, last anchoring forms being connected and fixed of case beam and pier stud by grouting, and grouting needs maintenance after finishing, and this maintenance process may further comprise the steps:
1. the water heating is placed on two described steam boxes at the two ends of case beam, add grouting material mixing water and to steam box, be scheduled to the red line position, energising is heated to fluidized state with mixing water, connect an end of appendix simultaneously at the switch place, two gas outlets of steam box, described steam box power is 6000W, operating voltage is 380V, and each steam box is that two bearings carry out steam curing simultaneously, and a Pin beam needs two steam boxes;
2. before the pinner anchor hole preheating box beam erection hot-water bag is placed in the pinner anchor hole, simultaneously the insulation of pinner surface coverage cotton-wadded quilt;
3. the hot-water bag in the pinner anchor hole is taken out in the beam contraposition that falls, and the contraposition of case beam is finished;
4. grouting construction carries out the support grouting construction according to routine grouting construction technology in winter;
5. make confined space and on the grouting slurry face that 4. step forms, cover one deck plastic foil immediately, cotton-wadded quilt is wrapped around bearing, form confined space; Add the enclosing aerofoil in the cotton-wadded quilt periphery then, prevent that part steam from leaking outside;
6. steam curing passes to two appendix other ends of above-mentioned steam box in the confined space of cotton-wadded quilt and bearing formation;
Field fabrication and grouting material test cube in the same condition when 7. ruggedness test is in the milk, specification is 40 * 40 * 160mm, is placed in the 5. described confined space of step, carry out steam curing together, by the test block compression test, when compression strength reaches 20MPa, remove steam unit.
Effect of the present invention is in severe cold area box beam erection engineering, and the intensity stand-by period obviously shortens behind the support grouting, has improved the speed of setting a roof beam in place greatly, has guaranteed construction quality.Adopt steam curing, can guarantee support grouting quality, efficiently set a roof beam in place.The appearance of some common quality defects after both having avoided being in the milk has been saved the time accelerating construction progress for the construction of building bridge again.When not using steam curing, frame one Pin beam needs about 6 hours; Use steam curing, frame one Pin beam needs 4 hours, average every day many 1 Pin beams, thereby guarantee box beam erection high-quality, efficient.In 900 tons of box beam erection processes of severe cold area, bridge formation machine via hole necessarily requires filling intensity more than 20MPa.After grouting is finished, carry out steam curing immediately, intensity reaches the 20MPa required time and is about about 45min.
Description of drawings
Fig. 1 is a steam box structural representation of the present invention;
Fig. 2 is a steam curing structural representation of the present invention;
Fig. 3 is the local enlarged diagram of Fig. 2;
Fig. 4 steam curing process chart of the present invention.
Among the figure:
1, casing 2, castor 3, heat-generating pipe 4, gas outlet switch
5, appendix 6, bearing 7, slurry 8, deep bead
The specific embodiment
Reaching embodiment in conjunction with the accompanying drawings is illustrated box girder erection support grouting in severe cold region steam box of the present invention and maintenance process thereof.
Box girder erection support grouting in severe cold region steam box of the present invention, the structure of this steam box includes square box 1, be provided with castor 2 in the bottom of described casing 1, in described casing 1, be provided with heat-generating pipe 3, on the two side of described casing 1, be respectively equipped with the gas outlet switch 4 that connects appendix.
Adopt the box girder erection support grouting in severe cold region maintenance process of above-mentioned steam box, in the box beam erection process, when beam is finished, fallen to the contraposition of case beam after on the jack, four the bearing crab-bolt bars in case beam bottom have been arranged in the anchor hole of pier stud top pinner, last anchoring forms being connected and fixed of case beam and pier stud by grouting, and grouting needs maintenance after finishing, and this maintenance process may further comprise the steps:
1. the water heating is placed on two above-mentioned steam boxes at the two ends of case beam, add grouting material mixing water and to steam box, be scheduled to the red line position, energising is heated to fluidized state with mixing water, connect an end of appendix 5 simultaneously at two gas outlet switch 4 places of steam box, described steam box power is 6000W, operating voltage is 380V, and each steam box is that two bearings carry out steam curing simultaneously, and a Pin beam needs two steam boxes;
2. before the pinner anchor hole preheating box beam erection hot-water bag is placed in the pinner anchor hole, simultaneously the insulation of pinner surface coverage cotton-wadded quilt;
3. the hot-water bag in the pinner anchor hole is taken out in the beam contraposition that falls, and the contraposition of case beam is finished;
4. grouting construction carries out the support grouting construction according to routine grouting construction technology in winter;
5. make confined space and on 7 of grouting slurries that 4. step forms, cover one deck plastic foil immediately, cotton-wadded quilt is wrapped around bearing, form confined space; Add enclosing aerofoil 8 in the cotton-wadded quilt periphery then, prevent that part steam from leaking outside;
6. steam curing passes to two appendix other ends of above-mentioned steam box in the confined space of cotton-wadded quilt and bearing formation;
Field fabrication and grouting material test cube in the same condition when 7. ruggedness test is in the milk, specification is 40 * 40 * 160mm, is placed in the 5. described confined space of step, carry out steam curing together, by the test block compression test, when compression strength reaches 20MPa, remove steam unit.
The box girder erection support grouting in severe cold region maintenance process of the above-mentioned steam box of employing of the present invention is achieved in that concrete steps are:
(1) the water heating adds mixing water to predetermined red line position in steam box, and energising is heated to fluidized state with mixing water, connects appendix 5 at two gas outlet switch 4 places simultaneously.
(2) preheating of pinner anchor hole is placed on the electric heating hot-water bag in the anchor hole, covers cotton-wadded quilt above to the pinner preheating,
(3) fall to taking out the electric heating hot-water bag when beam contraposition case beam falls the beam contraposition.
(4) grouting according to winter grouting construction technology carry out the support grouting operation.
(5) after grouting is finished, cover one deck plastic foil 7 of grouting slurries immediately, bearing is gone up cotton-wadded quilt all around, forms confined space.Add enclosing aerofoil 8 in the cotton-wadded quilt periphery then, prevent that steam from leaking outside.
(6) steam curing is ventilated to the space of cotton-wadded quilt and bearing 6 formation.
(7) the ruggedness test field fabrication with 40 * 40 * 160mm test block of grouting material with condition, be placed in the 5. described confined space of step, carry out steam curing together, by the test block compression test, when this test block compression strength reaches 20MPa, remove steam unit.
Support grouting steam curing method of the present invention is applied in 900 tons of box beam erection engineerings of the Harbin-to-Dalian special second Song Hua River grand bridge of visitor.Adopt steam curing, improved the speed of setting a roof beam in place greatly.Last year, my bridge train became the maximum troop of number that sets a roof beam in place in the winter construction in middle traffic control section.And institute's frame case beam all is up to the standards by management, owner.The middle headquarter of handing over bind into book form support grouting steam curing construction technology establishment of the present invention, promote completely in middle traffic control section, verify applicability of the present invention from the front.

Claims (1)

1. box girder erection support grouting in severe cold region maintenance process of adopting steam box, in the box beam erection process, when beam is finished, fallen to the contraposition of case beam after on the jack, four the bearing crab-bolt bars in case beam bottom have been arranged in the anchor hole of pier stud top pinner, last anchoring forms being connected and fixed of case beam and pier stud by grouting, and grouting needs maintenance after finishing, and this maintenance process may further comprise the steps:
1. the water heating is placed on two described steam boxes at the two ends of case beam, add grouting material mixing water and to steam box, be scheduled to the red line position, energising is heated to fluidized state with mixing water, connect an end of appendix simultaneously at the switch place, two gas outlets of steam box, described steam box power is 6000W, operating voltage is 380V, and each steam box is that two bearings carry out steam curing simultaneously, and a Pin beam needs two steam boxes;
2. before the pinner anchor hole preheating box beam erection hot-water bag is placed in the pinner anchor hole, simultaneously the insulation of pinner surface coverage cotton-wadded quilt;
3. the hot-water bag in the pinner anchor hole is taken out in the beam contraposition that falls, and the contraposition of case beam is finished;
4. grouting construction carries out the support grouting construction according to routine grouting construction technology in winter;
5. make confined space and on the grouting slurry face that 4. step forms, cover one deck plastic foil immediately, cotton-wadded quilt is wrapped around bearing, form confined space; Add the enclosing aerofoil in the cotton-wadded quilt periphery then, prevent that part steam from leaking outside;
6. steam curing passes to two appendix other ends of above-mentioned steam box in the confined space of cotton-wadded quilt and bearing formation;
Field fabrication and grouting material test cube in the same condition when 7. ruggedness test is in the milk, specification is 40 * 40 * 160mm, is placed in the 5. described confined space of step, carry out steam curing together, by the test block compression test, when compression strength reaches 20MPa, remove steam unit.
CN2009102287185A 2009-11-25 2009-11-25 Steam box for box girder erection support grouting in severe cold region and curing method thereof Active CN101722573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102287185A CN101722573B (en) 2009-11-25 2009-11-25 Steam box for box girder erection support grouting in severe cold region and curing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102287185A CN101722573B (en) 2009-11-25 2009-11-25 Steam box for box girder erection support grouting in severe cold region and curing method thereof

Publications (2)

Publication Number Publication Date
CN101722573A CN101722573A (en) 2010-06-09
CN101722573B true CN101722573B (en) 2011-08-03

Family

ID=42444411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102287185A Active CN101722573B (en) 2009-11-25 2009-11-25 Steam box for box girder erection support grouting in severe cold region and curing method thereof

Country Status (1)

Country Link
CN (1) CN101722573B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102108678B (en) * 2011-01-18 2014-09-17 龙建路桥股份有限公司 High-altitude construction complete set device and method in winter
CN104233960B (en) * 2014-09-30 2016-02-17 中铁四局集团有限公司 For workpiece and the construction method of the grouting of bridge continuous beam web
CN111197286A (en) * 2020-01-16 2020-05-26 中交一公局第八工程有限公司 High-speed railway support mortar steam curing means

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000239076A (en) * 1999-02-22 2000-09-05 Matsushita Electric Works Ltd Production of inorganic board
CN2803666Y (en) * 2005-05-31 2006-08-09 钱龙飞 Steam maintenace appts for cellular concrete building blocks
CN1830644A (en) * 2006-04-17 2006-09-13 上海隧道工程股份有限公司 Cast-in-place box girder low-temperature steam maintenance operating method
CN201050777Y (en) * 2007-06-21 2008-04-23 吴达新 Multifunctional movable steam generator
CN201140438Y (en) * 2007-12-25 2008-10-29 中铁四局集团有限公司 Automation control apparatus for case beam steam maintenance
KR20090078149A (en) * 2008-01-14 2009-07-17 양상규 Automatic system controlling the steam curing and method controlling the steam curing using the same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000239076A (en) * 1999-02-22 2000-09-05 Matsushita Electric Works Ltd Production of inorganic board
CN2803666Y (en) * 2005-05-31 2006-08-09 钱龙飞 Steam maintenace appts for cellular concrete building blocks
CN1830644A (en) * 2006-04-17 2006-09-13 上海隧道工程股份有限公司 Cast-in-place box girder low-temperature steam maintenance operating method
CN201050777Y (en) * 2007-06-21 2008-04-23 吴达新 Multifunctional movable steam generator
CN201140438Y (en) * 2007-12-25 2008-10-29 中铁四局集团有限公司 Automation control apparatus for case beam steam maintenance
KR20090078149A (en) * 2008-01-14 2009-07-17 양상규 Automatic system controlling the steam curing and method controlling the steam curing using the same

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
文向东.客运专线900t整孔箱梁冬期蒸养施工技术.《铁道建筑》.2008,(第9期), *

Also Published As

Publication number Publication date
CN101722573A (en) 2010-06-09

Similar Documents

Publication Publication Date Title
CN206267363U (en) A kind of pin-connected panel lightweight concrete integral wall
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN108661221A (en) A kind of precast floor slab and its connection structure and its construction method
CN101722573B (en) Steam box for box girder erection support grouting in severe cold region and curing method thereof
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN201296979Y (en) Embedded part for large-sized reinforcing steel bar concrete column top beam node
CN105421254A (en) In-situ repairing method of upper pinner of rail transit bridge support and pinner formwork
CN203846458U (en) Formwork system special for concrete construction
CN106193588A (en) A kind of method pouring building post-cast strip and pour mould
CN208088522U (en) A kind of novel fabricated bean column node of imitative joggle
CN104563524A (en) Anti-water-seepage prefabricated slab construction method
CN204662742U (en) The movable surface construction structure of a kind of pitched roof
CN201713970U (en) Structural system with light multi-ribbed plates and light multi-ribbed floor systems
CN107795035A (en) The installation fixed structure and its installation method of a kind of building wall board
CN206722216U (en) A kind of prefabricated girder of laminated floor slab
CN108756038A (en) Assembly concrete shear wall and floor support plate rigid connection node and construction method
CN103061568B (en) Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower
CN101929245A (en) Thin webbed girder vertical construction method
CN107012985A (en) A kind of prefabricated girder and the laminated floor slab construction technology containing the prefabricated girder
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN207739439U (en) A kind of steel framework constraint precast reinforced concrete shear wall structure
CN205711786U (en) Big cross section porous overlength cast-in-place box culvert formwork system
CN202577382U (en) Reinforcing structure of bus supporting pier in electrolytic plant
CN110552546B (en) Method for building underground parking lot waterproof facility by using tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300456 No. two, No. 173, Xingang Road, Tanggu District, Tianjin

Patentee after: Civil Aviation Airport Construction Engineering Co.,Ltd.

Address before: 300456 No. two, No. 173, Xingang Road, Tanggu District, Tianjin

Patentee before: NO.4 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.