CN204662742U - The movable surface construction structure of a kind of pitched roof - Google Patents
The movable surface construction structure of a kind of pitched roof Download PDFInfo
- Publication number
- CN204662742U CN204662742U CN201520249000.5U CN201520249000U CN204662742U CN 204662742 U CN204662742 U CN 204662742U CN 201520249000 U CN201520249000 U CN 201520249000U CN 204662742 U CN204662742 U CN 204662742U
- Authority
- CN
- China
- Prior art keywords
- formwork
- vertical keel
- concrete
- construction
- construction structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本实用新型公开了一种坡屋顶活动式面层施工结构,底层模板上安装有多个限位止水螺栓,限位止水螺栓上部固定有竖向龙骨;竖向龙骨用于安装多块面层模板,面层模板与竖向龙骨底面齐平;其中对应于竖向龙骨位置处的面层模板两侧分别设置有侧压骨,并通过侧压骨与竖向龙骨连接固定,其余面层模板直接与对应于竖向龙骨位置的面层模板侧向固定;面层模板和底层模板之间用于浇筑面层结构混凝土。本实用新型能够有效控制坡屋面面层结构的厚度,施工时逐级安装,逐级浇筑,保证面层结构密实、截面尺寸可控及表面平整,保证混凝土密实度,确保混凝土施工质量,避免了以往由于结构渗、漏而返工修补所造成的延误工期及其经济损失,显著降低了施工成本。
The utility model discloses a movable surface layer construction structure for a sloping roof. A plurality of limit water-stop bolts are installed on the bottom formwork, and a vertical keel is fixed on the upper part of the limit water-stop bolts; the vertical keel is used for installing multiple surface Layer formwork, the surface formwork is flush with the bottom surface of the vertical keel; the two sides of the surface formwork corresponding to the position of the vertical keel are respectively provided with side pressure bones, and are connected and fixed with the vertical keel through the side pressure bones, and the rest of the surface layer The formwork is directly fixed laterally with the surface formwork corresponding to the position of the vertical keel; the surface formwork and the bottom formwork are used for pouring surface structure concrete. The utility model can effectively control the thickness of the surface structure of the sloping roof. During construction, it is installed step by step and poured step by step, so as to ensure the dense surface structure, controllable section size and smooth surface, ensure the compactness of the concrete, ensure the quality of the concrete construction, and avoid In the past, the delay in construction period and economic loss caused by rework and repair due to structural leakage and leakage have significantly reduced construction costs.
Description
技术领域technical field
本实用新型涉及一种建筑工程施工领域,具体的说,是涉及一种用于坡屋顶的面层施工结构。The utility model relates to the field of building engineering construction, in particular to a surface layer construction structure for slope roofs.
背景技术Background technique
随着建筑业的发展、大众审美水平的不断提高,为了顺应人们生活多样化选择的需求,近几年来,在建筑设计上呈现出许多新颖别致、纷呈多样的坡屋面结构。传统上的坡屋面(通常指坡度在25度~75度之间的坡屋面)施工中往往采取安装斜坡底面模板或在钢筋面上附加一层钢丝网进行浇筑、拍实,在振捣过程中往往造成混凝土滑落,产生离析现象,致使坡屋面板厚度难以保证,并且在混凝土初凝前由于重力作用易产生拉裂裂缝,同时混凝土浇捣密实性难以得到控制,施工质量难以达到预期效果,而坡度较大的坡屋面如果采用双层固定模板,其做法类似剪力墙施工过程,一方面施工成本较高,另一方面施工难度较大。With the development of the construction industry and the continuous improvement of the public's aesthetic level, in order to meet the needs of people's diversified choices in life, in recent years, many novel, unique and diverse slope roof structures have appeared in architectural design. In the construction of traditional sloping roofs (usually referring to sloping roofs with a slope between 25 degrees and 75 degrees), it is often used to install slope bottom formwork or attach a layer of steel wire mesh on the reinforcement surface for pouring and compaction. It often causes the concrete to slip and segregate, which makes it difficult to guarantee the thickness of the slab roof, and it is easy to produce cracks due to gravity before the initial setting of the concrete. If a double-layer fixed formwork is used for a sloping roof with a large slope, the method is similar to the construction process of a shear wall. On the one hand, the construction cost is high, and on the other hand, the construction is relatively difficult.
实用新型内容Utility model content
本实用新型要解决的是目前的坡屋面面层结构施工难度较大、施工质量不易保证的技术问题,提供一种坡屋顶活动式面层施工结构,该面层施工结构便于安装和拆卸,能够有效控制屋面结构厚度,保证坡面混凝土成型质量。The utility model aims to solve the technical problems that the construction of the current sloping roof surface structure is relatively difficult and the construction quality is difficult to guarantee. It provides a sloping roof movable surface construction structure, which is easy to install and disassemble, and can Effectively control the thickness of the roof structure to ensure the quality of concrete forming on the slope.
为了解决上述技术问题,本实用新型通过以下的技术方案予以实现:In order to solve the above technical problems, the utility model is realized through the following technical solutions:
一种坡屋顶活动式面层施工结构,包括底层模板,所述底层模板上安装有多个限位止水螺栓,所述限位止水螺栓上部固定有竖向龙骨;所述竖向龙骨用于安装多块面层模板,所述面层模板与所述竖向龙骨底面齐平;其中对应于所述竖向龙骨位置处的所述面层模板两侧分别设置有侧压骨,并通过所述侧压骨与所述竖向龙骨连接固定,其余所述面层模板直接与对应于所述竖向龙骨位置的所述面层模板侧向固定;所述面层模板和所述底层模板之间用于浇筑面层结构混凝土。A movable surface construction structure for a sloping roof, comprising a bottom formwork, on which a plurality of limit waterstop bolts are installed, and a vertical keel is fixed on the upper part of the limit waterstop bolts; the vertical keel is used for For installing a plurality of surface formwork, the surface formwork is flush with the bottom surface of the vertical keel; wherein the two sides of the surface formwork corresponding to the position of the vertical keel are respectively provided with side pressure bones, and through The side pressure bone is connected and fixed to the vertical keel, and the remaining surface formwork is directly fixed laterally to the surface formwork corresponding to the position of the vertical keel; the surface formwork and the bottom formwork It is used for pouring surface structure concrete.
其中,相邻两个所述限位止水螺栓之间的间距为1000-1500mm。Wherein, the distance between two adjacent limit waterstop bolts is 1000-1500mm.
其中,所述限位止水螺栓底端外露于所述底层模板、顶端外露于所述竖向龙骨的长度均为80-100mm。Wherein, the lengths of the bottom ends of the limit waterstop bolts exposed to the bottom formwork and the top ends of the vertical keels are both 80-100 mm.
其中,所述面层模板的长度为1000-1200mm、宽度为500-600mm。Wherein, the length of the surface layer template is 1000-1200 mm, and the width is 500-600 mm.
其中,所述竖向龙骨采用方木双拼,所述方木的尺寸为40mm*60mm或50mm*50mm。Wherein, the vertical keel is double-assembled with square wood, and the size of the square wood is 40mm*60mm or 50mm*50mm.
其中,所述侧压骨的长度20-30cm,宽度为30mm,厚度为40mm。Wherein, the length of the lateral pressure bone is 20-30cm, the width is 30mm, and the thickness is 40mm.
本实用新型的有益效果是:The beneficial effects of the utility model are:
(一)本实用新型采用竖向龙骨作为安装面层模板的依据,有效控制坡屋面面层结构的厚度,面层模板预先制作,便于安装和拆卸,施工时逐级安装,逐级浇筑,面层模板安装与浇筑混凝土互不干扰工作面,相互依次循环进行,操作简单、施工方便,能保证面层结构密实、截面尺寸可控及表面平整,较好地保证了坡面混凝土的成型质量;(1) The utility model adopts the vertical keel as the basis for installing the surface formwork to effectively control the thickness of the slope roof surface structure. The surface formwork is prefabricated, which is convenient for installation and disassembly. During construction, it is installed step by step and poured step by step. Layer formwork installation and concrete pouring do not interfere with each other on the working face, and they are carried out sequentially, which is simple to operate and convenient to construct, and can ensure that the surface layer structure is dense, the cross-sectional size is controllable and the surface is smooth, and the molding quality of the slope concrete is better guaranteed;
(二)本实用新型与传统的单层模板施工结构相比较,能够有效避免混凝土滑落的缺陷,混凝土浇捣易达到密实的效果,保证了混凝土密实度,确保了混凝土施工质量,避免了以往由于结构渗、漏而返工修补所造成的延误工期及其经济损失;(2) Compared with the traditional single-layer formwork construction structure, the utility model can effectively avoid the defect of concrete slipping, and the concrete pouring and pounding can easily achieve a compact effect, which ensures the compactness of the concrete, ensures the construction quality of the concrete, and avoids Delay in construction period and economic loss caused by rework and repair of structural seepage and leakage;
(三)本实用新型与传统的双层固定模板施工结构相比较,显著降低了施工成本,其投入费用可减少60%左右。(3) Compared with the traditional double-layer fixed formwork construction structure, the utility model significantly reduces the construction cost, and its input cost can be reduced by about 60%.
附图说明Description of drawings
图1是本实用新型所提供的坡屋顶活动式面层施工结构的结构示意图;Fig. 1 is the structural representation of the movable surface layer construction structure of the slope roof provided by the utility model;
图2是本实用新型所提供的坡屋顶活动式面层施工结构的平面示意图。图中:1-限位止水螺栓;2-竖向龙骨;3-面层模板;4-侧压骨;5-铁钉;6-止水片;7-面层结构混凝土;8-底层模板。Fig. 2 is the schematic plan view of the movable surface layer construction structure of the sloping roof provided by the utility model. In the figure: 1-limit water-stop bolt; 2-vertical keel; 3-surface formwork; 4-side pressure bone; 5-iron nail; 6-waterstop; 7-surface structural concrete; 8-bottom template.
具体实施方式Detailed ways
为能进一步了解本实用新型的发明内容、特点及效果,兹例举以下实施例,并配合附图详细说明如下:In order to further understand the invention content, characteristics and effects of the present utility model, the following examples are given, and detailed descriptions are as follows in conjunction with the accompanying drawings:
如图1和图2所示,本实施例提供了一种坡屋顶活动式面层施工结构,主要由限位止水螺栓1、竖向龙骨2、面层模板3、侧压骨4、铁钉5、止水片6、面层结构混凝土7、底层模板8构成。面层模板3和底层模板8之间浇筑面层结构混凝土7,能够保证面层结构混凝土7结构密实、截面尺寸可控及表面平整。As shown in Figures 1 and 2, this embodiment provides a movable surface construction structure for a sloping roof, which mainly consists of a limit water stop bolt 1, a vertical keel 2, a surface formwork 3, side pressure frames 4, iron Nails 5, water stop sheets 6, surface structural concrete 7, and bottom formwork 8. The surface structure concrete 7 is poured between the surface formwork 3 and the bottom formwork 8, which can ensure that the structure of the surface structure concrete 7 is dense, the cross-sectional size is controllable and the surface is smooth.
限位止水螺栓1横纵排列的布置于底层模板8上,相邻两个限位止水螺栓1之间的间距控制在1000-1500mm。每个限位止水螺栓1焊接有三个止水片6,三个止水片6分别设置在紧贴面层模板3下表面的位置、紧贴底层模板8上表面的位置以及面层结构混凝土7中间的位置;止水片6与限位止水螺栓1应满焊严密,一方面确保面层结构混凝土7的厚度,另一方面还能延长渗水路线、增加对渗透水的阻力,从而防止结构渗漏。The limit water stop bolts 1 are arranged horizontally and vertically on the bottom template 8, and the distance between two adjacent limit water stop bolts 1 is controlled at 1000-1500mm. Each limit water-stop bolt 1 is welded with three water-stop sheets 6, and the three water-stop sheets 6 are respectively arranged on the position close to the lower surface of the surface formwork 3, the position close to the upper surface of the bottom formwork 8, and the surface layer structural concrete. 7, the position in the middle; the water stop sheet 6 and the limit water stop bolt 1 should be fully welded tightly, on the one hand to ensure the thickness of the surface structure concrete 7, on the other hand it can also extend the seepage route and increase the resistance to seepage water, thereby preventing Structure leaks.
竖向龙骨2锁紧固定于限位止水螺栓1上部,可采用40mm*60mm或50mm*50mm的方木双拼,双拼间的空隙用小木条夹钉。限位止水螺栓1底端外露于底层模板8、顶端外露于竖向龙骨2的长度均为100mm。The vertical keel 2 is locked and fixed on the upper part of the limit water-stop bolt 1, which can be made of 40mm*60mm or 50mm*50mm square wood double-piece, and the gap between the double-piece is nailed with small wooden strips. The lengths of the bottom end of the limit waterstop bolt 1 exposed to the bottom template 8 and the top end exposed to the vertical keel 2 are both 100mm.
面层模板3设置有多块,每块面层模板3的长度控制在1000-1200mm、宽度控制在500-600mm。根据竖向龙骨2的布置间距(也是限位止水螺栓1的布置间距),一部分面层模板3的两侧与竖向龙骨2位置对应,另一部分面层模板3附近无竖向龙骨2的设置。其中与竖向龙骨2位置对应的面层模板3,在预制时两侧分别加钉20~30cm长的30mm*40mm侧压骨4,然后通过侧压骨4以铁钉5与竖向龙骨2钉牢;而其余面层模板3直接与上述对应于竖向龙骨2位置的面层模板3侧向固定即可,如图2所示。面层模板3的长度应比两侧竖向龙骨2之间的净距小10mm(两端各5mm),以便于面层模板3的安放,安装时将面层模板3的下边缘与竖向龙骨2的下边缘对齐。The surface layer template 3 is provided with multiple pieces, and the length of each surface layer template 3 is controlled at 1000-1200mm, and the width is controlled at 500-600mm. According to the layout spacing of the vertical keel 2 (also the layout spacing of the limit water-stop bolt 1), the two sides of a part of the surface formwork 3 correspond to the positions of the vertical keel 2, and the other part of the surface formwork 3 has no vertical keel 2 set up. Among them, the surface template 3 corresponding to the position of the vertical keel 2, nails 20-30cm long and 30mm*40mm side pressure bone 4 on both sides during prefabrication, and then through the side pressure bone 4 with iron nails 5 and vertical keel 2 Nail firmly; and the remaining surface formwork 3 can be directly fixed laterally with the above-mentioned surface formwork 3 corresponding to the position of the vertical keel 2, as shown in Figure 2 . The length of the surface formwork 3 should be 10mm smaller than the clear distance between the vertical keels 2 on both sides (5mm at both ends), so as to facilitate the placement of the surface formwork 3. When installing, the lower edge of the surface formwork 3 and the vertical The lower edge of the keel 2 is aligned.
上述坡屋顶活动式面层施工结构的施工方法,其具体步骤如下:The construction method of above-mentioned sloping roof movable surface construction structure, its concrete steps are as follows:
1、安装底层模板8:坡屋面底层模板8支撑体系按规范要求搭设完成后,调整可调顶托标高,铺设坡屋面底层模板8,必须保证拼缝的严密。将底层模板8上的杂物清理干净,涂刷隔离剂时不得沾污钢筋,混凝土接搓处避免隔离剂沾污,经自检合格后,提交监理单位进行预检。1. Install the bottom formwork 8: After the support system of the slope roof bottom formwork 8 is erected according to the specification requirements, adjust the height of the adjustable jacking and lay the slope roof bottom formwork 8. The joints must be tight. Clean up the sundries on the bottom formwork 8, do not stain the steel bars when applying the release agent, and avoid contamination of the release agent on the joints of the concrete. After passing the self-inspection, submit it to the supervisory unit for pre-inspection.
2、弹线、放样,确定限位止水螺栓1的位置:利用计算机CAD技术进行设计绘图,绘制竖向龙骨2与限位止水螺栓1的位置图,确定面层模板3的分级数,现场施工采用数字化全站仪进行施工放样、弹线;2. Stretch the line, stake out, and determine the position of the limit water-stop bolt 1: use computer CAD technology to design and draw, draw the position diagram of the vertical keel 2 and the limit water-stop bolt 1, and determine the grade number of the surface template 3, On-site construction uses a digital total station for construction stakeout and line snapping;
限位止水螺栓1的布置间距控制在1000~1500mm左右,这种做法不仅能保证结构厚度,而且能延长渗水路线、增加对渗透水的阻力,防止渗漏。The arrangement distance of limit water stop bolts 1 is controlled at about 1000-1500mm. This method can not only ensure the thickness of the structure, but also prolong the seepage route, increase the resistance to seepage water, and prevent leakage.
3、确定好准确位置后,采用手钻进行钻孔,并清理底层模板8在手钻钻孔中产生的木屑。3. After determining the exact position, use a hand drill to drill holes, and clean up the sawdust produced by the bottom template 8 in the hand drill holes.
4、绑扎坡屋面钢筋:为了避免在浇捣面层结构混凝土7过程中板面钢筋下陷,保证板筋的有效高度,在双层钢筋网之间应增设有效的支撑马凳筋,支撑马凳筋不小于φ10,当板筋≥φ12时,间距不大于1000mm*1000mm,当板筋<φ12时,间距不大于600mm*600mm,同一方向上的支撑不少于2处,且距板筋末端不大于150mm。马凳筋与上、下层钢筋接触点采用点焊,同时在其周边2~3道范围内的上、下层钢筋网也采取点焊,以加强钢筋网整体稳定性。钢筋相互间应绑扎牢固,以防止浇捣面层结构混凝土7时,因碰撞、振动使绑扣松散,钢筋移位,造成露筋。4. Binding steel bars on sloping roofs: In order to avoid the subsidence of the steel bars on the slab surface during the pouring and tamping of the surface structure concrete 7, and to ensure the effective height of the bars, an effective supporting horse stool bar should be added between the double-layer steel mesh to support the horse stool The reinforcement is not less than φ10. When the reinforcement is ≥φ12, the spacing is not greater than 1000mm*1000mm. When the reinforcement is <φ12, the spacing is not greater than 600mm*600mm. There are no less than 2 supports in the same direction, and the distance from the end of the reinforcement Greater than 150mm. The contact points between the horse stool bars and the upper and lower layers of steel bars are spot welded. At the same time, the upper and lower layers of steel mesh within 2 to 3 surrounding areas are also spot welded to enhance the overall stability of the steel mesh. The steel bars should be tied firmly to each other to prevent the buckle from loosening due to collision and vibration when pouring and tamping the surface structure concrete 7, and the steel bars shifting, resulting in exposed bars.
5、安装限位止水螺栓1:安装过程中止水片6与限位止水螺栓1应满焊严密,防止结构渗漏的同时,以此确保混凝土保护层7的厚度,另外限位止水螺栓1外露于底层模板8和竖向龙骨2不宜太长,以80-100mm为宜。5. Install the limit water stop bolt 1: During the installation process, the water stop sheet 6 and the limit water stop bolt 1 should be fully welded tightly to prevent structural leakage and at the same time ensure the thickness of the concrete protective layer 7. In addition, the limit water stop The bolt 1 exposed to the bottom formwork 8 and the vertical keel 2 should not be too long, preferably 80-100mm.
6、依据坡屋面的走向沿坡底至坡顶,在每个限位止水螺栓1的上部锁紧面层模板3的竖向龙骨2;竖向龙骨2可采用40mm*60mm或50mm*50mm方木双拼,竖向龙骨2双拼方木间的空隙用小木条夹钉。6. According to the direction of the sloping roof, from the bottom of the slope to the top of the slope, lock the vertical keel 2 of the surface formwork 3 on the upper part of each limit water-stop bolt 1; the vertical keel 2 can be 40mm*60mm or 50mm*50mm The square wood is double-assembled, and the gap between the vertical keel 2 pairs of square wood is nailed with small wooden strips.
7、面层模板3预制:面层模板3经放样分级,并事先预制完成,宽度300~500mm,长度900~1200mm,预制时尽量采用同一模板数级,不足处经现场放样后确定,这样一方面便于模板安装、周转,节约材料;另一方面也有利于混凝土浇筑及在施工中检查混凝土浇筑是否密实,可适当地减少混凝土上、下层搭接时间,减少冷缝产生。7. Prefabrication of the surface formwork 3: The surface formwork 3 is graded by lofting and prefabricated in advance, with a width of 300-500mm and a length of 900-1200mm. The same formwork level should be used as far as possible during prefabrication. The deficiencies are determined after on-site lofting. On the one hand, it is convenient for formwork installation and turnover, and saves materials; on the other hand, it is also conducive to concrete pouring and checking whether the concrete pouring is compact during construction, which can appropriately reduce the lapping time of the upper and lower layers of concrete and reduce the generation of cold joints.
分级面层模板3预制时,两侧边加钉20~30cm长的30mm*40mm侧压骨4;面层模板3的长度应比两侧竖向龙骨2之间的净距小10mm(两端各5mm),以便于面层模板3安放。安装时将面层模板3的下边缘与竖向龙骨2的下边缘对齐,通过铁钉5将侧压骨4与竖向龙骨2钉牢。When the graded surface template 3 is prefabricated, nail 20-30cm long 30mm*40mm side pressure bone 4 on both sides; the length of the surface layer template 3 should be 10mm smaller than the clear distance between the vertical keels 2 on both sides Each 5mm), so that surface layer formwork 3 is placed. When installing, align the lower edge of the surface template 3 with the lower edge of the vertical keel 2, and nail the side pressure bone 4 and the vertical keel 2 firmly by iron nails 5.
8、浇筑面层结构混凝土7:浇筑面层结构混凝土7时在面层模板3混凝土浇筑预留口临时设置50cm高的挡板,避免浇筑时骨料滑落。对于钢筋排列较密的坡屋面,可采用φ30小型振动棒振捣。浇筑过程中可采用小锤敲击检查是否已浇筑密实。浇筑面层结构混凝土7时,可以斜屋檐为起点,绕屋面一周循环浇筑,浇筑完一层后即可安装上一层面层模板3,逐级逐段安装面层模板3,然后逐级浇筑混凝土,相互依次循环进行,直至浇筑结束。对于结构尺寸较大的,周长较大的坡屋面,应在施工前根据每层混凝土浇筑的速度,计算好浇筑时间;如有必要时,可适当考虑添加缓凝剂,避免混凝土搭接前产生冷缝。周长较大的坡屋面浇筑下一级混凝土之前若上一级混凝土已初凝,应对上一级混凝土施工缝进行处理,剔除浮渣打毛界面清理干净并刷纯水泥浆后浇筑下一级混凝土。8. Pouring the surface structure concrete 7: When pouring the surface structure concrete 7, temporarily set a 50cm high baffle at the concrete pouring opening of the surface formwork 3 to prevent the aggregate from slipping during pouring. For sloping roofs with densely arranged steel bars, φ30 small vibrating rods can be used to vibrate. During the pouring process, a small hammer can be used to check whether the pouring has been compacted. When pouring the surface layer structure concrete 7, you can use the inclined eaves as the starting point, and pour circularly around the roof. After pouring one layer, you can install the upper layer formwork 3, install the surface layer formwork 3 step by step, and then pour concrete step by step , each other in turn cycle, until the end of pouring. For sloping roofs with large structural dimensions and large perimeters, the pouring time should be calculated according to the pouring speed of each layer of concrete before construction; if necessary, appropriate consideration can be given to adding retarders to avoid concrete lapping. Create cold seams. If the upper-level concrete has initially set before pouring the next-level concrete on a sloping roof with a large perimeter, the construction joints of the upper-level concrete should be treated, the scum and roughening interface should be removed, and the next-level concrete should be poured after brushing pure cement slurry .
9、拆除面层模板3和底层模板8:面层模板3可在面层结构混凝土7强度达到1.2N/mm2后拆除以循环使用,拆模时应小心,严禁乱撬,以免造成限位止水螺栓1及面层结构混凝土7的缺棱掉角,底层模板8则应根据规范中梁板拆模的规定,以同条件试块试压强度为依据,经批准后,予以拆模。9. Remove the surface formwork 3 and the bottom formwork 8: the surface formwork 3 can be removed for recycling after the strength of the surface structure concrete 7 reaches 1.2N/mm 2. Care should be taken when removing the formwork, and random prying is strictly prohibited, so as not to cause a limit For the missing edges and corners of water-stop bolts 1 and surface structural concrete 7, the bottom formwork 8 should be demolished after approval according to the regulations on formwork removal for beams and slabs under the same conditions and based on the test compressive strength of test blocks under the same conditions.
尽管上面结合附图对本实用新型的优选实施例进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以作出很多形式的具体变换,这些均属于本实用新型的保护范围之内。Although the preferred embodiment of the utility model has been described above in conjunction with the accompanying drawings, the utility model is not limited to the above-mentioned specific implementation, and the above-mentioned specific implementation is only illustrative and not restrictive. Under the enlightenment of the utility model, those of ordinary skill can also make many specific transformations without departing from the spirit of the invention and the protection scope of the claims, and these all belong to the protection scope of the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520249000.5U CN204662742U (en) | 2015-04-22 | 2015-04-22 | The movable surface construction structure of a kind of pitched roof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520249000.5U CN204662742U (en) | 2015-04-22 | 2015-04-22 | The movable surface construction structure of a kind of pitched roof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204662742U true CN204662742U (en) | 2015-09-23 |
Family
ID=54133137
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520249000.5U Expired - Fee Related CN204662742U (en) | 2015-04-22 | 2015-04-22 | The movable surface construction structure of a kind of pitched roof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204662742U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105386597A (en) * | 2015-12-03 | 2016-03-09 | 浙江海滨建设集团有限公司 | Auxiliary casting device and auxiliary casting method of roof |
| CN106437142A (en) * | 2016-11-10 | 2017-02-22 | 中国三冶集团有限公司 | Construction method and double-layer formwork structure for cast-in-situ slope roof |
| CN110984453A (en) * | 2019-12-06 | 2020-04-10 | 中国十七冶集团有限公司 | BIM-based slope roof cast-in-place concrete construction method |
| CN111236720A (en) * | 2020-01-20 | 2020-06-05 | 中材海外工程有限公司 | Construction method for pouring silo decompression cone without construction joint |
-
2015
- 2015-04-22 CN CN201520249000.5U patent/CN204662742U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105386597A (en) * | 2015-12-03 | 2016-03-09 | 浙江海滨建设集团有限公司 | Auxiliary casting device and auxiliary casting method of roof |
| CN106437142A (en) * | 2016-11-10 | 2017-02-22 | 中国三冶集团有限公司 | Construction method and double-layer formwork structure for cast-in-situ slope roof |
| CN110984453A (en) * | 2019-12-06 | 2020-04-10 | 中国十七冶集团有限公司 | BIM-based slope roof cast-in-place concrete construction method |
| CN111236720A (en) * | 2020-01-20 | 2020-06-05 | 中材海外工程有限公司 | Construction method for pouring silo decompression cone without construction joint |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103615110B (en) | Random oblique netted nine-squares beam Hyperbolic Roof construction method | |
| CN101725202B (en) | Superimposed pouring method of beam and slab in transfer story of high-rise building | |
| CN107882240B (en) | Recycled block concrete prefabricated laminated slab and manufacturing process thereof | |
| CN106801517B (en) | A kind of prefabricated porous plate brick mixed structure of school building exterior reinforcement and strengthening method | |
| CN106437142A (en) | Construction method and double-layer formwork structure for cast-in-situ slope roof | |
| CN104060760B (en) | High Rise Building Transfer Floor Structure concrete super large beam construction in layer method | |
| CN108149819B (en) | Integrated superposed outer wall of building bottom reinforcing area and production and construction method thereof | |
| CN103046746A (en) | Construction method of conversion beam reinforcing bars for tall building structure | |
| CN202627495U (en) | Beam slab late poured band template supporting system | |
| CN105178244A (en) | Quick formwork erecting construction method for cast-in-place wave wall | |
| CN104912320A (en) | Synchronous construction method of shear walls on the two sides of settlement joint | |
| CN103590603A (en) | Large-span multi-curvature thin shell reinforced concrete structure construction method | |
| CN206245730U (en) | A kind of cast-in-place pitched roof double template structure | |
| CN115897589A (en) | Waterproof concrete interval pouring construction method for buried sewage treatment plant | |
| CN209874476U (en) | Non-dismantling side baffle structure of beam post-cast strip | |
| CN103806659B (en) | Super thick prestressing force change-over panel individual layer comprehensively supports and splits temperature control construction technology with control | |
| CN202644976U (en) | Slope roof double-side formwork support structure | |
| CN108005255A (en) | A method of building a wall | |
| CN106284653B (en) | A kind of construction method that balcony construct capital interspaces in advance | |
| CN201908244U (en) | Massive road precast slab | |
| CN109488037A (en) | A kind of environmental protection construction method that private residence is quickly rebuild | |
| CN105863088B (en) | Ultralong floor concrete last-cost joint design and construction technique | |
| CN104963344B (en) | The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out | |
| CN204418691U (en) | A kind of for cast-in-place vertical member and horizontal member junction concrete blocking apparatus | |
| CN111549690A (en) | A low-cost, high-performance rainwater tank-culvert combined structure and its construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 Termination date: 20200422 |