CN101706912A - 一种以销售订单bom为基础的物料跟踪及需求计算方法 - Google Patents

一种以销售订单bom为基础的物料跟踪及需求计算方法 Download PDF

Info

Publication number
CN101706912A
CN101706912A CN200910230621A CN200910230621A CN101706912A CN 101706912 A CN101706912 A CN 101706912A CN 200910230621 A CN200910230621 A CN 200910230621A CN 200910230621 A CN200910230621 A CN 200910230621A CN 101706912 A CN101706912 A CN 101706912A
Authority
CN
China
Prior art keywords
order
tracks
bom
sales order
tracking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910230621A
Other languages
English (en)
Inventor
王兴山
焦学瑞
赵旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Group Shandong General Software Co Ltd
Original Assignee
Inspur Group Shandong General Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Group Shandong General Software Co Ltd filed Critical Inspur Group Shandong General Software Co Ltd
Priority to CN200910230621A priority Critical patent/CN101706912A/zh
Publication of CN101706912A publication Critical patent/CN101706912A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

本发明提供一种以销售订单BOM为基础的物料跟踪及需求计算方法,是以销售订单BOM为基础的物料跟踪及需求计算的方法,该方法包括建立销售订单模型、销售订单bom模型、产品物料需求计算结果表模型,再按上述算法归集实现产品物料需求的计算和跟踪:通过建立一种销售订单bom的算法模型,既解决产品编号和产品bom众多的问题,又解决产品所需物料跟踪及物料需求高效计算的需求。

Description

一种以销售订单BOM为基础的物料跟踪及需求计算方法
技术领域
本发明涉及一种计算机应用技术,具体地说是一种用于ERP管理软件中一种以销售订单BOM为基础的物料跟踪及需求计算方法
背景技术
随着制造企业竞争的加剧,迫使企业的生产模式由大规模生产转向多品种小批量按单生产的生产方式,这种转变给企业ERP软件中的物料管理各环节增加了复杂度,如给产品如何编号带来工作量,如果一个订单一个产品编号,经过几年的数据积累,就会产品很多产品编号,而且这些编号基本不再使用,如果多个订单一个编号,又达不到物料精细化管理的要求.对于该产品的BOM(产品结构清单)管理也是如此,BOM多了带来管理复杂度,少了不利于精细化管理,况且按单生产模式也会要求某些重要物料或者关键材料只能在某个销售订单的产品上使用,实现物料专项专用,也便于跟踪材料质量状况,这也增加了物料跟踪的复杂度;产品根据BOM进行物料需求计划计算时,由于产品编号和bom个数过多,混合运算时导致性能下降。
发明内容
本发明给出了一种以销售订单BOM为基础的物料跟踪及需求计算方法,该方法包括下列步骤和内容:
A、在业务系统中建立销售订单模型及其属性定义:
订单主表:订单流水号,订单编号,制单日期,业务员,制单人等属性;
订单子表:订单流水号,分录号,物料,业务类型,数量、单价、金额等属性,其中业务类型录入方式为选择,其内容有三种,1)是预测生产,2)是按单生产,3)是配置生产。
B、在业务系统中建立销售订单BOM模型及其属性定义:流水号,父项物料,父项数量,跟踪号,子项物料、子项数量、子项类型、是否封存等属性;
C、在业务系统中建立各种计划订单(采购、外协、生产)模型及其属性定义:流水号,计划编号,计划状态,物料编号,跟踪类型,跟踪号,需求日期,需求数量,需求类型等属性;
D、通过模型实例化的具体业务的实现方法,实现方法包括3个步骤:(1)确定使用环境,选择实现的IT技术和工具;(2)设计上述三个模型描述的实例的数据结构;(3)选择适当的编程工具实现前台与后台数据交互,实现以销售订单BOM为基础的物料跟踪及需求计算的实现方法。
在销售订单模型实例化过程中,当业务类型属性是按单生产时,可以直接维护当前行产品的订单BOM,也可以订单制单后维护;在维护销售订单BOM时,跟踪号是根据销售订单流水号和分录号共同形成该产品从顶层到最低层的跟踪号,用户可以置为空,系统可以根据跟踪号的内容还原成销售订单号和产品号进行显示;当物料需求计划运算时,如果计算有跟踪号的物料的可用库存及毛需求时,不能与同等物料号的物料合并起来计算,以保持物料的跟踪;物料需求计算后生成三种计划订单,有采购计划订单、外协计划订单、生产计划订单,结果保存到产品物料需求计算结果表中,如果是bom中的跟踪号不为空,则计划订单中跟踪类型为按单跟踪,跟踪号也不为空.由于各种计划订单都有跟踪号,再与采购、外协、车间系统对接时,也顺便把跟踪号带到相应的系统,从而实现对重要材料按销售订单流水号和分录号进行跟踪.
当销售订单提货完成时,把对应的订单bom封存标志置为2-封存状态,以减少bom数据检索数量,提高性能。
本发明的方法必须包含但不局限于权利要求书描述的步骤和内容,步骤的顺序能够调整和细化;在模型的实现过程中要满足说明书中描述的数据结构,并在此基础上实现按照上述的算法实现物料需求的计算和跟踪,从而解决按单生产模式下物料如何编号,bom如何规划及物料跟踪及需求计算等需求。
本发明的优异效果是:通过建立一种销售订单bom的算法模型,即解决产品编号和产品bom众多的问题,又解决产品所需物料跟踪及物料需求高效计算的需求。
具体实施方式
本发明所述的以销售订单BOM为基础的物料跟踪及需求计算的方法包括建立销售订单模型、销售订单bom模型、产品物料需求计算结果表模型,再按上述算法归集实现产品物料需求的计算和跟踪:
销售订单模型属性描述如下:
订单主表:
1)订单流水号:唯一的标识一张销售订单的流水号。
2)订单编号:唯一的标识一张销售订单的编号。
3)制单日期:标识销售订单的编制日期。
4)业务员:标识销售订单的业务人员编号
5)制单人:标识销售订单的制单人员编号。
订单子表:
1)订单流水号:标识一张销售订单分录的流水号。
2)分录号:标识一张销售订单分录的分录号,和流水号一起唯一的确定一个分录号。
3)物料:标识订单的订购产品编号。
4)业务类型:标识业务性质,其内容有三种,1是预测生产,2是按单生产,3是配置生产。
5)数量:标识订购产品的数量。
6)单价:标识订购产品的单价。
7)金额:标识订购产品的金额。
A.销售订单BOM模型属性描述如下:
1)流水号:唯一的标识bom表中的一条记录
2)父项物料:标识产品结构清单中的父项物料编号。
3)父项数量:标识产品结构清单中的父项物料相对于子项用量的数量。
4)跟踪号:由销售订单流水号和分录号构成。
5)子项物料:标识产品结构清单中的子项物料编号。
6)子项数量:标识产品结构清单中的子项物料相对于父项用量的数量。
7)子项类型:标识物料是采购、外协还是生产。
8)是否封存:标识bom是否封存。
B.计划订单模型属性描述如下
1)流水号:唯一的标识计划订单的流水号。
2)计划编号:物料需求计划计算时形成的编号。
3)计划状态:标识该计划是编制还是下达状态。
4)物料编号:产品需求计算后的所需的物料编号
5)跟踪类型:内容有二种,1是无跟踪,2是按单跟踪;如果跟踪类型是按单跟踪,跟踪号不能为空。
6)跟踪号:由销售订单流水号和分录号构成。
7)需求日期:需求计算后的物料的需求日期。
8)需求数量:需求计算后的物料的净需求数量。
9)需求类型:标识物料是采购、外协还是生产需求。
D、根据销售订单bom计算产品物料需求的算法
在销售订单模型实例化过程中,当业务类型属性是2-按单生产时,可以直接维护当前行产品的订单BOM,也可以订单制单后维护;在维护销售订单BOM时,跟踪号是根据销售订单流水号和分录号共同形成该产品从顶层到最低层的跟踪号,用户可以置为空,系统可以根据跟踪号的内容还原成销售订单号和产品号进行显示;当物料需求计划运算时,如果计算有跟踪号的物料的可用库存及毛需求时,不能与同等物料号的物料合并起来计算,以保持物料的跟踪;物料需求计算后生成三种计划订单,有采购计划订单、外协计划订单、生产计划订单,结果保存到产品物料需求计算结果表中,如果是bom中的跟踪号不为空,则计划订单中跟踪类型为按单跟踪,跟踪号也不为空。由于各种计划订单都有跟踪号,再与采购、外协、车间系统对接时,也顺便把跟踪号带到相应的系统,从而实现对重要材料按销售订单流水号和分录号进行跟踪。
当销售订单提货完成时,把对应的订单bom封存标志置为2-封存状态,以减少bom数据检索数量,提高性能。
实施例
本发明已经成功应用于浪潮ERP-PS(v10.1)管理软件中,帮助许多按单生产类型的企业解决了物料如何编号、产品bom如何规划编制问题及后续物料按销售订单号回溯等需求。

Claims (1)

1.一种以销售订单BOM为基础的物料跟踪及需求计算方法,其特征在于,包括建立销售订单模型、销售订单bom模型和产品物料需求计算结果表模型,按上述算法归集实现产品物料需求的计算和跟踪:通过建立一种销售订单bom的算法模型,即解决产品编号和产品bom众多的问题,又解决产品所需物料跟踪及物料需求高效计算的需求;包括下列步骤和内容:
A、在业务系统中建立销售订单模型及其属性定义,包括以下内容:
订单主表:订单流水号,订单编号,制单日期,业务员,制单人的属性;
订单子表:订单流水号,分录号,物料,业务类型,数量、单价、金额的属性,其中业务类型录入方式为选择,其内容有三种,1)是预测生产,2)是按单生产,3)是配置生产;
B、在业务系统中建立销售订单BOM模型及其属性定义:包括流水号,父项物料,父项数量,跟踪号,子项物料、子项数量、子项类型、是否封存的属性;
C、在业务系统中建立各种计划订单包括:采购、外协、生产模型及其属性定义:包括流水号,计划编号,计划状态,物料编号,跟踪类型,跟踪号,需求日期,需求数量,需求类型的属性;
D、通过模型实例化的具体业务的实现,包括3个步骤:(1)确定使用环境,选择实现的IT技术和工具;(2)设计上述三个模型描述的实例的数据结构;(3)选择适当的编程工具实现前台与后台数据交互,实现以销售订单BOM为基础的物料跟踪及需求计算;
在销售订单模型实例化过程中,当业务类型属性是2)按单生产时,直接维护当前行产品的订单BOM,或订单制单后维护;在维护销售订单BOM时,跟踪号是根据销售订单流水号和分录号共同形成该产品从顶层到最低层的跟踪号,用户可以置为空,系统根据跟踪号的内容还原成销售订单号和产品号进行显示;当物料需求计划运算时,计算有跟踪号的物料的可用库存及毛需求时,不能与同等物料号的物料合并起来计算,以保持物料的跟踪;物料需求计算后生成采购计划订单、外协计划订单、生产计划订单,结果保存到产品物料需求计算结果表中,是bom中的跟踪号不为空,则计划订单中跟踪类型为按单跟踪,跟踪号也不为空,由于各种计划订单都有跟踪号,再与采购、外协、车间系统对接时,也顺便把跟踪号带到相应的系统,从而实现对重要材料按销售订单流水号和分录号进行跟踪;当销售订单提货完成时,把对应的订单bom封存标志置为步骤2)封存状态,以减少bom数据检索数量,提高性能。
CN200910230621A 2009-11-23 2009-11-23 一种以销售订单bom为基础的物料跟踪及需求计算方法 Pending CN101706912A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910230621A CN101706912A (zh) 2009-11-23 2009-11-23 一种以销售订单bom为基础的物料跟踪及需求计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910230621A CN101706912A (zh) 2009-11-23 2009-11-23 一种以销售订单bom为基础的物料跟踪及需求计算方法

Publications (1)

Publication Number Publication Date
CN101706912A true CN101706912A (zh) 2010-05-12

Family

ID=42377135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910230621A Pending CN101706912A (zh) 2009-11-23 2009-11-23 一种以销售订单bom为基础的物料跟踪及需求计算方法

Country Status (1)

Country Link
CN (1) CN101706912A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567826A (zh) * 2010-12-20 2012-07-11 金蝶软件(中国)有限公司 处理物料单据的方法和系统
CN102609815A (zh) * 2012-02-13 2012-07-25 浪潮集团山东通用软件有限公司 一种支持多计划策略的自动定位bom的实现方法
CN105404965A (zh) * 2015-11-04 2016-03-16 无锡华玥信息技术有限公司 线上销售订单处理系统及其监控方法
CN107066432A (zh) * 2016-10-24 2017-08-18 禾盈软件科技有限公司 单据自动生成的方法及其系统
CN108229875A (zh) * 2017-11-27 2018-06-29 郑州云海信息技术有限公司 一种服务器模块化bom架构下的服务备件方法
CN108269067A (zh) * 2018-02-09 2018-07-10 东莞嘉泰钟表有限公司 一种报关单的订单货物描述自动获取的方法
CN108416683A (zh) * 2018-02-27 2018-08-17 平安科技(深圳)有限公司 移动终端的保单确认方法、装置、设备及存储介质
CN109522334A (zh) * 2018-11-27 2019-03-26 Oppo(重庆)智能科技有限公司 一种欠料查询方、欠料查询系统及电子设备
CN111445175A (zh) * 2019-01-17 2020-07-24 趣增信息科技(上海)有限公司 一种在线销售订单处理方法
CN111461590A (zh) * 2020-03-02 2020-07-28 南京同赢信息科技有限公司 一种根据销售、库存、采购信息计算物料齐套的方法
CN111461914A (zh) * 2020-03-31 2020-07-28 深圳点链科技有限公司 订单跟踪核销管理的方法、系统及存储介质
CN111626689A (zh) * 2020-04-21 2020-09-04 徐工集团工程机械股份有限公司 一种基于产品实例的数据智能算法
CN111768048A (zh) * 2020-07-04 2020-10-13 浙江锐制软件技术有限公司 预测物料数量的精准计算方法及其系统

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567826A (zh) * 2010-12-20 2012-07-11 金蝶软件(中国)有限公司 处理物料单据的方法和系统
CN102609815A (zh) * 2012-02-13 2012-07-25 浪潮集团山东通用软件有限公司 一种支持多计划策略的自动定位bom的实现方法
CN105404965A (zh) * 2015-11-04 2016-03-16 无锡华玥信息技术有限公司 线上销售订单处理系统及其监控方法
CN107066432A (zh) * 2016-10-24 2017-08-18 禾盈软件科技有限公司 单据自动生成的方法及其系统
CN108229875A (zh) * 2017-11-27 2018-06-29 郑州云海信息技术有限公司 一种服务器模块化bom架构下的服务备件方法
CN108269067A (zh) * 2018-02-09 2018-07-10 东莞嘉泰钟表有限公司 一种报关单的订单货物描述自动获取的方法
CN108416683B (zh) * 2018-02-27 2021-06-25 平安科技(深圳)有限公司 移动终端的保单确认方法、装置、设备及存储介质
CN108416683A (zh) * 2018-02-27 2018-08-17 平安科技(深圳)有限公司 移动终端的保单确认方法、装置、设备及存储介质
CN109522334A (zh) * 2018-11-27 2019-03-26 Oppo(重庆)智能科技有限公司 一种欠料查询方、欠料查询系统及电子设备
CN111445175A (zh) * 2019-01-17 2020-07-24 趣增信息科技(上海)有限公司 一种在线销售订单处理方法
CN111461590A (zh) * 2020-03-02 2020-07-28 南京同赢信息科技有限公司 一种根据销售、库存、采购信息计算物料齐套的方法
CN111461914A (zh) * 2020-03-31 2020-07-28 深圳点链科技有限公司 订单跟踪核销管理的方法、系统及存储介质
WO2021197351A1 (zh) * 2020-03-31 2021-10-07 深圳点链科技有限公司 订单跟踪核销管理的方法、系统及存储介质
CN111626689A (zh) * 2020-04-21 2020-09-04 徐工集团工程机械股份有限公司 一种基于产品实例的数据智能算法
CN111626689B (zh) * 2020-04-21 2022-10-28 徐工集团工程机械股份有限公司 一种基于产品实例的数据智能算法
CN111768048A (zh) * 2020-07-04 2020-10-13 浙江锐制软件技术有限公司 预测物料数量的精准计算方法及其系统

Similar Documents

Publication Publication Date Title
CN101706912A (zh) 一种以销售订单bom为基础的物料跟踪及需求计算方法
CN109523108A (zh) 一种企业制造管理及采购一体化平台
CN109636135B (zh) 一种基于共享的数字供应链管理系统
Chase Jr Using big data to enhance demand-driven forecasting and planning
US20150109287A1 (en) Method and system for supply chain network sensitivity analysis and presentation
Alvarez et al. Towards lean manufacturing from theory of constraints: a case study in footwear industry
CN110097203A (zh) 库存调度方法、库存调度装置以及计算机可读存储介质
KR101550740B1 (ko) 실시간 공장상황을 반영한 디지털 팩토리 생산능력 관리 시스템
CN101706886A (zh) 一种以订单驱动的加工车间单件小批量混流生产方法
CN102376040A (zh) 一种企业采购份额分配决策支持系统
Niaz Revolutionizing Inventory Planning: Harnessing Digital Supply Data through Digitization to Optimize Storage Efficiency Pre-and Post-Pandemic
CN1763774A (zh) 一种流程工业可视化生产工艺流程描述的建模方法
US6370509B1 (en) Three-dimensional production schedule display for computer-implemented production management system
Lim et al. Graphical tools for production planning in small medium industries (SMIs) based on pinch analysis
CN115081868A (zh) 一种面向业务流程的erp加mes管理业务系统及其推送方法
CN105913188A (zh) 一种rfid供应链的多维管理系统及方法
CN103927618A (zh) 一种bom物料处理方法
De Meyer et al. Integration of information systems in manufacturing
Zhou An empirical study of the role of postponement application in reducing supply chain complexity
CN115375024A (zh) 一种基于bom材料损耗预测和提醒采购方法及系统
CN107506860A (zh) 精益生产计划实现系统及实现方法
CN107704989A (zh) 使用精益制造管理系统及方法
Malik How to implement Just-in-time in small scale industry
Ashayeri et al. A production planning model and a case study for the pharmaceutical industry in the Netherlands
Phillips Next-gen S&OP: reshaping the supply chain

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100512