CN101705660A - 用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法 - Google Patents

用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法 Download PDF

Info

Publication number
CN101705660A
CN101705660A CN200910175434A CN200910175434A CN101705660A CN 101705660 A CN101705660 A CN 101705660A CN 200910175434 A CN200910175434 A CN 200910175434A CN 200910175434 A CN200910175434 A CN 200910175434A CN 101705660 A CN101705660 A CN 101705660A
Authority
CN
China
Prior art keywords
steel
concrete
reaction frame
bridge
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910175434A
Other languages
English (en)
Other versions
CN101705660B (zh
Inventor
胡国伟
刘金生
李英俊
吴士民
刘志如
张俊兵
张宇宁
程文斌
徐建中
李建成
刘荣华
刘建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN2009101754344A priority Critical patent/CN101705660B/zh
Publication of CN101705660A publication Critical patent/CN101705660A/zh
Application granted granted Critical
Publication of CN101705660B publication Critical patent/CN101705660B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明属于桥梁工程,具体涉及一种用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法,解决了现有梁拱组合式桥梁钢管拱的竖转施工中,反力架后锚对梁体的不利影响、后锚设计不灵活、反力架台座对桥面的影响等问题。锚固体系,包括一端与反力架相连的钢绞线,另一端绕经混凝土桥梁的边跨实心段端部与边跨实心段内侧的钢箱相连;还包括边跨实心段端部固定的调平钢板,调平钢板上固定混凝土钢管。本发明具有如下有益效果:对桥梁结构桥面无损伤,受力体系简单明确,对梁体的线形没有影响,便于施工过程控制;节约施工成本和前期施工设计,保证了安全和快速施工。

Description

用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法
技术领域
本发明属于桥梁工程中采用“先梁后拱”修建连续刚构拱桥的技术领域,具体涉及一种用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法。
背景技术
在梁拱组合式桥梁的钢管拱施工中,常采用的方法有三种:一、按钢管拱的设计线形和位置在已完成的梁体上进行支架法拼装和合龙;二、采用缆索吊进行吊装,并按设计线形和位置进行拼装和合龙,用于“先拱后梁”施工技术领域;三、采用缆索吊吊装,按设计线形在已完成的梁体上进行支架法拼装,然后利用缆索吊的塔架对其竖转,就位后,合龙钢管拱。前面两种方法按设计线形和位置进行拼装,不涉及竖转时反力架的设置,对于第三种方法,钢管拱竖转时需要设计安全可靠,且对梁体影响较小的反力架锚固方法,目前已知的是:在梁体桥面上设置钢筋混凝土反力架台座,台座上面预先埋设精轧螺纹钢,然后通过精轧螺纹钢、螺帽,与反力架固定连接。该方法存在的不足是:反力架后锚所受的力对梁体的影响复杂,不便于进行受力分析,且后锚位置和允许承受的外力一旦在梁体完成浇筑后不能就行修改,前期施工设计工作量大。
发明内容
本发明为了解决现有梁拱组合式桥梁钢管拱的竖转施工中,反力架后锚对梁体的不利影响、后锚设计不灵活、反力架台座对桥面的影响等问题,提供了一种用于混凝土梁体上竖转钢管拱的反力架预应力锚固体系。
本发明采用如下的技术方案实现:
用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系,包括钢绞线,钢绞线一端与反力架的下端通过锚具相连,钢绞线另一端绕经混凝土桥梁的边跨实心段端部与边跨实心段内侧设置的钢箱通过锚具相连;所述预应力锚固体系还包括边跨实心段端部固定的调平钢板,调平钢板上固定有两根上下平行的由内部填充混凝土的空心钢管制成的混凝土钢管;两混凝土钢管外侧分别设置避免钢绞线滑离的限位板。
调平钢板按预先设计的位置通过精轧螺纹钢固定于边跨实心段的端部,调平钢板为可放置混凝土钢管的双圆弧凹槽形状,用于调整混凝土钢管的平整度。两混凝土钢管相邻接处通过与二者都相切的连接钢板连接。
采用上述的用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系的完成的锚固方法,其步骤如下:
1)、在混凝土桥梁的边跨实心段的端头固定调平钢板,
2)、取两根空钢管,将其内部填充混凝土,形成混凝土钢管,将混凝土钢管固定在调平钢板上,
3)、在混凝土桥梁的边跨实心段的内侧固定钢箱,将钢绞线的一端用锚具固定在钢箱上作为张拉端,
4)、钢绞线的另一端穿过钢箱和边跨实心段的预留孔,绕经混凝土钢管的外侧,然后与反力架的下端相连作为被动端。
5)、根据计算的施加给钢绞线的预应力大小,在反力架的锚固体系的张拉端施加给钢绞线预应力,以保证混凝土钢管、梁体、反力架的可靠连接,实现了混凝土桥梁上竖转钢拱时的反力架的锚固。
反力架锚固位置选择在边跨实心段,锚固时通过张拉端的锚具和钢箱、钢绞线、被动端的锚具和反力架以及用于改变钢绞线受力方向的混凝土钢管施加一定的预应力。
本发明具有如下有益效果:是一种对桥梁结构桥面无损伤的反力架锚固设计,梁体两端受压,可以充分保证梁体“受压不受拉”的受力体系,受力体系简单明确,对梁体的线形没有影响,便于施工过程控制;反力架锚固设计灵活,既可不用增设钢筋混凝土底座,节约施工成本和前期施工设计,又便于控制锚固能力,不影响梁体的质量和外观,保证了安全和快速施工;最大限度地减小了提升时竖转塔架的竖向力对梁体的影响,使整个竖转系统更加安全有效的运行。
附图说明
图1为钢管拱竖转示意图
图2为本发明的结构示意图
图3为图2的俯视图
图4为图2的A-A剖面图
图5为图2的B-B剖面图
图中:1-混凝土钢管,2-精轧螺纹钢,3-调平钢板,4-连接钢板,5-钢箱,6-限位板,7-钢绞线,8-反力架,9-张拉端锚具,10-被动端锚具,11-预留孔,12-混凝土桥梁,13-边跨实心段,14-提升索,15-竖转塔架,16-钢管拱,17-支撑架。
具体实施方式
切割2根空钢管(Q235),将其内部填充混凝土,使其成为混凝土钢管1;在混凝土桥梁12的梁体端头(即边跨实心段13)上通过精轧螺纹钢2固定调平钢板3;将2根混凝土钢管1通过连接钢板4固定在调平钢板3上;用工字钢和钢板制作钢箱5,将钢箱5固定在边跨实心段13的内侧,作为反力架8锚固的张拉端;钢绞线数量通过需要提升的最大钢管拱重量来计算,并选择相应规格的锚具;将钢绞线7穿过锚具、钢箱5和边跨实心段13已设计的预留孔11,绕经混凝土钢管1的外侧表面,然后通过锚具与反力架8相连,与反力架结合处作为被动端。整个锚固段固定点均采用ф25mm精轧螺纹钢。为防止钢绞线在张拉过程中滑离,在混凝土钢管的表面焊接两组限位板6,通过在张拉端施加给钢绞线的预应力,以保证混凝土钢管、梁体、反力架的可靠连接,从而实现了混凝土桥梁上竖转钢拱时的反力架的锚固。
以小榄水道特大桥(连续刚构拱组合桥)钢管拱竖转施工为例:
(1)钢绞线数量确定:根据钢管拱的结构和重量,一端竖转时最大张拉索力为2130KN,另一端为1640KN,考虑两端竖转过程中钢管拱拱脚(转角)处钢轴承的摩擦力,两端分别取摩擦力为200KN和166KN(最大荷载取值依据为索的最大拉力与坚转接触面的摩擦力之和),则一端竖转最大荷载2330KN,另一端1806.5KN.钢绞线选用公称直径为Φj15.24mm,标准强度为1860Mpa规格,单根钢绞线所承受的最大允许拉力按260KN设计,故,在一端设置20根钢绞线,另一端设置16根钢绞线,其安全系数均大于2.0.
(2)具体安装和操作:切割2根各1m长的ф530mm的空钢管(Q235),将其内部填充C50混凝土,使其成为钢管混凝土结构;在混凝土梁体端头(边跨实心段)上通过6根ф25mm精轧螺纹钢固定40mm厚的钢板,其上设有双圆弧凹槽用于放置混凝土钢管,该钢板作为调整梁体端头不平整的调平钢板;利用电动葫芦起吊,将2根各1m充填C50混凝土的钢管固定在调平钢板上;用4根I40b的工字钢和16mm厚的钢板制作钢箱,将钢箱通过12根ф25mm精轧螺纹钢固定在边跨实心段的内侧,作为反力架锚固的张拉端;通过已计算的钢绞线数量,分别并选择20孔和16孔的锚具,将钢绞线穿过锚具和边跨实心段已设计的预留孔,与钢箱、钢管混凝土、反力架相连,与反力架结合处作为被动端,为防止钢绞线在张拉过程中滑离,在钢管混凝土的表面焊接限位板,限位板采用40mm的钢板,最后在张拉端施加预应力,这样就实现了混凝土梁体上竖转钢管拱的反力架锚固。
(3)反力架锚固的预应力大小确定:施加的预应力根据钢绞线承受的最大拉力、钢绞线允许张拉控制力和钢绞线与钢管混凝土结构的摩擦力大小来确定,具体原则是:施加的预应力大于钢绞线与钢管混凝土结构的摩擦力,小于钢绞线允许张拉控制力与钢绞线承受的最大拉力之差。
(4)采用本发明对小榄水道特大桥(连续刚构拱组合桥)钢管拱竖转施工:1)减少了前期施工设计对工期的影响,节约工期7天。2)减少了对结构桥面的影响,避免了后期凿除混凝土和表面修饰。3)锚固位置选择在边跨,最大限度地减小了竖转塔架的竖向力,保证了竖转塔架结构的稳定性。4)钢管拱竖转时,悬臂梁段无竖向力,对梁体线形没有影响,保证了梁体变形理论计算与设计施工过程的一致。

Claims (4)

1.一种用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系,其特征在于其包括钢绞线(7),钢绞线(7)一端与反力架(8)的下端通过锚具相连,钢绞线(7)另一端绕经混凝土桥梁(12)的边跨实心段(13)端部与边跨实心段(13)内侧设置的钢箱(5)通过锚具相连;所述锚固体系还包括边跨实心段(13)端部固定的调平钢板(3),调平钢板(3)上固定有两根上下平行的由内部填充混凝土的空心钢管制成的混凝土钢管(1);两混凝土钢管(1)外侧分别设置避免钢绞线滑离的限位板(6)。
2.根据权利要求1所述的用于混凝土桥梁上竖转钢管拱的反力架锚固体系,其特征在于调平钢板(3)通过精轧螺纹钢(2)固定于边跨实心段(13)的端部。
3.根据权利要求1所述的用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系,其特征在于两混凝土钢管(1)相邻接处通过与二者都相切的连接钢板(4)连接。
4.一种采用如权利要求1或2或3所述的用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系的完成的锚固方法,其特征在于步骤如下:
1)、在混凝土桥梁(12)的边跨实心段(13)的端头固定调平钢板(3),
2)、取两根空钢管,将其内部填充混凝土,形成混凝土钢管(1),将混凝土钢管(1)固定在调平钢板(3)上,
3)、在混凝土桥梁(12)的边跨实心段的内侧固定钢箱(5),将钢绞线(7)的一端用锚具固定在钢箱(7)上作为张拉端,
4)、钢绞线(7)的另一端穿过钢箱(5)和边跨实心段的预留孔(11),绕经混凝土钢管(1)的外侧,然后与反力架(8)的下端相连作为被动端,
5)、根据计算的施加给钢绞线的预应力大小,在反力架的锚固体系的张拉端施加给钢绞线预应力。
CN2009101754344A 2009-11-10 2009-11-10 用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法 Active CN101705660B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101754344A CN101705660B (zh) 2009-11-10 2009-11-10 用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101754344A CN101705660B (zh) 2009-11-10 2009-11-10 用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法

Publications (2)

Publication Number Publication Date
CN101705660A true CN101705660A (zh) 2010-05-12
CN101705660B CN101705660B (zh) 2011-04-20

Family

ID=42375909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101754344A Active CN101705660B (zh) 2009-11-10 2009-11-10 用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法

Country Status (1)

Country Link
CN (1) CN101705660B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359076A (zh) * 2011-09-14 2012-02-22 成都市新筑路桥机械股份有限公司 一种桥梁转体施工结构
CN102589491A (zh) * 2012-01-16 2012-07-18 四川公路桥梁建设集团有限公司 一种预应力锚盒下料尺寸测量工具及其测量方法
CN102943444A (zh) * 2012-11-30 2013-02-27 上海市基础工程有限公司 采用阻尼式止动器进行桥梁转体止动和就位的施工工艺
CN103215894A (zh) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 移动式临时预应力张拉锚块
CN104110100A (zh) * 2013-12-02 2014-10-22 成都绿迪科技有限公司 钢筋夹片预应力张拉锚块
CN104652290A (zh) * 2015-02-03 2015-05-27 成军 钢桁架梁桥水平转体施工方法
CN107217603A (zh) * 2017-06-06 2017-09-29 中铁第四勘察设计院集团有限公司 钢箱拱圈竖向转体用转铰及钢箱拱圈竖向转体施工方法
CN112502024A (zh) * 2020-11-26 2021-03-16 上海建工五建集团有限公司 一种用于预制拱肋梁湿接头连接的装置及方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1280120A (fr) * 1960-11-19 1961-12-29 Procédé de construction d'arcs et de voûtes de ponts en béton et ponts obtenus par la mise en oeuvre de ce procédé
JP4542048B2 (ja) * 2006-02-06 2010-09-08 三井住友建設株式会社 アーチ橋の構築方法
CN101135138A (zh) * 2006-08-31 2008-03-05 周志祥 连续刚构桥竖转施工方法
CN100554588C (zh) * 2007-05-26 2009-10-28 重庆交通大学 一种竖转钢-混凝土组合拱桥

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359076A (zh) * 2011-09-14 2012-02-22 成都市新筑路桥机械股份有限公司 一种桥梁转体施工结构
CN102589491A (zh) * 2012-01-16 2012-07-18 四川公路桥梁建设集团有限公司 一种预应力锚盒下料尺寸测量工具及其测量方法
CN102589491B (zh) * 2012-01-16 2014-05-21 四川公路桥梁建设集团有限公司 一种预应力锚盒下料尺寸测量工具及其测量方法
CN102943444A (zh) * 2012-11-30 2013-02-27 上海市基础工程有限公司 采用阻尼式止动器进行桥梁转体止动和就位的施工工艺
CN103215894A (zh) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 移动式临时预应力张拉锚块
CN103215894B (zh) * 2013-04-26 2015-10-28 中铁第一勘察设计院集团有限公司 移动式临时预应力张拉锚块
CN104110100A (zh) * 2013-12-02 2014-10-22 成都绿迪科技有限公司 钢筋夹片预应力张拉锚块
CN104652290A (zh) * 2015-02-03 2015-05-27 成军 钢桁架梁桥水平转体施工方法
CN107217603A (zh) * 2017-06-06 2017-09-29 中铁第四勘察设计院集团有限公司 钢箱拱圈竖向转体用转铰及钢箱拱圈竖向转体施工方法
CN112502024A (zh) * 2020-11-26 2021-03-16 上海建工五建集团有限公司 一种用于预制拱肋梁湿接头连接的装置及方法

Also Published As

Publication number Publication date
CN101705660B (zh) 2011-04-20

Similar Documents

Publication Publication Date Title
CN101705660B (zh) 用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系及方法
CN104746435B (zh) 一种大角度y型墩柱的施工方法
KR100969005B1 (ko) 가설케이블을 이용한 무장력 사재케이블 상태의 사장교 시공방법 및 이를 위한 가설케이블
CN104631333B (zh) 拱桥小横梁、小纵梁及桥面板现浇施工移动吊架及方法
CN101597960B (zh) 无粘结预应力筒仓大吨位千斤顶张拉施工工艺
CN207862749U (zh) 一种新型组合式吊杆
CN106522112B (zh) 斜拉桥边跨梁段架设系统及其方法
CN203904851U (zh) 一种连续梁边跨直线段吊架系统
CN103643637B (zh) 大跨度钢管混凝土拱桥先竖转后原位整体提升施工方法
CN109750791B (zh) 一种装配式大悬挑钢结构
CN104532756A (zh) 斜拉桥钢拱塔双向牵引竖转施工方法
CN103898834B (zh) 一种钢管混凝土组合梁与桁架式索塔斜拉桥及其施工方法
CN113235425A (zh) 一种具有主索鞍及散索鞍特性的辊轴式索鞍及其使用方法
CN103821359A (zh) 大截面混凝土梁分层浇筑施工工法
CN110700119B (zh) 一种组装式贝雷梁挂篮上走行系统的设计工法
CN112064519B (zh) 一种长平台牵索挂篮及主梁节段施工方法
CN206538687U (zh) 斜拉桥边跨梁段架设系统
CN201546177U (zh) 用于混凝土桥梁上竖转钢管拱的反力架预应力锚固体系
CN103981807B (zh) 一种无牛腿钢锚梁
CN208869942U (zh) 一种大跨连续刚构桥体外预应力加载体系
CN207775717U (zh) 公路桥梁施工用预应力锚具
CN202323772U (zh) 桥梁v撑钢绞线倒挂法施工装置
CN104963292A (zh) 钢筋混凝土连跨拱桥或连续箱结构桥的施工方法
CN202450450U (zh) 一种悬索桥的加固改造结构
CN210104575U (zh) 大跨度前支点牵索挂篮抗弯结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: THE SIXTH CIVIL ENGINEERING CO., LTD., THE THIRD E

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Hu Guowei

Inventor after: Li Jiancheng

Inventor after: Liu Ronghua

Inventor after: Liu Jianzhong

Inventor after: Li Guandong

Inventor after: Qin Dejin

Inventor after: Liu Jinsheng

Inventor after: Li Yingjun

Inventor after: Wu Shimin

Inventor after: Liu Zhiru

Inventor after: Zhang Junbing

Inventor after: Zhang Yuning

Inventor after: Cheng Wenbin

Inventor after: Xu Jianzhong

Inventor before: Hu Guowei

Inventor before: Li Jiancheng

Inventor before: Liu Ronghua

Inventor before: Liu Jianzhong

Inventor before: Liu Jinsheng

Inventor before: Li Yingjun

Inventor before: Wu Shimin

Inventor before: Liu Zhiru

Inventor before: Zhang Junbing

Inventor before: Zhang Yuning

Inventor before: Cheng Wenbin

Inventor before: Xu Jianzhong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HU GUOWEI LIU JINSHENG LI YINGJUN WU SHIMIN LIU ZHIRU ZHANG JUNBING ZHANG YUNING CHENG WENBIN XU JIANZHONG LI JIANCHENG LIU RONGHUA LIU JIANZHONG TO: HU GUOWEI LIU JINSHENG LI YINGJUN WU SHIMIN LIU ZHIRU ZHANG JUNBING ZHANG YUNING CHENG WENBIN XU JIANZHONG LI JIANCHENG LIU RONGHUA LIU JIANZHONG LI GUANDONG QIN DEJIN

TA01 Transfer of patent application right

Effective date of registration: 20101203

Address after: 030001 Yingze street, Shanxi, No. 269, No.

Applicant after: China Railway Third Engineering Co., Ltd.

Co-applicant after: The Sixth Civil Engineering Co., Ltd., the Third Engineering Group Co., Ltd. of China Railway

Address before: 030001 Yingze street, Shanxi, No. 269, No.

Applicant before: China Railway Third Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant