CN101692549B - Pole replacing operation method for fixed double aluminum alloy holding poles - Google Patents

Pole replacing operation method for fixed double aluminum alloy holding poles Download PDF

Info

Publication number
CN101692549B
CN101692549B CN2009101677206A CN200910167720A CN101692549B CN 101692549 B CN101692549 B CN 101692549B CN 2009101677206 A CN2009101677206 A CN 2009101677206A CN 200910167720 A CN200910167720 A CN 200910167720A CN 101692549 B CN101692549 B CN 101692549B
Authority
CN
China
Prior art keywords
pole
bar
wind
fixed
aluminum alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009101677206A
Other languages
Chinese (zh)
Other versions
CN101692549A (en
Inventor
李援川
贺军
曹优平
王勇
苟剑
曹建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MIANYANG CITY POWER BUREAU
State Grid Corp of China SGCC
Original Assignee
MIANYANG CITY POWER BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MIANYANG CITY POWER BUREAU filed Critical MIANYANG CITY POWER BUREAU
Priority to CN2009101677206A priority Critical patent/CN101692549B/en
Publication of CN101692549A publication Critical patent/CN101692549A/en
Application granted granted Critical
Publication of CN101692549B publication Critical patent/CN101692549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

The invention discloses a pole replacing operation method for fixed double aluminum alloy holding poles, which comprises erection of a left pole and a right pole of an electric line, wherein the cracking defect of the right pole occurs at the middle lower section, and the erection is carried out by the following steps that: a herringbone secondary holding pole and a main bearing holding pole are erected at the left side and the right side of the right pole respectively, two wind ropes are fixed on the left ground and the right ground of the two holding poles respectively, and the two wind ropes are vertical to the over-pole electric line; a temporary wind rope is tied at the upper part of the left pole, the other end of the wind rope is fixed on the ground, and the temporary wind rope is vertical to the over-pole electric line; a hoisting device is arranged on the secondary holding pole; the right pole is hoisted by using the hoisting device, the lower section of the cracked right pole is cut and removed, and then a new pole is hoisted in place and is welded at butt seam; and the seam inspection is carried out after the welding is finished, then soil is filled back a foundation after the seam is qualified, and the construction measures are removed. The pole replacing operation method for the fixed double aluminum alloy holding poles has the characteristics of safe and quick construction.

Description

Pole replacing operation method for fixed double aluminum alloy holding poles
Technical field
B, left bar 1 top bind an interim wind rope 10, and the wind rope other end is fixed on the ground, left bar left side, and interim wind rope is with the bar power circuit is vertical excessively;
The present invention relates to power circuit maintenance activity method, particularly adopt double embrace bar mode that the electric pole that crack defect takes place in the middle and lower part is carried out the method that part is removed Replacement and Repair.
Background technology
Aerial power transmission line be in open-air and long-time running in be subjected to various condition influence such as environment and self, cause all kinds of line defcts and hidden danger, therefore the elimination of line defct and hidden danger is the emphasis in the circuit operation maintenance work, to guarantee the operation of aerial power transmission line equipment health and safety.In the production reality, the situation that often has the electric pole crack defect to occur in middle hypomere and need to repair at short notice, particularly be in the hillside when the bar position, both sides, front and back landform is precipitous, and hang with lead wire and earth wire on the bar, be not easy to tear open vertical rod, it is excessive (and for the construction of new frame that the vertical rod workload is torn in employing open, can adopt a right edge tier pole group cube formula to construct), it is short to permit interruption duration simultaneously, under such condition, safety is removed the electric pole defective section steadily at short notice, the new bar section that changes the outfit is a difficult problem to be solved.
Summary of the invention
The purpose of this invention is to provide a kind of assurance overhead power line safety, quick construction, pole replacing operation method for fixed double aluminum alloy holding poles easily.
The object of the present invention is achieved like this: a kind of pole replacing operation method for fixed double aluminum alloy holding poles, comprise the left bar on erecting power lines road, left bar backguy and right bar, right bar backguy, right bar crack defect occurs in middle hypomere, carry out according to the following steps: a, set up secondary pole of herringbone and herringbone primary load bearing pole respectively in right bar and arranged on left and right sides, two wind rope middle parts are separately fixed at secondary pole and primary load bearing pole top, the two ends of two wind ropes are separately fixed on secondary pole and the primary load bearing pole left and right side ground, and two wind ropes are with the bar power circuit is vertical excessively; B, left bar top bind an interim wind rope, and the wind rope other end is fixed on the ground, left bar left side, and interim wind rope is with the bar power circuit is vertical excessively; C, the lifting rope of boom hoisting is arranged on the secondary pole through two pulleys; D, right bar foundation excavation and base water Heibei provincial opera are surveyed; E, use hoisting apparatus hang right bar by hoisting line, and the right bar hypomere cutting of crackle will take place, and remove; F, to use hoisting apparatus to lift new bar by hoisting line in place, handles burr, and opposite joint welds new bar; After g, welding were finished, butt welded seam carried out x-ray inspection or ultrasonic detection, and the weld seam standard is equal to or higher than the II level; After h, Welding Testing were qualified, basic backfill soil was also removed working measure.
The invention has the beneficial effects as follows:
The present invention has reduced setting, helps the security control of setting, has reduced the control of job execution technology, easy construction; Saved carrier simultaneously and changed the bar cost, saved the engineering time, improved power supply reliability, it is one of working system preferably that this working system is applied in the working line defect processing.
Description of drawings
Fig. 1 is the schematic top plan view of pole of the present invention and wind rope and interim wind rope job site layout;
Fig. 2 is the front view of Fig. 1.
Embodiment
Fig. 1 Fig. 2 illustrates, and the present invention includes the left bar 1 on erecting power lines road, left bar backguy 8 and right bar 2, right bar backguy 9, and right bar crack defect occurs in middle hypomere, carries out according to the following steps:
A, set up secondary pole 4 of herringbone and herringbone primary load bearing pole 3 respectively in right bar 2 and arranged on left and right sides, two wind rope 7,6 middle parts are separately fixed at secondary pole and primary load bearing pole top, the two ends of two wind ropes 7,6 are separately fixed on secondary pole and the primary load bearing pole left and right side ground, and two wind ropes 7,6 are with the bar power circuit is vertical excessively;
B, left bar 1 top bind an interim wind rope 10, and the wind rope other end is fixed on the ground, left bar left side, and interim wind rope is with the bar power circuit is vertical excessively;
C, the lifting rope 5 of boom hoisting is arranged on the secondary pole 4 through two pulley 5b, 5a;
D, right bar foundation excavation and base water Heibei provincial opera are surveyed;
E, use hoisting apparatus hang right bar by hoisting line 5, and the right bar hypomere cutting of crackle will take place, and remove;
It is in place that f, use hoisting apparatus pass through the new bar of hoisting line 5 liftings, handles burr, and opposite joint welds new bar;
After g, welding were finished, butt welded seam carried out x-ray inspection or ultrasonic detection, and the weld seam standard is equal to or higher than the II level;
After h, Welding Testing were qualified, basic backfill soil was also removed working measure.
Can adopt bolt and metal sheet to be connected and fixed.Interim wind rope prevents to vibrate in the lifting process, plays firm electric pole effect.
Main Work tool of the present invention and material are prepared:
Figure DEST_PATH_GSB00000425880600021
Figure G2009101677206D00031

Claims (1)

1. a pole replacing operation method for fixed double aluminum alloy holding poles comprises left bar (1), left bar backguy (8) and right bar (2), the right bar backguy (9) on erecting power lines road, and right bar crack defect occurs in middle hypomere, it is characterized in that: carry out according to the following steps:
A, set up secondary pole (4) of herringbone and herringbone primary load bearing pole (3) respectively in right bar (2) and arranged on left and right sides, two wind ropes (7,6) middle part is separately fixed at secondary pole and primary load bearing pole top, the two ends of two wind ropes (7,6) are separately fixed on secondary pole and the primary load bearing pole left and right side ground, and two wind ropes (7,6) are with the bar power circuit is vertical excessively;
B, left bar (1) top bind an interim wind rope (10), and the wind rope other end is fixed on the ground, left bar left side, and interim wind rope is with the bar power circuit is vertical excessively;
C, the lifting rope (5) of boom hoisting is arranged on the secondary pole (4) through two pulleys (5b, 5a);
D, right bar foundation excavation and base water Heibei provincial opera are surveyed;
E, use hoisting apparatus hang right bar by hoisting line (5), and the right bar hypomere cutting of crackle will take place, and remove;
It is in place that f, use hoisting apparatus pass through the new bar of hoisting line (5) lifting, handles burr, and opposite joint welds new bar;
After g, welding were finished, butt welded seam carried out x-ray inspection or ultrasonic detection, and the weld seam standard is equal to or higher than the II level;
After h, Welding Testing were qualified, basic backfill soil was also removed working measure.
CN2009101677206A 2009-09-23 2009-09-23 Pole replacing operation method for fixed double aluminum alloy holding poles Active CN101692549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101677206A CN101692549B (en) 2009-09-23 2009-09-23 Pole replacing operation method for fixed double aluminum alloy holding poles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101677206A CN101692549B (en) 2009-09-23 2009-09-23 Pole replacing operation method for fixed double aluminum alloy holding poles

Publications (2)

Publication Number Publication Date
CN101692549A CN101692549A (en) 2010-04-07
CN101692549B true CN101692549B (en) 2011-08-31

Family

ID=42081213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101677206A Active CN101692549B (en) 2009-09-23 2009-09-23 Pole replacing operation method for fixed double aluminum alloy holding poles

Country Status (1)

Country Link
CN (1) CN101692549B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947953B (en) * 2015-05-21 2017-06-06 国家电网公司 A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1515055A (en) * 2001-06-11 2004-07-21 ������������ʽ���� Wire-changing device inside of electric pole and non-power-failure power distribution method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1515055A (en) * 2001-06-11 2004-07-21 ������������ʽ���� Wire-changing device inside of electric pole and non-power-failure power distribution method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李兴等.500kV输电线路铁塔严重倾斜的快速修复.《南方电网技术》.2008,第2卷(第05期), *
蓝芝宝.关于220kV线路受损砼杆更换的施工方法.《广西电力》.2004,(第04期), *

Also Published As

Publication number Publication date
CN101692549A (en) 2010-04-07

Similar Documents

Publication Publication Date Title
CN101956457B (en) Method for constructing rectangular steel pipe concrete column
CN107587508A (en) PHC pile tubes hammer construction method
CN101858163B (en) Method for installing flare tower frame in bulk
CN107191676A (en) Construction method of buried pipeline
CN113431340B (en) Construction method of rose-shaped special-shaped space grid steel structure
CN104563119A (en) Rotating type floating pile driving guide frame
CN106760841A (en) A kind of construction method of buckling restrained brace structure
CN207073199U (en) Hinge device
CN103061521A (en) Torque type mounting method for cantilever steel truss of large stadium
CN106087698B (en) Portable construction operation platform of bored pile
CN101692549B (en) Pole replacing operation method for fixed double aluminum alloy holding poles
CN206308626U (en) Operating platform for installing hanging basket at top of pier body of pier
JP5542033B2 (en) Pile driving device and pile driving method
CN204510221U (en) Rotary marine piling saddle
CN105421251B (en) Plate-girder jacking supporting mechanism, plate-girder jacking supporting tool
CN204252839U (en) The spliced crownblock beam of a kind of level
CN104141497B (en) A kind of shield machine translation tune reaction frame installation method that starts
CN206173993U (en) Aquatic cross beam tower crane foundation
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
CN204252022U (en) A kind of packaged type steel box-girder frange plate welding operation platform
CN204416961U (en) Single mast single-sheaved block group lifting derrick
CN106759435A (en) A kind of steel structure base ring of mountain region wind driven generator base
CN203559420U (en) Pile splicing construction device under quicksand geological conditions
CN101936011A (en) Bayonet binding-type connection method of steel sleeve box blocks and construction method using same
CN102296610B (en) Device for removing square pile and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130301

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130301

Address after: 621000 No. 168 Chaoyang Road, Sichuan, Mianyang

Patentee after: Mianyang City Power Bureau

Patentee after: State Grid Corporation of China

Address before: 621000 No. 168 Chaoyang Road, Sichuan, Mianyang

Patentee before: Mianyang City Power Bureau